SlideShare a Scribd company logo
1 of 30
Mobile Plant and Equipment
Conduct Local Risk Control
Training Package
Mobile Plant and Equipment
• To successfully complete this unit you must
demonstrate that you can:
- Plan and prepare for risk control
- Assess and identify unacceptable risk
- Identify, assess and implement risk
treatments
- Complete records and reports
Introduction
Mobile Plant and Equipment
Operator Obligations
• Be fit for work
• Comply with your site Code of Conduct
• Be qualified and authorised
• Select and use the correct PPE
• Report unsafe conditions or activities
• Report faults
• Operate equipment and perform tasks safely
• Use site lock and tag system
Mobile Plant and Equipment
Plan and Prepare for Operations
• Planning and preparation
includes:
- Attending shift briefings and
handovers
- Obtaining, interpreting and
applying relevant
documentation
- Confirming communication
methods and requirements for
task
Mobile Plant and Equipment
Attend Shift Briefings and Handovers
• Information includes:
- Situational report
- What tasks each person will be doing
- Location and status of work in area
- Known hazards and control measures
- Other evens that may occur:
o Road closures
o Shutdowns
Mobile Plant and Equipment
Documentation
Documentation Example
Government Acts PNG Mining (Safety) Act 1977
Regulations PNG Mining (Safety) Regulations
Industry Codes of Practice Hazardous Manual Tasks - Code of Practice
Standards ISO 31000 Risk Management Standard
Organisation Management Systems OTML Integrated Management System
Policies Safety and Occupational Health Policy
Procedures and Work
Instructions
Emergency Response Procedure
External Equipment Specific Documents Operations and Maintenance Manual, User Guide, Parts
Catalogue
Mobile Plant and Equipment
Working with Others
• Communicate and coordinate work with others
• Effective communication and teamwork helps efficient operations
• A team approach can be used to:
- Inspect work area
- Identify hazards
- Determine risk controls
- Analyse options
- Select and implement controls
- Review effectiveness
- Complete records
• Share information to keep everyone safe
Mobile Plant and Equipment
Communication Methods
• Oral communication during risk
management processes:
- Face-to-face
- Shift briefings
- Safety Shares
- Toolbox talks
• Communication Equipment
- Radio
- Phone
• Written communication for reporting
results:
- Risk management tools
- Hazard ID form
- Safe Work Procedures
Mobile Plant and Equipment
Communication Requirements
• Communicating in person:
- Speak clearly and directly
- Listen carefully
- Ask questions and give feedback to confirm your understanding
- Respond promptly
• Communicating in writing:
- Write clearly, use plain words
- Keep document brief
- Use forms and templates
- Read contents before submitting
• Communication Equipment
- Know how to use
- Inspect before use
- Have backups
Mobile Plant and Equipment
Conducting Local Risk Control
1. Identify the hazards
2. Identify existing and potential controls
3. Assess controls and select the most appropriate
4. Implement controls
5. Monitor the effectiveness of the controls
6. Communicate the process and outcomes
Mobile Plant and Equipment
Understanding Risk
Mobile Plant and Equipment
Use Your Senses
Mobile Plant and Equipment
Major Hazard Scenarios
Mobile Plant and Equipment
Common Mine Site Hazards
Mobile Plant and Equipment
• Ground and environmental
conditions
• Potential security issues
• Obstructions such as:
- Other personnel and equipment
- Power / service lines
- Drains
- Boundary and other markers
- Highwall and bench edge
instability
- Hazardous substances
Inspecting the Work Area
Mobile Plant and Equipment
• Inspect all tools and equipment
before and after use
• Inspect for:
- Faults
- Damage
- Suitability to task
• Faulty or damaged equipment:
- Isolate from service
- Tag Out of Service
- Report
Inspect Tools and Equipment
Mobile Plant and Equipment
Observe and Report Unsafe Conditions
• Observe and report unsafe:
- behaviours
- work systems
- processes
• Report so that no one gets hurt!
Mobile Plant and Equipment
Hazard Identification Tools
• Take 5
- Stop
- Think
- Identify
- Plan
- Proceed
• Job Safety Analysis
- Team based
- Determine Risk Rating
Mobile Plant and Equipment
Take 5 Steps
Mobile Plant and Equipment
Job Safety Analysis Steps
Mobile Plant and Equipment
Identify Existing and Potential Controls
• Talk to others
• Check:
- Key Control Data Sheets
- JSAs, Take 5s, Work Clearances
- Procedures and Work Instructions
- Reports
• Are existing controls effective?
• If unresolved hazards, stop work and talk to supervisor
• Determine the potential likelihood and consequence of an event if hazards
are not controlled
• Identify and implement additional controls
Mobile Plant and Equipment
• Developed in consultation with
operators and SMEs
• 3 Sections:
- Operational Requirements
- Task Requirements
- Design Requirements
Key Control Data Sheets
Mobile Plant and Equipment
Assess and Select Other Controls
Mobile Plant and Equipment
• A systematic approach to
managing workplace health and
safety risks
• Includes:
- The Ok Tedi Way
- Duty of Care
- OTML Life Saving Rules
- Integrated Management
System
- Policies, Procedures and Work
Instructions
- Risk Management Tools
- Work Clearances
Safety Management System
Mobile Plant and Equipment
Personal Protective Equipment (PPE)
Mobile Plant and Equipment
Implement Controls
• Reduce the risk So Far As Reasonably Practicable (SFARP)
• Determine the risk rating to ensure the appropriate approval level
• The risk rating is determined
by cross referencing the
maximum possible
consequence with the
likelihood of an event
happening
Mobile Plant and Equipment
Determining and Implementing Controls
1. Talk to others to identify all possible controls
2. Assess each control in terms of effectiveness versus resources
3. Select the most appropriate
4. Develop an implementation plan and get it approved
5. Implement the plan
6. Review the outcome
Mobile Plant and Equipment
Monitor Controls
• Once all controls have been implemented:
- Confirm the risk is controlled SFARP
• Ask:
- What types of controls are provided?
- Are they adequate?
- Are there enough controls?
- Does the combination of controls match
the hazard?
- Are the controls maintained in working
order at all times?
- What contingency planning is provided?
• Notify supervisor if risk is unacceptable
Mobile Plant and Equipment
Recording and Reporting
• Important source of information
• Way of communicating
• Include:
- Risk Assessments
- Hazard ID reports
- Incident reports
- Defect reports
- Shift reports
- Handover reports
- Log books and action registers
Mobile Plant and Equipment
Summary
• Do you have any questions?

More Related Content

Similar to Local-Risk-Control-Presentation.pptx

3.-unit-1-hazard-analysis-correction.pptx
3.-unit-1-hazard-analysis-correction.pptx3.-unit-1-hazard-analysis-correction.pptx
3.-unit-1-hazard-analysis-correction.pptx
ssuser1ecccc
 
mod 4.pdf ppt about the safety at industries
mod 4.pdf ppt about the safety at industriesmod 4.pdf ppt about the safety at industries
mod 4.pdf ppt about the safety at industries
Midhundas31
 
Incident Investigation Training by Zenith
Incident Investigation Training by ZenithIncident Investigation Training by Zenith
Incident Investigation Training by Zenith
Atlantic Training, LLC.
 
Hnc p n_d_health_&_safety_risk_assessment
Hnc p n_d_health_&_safety_risk_assessmentHnc p n_d_health_&_safety_risk_assessment
Hnc p n_d_health_&_safety_risk_assessment
DjCurrie
 
Hazard id and control training v1
Hazard id and control training v1Hazard id and control training v1
Hazard id and control training v1
Heatherawarens
 
Presentation OHSAS 18001
Presentation OHSAS  18001Presentation OHSAS  18001
Presentation OHSAS 18001
Gary Wong
 
Safety management
Safety managementSafety management
Safety management
Srini Vasan
 

Similar to Local-Risk-Control-Presentation.pptx (20)

Lecture HSE.pptx
Lecture HSE.pptxLecture HSE.pptx
Lecture HSE.pptx
 
Safety study for mariners for practical use.pptx
Safety study for mariners for practical use.pptxSafety study for mariners for practical use.pptx
Safety study for mariners for practical use.pptx
 
job_hazard_analysis.ppt
job_hazard_analysis.pptjob_hazard_analysis.ppt
job_hazard_analysis.ppt
 
3.-unit-1-hazard-analysis-correction.pptx
3.-unit-1-hazard-analysis-correction.pptx3.-unit-1-hazard-analysis-correction.pptx
3.-unit-1-hazard-analysis-correction.pptx
 
mod 4.pdf ppt about the safety at industries
mod 4.pdf ppt about the safety at industriesmod 4.pdf ppt about the safety at industries
mod 4.pdf ppt about the safety at industries
 
Incident Investigation and Analysis by HF&C
Incident Investigation and Analysis by HF&CIncident Investigation and Analysis by HF&C
Incident Investigation and Analysis by HF&C
 
Incident Investigation Safety Training 2015
Incident Investigation Safety Training 2015Incident Investigation Safety Training 2015
Incident Investigation Safety Training 2015
 
Incident Investigation Training by Zenith
Incident Investigation Training by ZenithIncident Investigation Training by Zenith
Incident Investigation Training by Zenith
 
Deviation, OOS & complaint investigation and CAPA
Deviation, OOS & complaint investigation and CAPADeviation, OOS & complaint investigation and CAPA
Deviation, OOS & complaint investigation and CAPA
 
Internal financial control - how ready are you - Webinar
Internal financial control - how ready are you - WebinarInternal financial control - how ready are you - Webinar
Internal financial control - how ready are you - Webinar
 
Hnc p n_d_health_&_safety_risk_assessment
Hnc p n_d_health_&_safety_risk_assessmentHnc p n_d_health_&_safety_risk_assessment
Hnc p n_d_health_&_safety_risk_assessment
 
Occupational health and safety in hospitals and health centers
Occupational health and safety in hospitals and health centersOccupational health and safety in hospitals and health centers
Occupational health and safety in hospitals and health centers
 
Total golden rules
Total golden rulesTotal golden rules
Total golden rules
 
Health and safety
Health and safetyHealth and safety
Health and safety
 
topic7.ppt
topic7.ppttopic7.ppt
topic7.ppt
 
Hazard id and control training v1
Hazard id and control training v1Hazard id and control training v1
Hazard id and control training v1
 
CompTIA Security+.pptx
CompTIA Security+.pptxCompTIA Security+.pptx
CompTIA Security+.pptx
 
Presentation OHSAS 18001
Presentation OHSAS  18001Presentation OHSAS  18001
Presentation OHSAS 18001
 
Safety management
Safety managementSafety management
Safety management
 
AQA AS ICT INFO1 Revision
AQA AS ICT INFO1 RevisionAQA AS ICT INFO1 Revision
AQA AS ICT INFO1 Revision
 

Recently uploaded

Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
Kira Dess
 

Recently uploaded (20)

Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptx
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) ppt
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdf
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 

Local-Risk-Control-Presentation.pptx

  • 1. Mobile Plant and Equipment Conduct Local Risk Control Training Package
  • 2. Mobile Plant and Equipment • To successfully complete this unit you must demonstrate that you can: - Plan and prepare for risk control - Assess and identify unacceptable risk - Identify, assess and implement risk treatments - Complete records and reports Introduction
  • 3. Mobile Plant and Equipment Operator Obligations • Be fit for work • Comply with your site Code of Conduct • Be qualified and authorised • Select and use the correct PPE • Report unsafe conditions or activities • Report faults • Operate equipment and perform tasks safely • Use site lock and tag system
  • 4. Mobile Plant and Equipment Plan and Prepare for Operations • Planning and preparation includes: - Attending shift briefings and handovers - Obtaining, interpreting and applying relevant documentation - Confirming communication methods and requirements for task
  • 5. Mobile Plant and Equipment Attend Shift Briefings and Handovers • Information includes: - Situational report - What tasks each person will be doing - Location and status of work in area - Known hazards and control measures - Other evens that may occur: o Road closures o Shutdowns
  • 6. Mobile Plant and Equipment Documentation Documentation Example Government Acts PNG Mining (Safety) Act 1977 Regulations PNG Mining (Safety) Regulations Industry Codes of Practice Hazardous Manual Tasks - Code of Practice Standards ISO 31000 Risk Management Standard Organisation Management Systems OTML Integrated Management System Policies Safety and Occupational Health Policy Procedures and Work Instructions Emergency Response Procedure External Equipment Specific Documents Operations and Maintenance Manual, User Guide, Parts Catalogue
  • 7. Mobile Plant and Equipment Working with Others • Communicate and coordinate work with others • Effective communication and teamwork helps efficient operations • A team approach can be used to: - Inspect work area - Identify hazards - Determine risk controls - Analyse options - Select and implement controls - Review effectiveness - Complete records • Share information to keep everyone safe
  • 8. Mobile Plant and Equipment Communication Methods • Oral communication during risk management processes: - Face-to-face - Shift briefings - Safety Shares - Toolbox talks • Communication Equipment - Radio - Phone • Written communication for reporting results: - Risk management tools - Hazard ID form - Safe Work Procedures
  • 9. Mobile Plant and Equipment Communication Requirements • Communicating in person: - Speak clearly and directly - Listen carefully - Ask questions and give feedback to confirm your understanding - Respond promptly • Communicating in writing: - Write clearly, use plain words - Keep document brief - Use forms and templates - Read contents before submitting • Communication Equipment - Know how to use - Inspect before use - Have backups
  • 10. Mobile Plant and Equipment Conducting Local Risk Control 1. Identify the hazards 2. Identify existing and potential controls 3. Assess controls and select the most appropriate 4. Implement controls 5. Monitor the effectiveness of the controls 6. Communicate the process and outcomes
  • 11. Mobile Plant and Equipment Understanding Risk
  • 12. Mobile Plant and Equipment Use Your Senses
  • 13. Mobile Plant and Equipment Major Hazard Scenarios
  • 14. Mobile Plant and Equipment Common Mine Site Hazards
  • 15. Mobile Plant and Equipment • Ground and environmental conditions • Potential security issues • Obstructions such as: - Other personnel and equipment - Power / service lines - Drains - Boundary and other markers - Highwall and bench edge instability - Hazardous substances Inspecting the Work Area
  • 16. Mobile Plant and Equipment • Inspect all tools and equipment before and after use • Inspect for: - Faults - Damage - Suitability to task • Faulty or damaged equipment: - Isolate from service - Tag Out of Service - Report Inspect Tools and Equipment
  • 17. Mobile Plant and Equipment Observe and Report Unsafe Conditions • Observe and report unsafe: - behaviours - work systems - processes • Report so that no one gets hurt!
  • 18. Mobile Plant and Equipment Hazard Identification Tools • Take 5 - Stop - Think - Identify - Plan - Proceed • Job Safety Analysis - Team based - Determine Risk Rating
  • 19. Mobile Plant and Equipment Take 5 Steps
  • 20. Mobile Plant and Equipment Job Safety Analysis Steps
  • 21. Mobile Plant and Equipment Identify Existing and Potential Controls • Talk to others • Check: - Key Control Data Sheets - JSAs, Take 5s, Work Clearances - Procedures and Work Instructions - Reports • Are existing controls effective? • If unresolved hazards, stop work and talk to supervisor • Determine the potential likelihood and consequence of an event if hazards are not controlled • Identify and implement additional controls
  • 22. Mobile Plant and Equipment • Developed in consultation with operators and SMEs • 3 Sections: - Operational Requirements - Task Requirements - Design Requirements Key Control Data Sheets
  • 23. Mobile Plant and Equipment Assess and Select Other Controls
  • 24. Mobile Plant and Equipment • A systematic approach to managing workplace health and safety risks • Includes: - The Ok Tedi Way - Duty of Care - OTML Life Saving Rules - Integrated Management System - Policies, Procedures and Work Instructions - Risk Management Tools - Work Clearances Safety Management System
  • 25. Mobile Plant and Equipment Personal Protective Equipment (PPE)
  • 26. Mobile Plant and Equipment Implement Controls • Reduce the risk So Far As Reasonably Practicable (SFARP) • Determine the risk rating to ensure the appropriate approval level • The risk rating is determined by cross referencing the maximum possible consequence with the likelihood of an event happening
  • 27. Mobile Plant and Equipment Determining and Implementing Controls 1. Talk to others to identify all possible controls 2. Assess each control in terms of effectiveness versus resources 3. Select the most appropriate 4. Develop an implementation plan and get it approved 5. Implement the plan 6. Review the outcome
  • 28. Mobile Plant and Equipment Monitor Controls • Once all controls have been implemented: - Confirm the risk is controlled SFARP • Ask: - What types of controls are provided? - Are they adequate? - Are there enough controls? - Does the combination of controls match the hazard? - Are the controls maintained in working order at all times? - What contingency planning is provided? • Notify supervisor if risk is unacceptable
  • 29. Mobile Plant and Equipment Recording and Reporting • Important source of information • Way of communicating • Include: - Risk Assessments - Hazard ID reports - Incident reports - Defect reports - Shift reports - Handover reports - Log books and action registers
  • 30. Mobile Plant and Equipment Summary • Do you have any questions?