Agenda
The Main Ones
Others
The Types of Waste
4
Transportation
• Definition: Any movement of materials, supplies or resources that does not add value to
the internal or external customer needs
• Characteristics
o Extra carts, fork lifts
o Multiple storage locations
o Complex inventory management
o Extra facility space
o Improper facility layout
Inventory
• Definition: Any supply in excess to process
requirements necessary to produce goods or
services just in time
• Characteristics
o Material between processes
o Additional material handling resources
o Additional investment / cost
o Storage space
o Perishable, damage and obsolescence
o LIFO instead of FIFO
Motion
• Definition: Any movement of people, resources or machines which does not
contribute/add value to the product or service
• Characteristics
o Human motion
o Lack of visual controls
o Looking for tools
o Material too far apart (walk time)
o Machine motion
Waiting
• Definition: Long period of inactivity for people, machine, or material waiting for
each other
• Characteristics
o Improper scheduling
o People waiting for machine or resources
o Poor material planning
o Late Deliveries
o Unbalanced operations
Over-Production
• Definition: Producing faster or excess quantity than the internal or external
customer needs
• Characteristics
o Just-in-case reward system
o Large lot size batch processing
o Improper demand planning/Unbalanced material flow
o Producing early
o Inventory stockpiles
Over-Processing
• Definition: Effort which adds NO value to a product or service. Enhancements
which are not valued by customers.
• Characteristics
o Lack of clear customer specifications
o Endless refinement
o Redundant approvals
o Extra copies or excessive information
Defect
• Definition: Rework needed to rectify the defect in product or service to fulfill
customer requirements
• Characteristics
o Quality problems
o Extra resources to inspect/test/rework
o Insufficient training
o Inconsistent work methods, tools
o Excessive variation
Other Types of Waste
Underutilized Skills
✓ Definition: Any skill that is not utilized to its full potential leading to customer value
✓ Characteristics
• Skills based compensation
• Over qualification
• Under performance
• Morale
Wrong Use of Automation
• Definition: Any automation that is taking longer than manual work or creating additional
work
• Characteristics
o Over automation
o Under automation
o Unnecessary automation
o Automation defects/rejects
o Examples
Wrong Use of Metrics
• Definition: Any metrics that is incorrectly measured, inappropriately used or
misinterpreted is another type of waste
• Characteristics
o Incorrect data collection
o Inappropriate use
o Misinterpretation
o Misaligned targets or goals
o Examples
Summary
Seven Main Types of Waste
Other Types of Waste
© Simplilearn Solutions
Knowledge Check
Knowledge
Check
A.
B.
C.
D.
1
Which of the following is not one of the seven wastes?
Overproduction
Transporting
Excess machine capacity
Waiting
Knowledge
Check
The correct answer is
A.
B.
C.
D.
1
The main seven types of waste do not include excess machine capacity. While it is in some form of potential waste of
resource, but it is not part of the seven main waste types.
C
Which of the following is not one of the seven wastes?
Overproduction
Transporting
Excess machine capacity
Waiting
Knowledge
Check
A.
B.
C.
D.
2
What are the main seven types of waste?
Transportation, inventory, motion, waiting, over-production, over-processing, defects
Money, software, entertainment, waiting, resources, under-utilized machines, excess machine
capacity
Inventory, storage, misalignment, overheating, electricity, chatting, communication
Transportation, inventory, motion, waiting, underutilized money, over-processing,
communication
Knowledge
Check
The correct answer is
A.
B.
C.
D.
2
The main seven types of waste are Transportation, inventory, motion, waiting, over-production, over-processing, defects.
A
What are the main seven types of waste?
Transportation, inventory, motion, waiting, over-production, over-processing, defects
Money, software, entertainment, waiting, resources, under-utilized machines, excess machine
capacity
Inventory, storage, misalignment, overheating, electricity, chatting, communication
Transportation, inventory, motion, waiting, underutilized money, over-processing,
communication

More Related Content

Similar to Lesson 2 - Types of Waste

Similar to Lesson 2 - Types of Waste (20)

elimination of wastes
elimination of wastes elimination of wastes
elimination of wastes
 
Seven wastes
Seven wastesSeven wastes
Seven wastes
 
Fleetmanagementbasics 12884529466649-phpapp01
Fleetmanagementbasics 12884529466649-phpapp01Fleetmanagementbasics 12884529466649-phpapp01
Fleetmanagementbasics 12884529466649-phpapp01
 
Fleet Management Basics
Fleet Management BasicsFleet Management Basics
Fleet Management Basics
 
Lean concepts and quality indicators final
Lean concepts and quality indicators finalLean concepts and quality indicators final
Lean concepts and quality indicators final
 
Simple Lean Value and Waste Training
Simple Lean Value and Waste TrainingSimple Lean Value and Waste Training
Simple Lean Value and Waste Training
 
Lean manufanturing
Lean manufanturingLean manufanturing
Lean manufanturing
 
Waste management
Waste managementWaste management
Waste management
 
Lean_Basics_Part_I_Rev4.ppt
Lean_Basics_Part_I_Rev4.pptLean_Basics_Part_I_Rev4.ppt
Lean_Basics_Part_I_Rev4.ppt
 
Lean Office by Operational Excellence Consulting
Lean Office by Operational Excellence ConsultingLean Office by Operational Excellence Consulting
Lean Office by Operational Excellence Consulting
 
Identifying Waste
Identifying WasteIdentifying Waste
Identifying Waste
 
Project proposal
Project proposalProject proposal
Project proposal
 
Dock to Dock Time Management
Dock to Dock Time ManagementDock to Dock Time Management
Dock to Dock Time Management
 
Lean Office
Lean OfficeLean Office
Lean Office
 
Lean Government by Operational Excellence Consulting
Lean Government by Operational Excellence ConsultingLean Government by Operational Excellence Consulting
Lean Government by Operational Excellence Consulting
 
Simple Lean Training
Simple  Lean TrainingSimple  Lean Training
Simple Lean Training
 
7 Lean Waste Presentation.pdf
7 Lean Waste Presentation.pdf7 Lean Waste Presentation.pdf
7 Lean Waste Presentation.pdf
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
Lean Wastes
 Lean Wastes Lean Wastes
Lean Wastes
 
Timwoods- Lean Manufacturing
Timwoods- Lean ManufacturingTimwoods- Lean Manufacturing
Timwoods- Lean Manufacturing
 

More from TunAnhTrnh9

Lesson 6 - Lean in Office
Lesson 6 - Lean in OfficeLesson 6 - Lean in Office
Lesson 6 - Lean in OfficeTunAnhTrnh9
 
Lesson 7 - Lean Metrics
Lesson 7 - Lean MetricsLesson 7 - Lean Metrics
Lesson 7 - Lean MetricsTunAnhTrnh9
 
Lesson 10 - Value stream mapping
Lesson 10 - Value stream mappingLesson 10 - Value stream mapping
Lesson 10 - Value stream mappingTunAnhTrnh9
 
Lesson 8 - Other Methodologies That Complement Lean
Lesson 8 - Other Methodologies That Complement LeanLesson 8 - Other Methodologies That Complement Lean
Lesson 8 - Other Methodologies That Complement LeanTunAnhTrnh9
 
Lesson 4 - Lean in Manufacturing
Lesson 4 - Lean in ManufacturingLesson 4 - Lean in Manufacturing
Lesson 4 - Lean in ManufacturingTunAnhTrnh9
 
Lesson 5 - Lean in Service
Lesson 5 - Lean in ServiceLesson 5 - Lean in Service
Lesson 5 - Lean in ServiceTunAnhTrnh9
 
Lesson 9 - Lean Maturity Matrix
Lesson 9 - Lean Maturity MatrixLesson 9 - Lean Maturity Matrix
Lesson 9 - Lean Maturity MatrixTunAnhTrnh9
 
Lesson 3 - Tools
Lesson 3 - ToolsLesson 3 - Tools
Lesson 3 - ToolsTunAnhTrnh9
 
Lesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEANLesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEANTunAnhTrnh9
 

More from TunAnhTrnh9 (9)

Lesson 6 - Lean in Office
Lesson 6 - Lean in OfficeLesson 6 - Lean in Office
Lesson 6 - Lean in Office
 
Lesson 7 - Lean Metrics
Lesson 7 - Lean MetricsLesson 7 - Lean Metrics
Lesson 7 - Lean Metrics
 
Lesson 10 - Value stream mapping
Lesson 10 - Value stream mappingLesson 10 - Value stream mapping
Lesson 10 - Value stream mapping
 
Lesson 8 - Other Methodologies That Complement Lean
Lesson 8 - Other Methodologies That Complement LeanLesson 8 - Other Methodologies That Complement Lean
Lesson 8 - Other Methodologies That Complement Lean
 
Lesson 4 - Lean in Manufacturing
Lesson 4 - Lean in ManufacturingLesson 4 - Lean in Manufacturing
Lesson 4 - Lean in Manufacturing
 
Lesson 5 - Lean in Service
Lesson 5 - Lean in ServiceLesson 5 - Lean in Service
Lesson 5 - Lean in Service
 
Lesson 9 - Lean Maturity Matrix
Lesson 9 - Lean Maturity MatrixLesson 9 - Lean Maturity Matrix
Lesson 9 - Lean Maturity Matrix
 
Lesson 3 - Tools
Lesson 3 - ToolsLesson 3 - Tools
Lesson 3 - Tools
 
Lesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEANLesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEAN
 

Recently uploaded

Danfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdfDanfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdfNurvisNavarroSanchez
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf884710SadaqatAli
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdfKamal Acharya
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234AafreenAbuthahir2
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdfKamal Acharya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdfKamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdfKamal Acharya
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptssuser9bd3ba
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxViniHema
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdfAhmedHussein950959
 
Antenna efficency lecture course chapter 3.pdf
Antenna  efficency lecture course chapter 3.pdfAntenna  efficency lecture course chapter 3.pdf
Antenna efficency lecture course chapter 3.pdfAbrahamGadissa
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdfKamal Acharya
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdfPratik Pawar
 
fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerapareshmondalnita
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 

Recently uploaded (20)

Danfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdfDanfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Antenna efficency lecture course chapter 3.pdf
Antenna  efficency lecture course chapter 3.pdfAntenna  efficency lecture course chapter 3.pdf
Antenna efficency lecture course chapter 3.pdf
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answer
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 

Lesson 2 - Types of Waste

  • 4. The Types of Waste 4
  • 5. Transportation • Definition: Any movement of materials, supplies or resources that does not add value to the internal or external customer needs • Characteristics o Extra carts, fork lifts o Multiple storage locations o Complex inventory management o Extra facility space o Improper facility layout
  • 6. Inventory • Definition: Any supply in excess to process requirements necessary to produce goods or services just in time • Characteristics o Material between processes o Additional material handling resources o Additional investment / cost o Storage space o Perishable, damage and obsolescence o LIFO instead of FIFO
  • 7. Motion • Definition: Any movement of people, resources or machines which does not contribute/add value to the product or service • Characteristics o Human motion o Lack of visual controls o Looking for tools o Material too far apart (walk time) o Machine motion
  • 8. Waiting • Definition: Long period of inactivity for people, machine, or material waiting for each other • Characteristics o Improper scheduling o People waiting for machine or resources o Poor material planning o Late Deliveries o Unbalanced operations
  • 9. Over-Production • Definition: Producing faster or excess quantity than the internal or external customer needs • Characteristics o Just-in-case reward system o Large lot size batch processing o Improper demand planning/Unbalanced material flow o Producing early o Inventory stockpiles
  • 10. Over-Processing • Definition: Effort which adds NO value to a product or service. Enhancements which are not valued by customers. • Characteristics o Lack of clear customer specifications o Endless refinement o Redundant approvals o Extra copies or excessive information
  • 11. Defect • Definition: Rework needed to rectify the defect in product or service to fulfill customer requirements • Characteristics o Quality problems o Extra resources to inspect/test/rework o Insufficient training o Inconsistent work methods, tools o Excessive variation
  • 12. Other Types of Waste
  • 13. Underutilized Skills ✓ Definition: Any skill that is not utilized to its full potential leading to customer value ✓ Characteristics • Skills based compensation • Over qualification • Under performance • Morale
  • 14. Wrong Use of Automation • Definition: Any automation that is taking longer than manual work or creating additional work • Characteristics o Over automation o Under automation o Unnecessary automation o Automation defects/rejects o Examples
  • 15. Wrong Use of Metrics • Definition: Any metrics that is incorrectly measured, inappropriately used or misinterpreted is another type of waste • Characteristics o Incorrect data collection o Inappropriate use o Misinterpretation o Misaligned targets or goals o Examples
  • 16. Summary Seven Main Types of Waste Other Types of Waste © Simplilearn Solutions
  • 18. Knowledge Check A. B. C. D. 1 Which of the following is not one of the seven wastes? Overproduction Transporting Excess machine capacity Waiting
  • 19. Knowledge Check The correct answer is A. B. C. D. 1 The main seven types of waste do not include excess machine capacity. While it is in some form of potential waste of resource, but it is not part of the seven main waste types. C Which of the following is not one of the seven wastes? Overproduction Transporting Excess machine capacity Waiting
  • 20. Knowledge Check A. B. C. D. 2 What are the main seven types of waste? Transportation, inventory, motion, waiting, over-production, over-processing, defects Money, software, entertainment, waiting, resources, under-utilized machines, excess machine capacity Inventory, storage, misalignment, overheating, electricity, chatting, communication Transportation, inventory, motion, waiting, underutilized money, over-processing, communication
  • 21. Knowledge Check The correct answer is A. B. C. D. 2 The main seven types of waste are Transportation, inventory, motion, waiting, over-production, over-processing, defects. A What are the main seven types of waste? Transportation, inventory, motion, waiting, over-production, over-processing, defects Money, software, entertainment, waiting, resources, under-utilized machines, excess machine capacity Inventory, storage, misalignment, overheating, electricity, chatting, communication Transportation, inventory, motion, waiting, underutilized money, over-processing, communication