Contents
Waste
Elimination of wastes
Lean operations
Jit
Kanban
conclusion
Waste
•Anything that does not have value or does not add value.
•Something customer will not pay for.
•It can be in the form of inputs, outputs, materials, stock etc.
•Why do we need to eliminate waste?
To increase profits
Improve efficiency
Reduce time and cost of production
Generally to improve the what company is running.
Types of wastes
1. Transportation
2. Inventory
3. Motion
4. Waiting
5. Over processing
6. Overproduction
7. defects
• The 7 wastes
are the root of
all unprofitable
activity and all
tools of lean
production
should be
focused on
getting rid of
these wastes
1.Transportation waste
•Any material movement from one place to another .
•Unnecessary material or tool/equipment movement.
•Causes
1. Poor root planning
2. Distant suppliers
3. Poor layout
4. Poor production planning
•Elimination
1. Co-location
2. Avoiding unnecessary steps in between process
2.Inventory waste
•Waste that consists of excess inventory above which is needed.
•Excessive raw material inventories and supplies.
•Causes
1. Poor demand forecasting
2. Incapable processes
3. Poor inventory planning and tracking
•Elimination
1. Do not store extra materials
2. Follow FIFO
3.Motion
•Any movement of people which does not contribute to the value of the product.
•Causes
1. Poor layout and housekeeping
2. Disorganized workplace
3. Unclear and non standardized workplace instructions
4. Unclear process and material flow
•Elimination
1. Store tools for immediate use and closer to workplace
2. Deliver items to internal customers as when they want them.
4.Waiting
• Man/machine idle or waiting time
• When a worker cannot proceed with the next task in a process.
•Causes
1. Lack of synchronization
2. Over staffing
3. Long set-up
4. Material/manpower shortage or delay
•Elimination
• Proper availability of materials and manpower
• Well organized process
5.Overprocessing
•Non-value added man and machine processing
•Causes
1. Unclear customer specifications
2. Unclear work instructions
3. Lack of a concurrent design
4. Lack of customer input related to requirements
•Elimination
•Identify value adding and non value adding activities
6.Overproduction
•Producing more than what is needed.
•Producing faster than what is needed.
•Causes
1. High capacity equipment
2. Building products that are not a priority
3. Poor production planning and producing just in case
•Elimination
•Just in time
•Limited production as per customer demand
7.Defects
•Cost due to storing, repairing/ repaired products.
•Includes cost of materials scrapped due to defects.
•Causes
1. Unskilled personnel
2. Unclear customer specifications
3. Incapable suppliers
4. Lack of process control
•Elimination
1. Improve the quality of raw material
2. Skilled personnel.
Lean operations
•Derived from Toyotas 1930 operating model “The Toyota Way”.
•Term lean was coined by John Krafcik in 1988 and defined by James Womack and Daniel Jones in 1996.
•Focusses on providing customer satisfaction using few resources.
•Objective:
1. Creating value for customers
2. Eliminating wastes.
Lean
principles:
Jit
• Jit – just in time
• Manufacturing and production of goods when needed.
• Usually small batches.
• Waste is less
Goals:
• Eliminate disruptions
• Increase efficiency and decrease waste by on time production
• No excess inventory
Example:
Car manufacturers
KANBAN
• When constructed, managed and functioning
properly, serves as areal time information.
• Principles:
1. Start with what you know
2. Agree to pursue incremental,
evolutionary changes
3. Respect the current process roles and
responsibilities
4. Encourage acts of leadership at all
levels.
CONCLUSION
Waste is anything that does not add value or does not have value so it is needed to be eliminated.
There are 7 types of wastes.
These lead to inefficiency of production system and increases cost and labor.
Lean operations has two main objectives: creating value for customers and eliminating wastes.
Just in time is used to increase efficiency and decrease wastes by producing on time and demand.
KANBAN allows to see the work in progress and identifies when and where workflow blockages happen
Thank you

More Related Content

What's hot

15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)Ashima Kandari
 
Supply chain foundations
Supply chain foundationsSupply chain foundations
Supply chain foundationsKelbySchwender
 
Global Supply Chain
Global Supply ChainGlobal Supply Chain
Global Supply Chainpirama2000
 
Manufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) systemManufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) systemYash Dave
 
POKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingPOKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingTimothy Wooi
 
Ch12 jit+&+lean+systems
Ch12 jit+&+lean+systemsCh12 jit+&+lean+systems
Ch12 jit+&+lean+systemsvideoaakash15
 
Ekol logistic
Ekol logistic   Ekol logistic
Ekol logistic Elif Bedir
 
Make or buy, insourcingoutsourcing
Make or buy, insourcingoutsourcingMake or buy, insourcingoutsourcing
Make or buy, insourcingoutsourcingAnkit
 
04 process design_Operations Management
04 process design_Operations Management04 process design_Operations Management
04 process design_Operations ManagementBrent Weeks
 
Operations Management for Competitive Advantage
Operations Management for Competitive AdvantageOperations Management for Competitive Advantage
Operations Management for Competitive AdvantageMBA ASAP
 
safexpress report - 2016
safexpress report - 2016safexpress report - 2016
safexpress report - 2016Arudhra N
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentationjhanakshah
 
Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing pptSwati Luthra
 
Operational strategy
Operational strategyOperational strategy
Operational strategyHarman Rana
 
Operations strategy
Operations strategy Operations strategy
Operations strategy Petre Vane
 

What's hot (20)

15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
Supply chain foundations
Supply chain foundationsSupply chain foundations
Supply chain foundations
 
Process design
Process designProcess design
Process design
 
Global Supply Chain
Global Supply ChainGlobal Supply Chain
Global Supply Chain
 
Manufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) systemManufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) system
 
POKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake ProofingPOKA-YOKE - A Lean Strategy to Mistake Proofing
POKA-YOKE - A Lean Strategy to Mistake Proofing
 
Ch12 jit+&+lean+systems
Ch12 jit+&+lean+systemsCh12 jit+&+lean+systems
Ch12 jit+&+lean+systems
 
Just in time
Just in timeJust in time
Just in time
 
Ekol logistic
Ekol logistic   Ekol logistic
Ekol logistic
 
Make or buy, insourcingoutsourcing
Make or buy, insourcingoutsourcingMake or buy, insourcingoutsourcing
Make or buy, insourcingoutsourcing
 
04 process design_Operations Management
04 process design_Operations Management04 process design_Operations Management
04 process design_Operations Management
 
LiA-rapport-tidsstudie-Fabio
LiA-rapport-tidsstudie-FabioLiA-rapport-tidsstudie-Fabio
LiA-rapport-tidsstudie-Fabio
 
Operations Management for Competitive Advantage
Operations Management for Competitive AdvantageOperations Management for Competitive Advantage
Operations Management for Competitive Advantage
 
safexpress report - 2016
safexpress report - 2016safexpress report - 2016
safexpress report - 2016
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Inventory managment and improvements
Inventory managment and improvementsInventory managment and improvements
Inventory managment and improvements
 
Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing ppt
 
Operational strategy
Operational strategyOperational strategy
Operational strategy
 
GREEN LOGISTICS
GREEN LOGISTICSGREEN LOGISTICS
GREEN LOGISTICS
 
Operations strategy
Operations strategy Operations strategy
Operations strategy
 

Similar to elimination of wastes

Lean manufanturing
Lean manufanturingLean manufanturing
Lean manufanturingshahrool
 
Lean management and six sigma
Lean management and six sigmaLean management and six sigma
Lean management and six sigmaMD SALMAN ANJUM
 
Production & materials management
Production & materials managementProduction & materials management
Production & materials managementVaibhav Shah
 
lean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accountslean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accountsSabaKhalid48
 
Dock to Dock Time Management
Dock to Dock Time ManagementDock to Dock Time Management
Dock to Dock Time ManagementAbhishek Raj
 
Lesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEANLesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEANTunAnhTrnh9
 
the Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptxthe Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptxFaith Youngsville, NC
 
Seven wastes
Seven wastesSeven wastes
Seven wastesfa99
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overviewPruek Pinyo
 
OM1 e06 (1).pptx
OM1 e06 (1).pptxOM1 e06 (1).pptx
OM1 e06 (1).pptxroli13
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing jaswanthLN
 
Introduction to lean thinking
Introduction to lean thinkingIntroduction to lean thinking
Introduction to lean thinkingVeron0320
 
Gagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmtGagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmtGagan Pareek, PMP
 
Muthuraja.ppt
Muthuraja.pptMuthuraja.ppt
Muthuraja.pptMbabba2
 

Similar to elimination of wastes (20)

Lean manufanturing
Lean manufanturingLean manufanturing
Lean manufanturing
 
Lean management and six sigma
Lean management and six sigmaLean management and six sigma
Lean management and six sigma
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Just in time
Just in timeJust in time
Just in time
 
Production & materials management
Production & materials managementProduction & materials management
Production & materials management
 
lean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accountslean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accounts
 
Dock to Dock Time Management
Dock to Dock Time ManagementDock to Dock Time Management
Dock to Dock Time Management
 
Lesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEANLesson 1 - Introduction of LEAN
Lesson 1 - Introduction of LEAN
 
the Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptxthe Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptx
 
Seven wastes
Seven wastesSeven wastes
Seven wastes
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
16 lean manufacturing
16 lean manufacturing16 lean manufacturing
16 lean manufacturing
 
OM1 e06 (1).pptx
OM1 e06 (1).pptxOM1 e06 (1).pptx
OM1 e06 (1).pptx
 
WASTE ELIMINATION
WASTE ELIMINATIONWASTE ELIMINATION
WASTE ELIMINATION
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
Introduction to lean thinking
Introduction to lean thinkingIntroduction to lean thinking
Introduction to lean thinking
 
Gagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmtGagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmt
 
Muthuraja.ppt
Muthuraja.pptMuthuraja.ppt
Muthuraja.ppt
 
Session 1 2
Session 1 2Session 1 2
Session 1 2
 
Simple Lean Training
Simple  Lean TrainingSimple  Lean Training
Simple Lean Training
 

More from Mutahira Ahad

The Persil Power Fiasco (1).pptx
The Persil Power Fiasco (1).pptxThe Persil Power Fiasco (1).pptx
The Persil Power Fiasco (1).pptxMutahira Ahad
 
SUPERMARKET BUSINESS PLAN.pptx
SUPERMARKET BUSINESS PLAN.pptxSUPERMARKET BUSINESS PLAN.pptx
SUPERMARKET BUSINESS PLAN.pptxMutahira Ahad
 
pestle analysis of wipro
pestle analysis of wipropestle analysis of wipro
pestle analysis of wiproMutahira Ahad
 
HUL rural Marketing strategies
HUL rural Marketing strategiesHUL rural Marketing strategies
HUL rural Marketing strategiesMutahira Ahad
 
impactof covid onindustry (1) (1).pptx
impactof covid onindustry (1) (1).pptximpactof covid onindustry (1) (1).pptx
impactof covid onindustry (1) (1).pptxMutahira Ahad
 
Digital payments.pptx
Digital payments.pptxDigital payments.pptx
Digital payments.pptxMutahira Ahad
 
Career Planning In Talent- (2) (2).pptx
Career Planning In Talent- (2) (2).pptxCareer Planning In Talent- (2) (2).pptx
Career Planning In Talent- (2) (2).pptxMutahira Ahad
 

More from Mutahira Ahad (12)

pricing
pricingpricing
pricing
 
VALUE SYSTEM.pptx
VALUE SYSTEM.pptxVALUE SYSTEM.pptx
VALUE SYSTEM.pptx
 
The Persil Power Fiasco (1).pptx
The Persil Power Fiasco (1).pptxThe Persil Power Fiasco (1).pptx
The Persil Power Fiasco (1).pptx
 
SUPERMARKET BUSINESS PLAN.pptx
SUPERMARKET BUSINESS PLAN.pptxSUPERMARKET BUSINESS PLAN.pptx
SUPERMARKET BUSINESS PLAN.pptx
 
pestle analysis of wipro
pestle analysis of wipropestle analysis of wipro
pestle analysis of wipro
 
HUL rural Marketing strategies
HUL rural Marketing strategiesHUL rural Marketing strategies
HUL rural Marketing strategies
 
recruitment.pptx
recruitment.pptxrecruitment.pptx
recruitment.pptx
 
irhra.pptx
irhra.pptxirhra.pptx
irhra.pptx
 
impactof covid onindustry (1) (1).pptx
impactof covid onindustry (1) (1).pptximpactof covid onindustry (1) (1).pptx
impactof covid onindustry (1) (1).pptx
 
Digital payments.pptx
Digital payments.pptxDigital payments.pptx
Digital payments.pptx
 
Career Planning In Talent- (2) (2).pptx
Career Planning In Talent- (2) (2).pptxCareer Planning In Talent- (2) (2).pptx
Career Planning In Talent- (2) (2).pptx
 
CADBOURY.pptx
CADBOURY.pptxCADBOURY.pptx
CADBOURY.pptx
 

Recently uploaded

Biodiversity and Health. Prof. Richard Kock.
Biodiversity and Health. Prof. Richard Kock.Biodiversity and Health. Prof. Richard Kock.
Biodiversity and Health. Prof. Richard Kock.pensoftservices
 
DETAILED LESSON FINAL DEMO TEACHING.docx
DETAILED LESSON FINAL DEMO TEACHING.docxDETAILED LESSON FINAL DEMO TEACHING.docx
DETAILED LESSON FINAL DEMO TEACHING.docxImilyAcma
 
CCXG global forum, April 2024, Julio Cordano
CCXG global forum, April 2024,  Julio CordanoCCXG global forum, April 2024,  Julio Cordano
CCXG global forum, April 2024, Julio CordanoOECD Environment
 
CCXG global forum, April 2024, Geert Fremout
CCXG global forum, April 2024,  Geert FremoutCCXG global forum, April 2024,  Geert Fremout
CCXG global forum, April 2024, Geert FremoutOECD Environment
 
CCXG global forum, April 2024, Delio Rincon
CCXG global forum, April 2024,  Delio RinconCCXG global forum, April 2024,  Delio Rincon
CCXG global forum, April 2024, Delio RinconOECD Environment
 
Project for the production of electricity.docx
Project for the production of electricity.docxProject for the production of electricity.docx
Project for the production of electricity.docxproject .
 
CCXG global forum, April 2024, Marcia Rocha
CCXG global forum, April 2024,  Marcia RochaCCXG global forum, April 2024,  Marcia Rocha
CCXG global forum, April 2024, Marcia RochaOECD Environment
 
CCXG global forum, April 2024, Davi Bonavides
CCXG global forum, April 2024,  Davi BonavidesCCXG global forum, April 2024,  Davi Bonavides
CCXG global forum, April 2024, Davi BonavidesOECD Environment
 
CCXG global forum, April 2024, Amar Bhattacharya
CCXG global forum, April 2024,  Amar BhattacharyaCCXG global forum, April 2024,  Amar Bhattacharya
CCXG global forum, April 2024, Amar BhattacharyaOECD Environment
 
7. PD 705 & RELEVANT FORESTRY LAWS PHILIPPINES
7. PD 705 & RELEVANT FORESTRY LAWS PHILIPPINES7. PD 705 & RELEVANT FORESTRY LAWS PHILIPPINES
7. PD 705 & RELEVANT FORESTRY LAWS PHILIPPINESMarlonJayBayag
 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysOECD Environment
 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoOECD Environment
 
Broiler SBA.docx for agricultural science csec
Broiler SBA.docx for agricultural science csecBroiler SBA.docx for agricultural science csec
Broiler SBA.docx for agricultural science csecLaceyannWilliams
 
CCXG global forum, April 2024, Alban Kitous
CCXG global forum, April 2024,  Alban KitousCCXG global forum, April 2024,  Alban Kitous
CCXG global forum, April 2024, Alban KitousOECD Environment
 
Synthetic biology. Fanny Coppens, Sciensano.
Synthetic biology. Fanny Coppens, Sciensano.Synthetic biology. Fanny Coppens, Sciensano.
Synthetic biology. Fanny Coppens, Sciensano.pensoftservices
 
_International World Heritage Day by Slidesgo.pptx
_International World Heritage Day by Slidesgo.pptx_International World Heritage Day by Slidesgo.pptx
_International World Heritage Day by Slidesgo.pptxsnehalshah72
 
CCXG global forum, April 2024, Jolien Noels
CCXG global forum, April 2024,  Jolien NoelsCCXG global forum, April 2024,  Jolien Noels
CCXG global forum, April 2024, Jolien NoelsOECD Environment
 
Title-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptxTitle-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptxSagar Chaudhary
 
The KM-GBF monitoring framework –status & key messages. Joachim Töpper and Ha...
The KM-GBF monitoring framework –status & key messages. Joachim Töpper and Ha...The KM-GBF monitoring framework –status & key messages. Joachim Töpper and Ha...
The KM-GBF monitoring framework –status & key messages. Joachim Töpper and Ha...pensoftservices
 
CCXG global forum, April 2024, Luca Lo Re
CCXG global forum, April 2024,  Luca Lo ReCCXG global forum, April 2024,  Luca Lo Re
CCXG global forum, April 2024, Luca Lo ReOECD Environment
 

Recently uploaded (20)

Biodiversity and Health. Prof. Richard Kock.
Biodiversity and Health. Prof. Richard Kock.Biodiversity and Health. Prof. Richard Kock.
Biodiversity and Health. Prof. Richard Kock.
 
DETAILED LESSON FINAL DEMO TEACHING.docx
DETAILED LESSON FINAL DEMO TEACHING.docxDETAILED LESSON FINAL DEMO TEACHING.docx
DETAILED LESSON FINAL DEMO TEACHING.docx
 
CCXG global forum, April 2024, Julio Cordano
CCXG global forum, April 2024,  Julio CordanoCCXG global forum, April 2024,  Julio Cordano
CCXG global forum, April 2024, Julio Cordano
 
CCXG global forum, April 2024, Geert Fremout
CCXG global forum, April 2024,  Geert FremoutCCXG global forum, April 2024,  Geert Fremout
CCXG global forum, April 2024, Geert Fremout
 
CCXG global forum, April 2024, Delio Rincon
CCXG global forum, April 2024,  Delio RinconCCXG global forum, April 2024,  Delio Rincon
CCXG global forum, April 2024, Delio Rincon
 
Project for the production of electricity.docx
Project for the production of electricity.docxProject for the production of electricity.docx
Project for the production of electricity.docx
 
CCXG global forum, April 2024, Marcia Rocha
CCXG global forum, April 2024,  Marcia RochaCCXG global forum, April 2024,  Marcia Rocha
CCXG global forum, April 2024, Marcia Rocha
 
CCXG global forum, April 2024, Davi Bonavides
CCXG global forum, April 2024,  Davi BonavidesCCXG global forum, April 2024,  Davi Bonavides
CCXG global forum, April 2024, Davi Bonavides
 
CCXG global forum, April 2024, Amar Bhattacharya
CCXG global forum, April 2024,  Amar BhattacharyaCCXG global forum, April 2024,  Amar Bhattacharya
CCXG global forum, April 2024, Amar Bhattacharya
 
7. PD 705 & RELEVANT FORESTRY LAWS PHILIPPINES
7. PD 705 & RELEVANT FORESTRY LAWS PHILIPPINES7. PD 705 & RELEVANT FORESTRY LAWS PHILIPPINES
7. PD 705 & RELEVANT FORESTRY LAWS PHILIPPINES
 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeaways
 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara Falduto
 
Broiler SBA.docx for agricultural science csec
Broiler SBA.docx for agricultural science csecBroiler SBA.docx for agricultural science csec
Broiler SBA.docx for agricultural science csec
 
CCXG global forum, April 2024, Alban Kitous
CCXG global forum, April 2024,  Alban KitousCCXG global forum, April 2024,  Alban Kitous
CCXG global forum, April 2024, Alban Kitous
 
Synthetic biology. Fanny Coppens, Sciensano.
Synthetic biology. Fanny Coppens, Sciensano.Synthetic biology. Fanny Coppens, Sciensano.
Synthetic biology. Fanny Coppens, Sciensano.
 
_International World Heritage Day by Slidesgo.pptx
_International World Heritage Day by Slidesgo.pptx_International World Heritage Day by Slidesgo.pptx
_International World Heritage Day by Slidesgo.pptx
 
CCXG global forum, April 2024, Jolien Noels
CCXG global forum, April 2024,  Jolien NoelsCCXG global forum, April 2024,  Jolien Noels
CCXG global forum, April 2024, Jolien Noels
 
Title-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptxTitle-Role of forestry in restoration of degraded lands.pptx
Title-Role of forestry in restoration of degraded lands.pptx
 
The KM-GBF monitoring framework –status & key messages. Joachim Töpper and Ha...
The KM-GBF monitoring framework –status & key messages. Joachim Töpper and Ha...The KM-GBF monitoring framework –status & key messages. Joachim Töpper and Ha...
The KM-GBF monitoring framework –status & key messages. Joachim Töpper and Ha...
 
CCXG global forum, April 2024, Luca Lo Re
CCXG global forum, April 2024,  Luca Lo ReCCXG global forum, April 2024,  Luca Lo Re
CCXG global forum, April 2024, Luca Lo Re
 

elimination of wastes

  • 1. Elimination of wastes PRESENTED BY: M U T A H I R A MBA C SECTION
  • 2. Contents Waste Elimination of wastes Lean operations Jit Kanban conclusion
  • 3. Waste •Anything that does not have value or does not add value. •Something customer will not pay for. •It can be in the form of inputs, outputs, materials, stock etc. •Why do we need to eliminate waste? To increase profits Improve efficiency Reduce time and cost of production Generally to improve the what company is running.
  • 4. Types of wastes 1. Transportation 2. Inventory 3. Motion 4. Waiting 5. Over processing 6. Overproduction 7. defects • The 7 wastes are the root of all unprofitable activity and all tools of lean production should be focused on getting rid of these wastes
  • 5. 1.Transportation waste •Any material movement from one place to another . •Unnecessary material or tool/equipment movement. •Causes 1. Poor root planning 2. Distant suppliers 3. Poor layout 4. Poor production planning •Elimination 1. Co-location 2. Avoiding unnecessary steps in between process
  • 6. 2.Inventory waste •Waste that consists of excess inventory above which is needed. •Excessive raw material inventories and supplies. •Causes 1. Poor demand forecasting 2. Incapable processes 3. Poor inventory planning and tracking •Elimination 1. Do not store extra materials 2. Follow FIFO
  • 7. 3.Motion •Any movement of people which does not contribute to the value of the product. •Causes 1. Poor layout and housekeeping 2. Disorganized workplace 3. Unclear and non standardized workplace instructions 4. Unclear process and material flow •Elimination 1. Store tools for immediate use and closer to workplace 2. Deliver items to internal customers as when they want them.
  • 8. 4.Waiting • Man/machine idle or waiting time • When a worker cannot proceed with the next task in a process. •Causes 1. Lack of synchronization 2. Over staffing 3. Long set-up 4. Material/manpower shortage or delay •Elimination • Proper availability of materials and manpower • Well organized process
  • 9. 5.Overprocessing •Non-value added man and machine processing •Causes 1. Unclear customer specifications 2. Unclear work instructions 3. Lack of a concurrent design 4. Lack of customer input related to requirements •Elimination •Identify value adding and non value adding activities
  • 10. 6.Overproduction •Producing more than what is needed. •Producing faster than what is needed. •Causes 1. High capacity equipment 2. Building products that are not a priority 3. Poor production planning and producing just in case •Elimination •Just in time •Limited production as per customer demand
  • 11. 7.Defects •Cost due to storing, repairing/ repaired products. •Includes cost of materials scrapped due to defects. •Causes 1. Unskilled personnel 2. Unclear customer specifications 3. Incapable suppliers 4. Lack of process control •Elimination 1. Improve the quality of raw material 2. Skilled personnel.
  • 12. Lean operations •Derived from Toyotas 1930 operating model “The Toyota Way”. •Term lean was coined by John Krafcik in 1988 and defined by James Womack and Daniel Jones in 1996. •Focusses on providing customer satisfaction using few resources. •Objective: 1. Creating value for customers 2. Eliminating wastes.
  • 14. Jit • Jit – just in time • Manufacturing and production of goods when needed. • Usually small batches. • Waste is less Goals: • Eliminate disruptions • Increase efficiency and decrease waste by on time production • No excess inventory Example: Car manufacturers
  • 16. • When constructed, managed and functioning properly, serves as areal time information. • Principles: 1. Start with what you know 2. Agree to pursue incremental, evolutionary changes 3. Respect the current process roles and responsibilities 4. Encourage acts of leadership at all levels.
  • 17. CONCLUSION Waste is anything that does not add value or does not have value so it is needed to be eliminated. There are 7 types of wastes. These lead to inefficiency of production system and increases cost and labor. Lean operations has two main objectives: creating value for customers and eliminating wastes. Just in time is used to increase efficiency and decrease wastes by producing on time and demand. KANBAN allows to see the work in progress and identifies when and where workflow blockages happen