Scrum is an agile project management framework that emphasizes iterative development, self-organizing cross-functional teams, and regular inspection of progress and adaptation to change. The key aspects of Scrum include 30-day sprints, daily stand-up meetings, a product backlog to track features, and assigning work to sprints via a sprint backlog. The core roles are the product owner, scrum master, and development team.
the presentation gives brief description about a methodology of software engineering which is most using software engineering process in today's IT world and helps student to know how a software company runs and build software product using various software engineering methodologies.
Scrum is a Agile framework which allows teams to work together in order to develop a product.
Building complex products for customers is an naturally difficult task.
In the Scrum methodology a sprint is the basic unit of development.
This simple and crisp quick reference card is for Agile and Scrum basics. It is a simple way to glance through all the concepts and use it as a tool for revision, even before an interview.
the presentation gives brief description about a methodology of software engineering which is most using software engineering process in today's IT world and helps student to know how a software company runs and build software product using various software engineering methodologies.
Scrum is a Agile framework which allows teams to work together in order to develop a product.
Building complex products for customers is an naturally difficult task.
In the Scrum methodology a sprint is the basic unit of development.
This simple and crisp quick reference card is for Agile and Scrum basics. It is a simple way to glance through all the concepts and use it as a tool for revision, even before an interview.
Software Development Guide To Accelerate PerformanceZaid Shabbir
Scrum is the most widely used framework across all software and business industries. By following complete scrum framework you can improve the quality product deliver in more adaptive way.
Slides contents content guidelines related to scrum framework and how some one become a certified scrum master. Slides elaborate scrum framework by using user friendly diagrams and bulleted points. After grasping the slides any one can easily pass certified scrum examination.
I am sure you will enjoy the contents and its really helpful to become a certified scrum practitioner.
The slide explains the basics of the Scrum Framework one of the most popular Agile implementations for beginners. You can learn fundamental knowledge about it.
This talk is a 101-level introduction to Scrum, the agile methodology, especially in terms of how it works for web development. We'll cover the scrum values, rituals, and team. We'll also discuss some common pitfalls and how to work around them.
What is Scrum? How to implement Scrum?
- This presentation describes the basic elements of the Scrum Framework.
- My goal is to provide an organized view that will help a novice understand and implement the Scrum foundation quickly.
Navigating the Metaverse: A Journey into Virtual Evolution"Donna Lenk
Join us for an exploration of the Metaverse's evolution, where innovation meets imagination. Discover new dimensions of virtual events, engage with thought-provoking discussions, and witness the transformative power of digital realms."
May Marketo Masterclass, London MUG May 22 2024.pdfAdele Miller
Can't make Adobe Summit in Vegas? No sweat because the EMEA Marketo Engage Champions are coming to London to share their Summit sessions, insights and more!
This is a MUG with a twist you don't want to miss.
Software Development Guide To Accelerate PerformanceZaid Shabbir
Scrum is the most widely used framework across all software and business industries. By following complete scrum framework you can improve the quality product deliver in more adaptive way.
Slides contents content guidelines related to scrum framework and how some one become a certified scrum master. Slides elaborate scrum framework by using user friendly diagrams and bulleted points. After grasping the slides any one can easily pass certified scrum examination.
I am sure you will enjoy the contents and its really helpful to become a certified scrum practitioner.
The slide explains the basics of the Scrum Framework one of the most popular Agile implementations for beginners. You can learn fundamental knowledge about it.
This talk is a 101-level introduction to Scrum, the agile methodology, especially in terms of how it works for web development. We'll cover the scrum values, rituals, and team. We'll also discuss some common pitfalls and how to work around them.
What is Scrum? How to implement Scrum?
- This presentation describes the basic elements of the Scrum Framework.
- My goal is to provide an organized view that will help a novice understand and implement the Scrum foundation quickly.
Navigating the Metaverse: A Journey into Virtual Evolution"Donna Lenk
Join us for an exploration of the Metaverse's evolution, where innovation meets imagination. Discover new dimensions of virtual events, engage with thought-provoking discussions, and witness the transformative power of digital realms."
May Marketo Masterclass, London MUG May 22 2024.pdfAdele Miller
Can't make Adobe Summit in Vegas? No sweat because the EMEA Marketo Engage Champions are coming to London to share their Summit sessions, insights and more!
This is a MUG with a twist you don't want to miss.
Cyaniclab : Software Development Agency Portfolio.pdfCyanic lab
CyanicLab, an offshore custom software development company based in Sweden,India, Finland, is your go-to partner for startup development and innovative web design solutions. Our expert team specializes in crafting cutting-edge software tailored to meet the unique needs of startups and established enterprises alike. From conceptualization to execution, we offer comprehensive services including web and mobile app development, UI/UX design, and ongoing software maintenance. Ready to elevate your business? Contact CyanicLab today and let us propel your vision to success with our top-notch IT solutions.
Developing Distributed High-performance Computing Capabilities of an Open Sci...Globus
COVID-19 had an unprecedented impact on scientific collaboration. The pandemic and its broad response from the scientific community has forged new relationships among public health practitioners, mathematical modelers, and scientific computing specialists, while revealing critical gaps in exploiting advanced computing systems to support urgent decision making. Informed by our team’s work in applying high-performance computing in support of public health decision makers during the COVID-19 pandemic, we present how Globus technologies are enabling the development of an open science platform for robust epidemic analysis, with the goal of collaborative, secure, distributed, on-demand, and fast time-to-solution analyses to support public health.
Listen to the keynote address and hear about the latest developments from Rachana Ananthakrishnan and Ian Foster who review the updates to the Globus Platform and Service, and the relevance of Globus to the scientific community as an automation platform to accelerate scientific discovery.
Custom Healthcare Software for Managing Chronic Conditions and Remote Patient...Mind IT Systems
Healthcare providers often struggle with the complexities of chronic conditions and remote patient monitoring, as each patient requires personalized care and ongoing monitoring. Off-the-shelf solutions may not meet these diverse needs, leading to inefficiencies and gaps in care. It’s here, custom healthcare software offers a tailored solution, ensuring improved care and effectiveness.
A Comprehensive Look at Generative AI in Retail App Testing.pdfkalichargn70th171
Traditional software testing methods are being challenged in retail, where customer expectations and technological advancements continually shape the landscape. Enter generative AI—a transformative subset of artificial intelligence technologies poised to revolutionize software testing.
Unleash Unlimited Potential with One-Time Purchase
BoxLang is more than just a language; it's a community. By choosing a Visionary License, you're not just investing in your success, you're actively contributing to the ongoing development and support of BoxLang.
SOCRadar Research Team: Latest Activities of IntelBrokerSOCRadar
The European Union Agency for Law Enforcement Cooperation (Europol) has suffered an alleged data breach after a notorious threat actor claimed to have exfiltrated data from its systems. Infamous data leaker IntelBroker posted on the even more infamous BreachForums hacking forum, saying that Europol suffered a data breach this month.
The alleged breach affected Europol agencies CCSE, EC3, Europol Platform for Experts, Law Enforcement Forum, and SIRIUS. Infiltration of these entities can disrupt ongoing investigations and compromise sensitive intelligence shared among international law enforcement agencies.
However, this is neither the first nor the last activity of IntekBroker. We have compiled for you what happened in the last few days. To track such hacker activities on dark web sources like hacker forums, private Telegram channels, and other hidden platforms where cyber threats often originate, you can check SOCRadar’s Dark Web News.
Stay Informed on Threat Actors’ Activity on the Dark Web with SOCRadar!
Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...Globus
The U.S. Geological Survey (USGS) has made substantial investments in meeting evolving scientific, technical, and policy driven demands on storing, managing, and delivering data. As these demands continue to grow in complexity and scale, the USGS must continue to explore innovative solutions to improve its management, curation, sharing, delivering, and preservation approaches for large-scale research data. Supporting these needs, the USGS has partnered with the University of Chicago-Globus to research and develop advanced repository components and workflows leveraging its current investment in Globus. The primary outcome of this partnership includes the development of a prototype enterprise repository, driven by USGS Data Release requirements, through exploration and implementation of the entire suite of the Globus platform offerings, including Globus Flow, Globus Auth, Globus Transfer, and Globus Search. This presentation will provide insights into this research partnership, introduce the unique requirements and challenges being addressed and provide relevant project progress.
Enhancing Research Orchestration Capabilities at ORNL.pdfGlobus
Cross-facility research orchestration comes with ever-changing constraints regarding the availability and suitability of various compute and data resources. In short, a flexible data and processing fabric is needed to enable the dynamic redirection of data and compute tasks throughout the lifecycle of an experiment. In this talk, we illustrate how we easily leveraged Globus services to instrument the ACE research testbed at the Oak Ridge Leadership Computing Facility with flexible data and task orchestration capabilities.
Prosigns: Transforming Business with Tailored Technology SolutionsProsigns
Unlocking Business Potential: Tailored Technology Solutions by Prosigns
Discover how Prosigns, a leading technology solutions provider, partners with businesses to drive innovation and success. Our presentation showcases our comprehensive range of services, including custom software development, web and mobile app development, AI & ML solutions, blockchain integration, DevOps services, and Microsoft Dynamics 365 support.
Custom Software Development: Prosigns specializes in creating bespoke software solutions that cater to your unique business needs. Our team of experts works closely with you to understand your requirements and deliver tailor-made software that enhances efficiency and drives growth.
Web and Mobile App Development: From responsive websites to intuitive mobile applications, Prosigns develops cutting-edge solutions that engage users and deliver seamless experiences across devices.
AI & ML Solutions: Harnessing the power of Artificial Intelligence and Machine Learning, Prosigns provides smart solutions that automate processes, provide valuable insights, and drive informed decision-making.
Blockchain Integration: Prosigns offers comprehensive blockchain solutions, including development, integration, and consulting services, enabling businesses to leverage blockchain technology for enhanced security, transparency, and efficiency.
DevOps Services: Prosigns' DevOps services streamline development and operations processes, ensuring faster and more reliable software delivery through automation and continuous integration.
Microsoft Dynamics 365 Support: Prosigns provides comprehensive support and maintenance services for Microsoft Dynamics 365, ensuring your system is always up-to-date, secure, and running smoothly.
Learn how our collaborative approach and dedication to excellence help businesses achieve their goals and stay ahead in today's digital landscape. From concept to deployment, Prosigns is your trusted partner for transforming ideas into reality and unlocking the full potential of your business.
Join us on a journey of innovation and growth. Let's partner for success with Prosigns.
Experience our free, in-depth three-part Tendenci Platform Corporate Membership Management workshop series! In Session 1 on May 14th, 2024, we began with an Introduction and Setup, mastering the configuration of your Corporate Membership Module settings to establish membership types, applications, and more. Then, on May 16th, 2024, in Session 2, we focused on binding individual members to a Corporate Membership and Corporate Reps, teaching you how to add individual members and assign Corporate Representatives to manage dues, renewals, and associated members. Finally, on May 28th, 2024, in Session 3, we covered questions and concerns, addressing any queries or issues you may have.
For more Tendenci AMS events, check out www.tendenci.com/events
How Recreation Management Software Can Streamline Your Operations.pptxwottaspaceseo
Recreation management software streamlines operations by automating key tasks such as scheduling, registration, and payment processing, reducing manual workload and errors. It provides centralized management of facilities, classes, and events, ensuring efficient resource allocation and facility usage. The software offers user-friendly online portals for easy access to bookings and program information, enhancing customer experience. Real-time reporting and data analytics deliver insights into attendance and preferences, aiding in strategic decision-making. Additionally, effective communication tools keep participants and staff informed with timely updates. Overall, recreation management software enhances efficiency, improves service delivery, and boosts customer satisfaction.
TROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERRORTier1 app
Even though at surface level ‘java.lang.OutOfMemoryError’ appears as one single error; underlyingly there are 9 types of OutOfMemoryError. Each type of OutOfMemoryError has different causes, diagnosis approaches and solutions. This session equips you with the knowledge, tools, and techniques needed to troubleshoot and conquer OutOfMemoryError in all its forms, ensuring smoother, more efficient Java applications.
Understanding Globus Data Transfers with NetSageGlobus
NetSage is an open privacy-aware network measurement, analysis, and visualization service designed to help end-users visualize and reason about large data transfers. NetSage traditionally has used a combination of passive measurements, including SNMP and flow data, as well as active measurements, mainly perfSONAR, to provide longitudinal network performance data visualization. It has been deployed by dozens of networks world wide, and is supported domestically by the Engagement and Performance Operations Center (EPOC), NSF #2328479. We have recently expanded the NetSage data sources to include logs for Globus data transfers, following the same privacy-preserving approach as for Flow data. Using the logs for the Texas Advanced Computing Center (TACC) as an example, this talk will walk through several different example use cases that NetSage can answer, including: Who is using Globus to share data with my institution, and what kind of performance are they able to achieve? How many transfers has Globus supported for us? Which sites are we sharing the most data with, and how is that changing over time? How is my site using Globus to move data internally, and what kind of performance do we see for those transfers? What percentage of data transfers at my institution used Globus, and how did the overall data transfer performance compare to the Globus users?
First Steps with Globus Compute Multi-User EndpointsGlobus
In this presentation we will share our experiences around getting started with the Globus Compute multi-user endpoint. Working with the Pharmacology group at the University of Auckland, we have previously written an application using Globus Compute that can offload computationally expensive steps in the researcher's workflows, which they wish to manage from their familiar Windows environments, onto the NeSI (New Zealand eScience Infrastructure) cluster. Some of the challenges we have encountered were that each researcher had to set up and manage their own single-user globus compute endpoint and that the workloads had varying resource requirements (CPUs, memory and wall time) between different runs. We hope that the multi-user endpoint will help to address these challenges and share an update on our progress here.
2. Introduction
• The two dominant Agile approaches are
Scrum and eXtreme Programming (XP).
• XP was arguably the first method deemed to
be “Agile”.
• We will start with Scrum – very popular and in
very wide use today!
3. Project Management Emphasis based on a
Standard 30-day Sprint
• Scrum: a definite project management emphasis.
• Scrum Master: A Scrum project Is managed by a
Scrum Master, who can be considered as much a
consultant or coach as a manager.
• Sprint. Scrum has a fundamental 30-day
development cycle called a Sprint, preceded by
– pre-Sprint activities and post-Sprint activities.
• Daily Scrum: A short (less than 30 minutes) daily
Scrum Meeting allows the team to monitor status
and communicate problems.
4. Product Backlog for Planning
• Project planning is based on a Product Backlog,
which contains
– functions and
– technology enhancements
• envisioned for the project.
• Two meetings are held –
– one to decide the features for the next Sprint and
– the other to plan out the work.
5. Scrum and Scalability
• Scrum: one of the few agile methods used to
scale up for larger projects.
• How done?
– Accomplished the same way as organizations
handle integrated product teams.
– Individual Scrum team coaches - part of a
higher echelon team of coaches spanning
several products.
– This provides for communications to avoid
conflicting development issues
6. Scrum - Queues
• Product Backlog Sprint Backlog Sprint
Working increment of the Software
• Scrum uses lightweight queue-based management
and work-breakdown mechanisms.
• Product Backlog queue: a low-tech customer-
managed queue of demand requests for products.
• .
• Sprint: At launch time, a Sprint (30-day time-boxed
iteration) does just-in-time planning
• Sprint Backlog: queue for Sprint work-mgmt.
7. Scrum - Management
• Daily Scrum: Very notable and very visible
• Is a daily standup,
– except that it is the team that is participating and
sharing coordination information not a central
project manager.
• Scrum Master
– holds daily scrum and
– acts more as a facilitator and runs interference for
the core team when blocks or issues arise.
(Kennaley, SDLC 3.0, p. 31)
8. FYI
• Remaining slides came from Wikipedia
– Cut, pasted, slightly modified.
• Lots of terms / concepts / jargon…
• Several items repeated for emphasis.
9. Core Roles
• Three core roles and a range of
ancillary roles
• Core roles:
–Core roles are those committed to the
project in the Scrum process
–Core roles: those producing the
product
10. Core Roles – Product Owner
• The Product Owner represents stakeholders and is
the voice of the customer.
• Product Owner is accountable for ensuring that the
team delivers value to the business.
• Product Owner
– writes customer-centric items (typically user stories),
– prioritizes them, and
– adds them to the product backlog.
Note:
• Scrum teams should have one Product Owner.
• May also be a member of the development team
• Not recommend this person be Scrum Master.
11. Core Roles – Development Team
• The Development Team is responsible for
delivering potentially shippable product
increments at end of each Sprint.
• Team = 3–9 people with cross-functional skills.
• Team does actual work
– (analyze, design, develop, test, technical
communication, document, etc.).
• Team is self-organizing, even though they may
interface with project management organizations
(PMOs).
12. Core Roles – Scrum Master
• Scrum is facilitated by a Scrum Master –
• Accountable for removing impediments for team
to deliver sprint goal / deliverables.
• Scrum Master is not the team leader, but acts as
a buffer between the team and any distracting
influences.
• Scrum Master ensures process is used as
intended.
• Scrum Master is the enforcer of rules.
• Scrum Master’s role: protect the Team and keep
it focused on the tasks at hand.
14. The Sprint (1 of 4)
• Sprint: basic unit of development in Scrum.
• Sprint duration: one week to one month;
• “Time Boxed" effort of a constant length.
• Each sprint:
• Preceded by a planning meeting,
– where the tasks for sprint are identified and an
– estimated commitment for the sprint goal made,
and followed by
– a review or retrospective meeting, where the
progress is reviewed and lessons for the next
sprint are identified.
15. The Sprint (2 of 4)
• During Sprint, team creates finished portions
of a product. (an increment)
• Features going into a Sprint come from the
product backlog: a prioritized list of reqments.
– Which backlog items go into sprint (sprint goals)
determined during Sprint Planning Mtg.
• Sprint Goal
– sets up minimum success criterion for the Sprint and
– keeps the team focused on the broader picture rather
than narrowly on the task at hand.
16. The Sprint (3 of 4)
• The team then determines how many selected
items can be completed during the next sprint.
•
These then go into the Sprint Backlog.
• Sprint Backlog is property of the development team,
During a sprint, no one is allowed to edit the sprint
backlog except for development team.
• Development: time-boxed; Sprint must end on time;
• Requirements not completed for any reason?
are omitted and returned to Product Backlog.
• When Sprint is done, team demonstrates software.
17. The Sprint (4 of 4)
• Scrum enables self-organizing teams
• Encourages co-location of all team members,
19. Artifact: Product Backlog
• Product backlog is an ordered list of "requirements"
that is maintained for a product
• Contains Product Backlog Items ordered by the Product
Owner based on
– considerations like risk,
– business value,
– dependencies,
– date needed, etc.
• Features added to backlog commonly written in story
format
• The product backlog is the “What” that will be built,
sorted in the relative order it should be built in.
– Is open and editable by anyone,
– Product Owner is ultimately responsible for ordering the
stories on the backlog for the Development Team.
20. Artifact: Product Backlog
• The product backlog contains rough estimates
of both business value and development
effort, these values are often stated in story
points using a rounded Fibonacci sequence.
• Those estimates help the Product Owner to
gauge the timeline and may influence
ordering of backlog items.
– Example, if the “add spellcheck” and “add table
support” features have the same business value, the
one with the smallest development effort will probably
have higher priority, because the Return on
Investment is higher.
21. Artifacts – The Product Backlog 2
• Product Owner: responsible for the product
backlog and the business value of each item
listed.
• Development Team: responsible for the
estimated effort to complete each backlog item.
• Team contributes by estimating Items and User-
Stories, either in “Story-points” or in “estimated
hours.”
22. Artifacts: Sprint Backlog
• Sprint Backlog: list of work the Development Team must
address during the next sprint.
• List derived by selecting stories/features from the top of
the product backlog until the Development Team feels it
has enough work to fill the sprint.
• Thinking: This is done by the Development Team asking
"Can we also do this?" and adding stories/features to the
sprint backlog.
• History: Development Team should note velocity of
previous Sprints (total story points completed from each
of the last sprints stories) when selecting stories/features
for the new sprint.
• Use number as guide for "effort" they can complete.
23. Artifacts: Sprint Backlog
• Stories/features: broken down into tasks by Development
Team
• Should normally be between four and sixteen hours of work.
• With this level of detail the Development Team understands
exactly what to do, and potentially, anyone can pick a task from
the list.
• Tasks on sprint backlog are never assigned; tasks are signed
up for. by team members during daily scrum, according to
priority and member skills.
• Promotes self-organization of Team, and developer buy-in.
• Sprint backlog is property of Team, and all included
estimates are provided by the Development Team.
24. Artifacts - Increment
• The ”increment” is sum of all Product
Backlog Items completed during a sprint and
all previous sprints.
• At end of a sprint, Increment must be done
according to Scrum Team's definition of
done.
• The increment must be in usable condition
regardless of whether the Product Owner
decides to actually release it.
25. Artifacts: Burn Down
• The sprint burn down chart is a publicly displayed chart
showing remaining work in the sprint backlog.
• Updated every day; gives a simple view of the sprint progress.
• Other types of burn down:
• Release burn down chart: shows amount of work left to
complete the target commitment for a Product Release
– This normally spans multiple iterations
• Alternative Release burn down chart: basically does the same,
but clearly shows scope changes to Release Content, by
resetting the baseline.
– This should not be confused with an earned value chart.
27. More Terminology Used in Scrum:
• Sprint burn down chart: Daily progress for a Sprint over
the sprint’s length.
• (User) Story: A feature added to the backlog is
commonly referred to as a story; has a specific
suggested structure.
• Done so development team can identify user,
action and required result in a request; simple way
of writing requests anyone can understand.
• Example: As a wiki user I want a tools menu on the
edit screen so that I can easily apply font
formatting.
28. More Terminology Used in Scrum:
• A story is an
– independent,
– negotiable,
– valuable,
– estimatable,
– small,
– testable requirement
• Despite being independent, stories have no
direct dependencies with other requirements.
• Stories may be clustered into epics (a group of
related stories) when represented on a product
roadmap or further down in the backlog.
29. More Terminology Used in Scrum:
• Tasks: Added to story at beginning of a sprint and
broken down into hours.
– Each task should not exceed 12 hours, but it's common for
teams to insist that a task take no more than a day to finish.
• Definition of Done (DoD): The exit-criteria used to
determine whether a product backlog item is complete.
• In many cases the DoD requires that all regression tests
should be successful.
30. More Terminology Used in Scrum:
• Velocity: The total effort a team is capable of in a
sprint. The number is derived by adding all the
story points from the last sprint's stories/features.
• This is a guideline for the team and assists them in
understanding how many stories they can do in a
sprint.
• Impediment: Anything that prevents a team
member from performing work as efficiently as
possible.