SlideShare a Scribd company logo
Evaluation of the kinds of hazard and risk management encountered with
explosive when blasting in surface and underground
Kinds of hazard and risk management:-
What is a hazard?
The meaning of the word hazard can be confusing. Often dictionaries do not give specific
definitions or combine it with the term "risk". For example, one dictionary defines hazard as "a
danger or risk" which helps explain why many people use the terms interchangeably.
There are many definitions for hazard but the most common definition when talking about
workplace health and safety is: A hazard is any source of potential damage, harm or adverse
health effects on something or someone. The CSA Z1002 Standard "Occupational health and
safety - Hazard identification and elimination and risk assessment and control" uses the
following terms:
Harm - physical injury or damage to health.
Hazard - a potential source of harm to a worker.
Basically, a hazard is the potential for harm or an adverse effect (for example, to people as
health effects, to organizations as property or equipment losses, or to the environment).
Sometimes the resulting harm is referred to as the hazard instead of the actual source of the
hazard. For example, the disease tuberculosis (TB) might be called a "hazard" by some but, in
general, the TB-causing bacteria (Mycobacterium tuberculosis) would be considered the
"hazard" or "hazardous biological agent".
Hazard type defines and describes the nature of the hazard arising from an explosive in
manufacture and storage conditions.
Hazard
type
Definition(regulation 2 ER2014) Explanation
Hazard
Type 1
An explosive which, as a result of, or as a result
of any effect of, the conditions of its storage or
process of manufacture has a mass explosion
hazard
a mass explosion is one in
which the entire body of
explosives explodes as one
Hazard
Type 2
An explosive which, as a result of, or as a result
of any effect of, the conditions of its storage or
process of manufacture has a serious projectile
hazard but does not have a mass explosion
hazard
Hazard
Type 3
An explosive which, as a result of, or as a result
of any effect of, the conditions of its storage or
process of manufacture has a fire hazard and
either a minor blast hazard or a minor projection
hazard, or both, but does not have a mass
explosion hazard
ie those explosives which give
rise to considerable radiant
heat or which burn to produce
a minor blast or projection
hazard
Hazard
Type 4
an explosive which, as a result of, or as a result
of any effect of, the conditions of its storage or
process of manufacture has a fire or slight
explosion hazard, or both, with only local effect
those explosives which
present only a low hazard in
the event of ignition or
initiation, where no significant
blast or projection
offragments size or range is
expected
2
Hazard type represents the potential behaviour of the explosives in the form in which they are
manufactured or stored. This means that explosives do not have inherent hazard types that can
be automatically ascribed without consideration. Hazard type will be dependant on:
• the quantity of explosives
• the types of explosives
• the loading density
• packaging (if any) or containment
• the presence of barriers or other controls that will prevent rapid communication of an event
between explosives;
• orientation
• how an event involving the explosives might progress or degrade any controls
Hazard Identification and Evaluation
Before beginning the hazard evaluation and risk assessment process, a researcher must define
the scope of work. What are the tasks that must be evaluated? A well-defined scope of work
is a key starting point for all steps in the risk assessment and hazard analysis.
The next step after identifying the scope of work is to identify the hazard. A HAZARD IS A
POTENTIAL FOR HARM. Hazards can be identified as an agent, condition, or activity that
has the potential to cause injury, illness, loss of property, or damage to the environment. The
table below has been adapted from Identifying and Evaluating Hazards in Research
Laboratories, which you can find in the Resource tab to the right.
Table 3-1: Examples of Hazards Commonly Identified for Research Activities
Hazard
Types
Examples
Agent
Carcinogenic, teratogenic, corrosive, pyrophoric, toxic, mutagenic,
reproductive hazard, explosive, nonionizing radiation, biological
hazard/pathogenic, flammable, oxidizing, self-reactive or unstable,
potentially explosive, reducing, water-reactive, sensitizing, peroxide-
forming, catalytic, or chemical asphyxiate
Condition
High pressure, low pressure, electrical, uneven surfaces, pinch points,
suspended weight, hot surfaces, extreme cold, steam, noise, clutter,
magnetic fields, simple asphyxiant, oxygen-deficient spaces,
ultraviolet radiation, or laser light
Activity
Creation of secondary products, lifting, chemical mixing, long-term
use of dry boxes, repetitive pipetting, scale up, handling waste,
transportation of hazardous materials, handling glassware and other
sharp objects, heating chemicals, recrystallizations, extractions, or
centrifuging
Hazard Controls
When evaluating the risks associated with specific hazards, the results of this evaluation should
guide the researcher in the selection of risk management techniques including elimination,
3
substitution, engineering controls, administrative controls, and personal protective
equipment. This is known as the Hierarchy of Controls.
Elimination and Substitution
The most preferred method of controlling risk is to eliminate the hazard altogether. In most
cases, elimination is not feasible and when possible, substitution is the best approach to hazard
mitigation. When possible, substitute less hazardous agents in place of their more hazardous
counterparts. This also applies to conditions and activities. Examples include substituting
toluene for benzene, non-lead-based paints for lead-based ones, or SawStop table saws for
existing traditional table saws.
Engineering Controls
Engineering controls consist of a variety of methods for minimizing hazards, including process
control, enclosure and isolation, and ventilation.
• Process controls involve changing the way that a job activity is performed in order to
reduce risk. Examples of this include using wet methods when drilling or grinding or
using temperature controls to minimize vapor generation.
• Enclosure and isolation are targeted at keeping the chemical in and the researcher out,
or visa versa. Glove boxes are a good example of enclosure and isolation. Interlock
systems for lasers and machinery are other good examples of isolating processes.
• The most common method for ventilation in research laboratories is localized exhaust
systems. Fume hoods, snorkels, and other ventilation systems are discussed at length
in the Laboratory Equipment and Engineering Controls section of this site.
4
Administrative Controls
Administrative controls are controls which alter the way work is performed. They may consists
of policies, training, standard operating procedures/guidelines, personal hygiene practices,
work scheduling, etc. These controls are meant to minimize the exposure to the hazard and
should only be used when the exposure cannot be completely mitigated through
elimination/substitution or engineering controls.
What is risk?
Risk is the chance or probability that a person will be harmed or experience an adverse health
effect if exposed to a hazard. It may also apply to situations with property or equipment loss,
or harmful effects on the environment.
The CSA Z1002 Standard "Occupational health and safety - Hazard identification and
elimination and risk assessment and control" uses the following terms:
Risk – the combination of the likelihood of the occurrence of a harm and the severity of that
harm.
Note: In risk assessment terminology, the word “likelihood” is used to refer to the chance of
something happening, whether defined, measured, or determined objectively or subjectively,
qualitatively or quantitatively, and described using general terms or mathematically (e.g., a
probability or a frequency over a given time period)
Types of risk
There are two generic types of risk that may be considered during the risk management process
for explosive facilities:
a) individual risk (IR). This is the chance of a fatality or serious injury to a particular
individual in a specific location as a result of an accidental initiation of explosives; and
b) societal risk (SR). This expresses
the probability of the largest number of
people that might be fatalities or
seriously injured as a result of an
explosives accident.
As the criteria for IR or SR are derived
from different sources the risk levels that
have been estimated during the risk
management process shall be clearly
annotated to indicate whether the
estimate is for IR or SR. The respective
limits of tolerability for IR and SR are
usually independent of each other. In
practice, IR would normally be used
during the risk assessment process as SR
is often more difficult to estimate. This is
because societal risk concerns often
5
involve a much wider range of potential outcomes.
It is possible that tolerable risk may be achieved using one set of criteria but not achieved using
the other criteria. In this case remedial action should be taken to ensure that both sets of criteria
are met. If this is not possible or practicable then the national technical authority shall exercise
best judgment and also seek formal political approval for the continued use of the explosives
facility.
Determining tolerable risk
Tolerable risk is determined by the search for absolute safety contrasted against factors such
as:
a) the inherent explosive safety hazards of storing, handling and processing ammunition;
b) available resources;
c) the conventions of the society where the ammunition is being stored; and
d) the financial costs.
It follows that there is therefore a need to continually review the tolerable risk that underpins
the concept behind stockpile management operations in a particular environment.
The level of tolerable risk shall be determined by the appropriate national authority, but it
should not be less than the tolerable risk accepted, for example, in manufacturing or industrial
6
processes. The levels of tolerable risk (based on individual risk criteria) shown in Table 3 could
be considered as reasonable and practicable:
Tolerable risk is achieved by the iterative process of risk assessment (risk analysis and risk
evaluation) and risk reduction. See Figure
7
Explosive when blasting in surface and underground its general effects
General
An explosion is a sudden release of energy caused by a very rapid chemical reaction that
turns a solid or liquid into heat and gas. This reaction takes place in less than a millisecond. In
the process of turning a solid or liquid into a gas expansion occurs, so in the case of an
explosion the expanding gas is produced extremely rapidly and pushes the surrounding air out
in front of it, thus creating a pressure wave, known as the Blast Wave. When an explosion
occurs at ground level there are several effects created that cause damage and injury. The
extent of these effects will be generally dependent on the power, quality and the quantity of
explosive deployed. The six basic effects are:
a) thermal radiation;
b) brisance or shattering;
c) primary fragments;
d) blast wave;
e) ground shock; and
f) secondary fragments.
Each of these effects are summarised in the following sections.
Thermal effects
The thermal effects can be considered to be a ‘ball of fire’ created as part of the explosive
process. It is very local to the seat of the explosion and is very short lived (a few
milliseconds). The thermal effects are particularly hazardous to those very close to the blast
(i.e. taking shelter in a hardened structure) as the heat is able to penetrate small openings in a
structure. For those in the open the blast wave and fragment effects have a greater range for
inflicting damage.
Brisance
Brisance is the shattering effect, and it is very local to the seat of the explosion and is
generally associated with high explosives. The effect of brisance can be severe when an
explosive device is placed directly in contact with a structural component. A small air gap
between the explosive and the target is effective at mitigating the onset of brisance-induced
failures.
Primary Fragments
These are the fragments of the device or container of the device, which have been shattered
by the brisance effect and are propelled at high velocity over great distances. Primary
fragments can travel ahead of the blast wave and have the potential to cause injuries at a
greater range than the blast wave.
Blast Wave
The blast wave is a very fast moving high-pressure wave created by the rapidly expanding gas
of the explosion, which gradually diminishes with distance. The blast wave is capable of
reflecting off surfaces and in the process can magnify itself. This is typically displayed when
large devices are detonated in urban environments and the blast is ‘funnelled’ down narrow
streets. The blast wave has the potential to cause fatalities and serious injuries including lung
and organ damage, rupture of the eardrums and the like. It can also cause injury due to whole
body translation (or throwing) of individuals.
8
Ground Shock
Ground shock is produced by the brisance effect of the explosion shattering the ground local
to the seat of the explosion, i.e., creating the crater of the explosion. The shock wave resulting
from the crater’s creation continues through the ground and is known as ground shock. The
ground shock has the potential to cause damage to underground services (e.g. water,
electricity etc) as well as structures below ground. It is not uncommon for floods to occur
after a vehicle bomb attack, caused by the rupture of water mains.
Secondary Fragments
These are the fragments that have been created by the blast wave imparting pressure onto
friable materials that are unable to withstand this pressure or loose articles. The energy
imparted to the fragments created by the blast can be such as to throw them large distances
and at great speed. Typical friable materials that form secondary fragments are glass, roof
slates, timber, metal frames and the like. Due to the human body’s moderate resistance to the
effects of the ‘blast wave’, secondary fragments are likely to cause injury at greater distance
than the blast wave. The formation of secondary fragments can cause fatalities and serious
injury.
Confinement Effects
The detonation of an explosive within a building is more severe than in an open environment.
This is because the blast wave is able to undergo multiple reflections (of walls, floors etc),
which leads to an increase in the amplitude and duration of the blast pressure. This increases
the severity of damage to both structural elements as well as humans. For internal explosions
within robust rooms, it is possible for even more severe confinement effects to occur. This is
a result of the confinement of the extremely hot gases that are produced by detonation. By
suppressing the expansion of the gases, very high pressures/forces are applied to the room
enclosure. The smaller the room the higher the resulting pressure.

More Related Content

What's hot

Session 08_Risk Assessment Program for YSP_Risk Treatment and Communication
Session 08_Risk Assessment Program for YSP_Risk Treatment and CommunicationSession 08_Risk Assessment Program for YSP_Risk Treatment and Communication
Session 08_Risk Assessment Program for YSP_Risk Treatment and Communication
Muizz Anibire
 
Industrial safety
Industrial safetyIndustrial safety
Industrial safety
Deep parmar
 
Hazards and risk management
Hazards and risk managementHazards and risk management
Hazards and risk management
saurastra university
 
Preliminary Hazard Analysis (PHA): New hybrid approach to railway risk analysis
Preliminary Hazard Analysis (PHA): New hybrid approach to railway risk analysisPreliminary Hazard Analysis (PHA): New hybrid approach to railway risk analysis
Preliminary Hazard Analysis (PHA): New hybrid approach to railway risk analysis
IRJESJOURNAL
 
Risk Assessment Program For Young Safety Professionals (YSP)
Risk Assessment Program For Young Safety Professionals (YSP)Risk Assessment Program For Young Safety Professionals (YSP)
Risk Assessment Program For Young Safety Professionals (YSP)
Muizz Anibire
 
Session 05_Risk Assessment Program for YSP_Risk Analysis II
Session 05_Risk Assessment Program for YSP_Risk Analysis IISession 05_Risk Assessment Program for YSP_Risk Analysis II
Session 05_Risk Assessment Program for YSP_Risk Analysis II
Muizz Anibire
 
Process Hazard Analysis
Process Hazard AnalysisProcess Hazard Analysis
Process Hazard Analysis
NGE
 
Session 02 Risk Assessment Program for YSP_The Risk Assessment Process
Session 02 Risk Assessment Program for YSP_The Risk Assessment ProcessSession 02 Risk Assessment Program for YSP_The Risk Assessment Process
Session 02 Risk Assessment Program for YSP_The Risk Assessment Process
Muizz Anibire
 
Risk Management
Risk ManagementRisk Management
Risk Management
Jacobe2008
 
Ich guidelines on risk assessment and risk mangment
Ich guidelines on risk assessment and risk mangmentIch guidelines on risk assessment and risk mangment
Ich guidelines on risk assessment and risk mangment
Ashvin Bhoge
 
Session 07_Risk Assessment Program for YSP_Risk Evaluation
Session 07_Risk Assessment Program for YSP_Risk EvaluationSession 07_Risk Assessment Program for YSP_Risk Evaluation
Session 07_Risk Assessment Program for YSP_Risk Evaluation
Muizz Anibire
 
Ten tips on hazop quality control
Ten tips on hazop quality controlTen tips on hazop quality control
Ten tips on hazop quality control
Paul Baybutt
 
Seven questions answered by process hazard analysis
Seven questions answered by process hazard analysisSeven questions answered by process hazard analysis
Seven questions answered by process hazard analysis
Paul Baybutt
 
Quality risk management by talha usmani
Quality risk management by talha usmaniQuality risk management by talha usmani
Quality risk management by talha usmani
mtalhausmani
 
Riskass06[1]
Riskass06[1]Riskass06[1]
Riskass06[1]
JOE LYSTER
 
Quality risk management
Quality risk managementQuality risk management
Quality risk management
KarunaMane1
 
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Yuvraj Shrivastava
 
Risk Assessment and Management
Risk Assessment and ManagementRisk Assessment and Management
Risk Assessment and Management
Isuru Asiri
 
Hazard analysis
Hazard analysisHazard analysis
Hazard analysis
Anand kumar
 

What's hot (20)

Session 08_Risk Assessment Program for YSP_Risk Treatment and Communication
Session 08_Risk Assessment Program for YSP_Risk Treatment and CommunicationSession 08_Risk Assessment Program for YSP_Risk Treatment and Communication
Session 08_Risk Assessment Program for YSP_Risk Treatment and Communication
 
Industrial safety
Industrial safetyIndustrial safety
Industrial safety
 
Hazards and risk management
Hazards and risk managementHazards and risk management
Hazards and risk management
 
Preliminary Hazard Analysis (PHA): New hybrid approach to railway risk analysis
Preliminary Hazard Analysis (PHA): New hybrid approach to railway risk analysisPreliminary Hazard Analysis (PHA): New hybrid approach to railway risk analysis
Preliminary Hazard Analysis (PHA): New hybrid approach to railway risk analysis
 
Risk Assessment Program For Young Safety Professionals (YSP)
Risk Assessment Program For Young Safety Professionals (YSP)Risk Assessment Program For Young Safety Professionals (YSP)
Risk Assessment Program For Young Safety Professionals (YSP)
 
Session 05_Risk Assessment Program for YSP_Risk Analysis II
Session 05_Risk Assessment Program for YSP_Risk Analysis IISession 05_Risk Assessment Program for YSP_Risk Analysis II
Session 05_Risk Assessment Program for YSP_Risk Analysis II
 
Process Hazard Analysis
Process Hazard AnalysisProcess Hazard Analysis
Process Hazard Analysis
 
Session 02 Risk Assessment Program for YSP_The Risk Assessment Process
Session 02 Risk Assessment Program for YSP_The Risk Assessment ProcessSession 02 Risk Assessment Program for YSP_The Risk Assessment Process
Session 02 Risk Assessment Program for YSP_The Risk Assessment Process
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Ich guidelines on risk assessment and risk mangment
Ich guidelines on risk assessment and risk mangmentIch guidelines on risk assessment and risk mangment
Ich guidelines on risk assessment and risk mangment
 
Session 07_Risk Assessment Program for YSP_Risk Evaluation
Session 07_Risk Assessment Program for YSP_Risk EvaluationSession 07_Risk Assessment Program for YSP_Risk Evaluation
Session 07_Risk Assessment Program for YSP_Risk Evaluation
 
Ten tips on hazop quality control
Ten tips on hazop quality controlTen tips on hazop quality control
Ten tips on hazop quality control
 
Seven questions answered by process hazard analysis
Seven questions answered by process hazard analysisSeven questions answered by process hazard analysis
Seven questions answered by process hazard analysis
 
Topic5
Topic5Topic5
Topic5
 
Quality risk management by talha usmani
Quality risk management by talha usmaniQuality risk management by talha usmani
Quality risk management by talha usmani
 
Riskass06[1]
Riskass06[1]Riskass06[1]
Riskass06[1]
 
Quality risk management
Quality risk managementQuality risk management
Quality risk management
 
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
 
Risk Assessment and Management
Risk Assessment and ManagementRisk Assessment and Management
Risk Assessment and Management
 
Hazard analysis
Hazard analysisHazard analysis
Hazard analysis
 

Similar to Kinds of hazard and risk management

Week 3 Occupational Hazards & Risk Spring 2010!!
Week 3 Occupational Hazards & Risk Spring 2010!!Week 3 Occupational Hazards & Risk Spring 2010!!
Week 3 Occupational Hazards & Risk Spring 2010!!sewhood
 
Presentation1
Presentation1Presentation1
Presentation1
GULFAM KHALID
 
Risk Assessment and Job Safety Analysis
Risk Assessment and Job Safety AnalysisRisk Assessment and Job Safety Analysis
Risk Assessment and Job Safety Analysis
Gaurav Singh Rajput
 
Risk Assessment & Job Safety Analysis | JSA | RA
Risk Assessment & Job Safety Analysis | JSA | RARisk Assessment & Job Safety Analysis | JSA | RA
Risk Assessment & Job Safety Analysis | JSA | RA
Gaurav Singh Rajput
 
HSE-BMS-006 Risk Assessment & JSA.ppt
HSE-BMS-006 Risk Assessment & JSA.pptHSE-BMS-006 Risk Assessment & JSA.ppt
HSE-BMS-006 Risk Assessment & JSA.ppt
GkMechanical
 
Unit IV GE8076 Professional Ethics in Engineering
Unit IV GE8076 Professional Ethics in Engineering Unit IV GE8076 Professional Ethics in Engineering
Unit IV GE8076 Professional Ethics in Engineering
Dr. SELVAGANESAN S
 
Risk assessment-training
Risk assessment-trainingRisk assessment-training
Risk assessment-training
Nguyên Hà Văn
 
Risk assessment-training
Risk assessment-trainingRisk assessment-training
Risk assessment-training
Ishah Khaliq
 
5203 Disaster and Climate Resilience, Occupational Health and Safety
5203 Disaster and Climate Resilience, Occupational Health and Safety 5203 Disaster and Climate Resilience, Occupational Health and Safety
5203 Disaster and Climate Resilience, Occupational Health and Safety
Md. Abdullah-Al-Mahbub
 
Occupational health as safety.
Occupational health as safety.Occupational health as safety.
Occupational health as safety.
Polycarpe Feussi
 
Personality and Individual Differences: Determinants of Personality - Major P...
Personality and Individual Differences: Determinants of Personality - Major P...Personality and Individual Differences: Determinants of Personality - Major P...
Personality and Individual Differences: Determinants of Personality - Major P...
RAJESHSKR
 
Workplace Health & Safety
Workplace Health & Safety Workplace Health & Safety
Workplace Health & Safety finnlaura
 
HIRA (hazard identification risk assessment)
HIRA (hazard identification risk assessment)HIRA (hazard identification risk assessment)
HIRA (hazard identification risk assessment)
PrasantakumarNayak4
 
Hira – hazard identification & risk assessment
Hira – hazard identification & risk assessment Hira – hazard identification & risk assessment
Hira – hazard identification & risk assessment
Salim Solanki
 
Hazard Management Requirements in the Health and Safety at Work Act
Hazard Management Requirements in the Health and Safety at Work ActHazard Management Requirements in the Health and Safety at Work Act
Hazard Management Requirements in the Health and Safety at Work ActHans Buwalda
 
unit4.pptx professional ethics in engineering
unit4.pptx professional ethics in engineeringunit4.pptx professional ethics in engineering
unit4.pptx professional ethics in engineering
PoornachanranKV
 
OHS
OHSOHS
OHS
bips007
 
fire Safety and Hazard Analysis.pptx
fire Safety and Hazard Analysis.pptxfire Safety and Hazard Analysis.pptx
fire Safety and Hazard Analysis.pptx
zeidali3
 
fire Safety and Hazard Analysis.pptx
fire Safety and Hazard Analysis.pptxfire Safety and Hazard Analysis.pptx
fire Safety and Hazard Analysis.pptx
zeidali3
 

Similar to Kinds of hazard and risk management (20)

Week 3 Occupational Hazards & Risk Spring 2010!!
Week 3 Occupational Hazards & Risk Spring 2010!!Week 3 Occupational Hazards & Risk Spring 2010!!
Week 3 Occupational Hazards & Risk Spring 2010!!
 
Presentation1
Presentation1Presentation1
Presentation1
 
Risk Assessment and Job Safety Analysis
Risk Assessment and Job Safety AnalysisRisk Assessment and Job Safety Analysis
Risk Assessment and Job Safety Analysis
 
Risk Assessment & Job Safety Analysis | JSA | RA
Risk Assessment & Job Safety Analysis | JSA | RARisk Assessment & Job Safety Analysis | JSA | RA
Risk Assessment & Job Safety Analysis | JSA | RA
 
HSE-BMS-006 Risk Assessment & JSA.ppt
HSE-BMS-006 Risk Assessment & JSA.pptHSE-BMS-006 Risk Assessment & JSA.ppt
HSE-BMS-006 Risk Assessment & JSA.ppt
 
Unit IV GE8076 Professional Ethics in Engineering
Unit IV GE8076 Professional Ethics in Engineering Unit IV GE8076 Professional Ethics in Engineering
Unit IV GE8076 Professional Ethics in Engineering
 
Risk assessment-training
Risk assessment-trainingRisk assessment-training
Risk assessment-training
 
Risk assessment-training
Risk assessment-trainingRisk assessment-training
Risk assessment-training
 
Unit 5 risk assessment and management
Unit 5 risk assessment and managementUnit 5 risk assessment and management
Unit 5 risk assessment and management
 
5203 Disaster and Climate Resilience, Occupational Health and Safety
5203 Disaster and Climate Resilience, Occupational Health and Safety 5203 Disaster and Climate Resilience, Occupational Health and Safety
5203 Disaster and Climate Resilience, Occupational Health and Safety
 
Occupational health as safety.
Occupational health as safety.Occupational health as safety.
Occupational health as safety.
 
Personality and Individual Differences: Determinants of Personality - Major P...
Personality and Individual Differences: Determinants of Personality - Major P...Personality and Individual Differences: Determinants of Personality - Major P...
Personality and Individual Differences: Determinants of Personality - Major P...
 
Workplace Health & Safety
Workplace Health & Safety Workplace Health & Safety
Workplace Health & Safety
 
HIRA (hazard identification risk assessment)
HIRA (hazard identification risk assessment)HIRA (hazard identification risk assessment)
HIRA (hazard identification risk assessment)
 
Hira – hazard identification & risk assessment
Hira – hazard identification & risk assessment Hira – hazard identification & risk assessment
Hira – hazard identification & risk assessment
 
Hazard Management Requirements in the Health and Safety at Work Act
Hazard Management Requirements in the Health and Safety at Work ActHazard Management Requirements in the Health and Safety at Work Act
Hazard Management Requirements in the Health and Safety at Work Act
 
unit4.pptx professional ethics in engineering
unit4.pptx professional ethics in engineeringunit4.pptx professional ethics in engineering
unit4.pptx professional ethics in engineering
 
OHS
OHSOHS
OHS
 
fire Safety and Hazard Analysis.pptx
fire Safety and Hazard Analysis.pptxfire Safety and Hazard Analysis.pptx
fire Safety and Hazard Analysis.pptx
 
fire Safety and Hazard Analysis.pptx
fire Safety and Hazard Analysis.pptxfire Safety and Hazard Analysis.pptx
fire Safety and Hazard Analysis.pptx
 

More from Shahid Hussain

A Gravity survey is an indirect (surface) means of calculating the density pr...
A Gravity survey is an indirect (surface) means of calculating the density pr...A Gravity survey is an indirect (surface) means of calculating the density pr...
A Gravity survey is an indirect (surface) means of calculating the density pr...
Shahid Hussain
 
Bigbook 01
Bigbook 01Bigbook 01
Bigbook 01
Shahid Hussain
 
About Topgrapic Map Details & know how to study topograpic map.
About Topgrapic Map Details & know how to study topograpic map.About Topgrapic Map Details & know how to study topograpic map.
About Topgrapic Map Details & know how to study topograpic map.
Shahid Hussain
 
The geologic time scale
The geologic time scaleThe geologic time scale
The geologic time scale
Shahid Hussain
 
Hardness scale
Hardness scaleHardness scale
Hardness scale
Shahid Hussain
 
EARTH EARTHQUAKES
EARTH EARTHQUAKESEARTH EARTHQUAKES
EARTH EARTHQUAKES
Shahid Hussain
 
EARTH THEORY OF PLATE TECTONICS
EARTH THEORY OF PLATE TECTONICSEARTH THEORY OF PLATE TECTONICS
EARTH THEORY OF PLATE TECTONICS
Shahid Hussain
 
EARTH WEATHERING AND EROSION
EARTH WEATHERING AND EROSIONEARTH WEATHERING AND EROSION
EARTH WEATHERING AND EROSION
Shahid Hussain
 
EARTH DRAINAGE PATTERN AND TYPES
EARTH DRAINAGE PATTERN AND TYPESEARTH DRAINAGE PATTERN AND TYPES
EARTH DRAINAGE PATTERN AND TYPES
Shahid Hussain
 
EARTH VALLEY FORMATION
EARTH VALLEY FORMATIONEARTH VALLEY FORMATION
EARTH VALLEY FORMATION
Shahid Hussain
 
EARTH MOUNTAIN BUILDING
EARTH MOUNTAIN BUILDINGEARTH MOUNTAIN BUILDING
EARTH MOUNTAIN BUILDING
Shahid Hussain
 
CHEMICAL COMPOSITION OF THE EARTH CRUST MINERALS AND ROCKS
CHEMICAL COMPOSITION OF THE EARTH CRUST MINERALS AND ROCKSCHEMICAL COMPOSITION OF THE EARTH CRUST MINERALS AND ROCKS
CHEMICAL COMPOSITION OF THE EARTH CRUST MINERALS AND ROCKS
Shahid Hussain
 
EARTH STRUCTURE AND COMPOSITION
EARTH STRUCTURE AND COMPOSITIONEARTH STRUCTURE AND COMPOSITION
EARTH STRUCTURE AND COMPOSITION
Shahid Hussain
 
THE ENTERIOR OF EARTH
THE ENTERIOR OF EARTHTHE ENTERIOR OF EARTH
THE ENTERIOR OF EARTH
Shahid Hussain
 
ORIGIN OF EARTH AND IT’S PLACE IN UNIVERSE
ORIGIN OF EARTH AND IT’S PLACE IN UNIVERSEORIGIN OF EARTH AND IT’S PLACE IN UNIVERSE
ORIGIN OF EARTH AND IT’S PLACE IN UNIVERSE
Shahid Hussain
 
INTRODUCTION TO GEOLOGY
INTRODUCTION TO GEOLOGYINTRODUCTION TO GEOLOGY
INTRODUCTION TO GEOLOGY
Shahid Hussain
 

More from Shahid Hussain (16)

A Gravity survey is an indirect (surface) means of calculating the density pr...
A Gravity survey is an indirect (surface) means of calculating the density pr...A Gravity survey is an indirect (surface) means of calculating the density pr...
A Gravity survey is an indirect (surface) means of calculating the density pr...
 
Bigbook 01
Bigbook 01Bigbook 01
Bigbook 01
 
About Topgrapic Map Details & know how to study topograpic map.
About Topgrapic Map Details & know how to study topograpic map.About Topgrapic Map Details & know how to study topograpic map.
About Topgrapic Map Details & know how to study topograpic map.
 
The geologic time scale
The geologic time scaleThe geologic time scale
The geologic time scale
 
Hardness scale
Hardness scaleHardness scale
Hardness scale
 
EARTH EARTHQUAKES
EARTH EARTHQUAKESEARTH EARTHQUAKES
EARTH EARTHQUAKES
 
EARTH THEORY OF PLATE TECTONICS
EARTH THEORY OF PLATE TECTONICSEARTH THEORY OF PLATE TECTONICS
EARTH THEORY OF PLATE TECTONICS
 
EARTH WEATHERING AND EROSION
EARTH WEATHERING AND EROSIONEARTH WEATHERING AND EROSION
EARTH WEATHERING AND EROSION
 
EARTH DRAINAGE PATTERN AND TYPES
EARTH DRAINAGE PATTERN AND TYPESEARTH DRAINAGE PATTERN AND TYPES
EARTH DRAINAGE PATTERN AND TYPES
 
EARTH VALLEY FORMATION
EARTH VALLEY FORMATIONEARTH VALLEY FORMATION
EARTH VALLEY FORMATION
 
EARTH MOUNTAIN BUILDING
EARTH MOUNTAIN BUILDINGEARTH MOUNTAIN BUILDING
EARTH MOUNTAIN BUILDING
 
CHEMICAL COMPOSITION OF THE EARTH CRUST MINERALS AND ROCKS
CHEMICAL COMPOSITION OF THE EARTH CRUST MINERALS AND ROCKSCHEMICAL COMPOSITION OF THE EARTH CRUST MINERALS AND ROCKS
CHEMICAL COMPOSITION OF THE EARTH CRUST MINERALS AND ROCKS
 
EARTH STRUCTURE AND COMPOSITION
EARTH STRUCTURE AND COMPOSITIONEARTH STRUCTURE AND COMPOSITION
EARTH STRUCTURE AND COMPOSITION
 
THE ENTERIOR OF EARTH
THE ENTERIOR OF EARTHTHE ENTERIOR OF EARTH
THE ENTERIOR OF EARTH
 
ORIGIN OF EARTH AND IT’S PLACE IN UNIVERSE
ORIGIN OF EARTH AND IT’S PLACE IN UNIVERSEORIGIN OF EARTH AND IT’S PLACE IN UNIVERSE
ORIGIN OF EARTH AND IT’S PLACE IN UNIVERSE
 
INTRODUCTION TO GEOLOGY
INTRODUCTION TO GEOLOGYINTRODUCTION TO GEOLOGY
INTRODUCTION TO GEOLOGY
 

Recently uploaded

The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 

Recently uploaded (20)

The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 

Kinds of hazard and risk management

  • 1. Evaluation of the kinds of hazard and risk management encountered with explosive when blasting in surface and underground Kinds of hazard and risk management:- What is a hazard? The meaning of the word hazard can be confusing. Often dictionaries do not give specific definitions or combine it with the term "risk". For example, one dictionary defines hazard as "a danger or risk" which helps explain why many people use the terms interchangeably. There are many definitions for hazard but the most common definition when talking about workplace health and safety is: A hazard is any source of potential damage, harm or adverse health effects on something or someone. The CSA Z1002 Standard "Occupational health and safety - Hazard identification and elimination and risk assessment and control" uses the following terms: Harm - physical injury or damage to health. Hazard - a potential source of harm to a worker. Basically, a hazard is the potential for harm or an adverse effect (for example, to people as health effects, to organizations as property or equipment losses, or to the environment). Sometimes the resulting harm is referred to as the hazard instead of the actual source of the hazard. For example, the disease tuberculosis (TB) might be called a "hazard" by some but, in general, the TB-causing bacteria (Mycobacterium tuberculosis) would be considered the "hazard" or "hazardous biological agent". Hazard type defines and describes the nature of the hazard arising from an explosive in manufacture and storage conditions. Hazard type Definition(regulation 2 ER2014) Explanation Hazard Type 1 An explosive which, as a result of, or as a result of any effect of, the conditions of its storage or process of manufacture has a mass explosion hazard a mass explosion is one in which the entire body of explosives explodes as one Hazard Type 2 An explosive which, as a result of, or as a result of any effect of, the conditions of its storage or process of manufacture has a serious projectile hazard but does not have a mass explosion hazard Hazard Type 3 An explosive which, as a result of, or as a result of any effect of, the conditions of its storage or process of manufacture has a fire hazard and either a minor blast hazard or a minor projection hazard, or both, but does not have a mass explosion hazard ie those explosives which give rise to considerable radiant heat or which burn to produce a minor blast or projection hazard Hazard Type 4 an explosive which, as a result of, or as a result of any effect of, the conditions of its storage or process of manufacture has a fire or slight explosion hazard, or both, with only local effect those explosives which present only a low hazard in the event of ignition or initiation, where no significant blast or projection offragments size or range is expected
  • 2. 2 Hazard type represents the potential behaviour of the explosives in the form in which they are manufactured or stored. This means that explosives do not have inherent hazard types that can be automatically ascribed without consideration. Hazard type will be dependant on: • the quantity of explosives • the types of explosives • the loading density • packaging (if any) or containment • the presence of barriers or other controls that will prevent rapid communication of an event between explosives; • orientation • how an event involving the explosives might progress or degrade any controls Hazard Identification and Evaluation Before beginning the hazard evaluation and risk assessment process, a researcher must define the scope of work. What are the tasks that must be evaluated? A well-defined scope of work is a key starting point for all steps in the risk assessment and hazard analysis. The next step after identifying the scope of work is to identify the hazard. A HAZARD IS A POTENTIAL FOR HARM. Hazards can be identified as an agent, condition, or activity that has the potential to cause injury, illness, loss of property, or damage to the environment. The table below has been adapted from Identifying and Evaluating Hazards in Research Laboratories, which you can find in the Resource tab to the right. Table 3-1: Examples of Hazards Commonly Identified for Research Activities Hazard Types Examples Agent Carcinogenic, teratogenic, corrosive, pyrophoric, toxic, mutagenic, reproductive hazard, explosive, nonionizing radiation, biological hazard/pathogenic, flammable, oxidizing, self-reactive or unstable, potentially explosive, reducing, water-reactive, sensitizing, peroxide- forming, catalytic, or chemical asphyxiate Condition High pressure, low pressure, electrical, uneven surfaces, pinch points, suspended weight, hot surfaces, extreme cold, steam, noise, clutter, magnetic fields, simple asphyxiant, oxygen-deficient spaces, ultraviolet radiation, or laser light Activity Creation of secondary products, lifting, chemical mixing, long-term use of dry boxes, repetitive pipetting, scale up, handling waste, transportation of hazardous materials, handling glassware and other sharp objects, heating chemicals, recrystallizations, extractions, or centrifuging Hazard Controls When evaluating the risks associated with specific hazards, the results of this evaluation should guide the researcher in the selection of risk management techniques including elimination,
  • 3. 3 substitution, engineering controls, administrative controls, and personal protective equipment. This is known as the Hierarchy of Controls. Elimination and Substitution The most preferred method of controlling risk is to eliminate the hazard altogether. In most cases, elimination is not feasible and when possible, substitution is the best approach to hazard mitigation. When possible, substitute less hazardous agents in place of their more hazardous counterparts. This also applies to conditions and activities. Examples include substituting toluene for benzene, non-lead-based paints for lead-based ones, or SawStop table saws for existing traditional table saws. Engineering Controls Engineering controls consist of a variety of methods for minimizing hazards, including process control, enclosure and isolation, and ventilation. • Process controls involve changing the way that a job activity is performed in order to reduce risk. Examples of this include using wet methods when drilling or grinding or using temperature controls to minimize vapor generation. • Enclosure and isolation are targeted at keeping the chemical in and the researcher out, or visa versa. Glove boxes are a good example of enclosure and isolation. Interlock systems for lasers and machinery are other good examples of isolating processes. • The most common method for ventilation in research laboratories is localized exhaust systems. Fume hoods, snorkels, and other ventilation systems are discussed at length in the Laboratory Equipment and Engineering Controls section of this site.
  • 4. 4 Administrative Controls Administrative controls are controls which alter the way work is performed. They may consists of policies, training, standard operating procedures/guidelines, personal hygiene practices, work scheduling, etc. These controls are meant to minimize the exposure to the hazard and should only be used when the exposure cannot be completely mitigated through elimination/substitution or engineering controls. What is risk? Risk is the chance or probability that a person will be harmed or experience an adverse health effect if exposed to a hazard. It may also apply to situations with property or equipment loss, or harmful effects on the environment. The CSA Z1002 Standard "Occupational health and safety - Hazard identification and elimination and risk assessment and control" uses the following terms: Risk – the combination of the likelihood of the occurrence of a harm and the severity of that harm. Note: In risk assessment terminology, the word “likelihood” is used to refer to the chance of something happening, whether defined, measured, or determined objectively or subjectively, qualitatively or quantitatively, and described using general terms or mathematically (e.g., a probability or a frequency over a given time period) Types of risk There are two generic types of risk that may be considered during the risk management process for explosive facilities: a) individual risk (IR). This is the chance of a fatality or serious injury to a particular individual in a specific location as a result of an accidental initiation of explosives; and b) societal risk (SR). This expresses the probability of the largest number of people that might be fatalities or seriously injured as a result of an explosives accident. As the criteria for IR or SR are derived from different sources the risk levels that have been estimated during the risk management process shall be clearly annotated to indicate whether the estimate is for IR or SR. The respective limits of tolerability for IR and SR are usually independent of each other. In practice, IR would normally be used during the risk assessment process as SR is often more difficult to estimate. This is because societal risk concerns often
  • 5. 5 involve a much wider range of potential outcomes. It is possible that tolerable risk may be achieved using one set of criteria but not achieved using the other criteria. In this case remedial action should be taken to ensure that both sets of criteria are met. If this is not possible or practicable then the national technical authority shall exercise best judgment and also seek formal political approval for the continued use of the explosives facility. Determining tolerable risk Tolerable risk is determined by the search for absolute safety contrasted against factors such as: a) the inherent explosive safety hazards of storing, handling and processing ammunition; b) available resources; c) the conventions of the society where the ammunition is being stored; and d) the financial costs. It follows that there is therefore a need to continually review the tolerable risk that underpins the concept behind stockpile management operations in a particular environment. The level of tolerable risk shall be determined by the appropriate national authority, but it should not be less than the tolerable risk accepted, for example, in manufacturing or industrial
  • 6. 6 processes. The levels of tolerable risk (based on individual risk criteria) shown in Table 3 could be considered as reasonable and practicable: Tolerable risk is achieved by the iterative process of risk assessment (risk analysis and risk evaluation) and risk reduction. See Figure
  • 7. 7 Explosive when blasting in surface and underground its general effects General An explosion is a sudden release of energy caused by a very rapid chemical reaction that turns a solid or liquid into heat and gas. This reaction takes place in less than a millisecond. In the process of turning a solid or liquid into a gas expansion occurs, so in the case of an explosion the expanding gas is produced extremely rapidly and pushes the surrounding air out in front of it, thus creating a pressure wave, known as the Blast Wave. When an explosion occurs at ground level there are several effects created that cause damage and injury. The extent of these effects will be generally dependent on the power, quality and the quantity of explosive deployed. The six basic effects are: a) thermal radiation; b) brisance or shattering; c) primary fragments; d) blast wave; e) ground shock; and f) secondary fragments. Each of these effects are summarised in the following sections. Thermal effects The thermal effects can be considered to be a ‘ball of fire’ created as part of the explosive process. It is very local to the seat of the explosion and is very short lived (a few milliseconds). The thermal effects are particularly hazardous to those very close to the blast (i.e. taking shelter in a hardened structure) as the heat is able to penetrate small openings in a structure. For those in the open the blast wave and fragment effects have a greater range for inflicting damage. Brisance Brisance is the shattering effect, and it is very local to the seat of the explosion and is generally associated with high explosives. The effect of brisance can be severe when an explosive device is placed directly in contact with a structural component. A small air gap between the explosive and the target is effective at mitigating the onset of brisance-induced failures. Primary Fragments These are the fragments of the device or container of the device, which have been shattered by the brisance effect and are propelled at high velocity over great distances. Primary fragments can travel ahead of the blast wave and have the potential to cause injuries at a greater range than the blast wave. Blast Wave The blast wave is a very fast moving high-pressure wave created by the rapidly expanding gas of the explosion, which gradually diminishes with distance. The blast wave is capable of reflecting off surfaces and in the process can magnify itself. This is typically displayed when large devices are detonated in urban environments and the blast is ‘funnelled’ down narrow streets. The blast wave has the potential to cause fatalities and serious injuries including lung and organ damage, rupture of the eardrums and the like. It can also cause injury due to whole body translation (or throwing) of individuals.
  • 8. 8 Ground Shock Ground shock is produced by the brisance effect of the explosion shattering the ground local to the seat of the explosion, i.e., creating the crater of the explosion. The shock wave resulting from the crater’s creation continues through the ground and is known as ground shock. The ground shock has the potential to cause damage to underground services (e.g. water, electricity etc) as well as structures below ground. It is not uncommon for floods to occur after a vehicle bomb attack, caused by the rupture of water mains. Secondary Fragments These are the fragments that have been created by the blast wave imparting pressure onto friable materials that are unable to withstand this pressure or loose articles. The energy imparted to the fragments created by the blast can be such as to throw them large distances and at great speed. Typical friable materials that form secondary fragments are glass, roof slates, timber, metal frames and the like. Due to the human body’s moderate resistance to the effects of the ‘blast wave’, secondary fragments are likely to cause injury at greater distance than the blast wave. The formation of secondary fragments can cause fatalities and serious injury. Confinement Effects The detonation of an explosive within a building is more severe than in an open environment. This is because the blast wave is able to undergo multiple reflections (of walls, floors etc), which leads to an increase in the amplitude and duration of the blast pressure. This increases the severity of damage to both structural elements as well as humans. For internal explosions within robust rooms, it is possible for even more severe confinement effects to occur. This is a result of the confinement of the extremely hot gases that are produced by detonation. By suppressing the expansion of the gases, very high pressures/forces are applied to the room enclosure. The smaller the room the higher the resulting pressure.