The rehabilitation of EAWA Well #7 through air development removed large volumes of debris from the well bore and surrounding water-bearing zones. This resulted in cleaner water discharge and an increase in well yield from 400 gpm to over 1,000 gpm. Post-rehabilitation testing showed the well could sustain pumping of 620 gpm with only 2.2 feet of drawdown and estimated a maximum yield of over 1,500 gpm.