The Kaveri is a large Indian river. The origin of the river is at Talakaveri , Kodagu in Karnataka, flows generally south and east through Karnataka and Tamil Nadu and across the southern Deccan plateau through the southeastern lowlands, emptying into the Bay of Bengal through two principal mouths In Poompuhar , Tamilnadu.
SSP would generate electricity. On completion, annual additional agricultural production would be Rs. 1600 crores, power generation and water supply Rs. 175 crores, aggregating about Rs. 2175 crores every year equivalent to about Rs. 6.0 crores a day.
Gujarat-india-engineering-mega structure.
The Kaveri is a large Indian river. The origin of the river is at Talakaveri , Kodagu in Karnataka, flows generally south and east through Karnataka and Tamil Nadu and across the southern Deccan plateau through the southeastern lowlands, emptying into the Bay of Bengal through two principal mouths In Poompuhar , Tamilnadu.
SSP would generate electricity. On completion, annual additional agricultural production would be Rs. 1600 crores, power generation and water supply Rs. 175 crores, aggregating about Rs. 2175 crores every year equivalent to about Rs. 6.0 crores a day.
Gujarat-india-engineering-mega structure.
48 km from Dhanbad, Maithon is termed as mother’s abode. It has the biggest reservoir in DVC. Conceived on the lines of Tennessee Valley, USA it has been designed for flood control & generates 60,000 kW of electric power. It is built on the river Barakar.
The Maithon Dam is 48 km from Dhanbad, in the state of Jharkhand.
DVC is the first-ever multipurpose river valley project of independent India
DVC has been generating, transmitting & distributing electrical energy since 1953
Discussion on types of soil, floods, interlinking of rivers, fisheries etc
Problems faced in Maithon dam in respect of power generation, sedimentation.
Preventive measures to be taken for sedimentation.
Social Media - The Art & Science of Linked In - March 2011MONEY3
Using LINKED IN to gain exposure, engage customers, and grow your business.
Discover why Linked In is the most powerful yet underutilised Social Media platform for Business-to-Business (B2B) enterprises and Professional Services Firms.
48 km from Dhanbad, Maithon is termed as mother’s abode. It has the biggest reservoir in DVC. Conceived on the lines of Tennessee Valley, USA it has been designed for flood control & generates 60,000 kW of electric power. It is built on the river Barakar.
The Maithon Dam is 48 km from Dhanbad, in the state of Jharkhand.
DVC is the first-ever multipurpose river valley project of independent India
DVC has been generating, transmitting & distributing electrical energy since 1953
Discussion on types of soil, floods, interlinking of rivers, fisheries etc
Problems faced in Maithon dam in respect of power generation, sedimentation.
Preventive measures to be taken for sedimentation.
Social Media - The Art & Science of Linked In - March 2011MONEY3
Using LINKED IN to gain exposure, engage customers, and grow your business.
Discover why Linked In is the most powerful yet underutilised Social Media platform for Business-to-Business (B2B) enterprises and Professional Services Firms.
“ Investigating the Issues of Displacement and Rehabilitation:A case Study of...Satya Ranjan Swain
Presented in the XXXIV All India Sociological Conference on Youth, Globalization and Social Transformation held at the University of Rajstan in Jaipur, Rajstan, India on 27th to 29th of December, 2008 in a session of the ISS Ad hoc Group on Sociology of Law at the XXXIV All India Sociological Conference.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Cosmetic shop management system project report.pdf
Sardar sarovar dam
1.
2. • The plan for harnessing the river for irrigation and power generation
in the Narmada basin was initiated in 1946. Seven projects
including the Bharuch project were identified during the initial
Survey and 4 projects Bharuch (Gujarat), Bargi, Tawa and Punasa
in Madhya Pradesh were given top priority for investigation. After
the completion of investigation, the proposed dam at Gora in
Gujarat with the full reservoir level (FRL) 161 ft (49.08m) was
selected and the foundation stone was laid by late Prime Minister,
Pandit Jawaharlal Nehru on 5th April, 1961. However as more
detailed, modernised contour sheets from the Survey of India were
available thereafter, possibility of raising the height of the dam for
optimum utilisation of water was considered.
3. • In 1964, to resolve the dispute about sharing of the Narmada
Waters between the Governments of Gujarat and Madhya Pradesh,
the Government of India appointed an expert committee under the
Chairmanship of late Dr. Khosla which recommended a higher dam
with FRL 500 ft (152.44m) in 1965. However, Govt. of M.P. was not
agreeable to development of Narmada water as per Khosla
Committee report and hence the Narmada Water Dispute Tribunal
(NWDT) was constituted by the Government of India in October
1969, under the Inter State River Water Disputes Act, 1956. NWDT
gave its final award in December 1979.
4. 1 Length of main concrete gravity dam 1210.00 m
2 Maximum height above deepest foundation level 163.00 m
3 Top R.L. of dam. 146.50 m
4 Catchments area of river above dam site 88,000 Sq. km
5 Live storage capacity 0.5860M.Ha.m (4.75 MAF)
6
Length of reservoir
Maximum width
Average Width
214.00 km
16.10 km
1.77 km
7
Spillway gates
Chute Spillway
Service Spillway
7 Nos. 60' x 60'
23 Nos. 60' x 55'
8 Spillway Capacity
85000 cumecs
(30 lakh cusecs)
5. 1 River bed power house 1200 MW
2 Canal head power house 250 MW
1 River bed power house 1200 MW
2 Canal head power house 250 MW
1 River bed power house 1200 MW
2 Canal head power house 250 MW
1 River bed power house 1200 MW
2 Canal head power house 250 MW
6. Main Canal
1 Full supply level (F.S.L.) at H.R. 91.44 m (300 ft)
2 Length upto Gujarat - Rajasthan border 458.318 km
3 Base width in head reach 73.01 m
4 Full supply depth (F.S.D.) in head reach 7.60 m
5 Design discharge capacity
(1) In head reach 1133 cumecs
(40,000 cusecs)
(2) At Gujarat Rajasthan border 74.55 cumecs
(2,600 cusecs)
7. 1 Numbers of Branches 38
2 Length of distribution system network 74626.00 km
3 Culturable Command Area 18.45 lakh hectares
1 Numbers of Branches 38
2 Length of distribution system network 74626.00 km
3 Culturable Command Area 18.45 lakh hectares
1 Numbers of Branches 38
2 Length of distribution system network 74626.00 km