Joseph Iwanicki 
5235 Diamond Heights Blvd #105, San Francisco, CA, 94131 
Phone: 415-290-0264 
E-Mail: joe.iwanicki@gmail.com 
Professional Summary 
First Republic Bank VP, Core Support Services 
January 1998 – August 2014 
 Result oriented professional with over 15 years of experience as a Banking Professional ranging from Banks Core Application 
system, Product Manager and Payment transactions 
 Experience in Product Analysis by hands-on requirement collection, analysis and functional specs review 
 Experience in Business Continuity Planning 
 Performing GAP Analysis, RFP’s, Risk Analysis, Impact Analysis for new and change request from business units and stakeholders 
 Liaison with Stakeholders, Business Units, Technical Engineering, Compliance, BSA/AML, Digital Channels, Project Managers 
 Experience in arranging meetings, brainstorming sessions and gathering business and functional requirements 
 Contributed in design business process and workflow diagrams 
 Supported QA team creating test scripts and performing user acceptance testing (UAT) 
 Provided innovated recommendations and solutions to designs to improve customer experience 
Achievements 
Checking, Savings, Certificate of Deposit, Retirement, Money Market Checking / Savings Products 15 + years 
Successfully implemented, maintained, enhanced various types to Deposit, Savings, Retirement, for both Consumer / 
Business products. 
 Worked with cross functional team ranging from Project Manger, Sales Support, Compliance, BSA/AML, Marketing, 
Stakeholders, Developers and Data management 
 Collected business requirements from various Business Units and Stakeholders 
 Conducted JAD sessions, brainstorming sessions with key stakeholders and business units for design function 
diagram 
 Created WBS and identified resource owners 
 Performed core system analysis 
 Performed GAP analysis 
 Liaison between Developers and key business partners to functional specification review and approvals from 
stakeholders 
 Created and Documents product indicators for general ledger mapping, RMS New Account opening, teller 
applications 
 Supported and document annual B-Notices and backup withholding 
 Created, maintained, and documented various types product flags and account flags indicated for various types of 
products and services supported by 3 party venders, ATM, Remote Deposit Capture, Mobile Banking, Online 
Banking, Fraud detection products, internal and external balance reporting options 
 Supported and documented Year Tax Reporting process, generating Gov’t, Tax Form, IRS reporting, 
 Created Business, Functional (BRD’s and FRD’s) and Technical Documents for feature implementation 
 Created both new/maintained existing products, implemented various types of changes impacting interest rate 
calculation, regulatory product type, NSF / UCF controls, line of credit access, product fee assessment, statement 
controls, transaction options, interest payment option, product descriptions
Page 2 
Dodd Frank Act 2013 
Successfully implemented Remittance Transfer Rule to provide new protection disclosure requirements and error resolution 
and cancellation rights to consumers who send remittance transfers in foreign country 
 Worked with cross functional team ranging from Project Manager, Compliance and Stakeholders 
 Collected business requirements from various business units 
 Conducted brainstorming sessions with key stakeholders and business units for design functional diagram 
 Created WBS and identify resource owner 
 Performed core system analysis 
 Created and maintain issue log 
 Created Business, Functional (BRDs and FRDs) and Technical Documents for feature implementation 
 Identified and escalated functional issues and provided solutions to meet the business objective 
 Participated to support end to end testing with QA team in creating test cases and success criteria 
BSA / AML Transactional Monitoring and Risk Assessment 2011 - 2013 
Implemented a file extract to support BSA/AML 3rd party transaction monitoring system for anti -money laundering 
 Worked with key business units ranging from BSA/AML and Data Management 
 Collected business requirements from BSA/AML by conducting brainstorming session 
 Supported project as Subject Matter Expert for core banking system transactions on Deposit Application 
 Created Business, Functional (BRD’s and FRD’s) and Technical Documents for implementation 
Account Reconciliation Positive Payee 2013 
Implemented a new 3rd party Positive Pay Service provider for Corporate Online Treasury Management Services 
 Worked with key business units ranging from Project Manager, Business Owners and Stakeholders 
 Collected business requirements from various business owners within Digital Channels 
 Supported project as Subject Matter Expert for core banking system transactions on Deposit Application 
 Performed data element mapping from core deposit to vender file layout specification 
 Researched and outlined complex dependencies for the implementation and coordinated with impacted business partners 
 Identified and escalated functional issues and provided solutions to meet the business objective 
 Created Business, Functional (BRD’s and FRD’s) and Technical Documents for implementation 
 Supported business partner in creating test scripts cases for both success and failure criteria 
IAT Automated Clearing House Exceptions item 2012 
Implemented the ability to identify international IAT exception transactions to perform extra due diligence OFAC review 
 Worked with key business units ranging from AML / BSA team and Core Banking team 
 Collected business requirements from AML / BSA and Compliance team 
 Researched and outlined complex dependencies for the implementation and coordinated with impacted business partners 
 Supported project as Subject Matter Expert for core banking system transactions on Deposit Application 
 Data mapped IAT ACH items into Exception Item Handling application 
 Produced back office process mapping diagram using UML 
 Created transactional exception item process to perform additional OFAC review screening 
 Supported QA business partner in creating test scripts cases for both success and failure criteria
Page 3 
Mobile Banking Check Deposit 2012 
Actively involved implementing Consumer Mobile Check Deposit for both a customer facing experience and back office 
support. 
 Worked with key business units ranging from Project Manager, Digital Channels, Compliance, BSA/ AML and Core Banking team 
 Collected business requirements from Digital Channels for customer facing experience 
 Researched and outlined complex dependencies for the implementation and coordinated with impacted business partners 
 Supported project as Subject Matter Expert for core banking system transactions for Deposit Application 
 Conducted JAD sessions with key stakeholders and business units for design functional diagram 
 Produced back office process mapping diagram using UML 
 Identified and escalated functional issues and provided solutions to meet the business objective 
 Created Business, Functional (BRD’s and FRD’s) and Technical Documents for implementation 
 Supported business unit for the SFTP transmission data files between service provider and core banking team 
 Documented and detailed transactional data elements to be captured by BSA/AML transactional monitoring system for risk 
ranking 
 Supported QA business partner in creating test scripts cases for both success and failure criteria 
 Analyzed business processes and design workflow diagrams for various stakeholders utilizing MS Viso 
 Created, documented and maintained issue list, as well as monitoring item closer rate 
Bank Secrecy Act 2012 
Implemented a new 3rd party CTR system ASP solution to support BSA electronic filing currency transactions reporting within 
15 days whenever a transaction or series of transactions in currency involves more than $10,000 in either single or multiple 
cash in or cash out, is conducted by or on behalf of the same person, and is conducted on the same business day 
 Worked with key business units ranging from Teller Application Support, ATM Business Unit, Compliance, AML/BSA and Core 
Banking team 
 Supported business unit collecting business requirement from Teller Application Support 
 Researched and outlined complex dependencies for the implementation and coordinated with impacted business partners 
 Supported project as Subject Matter Expert for core banking system transactions for Deposit Application 
 Identified and data mapped cash transaction codes 
 Conducted JAD sessions with key stakeholders and business units for design functional diagram 
 Produced back office process mapping diagram using UML 
 Identified and escalated functional issues and provided solutions to meet the business objective 
 Created Business, Functional (BRD’s and FRD’s) and Technical Documents for implementation 
 Analyzed business process and design workflow diagrams for various stakeholders utilizing MS Viso 
 Review product function specifications 
 Supported business partner in creating test scripts cases for both success and failure criteria 
 Supported QA team documenting and analyzing workflow 
Online Banking Solutions File Delivery 2011 
Implemented a 3rd party ASP automated solution to provide a multi-channeled reporting, transaction and file delivery 
Service to corporate clients 
 Worked with key business units ranging from Project Manager, Digital Channels and Core Banking team 
 Supported business unit collecting business requirement from key stakeholder within Digital Channels 
 Researched and outlined complex dependencies for the implementation and coordinated with impacted business partners 
 Supported project as Subject Matter Expert for core banking system 
 Created and document business requirements and converted into technical requirements 
 Conducted JAD sessions with key stakeholders and business units for design functional diagram 
 Produced back office process mapping diagram using UML 
 Identified and escalated functional issues and provided solutions to meet the business objective
Page 4 
 Created Business, Functional (BRD’s and FRD’s) and Technical Documents for implementation 
 Data map deposit transaction codes to BAI2 codes 
 Analyzed business process and design workflow diagrams for various stakeholders utilizing MS Viso 
 Review product function specifications with key business units and stakeholders 
 Analyzed data extract output file for QA 
 Supported business partner in creating test scripts cases for both success and failure criteria 
 Supported QA team documenting and analyzing workflow 
Weiland Account Analysis 2011 
Participated in the implemented of Business Account Analysis system to support the expansion for fee revenue /income 
 Worked with key business units ranging from Project Manager, Business Services, Treasury Management Services and Core 
Banking team 
 Supported business unit collecting business requirement from key stakeholder and business units 
 Researched and outlined complex dependencies for the implementation and coordinated with impacted business partners 
 Supported project as Subject Matter Expert for core banking system 
 Created and document business requirements and converted into technical requirements 
 Conducted JAD sessions with key stakeholders and business units for design functional diagram 
 Produced back office process mapping diagram using UML 
 Identified and escalated functional issues and provided solutions to meet the business objective 
 Created Business, Functional (BRD’s and FRD’s) and Technical documents for implementation 
 Data map deposit transaction codes to BAI2 codes 
 Analyzed business process and design workflow diagrams for various stakeholders utilizing MS Viso 
 Review product function specifications with key business units and stakeholders 
 Analyzed data extract output file for QA 
 Supported business partner in creating test scripts cases for both success and failure criteria 
 Supported QA team documenting and analyzing workflow 
ATM Imaging 2011 
Implemented imaging enable ATM to maintain competitive, expedite checking processing, to increase revenue by reducing 
float and reducing Federal Reserve cost for check clearing 
 Supported business unit collecting business requirement 
 Researched and outlined complex dependencies for the implementation and coordinated with impacted business partners 
 Supported project as Subject Matter Expert for core banking system 
 Created and document business requirements and converted into technical requirements 
 Conducted JAD sessions with key stakeholders and business units for design functional diagram 
 Produced back office process mapping diagram using UML 
 Created Business, Functional (BRD’s and FRD’s) and Technical documents for implementation 
Spectrum Foreign Exchange 2010 
Successfully implemented a new Foreign Currency transfer Exchange 3rd party system to support the expansion for FX 
Services 
 Worked with business units ranging from Project Manager, Technical Engineering, Middleware Support, Compliance 
 Supported business unit collecting business requirement 
 Researched and outlined complex dependencies for the implementation and coordinated with impacted business partners 
 Supported project as Subject Matter Expert for core banking system 
 Participated in JAD Sessions with key stakeholders and business units for design functional diagrams 
 Created Business, Functional (BRD’s and FRD’s) and Technical documents for implementation 
 Data Map FX Transactions Type to deposit application debit and credit tran codes 
 Created Produced back office process mapping diagram using UML 
 Review product function specifications with key business units and stakeholders 
 Analyzed data extract output file for QA 
 Supported business partner in creating test scripts cases for both success and failure criteria 
 Supported QA team documenting and analyzing workflow
Page 5 
Datafaction Software Integration 2009 
Business Analysis for a product and technical team to development a real-time interface for an account software application 
 Worked with business units ranging from Project Manager, Technical Engineering, Middleware Support 
 Supported business unit collecting business requirement 
 Researched and outlined complex dependencies for the implementation and coordinated with impacted business partners 
 Supported project as Subject Matter Expert for core banking system 
 Participated in JAD Sessions with key stakeholders and business units for design functional diagrams 
 Created Business, Functional (BRD’s and FRD’s) and Technical documents for implementation 
 Participated in the design Admin Tool utilized for back office setup and processing 
 Created and Produced back office process mapping diagram using UML 
 Review product function specifications with key business units and stakeholders 
 Analyzed data extract output file for QA 
 Supported business partner in creating test scripts cases for both success and failure criteria 
 Supported QA team documenting and analyzing workflow 
Education 
Rockport High, Rockport MA 1985 
Banking Regulation 
Reg CC – Funds Availability Dodd Frank 
Reg DD – Truth in Savings Community Reinvestment Act 
Reg E - Electronic Funds Act Large Bank Insurance Determination Modernization 
Reg D – Transaction Limitation US Patriot Act 
Bank Secrecy Act 
Certificates 
HTML / CSS http://ude.my/UC-CVDBWC8T November 2014 
IT Security Hacking Training http://ude.my/UC-XF18HCEG October 2014 
Excel http://ude.my/UC-NUU6VWHZ October 2014 
Basic SQL http://ude.my/UC-RDZ177B6 October 2014 
Project Management 101 ht tp://groupon.videotrainer.com/Training/accts/careeracademy/certificates/Default_Certificate.htm 
September 2014 
File Layout Knowledge 
Imaging: X9.37
Page 6 
Monetary: ACH, Fedwire, Swift Messaging 
Balance Reporting: BAI2, ANSI X12, EDI 822 
Technical Skills 
General Software: MS Office, MS Viso, SharePoint, 
Development: HTML, CSS, Swift 
Design Methodologies: MS Viso 
Database: SQL 
OS: iO8, Win 7/XP 
Collaboration Tools: Github, SharePoint 
Key Skills, Knowledge and Ability 
 Strong analytical, problem solving and communication 
 Team building skills and team player 
 Proficient in Excel 
 Punctual and ability to complete task on time 
 Ability to be a self starter 
 Ability to multi-task and respond to multiple priorities 
 Ability to build strong relationships with cross functional teams at different level 
 Ability to manage and support various projects 
 Treasury Management Services

JoeIwanicki_Resume_nov212014

  • 1.
    Joseph Iwanicki 5235Diamond Heights Blvd #105, San Francisco, CA, 94131 Phone: 415-290-0264 E-Mail: joe.iwanicki@gmail.com Professional Summary First Republic Bank VP, Core Support Services January 1998 – August 2014  Result oriented professional with over 15 years of experience as a Banking Professional ranging from Banks Core Application system, Product Manager and Payment transactions  Experience in Product Analysis by hands-on requirement collection, analysis and functional specs review  Experience in Business Continuity Planning  Performing GAP Analysis, RFP’s, Risk Analysis, Impact Analysis for new and change request from business units and stakeholders  Liaison with Stakeholders, Business Units, Technical Engineering, Compliance, BSA/AML, Digital Channels, Project Managers  Experience in arranging meetings, brainstorming sessions and gathering business and functional requirements  Contributed in design business process and workflow diagrams  Supported QA team creating test scripts and performing user acceptance testing (UAT)  Provided innovated recommendations and solutions to designs to improve customer experience Achievements Checking, Savings, Certificate of Deposit, Retirement, Money Market Checking / Savings Products 15 + years Successfully implemented, maintained, enhanced various types to Deposit, Savings, Retirement, for both Consumer / Business products.  Worked with cross functional team ranging from Project Manger, Sales Support, Compliance, BSA/AML, Marketing, Stakeholders, Developers and Data management  Collected business requirements from various Business Units and Stakeholders  Conducted JAD sessions, brainstorming sessions with key stakeholders and business units for design function diagram  Created WBS and identified resource owners  Performed core system analysis  Performed GAP analysis  Liaison between Developers and key business partners to functional specification review and approvals from stakeholders  Created and Documents product indicators for general ledger mapping, RMS New Account opening, teller applications  Supported and document annual B-Notices and backup withholding  Created, maintained, and documented various types product flags and account flags indicated for various types of products and services supported by 3 party venders, ATM, Remote Deposit Capture, Mobile Banking, Online Banking, Fraud detection products, internal and external balance reporting options  Supported and documented Year Tax Reporting process, generating Gov’t, Tax Form, IRS reporting,  Created Business, Functional (BRD’s and FRD’s) and Technical Documents for feature implementation  Created both new/maintained existing products, implemented various types of changes impacting interest rate calculation, regulatory product type, NSF / UCF controls, line of credit access, product fee assessment, statement controls, transaction options, interest payment option, product descriptions
  • 2.
    Page 2 DoddFrank Act 2013 Successfully implemented Remittance Transfer Rule to provide new protection disclosure requirements and error resolution and cancellation rights to consumers who send remittance transfers in foreign country  Worked with cross functional team ranging from Project Manager, Compliance and Stakeholders  Collected business requirements from various business units  Conducted brainstorming sessions with key stakeholders and business units for design functional diagram  Created WBS and identify resource owner  Performed core system analysis  Created and maintain issue log  Created Business, Functional (BRDs and FRDs) and Technical Documents for feature implementation  Identified and escalated functional issues and provided solutions to meet the business objective  Participated to support end to end testing with QA team in creating test cases and success criteria BSA / AML Transactional Monitoring and Risk Assessment 2011 - 2013 Implemented a file extract to support BSA/AML 3rd party transaction monitoring system for anti -money laundering  Worked with key business units ranging from BSA/AML and Data Management  Collected business requirements from BSA/AML by conducting brainstorming session  Supported project as Subject Matter Expert for core banking system transactions on Deposit Application  Created Business, Functional (BRD’s and FRD’s) and Technical Documents for implementation Account Reconciliation Positive Payee 2013 Implemented a new 3rd party Positive Pay Service provider for Corporate Online Treasury Management Services  Worked with key business units ranging from Project Manager, Business Owners and Stakeholders  Collected business requirements from various business owners within Digital Channels  Supported project as Subject Matter Expert for core banking system transactions on Deposit Application  Performed data element mapping from core deposit to vender file layout specification  Researched and outlined complex dependencies for the implementation and coordinated with impacted business partners  Identified and escalated functional issues and provided solutions to meet the business objective  Created Business, Functional (BRD’s and FRD’s) and Technical Documents for implementation  Supported business partner in creating test scripts cases for both success and failure criteria IAT Automated Clearing House Exceptions item 2012 Implemented the ability to identify international IAT exception transactions to perform extra due diligence OFAC review  Worked with key business units ranging from AML / BSA team and Core Banking team  Collected business requirements from AML / BSA and Compliance team  Researched and outlined complex dependencies for the implementation and coordinated with impacted business partners  Supported project as Subject Matter Expert for core banking system transactions on Deposit Application  Data mapped IAT ACH items into Exception Item Handling application  Produced back office process mapping diagram using UML  Created transactional exception item process to perform additional OFAC review screening  Supported QA business partner in creating test scripts cases for both success and failure criteria
  • 3.
    Page 3 MobileBanking Check Deposit 2012 Actively involved implementing Consumer Mobile Check Deposit for both a customer facing experience and back office support.  Worked with key business units ranging from Project Manager, Digital Channels, Compliance, BSA/ AML and Core Banking team  Collected business requirements from Digital Channels for customer facing experience  Researched and outlined complex dependencies for the implementation and coordinated with impacted business partners  Supported project as Subject Matter Expert for core banking system transactions for Deposit Application  Conducted JAD sessions with key stakeholders and business units for design functional diagram  Produced back office process mapping diagram using UML  Identified and escalated functional issues and provided solutions to meet the business objective  Created Business, Functional (BRD’s and FRD’s) and Technical Documents for implementation  Supported business unit for the SFTP transmission data files between service provider and core banking team  Documented and detailed transactional data elements to be captured by BSA/AML transactional monitoring system for risk ranking  Supported QA business partner in creating test scripts cases for both success and failure criteria  Analyzed business processes and design workflow diagrams for various stakeholders utilizing MS Viso  Created, documented and maintained issue list, as well as monitoring item closer rate Bank Secrecy Act 2012 Implemented a new 3rd party CTR system ASP solution to support BSA electronic filing currency transactions reporting within 15 days whenever a transaction or series of transactions in currency involves more than $10,000 in either single or multiple cash in or cash out, is conducted by or on behalf of the same person, and is conducted on the same business day  Worked with key business units ranging from Teller Application Support, ATM Business Unit, Compliance, AML/BSA and Core Banking team  Supported business unit collecting business requirement from Teller Application Support  Researched and outlined complex dependencies for the implementation and coordinated with impacted business partners  Supported project as Subject Matter Expert for core banking system transactions for Deposit Application  Identified and data mapped cash transaction codes  Conducted JAD sessions with key stakeholders and business units for design functional diagram  Produced back office process mapping diagram using UML  Identified and escalated functional issues and provided solutions to meet the business objective  Created Business, Functional (BRD’s and FRD’s) and Technical Documents for implementation  Analyzed business process and design workflow diagrams for various stakeholders utilizing MS Viso  Review product function specifications  Supported business partner in creating test scripts cases for both success and failure criteria  Supported QA team documenting and analyzing workflow Online Banking Solutions File Delivery 2011 Implemented a 3rd party ASP automated solution to provide a multi-channeled reporting, transaction and file delivery Service to corporate clients  Worked with key business units ranging from Project Manager, Digital Channels and Core Banking team  Supported business unit collecting business requirement from key stakeholder within Digital Channels  Researched and outlined complex dependencies for the implementation and coordinated with impacted business partners  Supported project as Subject Matter Expert for core banking system  Created and document business requirements and converted into technical requirements  Conducted JAD sessions with key stakeholders and business units for design functional diagram  Produced back office process mapping diagram using UML  Identified and escalated functional issues and provided solutions to meet the business objective
  • 4.
    Page 4 Created Business, Functional (BRD’s and FRD’s) and Technical Documents for implementation  Data map deposit transaction codes to BAI2 codes  Analyzed business process and design workflow diagrams for various stakeholders utilizing MS Viso  Review product function specifications with key business units and stakeholders  Analyzed data extract output file for QA  Supported business partner in creating test scripts cases for both success and failure criteria  Supported QA team documenting and analyzing workflow Weiland Account Analysis 2011 Participated in the implemented of Business Account Analysis system to support the expansion for fee revenue /income  Worked with key business units ranging from Project Manager, Business Services, Treasury Management Services and Core Banking team  Supported business unit collecting business requirement from key stakeholder and business units  Researched and outlined complex dependencies for the implementation and coordinated with impacted business partners  Supported project as Subject Matter Expert for core banking system  Created and document business requirements and converted into technical requirements  Conducted JAD sessions with key stakeholders and business units for design functional diagram  Produced back office process mapping diagram using UML  Identified and escalated functional issues and provided solutions to meet the business objective  Created Business, Functional (BRD’s and FRD’s) and Technical documents for implementation  Data map deposit transaction codes to BAI2 codes  Analyzed business process and design workflow diagrams for various stakeholders utilizing MS Viso  Review product function specifications with key business units and stakeholders  Analyzed data extract output file for QA  Supported business partner in creating test scripts cases for both success and failure criteria  Supported QA team documenting and analyzing workflow ATM Imaging 2011 Implemented imaging enable ATM to maintain competitive, expedite checking processing, to increase revenue by reducing float and reducing Federal Reserve cost for check clearing  Supported business unit collecting business requirement  Researched and outlined complex dependencies for the implementation and coordinated with impacted business partners  Supported project as Subject Matter Expert for core banking system  Created and document business requirements and converted into technical requirements  Conducted JAD sessions with key stakeholders and business units for design functional diagram  Produced back office process mapping diagram using UML  Created Business, Functional (BRD’s and FRD’s) and Technical documents for implementation Spectrum Foreign Exchange 2010 Successfully implemented a new Foreign Currency transfer Exchange 3rd party system to support the expansion for FX Services  Worked with business units ranging from Project Manager, Technical Engineering, Middleware Support, Compliance  Supported business unit collecting business requirement  Researched and outlined complex dependencies for the implementation and coordinated with impacted business partners  Supported project as Subject Matter Expert for core banking system  Participated in JAD Sessions with key stakeholders and business units for design functional diagrams  Created Business, Functional (BRD’s and FRD’s) and Technical documents for implementation  Data Map FX Transactions Type to deposit application debit and credit tran codes  Created Produced back office process mapping diagram using UML  Review product function specifications with key business units and stakeholders  Analyzed data extract output file for QA  Supported business partner in creating test scripts cases for both success and failure criteria  Supported QA team documenting and analyzing workflow
  • 5.
    Page 5 DatafactionSoftware Integration 2009 Business Analysis for a product and technical team to development a real-time interface for an account software application  Worked with business units ranging from Project Manager, Technical Engineering, Middleware Support  Supported business unit collecting business requirement  Researched and outlined complex dependencies for the implementation and coordinated with impacted business partners  Supported project as Subject Matter Expert for core banking system  Participated in JAD Sessions with key stakeholders and business units for design functional diagrams  Created Business, Functional (BRD’s and FRD’s) and Technical documents for implementation  Participated in the design Admin Tool utilized for back office setup and processing  Created and Produced back office process mapping diagram using UML  Review product function specifications with key business units and stakeholders  Analyzed data extract output file for QA  Supported business partner in creating test scripts cases for both success and failure criteria  Supported QA team documenting and analyzing workflow Education Rockport High, Rockport MA 1985 Banking Regulation Reg CC – Funds Availability Dodd Frank Reg DD – Truth in Savings Community Reinvestment Act Reg E - Electronic Funds Act Large Bank Insurance Determination Modernization Reg D – Transaction Limitation US Patriot Act Bank Secrecy Act Certificates HTML / CSS http://ude.my/UC-CVDBWC8T November 2014 IT Security Hacking Training http://ude.my/UC-XF18HCEG October 2014 Excel http://ude.my/UC-NUU6VWHZ October 2014 Basic SQL http://ude.my/UC-RDZ177B6 October 2014 Project Management 101 ht tp://groupon.videotrainer.com/Training/accts/careeracademy/certificates/Default_Certificate.htm September 2014 File Layout Knowledge Imaging: X9.37
  • 6.
    Page 6 Monetary:ACH, Fedwire, Swift Messaging Balance Reporting: BAI2, ANSI X12, EDI 822 Technical Skills General Software: MS Office, MS Viso, SharePoint, Development: HTML, CSS, Swift Design Methodologies: MS Viso Database: SQL OS: iO8, Win 7/XP Collaboration Tools: Github, SharePoint Key Skills, Knowledge and Ability  Strong analytical, problem solving and communication  Team building skills and team player  Proficient in Excel  Punctual and ability to complete task on time  Ability to be a self starter  Ability to multi-task and respond to multiple priorities  Ability to build strong relationships with cross functional teams at different level  Ability to manage and support various projects  Treasury Management Services