Jefferson Manor Phase IIIA
(Albemarle Drive and Portions
of Edgehill Drive)
Citizens Information Meeting
June 15, 2017, 7:00PM to 9:00PM (Mount Eagle Elem. School)
(Brief Formal Presentation Starts at 7:15)
1
Project Team
Supervisor McKay’s office
Fairfax County Department of Transportation (FCDOT)
• Transportation Design (TDD)
• Capital Projects and Operations (CPOD)
Fairfax County Department of Public Works & Environmental Services
(DPWES)
• Construction (UDCD)
• Land Acquisition (LAD)
Design Consultant (RDA)
2
Meeting Schedule
Tonight’s Agenda
• Jefferson Manor Phase IIIA Design Plan
presentation followed by general Q&A
• Return to display boards, one-on-one discussion,
individual questions
• Meeting Ends – 9:00PM
3
Meeting Purpose
Tonight’s Purpose:
• Provide an overview of the project improvements
• Provide the public an update on on-going activities related to
project, current status, and next steps
• Provide an opportunity for the public to review the current
design and provide input
4
Project Background
• Part of Jefferson Manor Master Plan (1992)
• Locally Funded Project: Est. Project Cost = $2.6 Million
• Proposed roadway and drainage improvements will meet VDOT
Standards, for VDOT maintenance
• Pedestrian facility will meet all VDOT & County Standards for
maintenance and for ADA accessibility compliance.
5
Project Vicinity Map
EdgehillDr.
Project
Limits
Project Overview
Existing Conditions:
Albemarle Drive / Edgehill Drive
• Substandard Width Sidewalks
• Lack of Drainage Infrastructure
• Existing Utility Poles in Sidewalk
• Private Retaining Walls Leaning
into Sidewalk Space
7
Proposed Design
8
Proposed Design:
• Curb and Gutter to be replaced with
current VDOT standard
• Existing Sidewalks upgraded from 4’
Width to 5’ Width, in compliance with
current VDOT Standards
• New concrete steps meeting current
VDOT Standards
• New concrete driveway aprons
Proposed Design
9
Proposed Design Continued:
• New Storm Sewer/Drainage System
• New Road Pavement and Striping
• Maintain Existing On-Street Parking
• Relocation and/or Upgrade of Existing Utilities (underground and
overhead)
• Upgrade Street Lighting
Proposed Design
10
Proposed Design Continued:
• Potential Impacts to Private Property
o Tree and Vegetation Impacts are anticipated
o Existing non-standard structures (i.e. retaining walls, steps etc.) within
VDOT right-of-way will be removed and/or rebuilt on private property, in
coordination with property owners.
o If property is to be impacted during construction, we will obtain
easements or right-of-way before work begins.
Land Acquisition
Land Acquisition Process:
• Plats will be prepared showing easements and/or right-of-way
needed.
• Land Acquisition Agent will contact property owners to negotiate.
11
Construction
Construction
• We will coordinate with you well in advance of construction start.
• Vehicle access to properties may be temporarily unavailable.
• On-street parking will be limited in construction areas.
12
Project Schedule
Tentative Project Schedule:
Pre-Final Design: Current
Land Acquisition Schedule : Fall 2017 to Spring 2018
Utility Relocation Schedule: Spring 2018
Final Design: Summer 2018
Begin Construction: Late 2018
Construction Completion: Summer 2019
13
Citizen Input
14
Ways to Comment
• Fill out & submit a comment sheet tonight (Comment Box Provided)
• Comment section on project website:
http://www.fairfaxcounty.gov/fcdot/jefferson_manor.htm
• Email Latesa Turner: Latesa.Turner@fairfaxcounty.gov
• Fill out and mail a comment sheet:
Latesa Turner
Fairfax County Dept. of Transportation
4050 Legato Road, Suite 400
Fairfax, VA 22033
Question/Answers
15
Questions?
16
Thank you!
Jefferson Manor Phase IIIA
(Albemarle Drive and Portions
of Edgehill Drive )

More Related Content

What's hot

Transportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future UpdatesTransportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future Updates
Fairfax County
 
Silver Line Phase 1-Status Report: Feb. 4, 2014
Silver Line Phase 1-Status Report: Feb. 4, 2014Silver Line Phase 1-Status Report: Feb. 4, 2014
Silver Line Phase 1-Status Report: Feb. 4, 2014
Fairfax County
 
Citizens Information Meeting: Lee Chapel Road Walkway
Citizens Information Meeting: Lee Chapel Road WalkwayCitizens Information Meeting: Lee Chapel Road Walkway
Citizens Information Meeting: Lee Chapel Road Walkway
Fairfax County
 
Silver Line Phase 1-Status Report: May 6, 2014
Silver Line Phase 1-Status Report: May 6, 2014Silver Line Phase 1-Status Report: May 6, 2014
Silver Line Phase 1-Status Report: May 6, 2014
Fairfax County
 
Silver Line Phase 1 Status Report
Silver Line Phase 1 Status ReportSilver Line Phase 1 Status Report
Silver Line Phase 1 Status Report
Fairfax County
 
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
Fairfax County
 
Silver Line Phase 1 Status Report-Sept. 16, 2014
Silver Line Phase 1 Status Report-Sept. 16, 2014Silver Line Phase 1 Status Report-Sept. 16, 2014
Silver Line Phase 1 Status Report-Sept. 16, 2014
Fairfax County
 
Silver Line Update: Board Transportation Committee May 24, 2016
Silver Line Update: Board Transportation Committee May 24, 2016Silver Line Update: Board Transportation Committee May 24, 2016
Silver Line Update: Board Transportation Committee May 24, 2016
Fairfax County
 
Kirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationKirby Road Sidewalk Presentation
Kirby Road Sidewalk Presentation
Fairfax County
 
Fairfax County Commercial and Industrial Property Tax for Transportation
Fairfax County Commercial and Industrial Property Tax for TransportationFairfax County Commercial and Industrial Property Tax for Transportation
Fairfax County Commercial and Industrial Property Tax for Transportation
Fairfax County
 
Sunset Hills Road Walkway
Sunset Hills Road WalkwaySunset Hills Road Walkway
Sunset Hills Road Walkway
Fairfax County
 
Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016
Fairfax County
 
Burke Road Corridor Community Meeting : June 18, 2018
Burke Road Corridor Community Meeting : June 18, 2018Burke Road Corridor Community Meeting : June 18, 2018
Burke Road Corridor Community Meeting : June 18, 2018
Fairfax County
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Fairfax County
 
Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016
Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016
Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016
VDOT Northern Virginia
 
North Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsNorth Shore Sidewalk Improvements
North Shore Sidewalk Improvements
Fairfax County
 
Fairfax County Parkway Trail at Dulles Toll Road EB Ramp Improvement Study
Fairfax County Parkway Trail at Dulles Toll Road EB Ramp Improvement StudyFairfax County Parkway Trail at Dulles Toll Road EB Ramp Improvement Study
Fairfax County Parkway Trail at Dulles Toll Road EB Ramp Improvement Study
Fairfax County
 
Beulah Road Walkway
Beulah Road WalkwayBeulah Road Walkway
Beulah Road Walkway
Fairfax County
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Fairfax County
 

What's hot (19)

Transportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future UpdatesTransportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future Updates
 
Silver Line Phase 1-Status Report: Feb. 4, 2014
Silver Line Phase 1-Status Report: Feb. 4, 2014Silver Line Phase 1-Status Report: Feb. 4, 2014
Silver Line Phase 1-Status Report: Feb. 4, 2014
 
Citizens Information Meeting: Lee Chapel Road Walkway
Citizens Information Meeting: Lee Chapel Road WalkwayCitizens Information Meeting: Lee Chapel Road Walkway
Citizens Information Meeting: Lee Chapel Road Walkway
 
Silver Line Phase 1-Status Report: May 6, 2014
Silver Line Phase 1-Status Report: May 6, 2014Silver Line Phase 1-Status Report: May 6, 2014
Silver Line Phase 1-Status Report: May 6, 2014
 
Silver Line Phase 1 Status Report
Silver Line Phase 1 Status ReportSilver Line Phase 1 Status Report
Silver Line Phase 1 Status Report
 
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
Springfield Multi-Use Parking Garage: Public Information Meeting Aug. 17, 2016
 
Silver Line Phase 1 Status Report-Sept. 16, 2014
Silver Line Phase 1 Status Report-Sept. 16, 2014Silver Line Phase 1 Status Report-Sept. 16, 2014
Silver Line Phase 1 Status Report-Sept. 16, 2014
 
Silver Line Update: Board Transportation Committee May 24, 2016
Silver Line Update: Board Transportation Committee May 24, 2016Silver Line Update: Board Transportation Committee May 24, 2016
Silver Line Update: Board Transportation Committee May 24, 2016
 
Kirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationKirby Road Sidewalk Presentation
Kirby Road Sidewalk Presentation
 
Fairfax County Commercial and Industrial Property Tax for Transportation
Fairfax County Commercial and Industrial Property Tax for TransportationFairfax County Commercial and Industrial Property Tax for Transportation
Fairfax County Commercial and Industrial Property Tax for Transportation
 
Sunset Hills Road Walkway
Sunset Hills Road WalkwaySunset Hills Road Walkway
Sunset Hills Road Walkway
 
Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016
 
Burke Road Corridor Community Meeting : June 18, 2018
Burke Road Corridor Community Meeting : June 18, 2018Burke Road Corridor Community Meeting : June 18, 2018
Burke Road Corridor Community Meeting : June 18, 2018
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
 
Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016
Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016
Route 1 Widening "Pardon Our Dust" Meeting, April 27, 2016
 
North Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsNorth Shore Sidewalk Improvements
North Shore Sidewalk Improvements
 
Fairfax County Parkway Trail at Dulles Toll Road EB Ramp Improvement Study
Fairfax County Parkway Trail at Dulles Toll Road EB Ramp Improvement StudyFairfax County Parkway Trail at Dulles Toll Road EB Ramp Improvement Study
Fairfax County Parkway Trail at Dulles Toll Road EB Ramp Improvement Study
 
Beulah Road Walkway
Beulah Road WalkwayBeulah Road Walkway
Beulah Road Walkway
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
 

Similar to Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)

Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017
Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017
Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017
Fairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Fairfax County
 
Pardon Our Dust meeting, March 9, 2016
Pardon Our Dust meeting, March 9, 2016Pardon Our Dust meeting, March 9, 2016
Pardon Our Dust meeting, March 9, 2016
VDOT Northern Virginia
 
Land Subdivisions University Course
Land Subdivisions University CourseLand Subdivisions University Course
Land Subdivisions University Course
NettlemanU
 
Kirby Road Sidewalk - Citizens Information Meeting: Dec. 11, 2018
Kirby Road Sidewalk - Citizens Information Meeting: Dec. 11, 2018Kirby Road Sidewalk - Citizens Information Meeting: Dec. 11, 2018
Kirby Road Sidewalk - Citizens Information Meeting: Dec. 11, 2018
Fairfax County
 
Public mtg at_brentwood final
Public mtg at_brentwood finalPublic mtg at_brentwood final
Public mtg at_brentwood finalProjectClearSTL
 
Hearst community meeting 10.02.18 pn_3-30pm
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pm
RamaChilamkurthy
 
Powerpoint - Langley School Pump Station and Force Main Project
Powerpoint  -  Langley School Pump Station and Force Main ProjectPowerpoint  -  Langley School Pump Station and Force Main Project
Powerpoint - Langley School Pump Station and Force Main Project
Fairfax County
 
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Fairfax County
 
Lakevale Sewer Improvements Community Meeting
Lakevale Sewer Improvements Community MeetingLakevale Sewer Improvements Community Meeting
Lakevale Sewer Improvements Community Meeting
Fairfax County
 
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectCommunity Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Fairfax County
 
Enhance Clifton Public Meeting 1
Enhance Clifton Public Meeting 1Enhance Clifton Public Meeting 1
Enhance Clifton Public Meeting 1
Seventh Hill
 
University Drive Pedestrian Safety Improvements Phase II
University Drive Pedestrian Safety Improvements Phase IIUniversity Drive Pedestrian Safety Improvements Phase II
University Drive Pedestrian Safety Improvements Phase IICity of College Station
 
A5 Form Based Codes
A5 Form Based CodesA5 Form Based Codes
Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010
Daniel X. O'Neil
 
228 congressparkway overview_jan2010
228 congressparkway overview_jan2010228 congressparkway overview_jan2010
228 congressparkway overview_jan2010
Daniel X. O'Neil
 
Judicial (Massey) Complex Master Plan Briefing July 2020
Judicial (Massey) Complex Master Plan Briefing July 2020Judicial (Massey) Complex Master Plan Briefing July 2020
Judicial (Massey) Complex Master Plan Briefing July 2020
Fairfax County
 
20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_awardSamat Jain
 

Similar to Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive) (20)

Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017
Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017
Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Pardon Our Dust meeting, March 9, 2016
Pardon Our Dust meeting, March 9, 2016Pardon Our Dust meeting, March 9, 2016
Pardon Our Dust meeting, March 9, 2016
 
Land Subdivisions University Course
Land Subdivisions University CourseLand Subdivisions University Course
Land Subdivisions University Course
 
Kirby Road Sidewalk - Citizens Information Meeting: Dec. 11, 2018
Kirby Road Sidewalk - Citizens Information Meeting: Dec. 11, 2018Kirby Road Sidewalk - Citizens Information Meeting: Dec. 11, 2018
Kirby Road Sidewalk - Citizens Information Meeting: Dec. 11, 2018
 
Kalorama Park Community Meeting Presentation (May 22, 2014)
Kalorama Park Community Meeting Presentation (May 22, 2014)Kalorama Park Community Meeting Presentation (May 22, 2014)
Kalorama Park Community Meeting Presentation (May 22, 2014)
 
Public mtg at_brentwood final
Public mtg at_brentwood finalPublic mtg at_brentwood final
Public mtg at_brentwood final
 
Hearst community meeting 10.02.18 pn_3-30pm
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pm
 
Powerpoint - Langley School Pump Station and Force Main Project
Powerpoint  -  Langley School Pump Station and Force Main ProjectPowerpoint  -  Langley School Pump Station and Force Main Project
Powerpoint - Langley School Pump Station and Force Main Project
 
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
 
Lakevale Sewer Improvements Community Meeting
Lakevale Sewer Improvements Community MeetingLakevale Sewer Improvements Community Meeting
Lakevale Sewer Improvements Community Meeting
 
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectCommunity Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
 
Enhance Clifton Public Meeting 1
Enhance Clifton Public Meeting 1Enhance Clifton Public Meeting 1
Enhance Clifton Public Meeting 1
 
University Drive Pedestrian Safety Improvements Phase II
University Drive Pedestrian Safety Improvements Phase IIUniversity Drive Pedestrian Safety Improvements Phase II
University Drive Pedestrian Safety Improvements Phase II
 
A5 Form Based Codes
A5 Form Based CodesA5 Form Based Codes
A5 Form Based Codes
 
Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010
 
228 congressparkway overview_jan2010
228 congressparkway overview_jan2010228 congressparkway overview_jan2010
228 congressparkway overview_jan2010
 
Judicial (Massey) Complex Master Plan Briefing July 2020
Judicial (Massey) Complex Master Plan Briefing July 2020Judicial (Massey) Complex Master Plan Briefing July 2020
Judicial (Massey) Complex Master Plan Briefing July 2020
 
Kalorama Community Meeting (July 17, 2014)
Kalorama Community Meeting (July 17, 2014)Kalorama Community Meeting (July 17, 2014)
Kalorama Community Meeting (July 17, 2014)
 
20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award
 

More from Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
Fairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Fairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Fairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
Fairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Fairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
Fairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
Fairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
Fairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Fairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
Fairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
Fairfax County
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Fairfax County
 

More from Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
 

Recently uploaded

31052024_First India Newspaper Jaipur.pdf
31052024_First India Newspaper Jaipur.pdf31052024_First India Newspaper Jaipur.pdf
31052024_First India Newspaper Jaipur.pdf
FIRST INDIA
 
Do Linguistics Still Matter in the Age of Large Language Models.pptx
Do Linguistics Still Matter in the Age of Large Language Models.pptxDo Linguistics Still Matter in the Age of Large Language Models.pptx
Do Linguistics Still Matter in the Age of Large Language Models.pptx
Slator- Language Industry Intelligence
 
01062024_First India Newspaper Jaipur.pdf
01062024_First India Newspaper Jaipur.pdf01062024_First India Newspaper Jaipur.pdf
01062024_First India Newspaper Jaipur.pdf
FIRST INDIA
 
Draft-1-Resolutions-Key-Interventions-.pdf
Draft-1-Resolutions-Key-Interventions-.pdfDraft-1-Resolutions-Key-Interventions-.pdf
Draft-1-Resolutions-Key-Interventions-.pdf
bhavenpr
 
Resolutions-Key-Interventions-28-May-2024.pdf
Resolutions-Key-Interventions-28-May-2024.pdfResolutions-Key-Interventions-28-May-2024.pdf
Resolutions-Key-Interventions-28-May-2024.pdf
bhavenpr
 
Preview of Court Document for Iseyin community
Preview of Court Document for Iseyin communityPreview of Court Document for Iseyin community
Preview of Court Document for Iseyin community
contact193699
 
AI and Covert Influence Operations: Latest Trends
AI and Covert Influence Operations: Latest TrendsAI and Covert Influence Operations: Latest Trends
AI and Covert Influence Operations: Latest Trends
CI kumparan
 
Codes n Conventionss copy (1).paaaaaaptx
Codes n Conventionss copy (1).paaaaaaptxCodes n Conventionss copy (1).paaaaaaptx
Codes n Conventionss copy (1).paaaaaaptx
ZackSpencer3
 
2024 is the point of certainty. Forecast of UIF experts
2024 is the point of certainty. Forecast of UIF experts2024 is the point of certainty. Forecast of UIF experts
2024 is the point of certainty. Forecast of UIF experts
olaola5673
 
role of women and girls in various terror groups
role of women and girls in various terror groupsrole of women and girls in various terror groups
role of women and girls in various terror groups
sadiakorobi2
 
Sharjeel-Imam-Judgement-CRLA-215-2024_29-05-2024.pdf
Sharjeel-Imam-Judgement-CRLA-215-2024_29-05-2024.pdfSharjeel-Imam-Judgement-CRLA-215-2024_29-05-2024.pdf
Sharjeel-Imam-Judgement-CRLA-215-2024_29-05-2024.pdf
bhavenpr
 
03062024_First India Newspaper Jaipur.pdf
03062024_First India Newspaper Jaipur.pdf03062024_First India Newspaper Jaipur.pdf
03062024_First India Newspaper Jaipur.pdf
FIRST INDIA
 
Hogan Comes Home: an MIA WWII crewman is returned
Hogan Comes Home: an MIA WWII crewman is returnedHogan Comes Home: an MIA WWII crewman is returned
Hogan Comes Home: an MIA WWII crewman is returned
rbakerj2
 

Recently uploaded (13)

31052024_First India Newspaper Jaipur.pdf
31052024_First India Newspaper Jaipur.pdf31052024_First India Newspaper Jaipur.pdf
31052024_First India Newspaper Jaipur.pdf
 
Do Linguistics Still Matter in the Age of Large Language Models.pptx
Do Linguistics Still Matter in the Age of Large Language Models.pptxDo Linguistics Still Matter in the Age of Large Language Models.pptx
Do Linguistics Still Matter in the Age of Large Language Models.pptx
 
01062024_First India Newspaper Jaipur.pdf
01062024_First India Newspaper Jaipur.pdf01062024_First India Newspaper Jaipur.pdf
01062024_First India Newspaper Jaipur.pdf
 
Draft-1-Resolutions-Key-Interventions-.pdf
Draft-1-Resolutions-Key-Interventions-.pdfDraft-1-Resolutions-Key-Interventions-.pdf
Draft-1-Resolutions-Key-Interventions-.pdf
 
Resolutions-Key-Interventions-28-May-2024.pdf
Resolutions-Key-Interventions-28-May-2024.pdfResolutions-Key-Interventions-28-May-2024.pdf
Resolutions-Key-Interventions-28-May-2024.pdf
 
Preview of Court Document for Iseyin community
Preview of Court Document for Iseyin communityPreview of Court Document for Iseyin community
Preview of Court Document for Iseyin community
 
AI and Covert Influence Operations: Latest Trends
AI and Covert Influence Operations: Latest TrendsAI and Covert Influence Operations: Latest Trends
AI and Covert Influence Operations: Latest Trends
 
Codes n Conventionss copy (1).paaaaaaptx
Codes n Conventionss copy (1).paaaaaaptxCodes n Conventionss copy (1).paaaaaaptx
Codes n Conventionss copy (1).paaaaaaptx
 
2024 is the point of certainty. Forecast of UIF experts
2024 is the point of certainty. Forecast of UIF experts2024 is the point of certainty. Forecast of UIF experts
2024 is the point of certainty. Forecast of UIF experts
 
role of women and girls in various terror groups
role of women and girls in various terror groupsrole of women and girls in various terror groups
role of women and girls in various terror groups
 
Sharjeel-Imam-Judgement-CRLA-215-2024_29-05-2024.pdf
Sharjeel-Imam-Judgement-CRLA-215-2024_29-05-2024.pdfSharjeel-Imam-Judgement-CRLA-215-2024_29-05-2024.pdf
Sharjeel-Imam-Judgement-CRLA-215-2024_29-05-2024.pdf
 
03062024_First India Newspaper Jaipur.pdf
03062024_First India Newspaper Jaipur.pdf03062024_First India Newspaper Jaipur.pdf
03062024_First India Newspaper Jaipur.pdf
 
Hogan Comes Home: an MIA WWII crewman is returned
Hogan Comes Home: an MIA WWII crewman is returnedHogan Comes Home: an MIA WWII crewman is returned
Hogan Comes Home: an MIA WWII crewman is returned
 

Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)

  • 1. Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive) Citizens Information Meeting June 15, 2017, 7:00PM to 9:00PM (Mount Eagle Elem. School) (Brief Formal Presentation Starts at 7:15) 1
  • 2. Project Team Supervisor McKay’s office Fairfax County Department of Transportation (FCDOT) • Transportation Design (TDD) • Capital Projects and Operations (CPOD) Fairfax County Department of Public Works & Environmental Services (DPWES) • Construction (UDCD) • Land Acquisition (LAD) Design Consultant (RDA) 2
  • 3. Meeting Schedule Tonight’s Agenda • Jefferson Manor Phase IIIA Design Plan presentation followed by general Q&A • Return to display boards, one-on-one discussion, individual questions • Meeting Ends – 9:00PM 3
  • 4. Meeting Purpose Tonight’s Purpose: • Provide an overview of the project improvements • Provide the public an update on on-going activities related to project, current status, and next steps • Provide an opportunity for the public to review the current design and provide input 4
  • 5. Project Background • Part of Jefferson Manor Master Plan (1992) • Locally Funded Project: Est. Project Cost = $2.6 Million • Proposed roadway and drainage improvements will meet VDOT Standards, for VDOT maintenance • Pedestrian facility will meet all VDOT & County Standards for maintenance and for ADA accessibility compliance. 5
  • 7. Project Overview Existing Conditions: Albemarle Drive / Edgehill Drive • Substandard Width Sidewalks • Lack of Drainage Infrastructure • Existing Utility Poles in Sidewalk • Private Retaining Walls Leaning into Sidewalk Space 7
  • 8. Proposed Design 8 Proposed Design: • Curb and Gutter to be replaced with current VDOT standard • Existing Sidewalks upgraded from 4’ Width to 5’ Width, in compliance with current VDOT Standards • New concrete steps meeting current VDOT Standards • New concrete driveway aprons
  • 9. Proposed Design 9 Proposed Design Continued: • New Storm Sewer/Drainage System • New Road Pavement and Striping • Maintain Existing On-Street Parking • Relocation and/or Upgrade of Existing Utilities (underground and overhead) • Upgrade Street Lighting
  • 10. Proposed Design 10 Proposed Design Continued: • Potential Impacts to Private Property o Tree and Vegetation Impacts are anticipated o Existing non-standard structures (i.e. retaining walls, steps etc.) within VDOT right-of-way will be removed and/or rebuilt on private property, in coordination with property owners. o If property is to be impacted during construction, we will obtain easements or right-of-way before work begins.
  • 11. Land Acquisition Land Acquisition Process: • Plats will be prepared showing easements and/or right-of-way needed. • Land Acquisition Agent will contact property owners to negotiate. 11
  • 12. Construction Construction • We will coordinate with you well in advance of construction start. • Vehicle access to properties may be temporarily unavailable. • On-street parking will be limited in construction areas. 12
  • 13. Project Schedule Tentative Project Schedule: Pre-Final Design: Current Land Acquisition Schedule : Fall 2017 to Spring 2018 Utility Relocation Schedule: Spring 2018 Final Design: Summer 2018 Begin Construction: Late 2018 Construction Completion: Summer 2019 13
  • 14. Citizen Input 14 Ways to Comment • Fill out & submit a comment sheet tonight (Comment Box Provided) • Comment section on project website: http://www.fairfaxcounty.gov/fcdot/jefferson_manor.htm • Email Latesa Turner: Latesa.Turner@fairfaxcounty.gov • Fill out and mail a comment sheet: Latesa Turner Fairfax County Dept. of Transportation 4050 Legato Road, Suite 400 Fairfax, VA 22033
  • 16. 16 Thank you! Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive )