This document provides an overview and analysis of operational ramp options from the Dulles Toll Road to Tysons, Virginia for a transportation committee meeting. It summarizes two options: Option 1 includes ramps at Boone Boulevard, Greensboro Drive, and Jones Branch Drive with a collector-distributor road; Option 2 includes ramps at Boone Boulevard and Jones Branch Drive with urban frontage roads. Both options improve traffic but Option 2 better fits the urban vision while Option 1 has slightly higher traffic capacity. The analysis considers traffic, environmental, and cost impacts and outlines public outreach and a project timeline with completion estimated after 2040.