I am an Estimator with 4.5 years’ experience in the construction environment. During this
time I have provided costing support to construction projects which included the building of
mining plants and the entire infrastructure around the plant such as the roads, dams,
housing for site personnel, service villages, water treatment facilities and administration
blocks.
I have always been interested in the Total Cost Management of various projects. I like to
understand and control the costs associated with projects and therefore I chose a career
path of estimating and cost control.
During my tenure in the project environment I did proposal preparation, managing and
forecasting of projects costs, as well as doing resource efficiency analysis (Earned Value
Management). I have a very positive attitude towards life and always inspires to be a quality
person and team player. I believe that I can add value to any company.
CAREER HISTORY
Between the years of 2011-2015 I was employed by TENOVA Bateman and was in charge
of Estimating and Cost Control on the following projects:
 ZIMPLATS – Execution Project - Base Metals Refinery (EPCM), 42 Members, $130m,
Zimbabwe. My Role as Estimator/Cost Controller included:
Proposal and Tender Cost Analysis, Defining Cost Breakdown Structure, Estimating and
distribution of budget, managing of budget and forecast of all orders/contracts/indirect
costs and home office costs, weekly cash flow reporting and resource efficiency control.
 KASSINGA – Iron Ore Project ( EPCM), 42 Members, $10m, Angola
Proposal Input, Budget Implementation into Oracle, Budget and Forecast Control of Sub-
Contractors commitments, Indirect Field Costs and Home Office Costs and other costs,
Resource Efficiency control done on Earned Value Management principle.
 KISANFU – Pre Feasibility Study and Definitive Feasibility Study, 25 Members, $3m
Budgeting and Forecasting, Change Management and progress reporting Bi-weekly
 MONDO – Front end Engineering, 35 Members, $1.5m, Finland
Weekly reporting on cash flow, Change Management and resource efficiency reporting
on bi-weekly basis
 FOSKOR – Feasibility Study, 12 Members, $1m, RSA
Budgeting and Forecasting, Change Management and weekly cash flow reporting
Hartley – Definitive Feasibility Study and Front end Engineering, 17 Members,
$900,000, Zimbabwe
Estimating Costs for proposal and price fix phase, Budget compilation, Budget and
forecast control, Change Management and weekly cash flow reporting.
QUALIFICATIONS
Bachelor Degree B.com Economics and International Trade – North West University 2010
Certificate in Microsoft Excel Intermediate and Advanced User – Comp ED IT 2012
Management Certificates for non-managers – Astro Tech 2012
Certified Cost Technician – AACE International 2013
Project Controls Certificate based on Earned Value Management – MWC 2014
PROJECT RELATED EXPERIENCE / MAJOR ACHIEVEMENTS
During my time at Tenova, I have worked on various projects as the Estimator and Cost
Controller. Below is an explanation of such projects.
Type of project:
Industry:
Duration:
Team size:
Budget:
Summary:
My role:
Execution Projects
Mining and Infrastructure Construction
1-3 Years
+/- 40 People
$500,000 – $220,000,000
In the execution phase, the project team are able to do Engineering,
Procurement and Construction Management. This includes building the
road leading to the mining plant (as well as all roads in and around the
service village), building the service village, erecting the mining
infrastructure, erecting the housing and administration blocks for all site
personnel and building the water treatment and water storage plants.
The team does the full commissioning of all infrastructures and the
process plants. After Commissioning of the plant, it is to be handed
over to the client to conclude the mining process. The team provides a
full Operational Cost analysis report to client for the next 3 years of
processing.
Being the Estimator/Cost Controller on execution projects included
tasks such as:
- Studying of all client document to understand client requirements
- Defining the Work Breakdown Structure
- Defining the Cost Breakdown Structure
- Implementing Cost Breakdown Structure in ERP System like Oracle
- Manage the set Budget for entire duration of project.
- Manage Man Hour Commitments
- Manage Indirect Costs Occurred
- Manage Consultant Commitments
- Reporting on monthly trends such as cash flows, monthly variance
reports and
man hour efficiency reports (Earned Value Management)
- Establish proper Change Management principles and compile change
register
- Continuous evaluation of escalation receivable and payable
- Participating in Risk Analysis
- Compiling of Close Out Reports
Type of project:
Industry:
Duration:
Team size:
Budget:
Summary:
My role:
Feasibility Studies
Mining and Infrastructure Construction
1-12 Months
+/- 20 People
$100,000.00 - $1,000,000.00
In this feasibility phase we compile reports to determine if it will be
feasible for the client to conclude mining processes on the specific
area. The feasibility report includes the costs of designing the plant and
infrastructures (CAPEX) as well as the operational costs involved in
running the mining process and up keeping of infrastructures build
(OPEX)
Being the Estimator/Cost Controller on these projects included tasks
such as:
- Implementing the Budget into an ERP System like Oracle,
- Controlling the budget of man hours needed to conclude all
infrastructures,
- Forecasting of man hours to be used for work outstanding,
- Forecasting the costs associated with sub-contractors,
- Compiling cash flows for project managers,
- Compiling Monthly Movement Reports,
- Change Management,
- Compiling History and Lessons Learned Reports.
INTERESTS
Golf, Rugby, Family
REFERENCES
Mr. Willem Heusdens – Project Controls Manager, TENOVA Mining and Minerals
Contact: (+27) 72 355 5461
E-mail: willem.heusdens@gmail.com
Dr. Dick Joubert – Project Manager, TENOVA Mining and Minerals
Contact: (+27)82 927 9976, (+27)11 899 2555
E-mail: dick.joubert@tenova.com

More Related Content

What's hot (20)

Quantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfQuantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdf
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity Surveying
 
MUGHAL 2
MUGHAL 2MUGHAL 2
MUGHAL 2
 
Quantity Surveyor
Quantity SurveyorQuantity Surveyor
Quantity Surveyor
 
Mina Updated Resume
Mina Updated ResumeMina Updated Resume
Mina Updated Resume
 
AYMAN HELMY_CV
AYMAN HELMY_CVAYMAN HELMY_CV
AYMAN HELMY_CV
 
Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]
 
Mohamed khamis
Mohamed khamisMohamed khamis
Mohamed khamis
 
Myself_Aug15
Myself_Aug15Myself_Aug15
Myself_Aug15
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Don Mac Donald CV
Don Mac Donald CVDon Mac Donald CV
Don Mac Donald CV
 
QS -MEP cv of S.Dutta 1-11-15 (1) (1)
QS -MEP cv of S.Dutta  1-11-15 (1) (1)QS -MEP cv of S.Dutta  1-11-15 (1) (1)
QS -MEP cv of S.Dutta 1-11-15 (1) (1)
 
Raman Rezaei Infographic
Raman Rezaei InfographicRaman Rezaei Infographic
Raman Rezaei Infographic
 
MC-CV-
MC-CV-MC-CV-
MC-CV-
 
السي في
السي فيالسي في
السي في
 
Ravi cv Bsc(Hons)
Ravi cv Bsc(Hons)Ravi cv Bsc(Hons)
Ravi cv Bsc(Hons)
 
jyotithakurkumar@gmail.com
jyotithakurkumar@gmail.comjyotithakurkumar@gmail.com
jyotithakurkumar@gmail.com
 
hikal CV June 2016
hikal CV June 2016hikal CV June 2016
hikal CV June 2016
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
 
Michelle ~Resume
Michelle ~ResumeMichelle ~Resume
Michelle ~Resume
 

Similar to JD van Rensburg - Estimator CV.

Similar to JD van Rensburg - Estimator CV. (20)

Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16
 
Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef sam
 
Randolph Angelito CV
Randolph Angelito CVRandolph Angelito CV
Randolph Angelito CV
 
SamGhoshProjectmanagement7
SamGhoshProjectmanagement7SamGhoshProjectmanagement7
SamGhoshProjectmanagement7
 
EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015
 
Jamal Oklah CV
Jamal Oklah CVJamal Oklah CV
Jamal Oklah CV
 
RRV CV
RRV CVRRV CV
RRV CV
 
Peter Khalil CV
Peter Khalil CVPeter Khalil CV
Peter Khalil CV
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
BMH - Detail Resume - August 2016
BMH - Detail Resume - August  2016BMH - Detail Resume - August  2016
BMH - Detail Resume - August 2016
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
2017 Updated CV - Essam Harby
2017 Updated  CV - Essam Harby2017 Updated  CV - Essam Harby
2017 Updated CV - Essam Harby
 
Jois Lakshmipathy - CV
Jois Lakshmipathy - CVJois Lakshmipathy - CV
Jois Lakshmipathy - CV
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
C.V
C.VC.V
C.V
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - Latest
 
Cv of yasser_alammari
Cv of yasser_alammari Cv of yasser_alammari
Cv of yasser_alammari
 
Soumyajit Das
Soumyajit DasSoumyajit Das
Soumyajit Das
 
Detailed CV 11 Nov 15
Detailed CV 11 Nov 15Detailed CV 11 Nov 15
Detailed CV 11 Nov 15
 

JD van Rensburg - Estimator CV.

  • 1. J D VA N R E N S B U R G – C V jdvr87@gmail.com Full Driving License 022 318 2598 PERSONAL OVERVIEW I am an Estimator with 4.5 years’ experience in the construction environment. During this time I have provided costing support to construction projects which included the building of mining plants and the entire infrastructure around the plant such as the roads, dams, housing for site personnel, service villages, water treatment facilities and administration blocks. I have always been interested in the Total Cost Management of various projects. I like to understand and control the costs associated with projects and therefore I chose a career path of estimating and cost control. During my tenure in the project environment I did proposal preparation, managing and forecasting of projects costs, as well as doing resource efficiency analysis (Earned Value Management). I have a very positive attitude towards life and always inspires to be a quality person and team player. I believe that I can add value to any company. CAREER HISTORY Between the years of 2011-2015 I was employed by TENOVA Bateman and was in charge of Estimating and Cost Control on the following projects:  ZIMPLATS – Execution Project - Base Metals Refinery (EPCM), 42 Members, $130m, Zimbabwe. My Role as Estimator/Cost Controller included: Proposal and Tender Cost Analysis, Defining Cost Breakdown Structure, Estimating and distribution of budget, managing of budget and forecast of all orders/contracts/indirect costs and home office costs, weekly cash flow reporting and resource efficiency control.  KASSINGA – Iron Ore Project ( EPCM), 42 Members, $10m, Angola Proposal Input, Budget Implementation into Oracle, Budget and Forecast Control of Sub- Contractors commitments, Indirect Field Costs and Home Office Costs and other costs, Resource Efficiency control done on Earned Value Management principle.  KISANFU – Pre Feasibility Study and Definitive Feasibility Study, 25 Members, $3m Budgeting and Forecasting, Change Management and progress reporting Bi-weekly  MONDO – Front end Engineering, 35 Members, $1.5m, Finland Weekly reporting on cash flow, Change Management and resource efficiency reporting on bi-weekly basis  FOSKOR – Feasibility Study, 12 Members, $1m, RSA Budgeting and Forecasting, Change Management and weekly cash flow reporting
  • 2. Hartley – Definitive Feasibility Study and Front end Engineering, 17 Members, $900,000, Zimbabwe Estimating Costs for proposal and price fix phase, Budget compilation, Budget and forecast control, Change Management and weekly cash flow reporting. QUALIFICATIONS Bachelor Degree B.com Economics and International Trade – North West University 2010 Certificate in Microsoft Excel Intermediate and Advanced User – Comp ED IT 2012 Management Certificates for non-managers – Astro Tech 2012 Certified Cost Technician – AACE International 2013 Project Controls Certificate based on Earned Value Management – MWC 2014 PROJECT RELATED EXPERIENCE / MAJOR ACHIEVEMENTS During my time at Tenova, I have worked on various projects as the Estimator and Cost Controller. Below is an explanation of such projects. Type of project: Industry: Duration: Team size: Budget: Summary: My role: Execution Projects Mining and Infrastructure Construction 1-3 Years +/- 40 People $500,000 – $220,000,000 In the execution phase, the project team are able to do Engineering, Procurement and Construction Management. This includes building the road leading to the mining plant (as well as all roads in and around the service village), building the service village, erecting the mining infrastructure, erecting the housing and administration blocks for all site personnel and building the water treatment and water storage plants. The team does the full commissioning of all infrastructures and the process plants. After Commissioning of the plant, it is to be handed over to the client to conclude the mining process. The team provides a full Operational Cost analysis report to client for the next 3 years of processing. Being the Estimator/Cost Controller on execution projects included tasks such as: - Studying of all client document to understand client requirements - Defining the Work Breakdown Structure - Defining the Cost Breakdown Structure - Implementing Cost Breakdown Structure in ERP System like Oracle - Manage the set Budget for entire duration of project. - Manage Man Hour Commitments - Manage Indirect Costs Occurred - Manage Consultant Commitments
  • 3. - Reporting on monthly trends such as cash flows, monthly variance reports and man hour efficiency reports (Earned Value Management) - Establish proper Change Management principles and compile change register - Continuous evaluation of escalation receivable and payable - Participating in Risk Analysis - Compiling of Close Out Reports Type of project: Industry: Duration: Team size: Budget: Summary: My role: Feasibility Studies Mining and Infrastructure Construction 1-12 Months +/- 20 People $100,000.00 - $1,000,000.00 In this feasibility phase we compile reports to determine if it will be feasible for the client to conclude mining processes on the specific area. The feasibility report includes the costs of designing the plant and infrastructures (CAPEX) as well as the operational costs involved in running the mining process and up keeping of infrastructures build (OPEX) Being the Estimator/Cost Controller on these projects included tasks such as: - Implementing the Budget into an ERP System like Oracle, - Controlling the budget of man hours needed to conclude all infrastructures, - Forecasting of man hours to be used for work outstanding, - Forecasting the costs associated with sub-contractors, - Compiling cash flows for project managers, - Compiling Monthly Movement Reports, - Change Management, - Compiling History and Lessons Learned Reports. INTERESTS Golf, Rugby, Family REFERENCES Mr. Willem Heusdens – Project Controls Manager, TENOVA Mining and Minerals Contact: (+27) 72 355 5461 E-mail: willem.heusdens@gmail.com Dr. Dick Joubert – Project Manager, TENOVA Mining and Minerals Contact: (+27)82 927 9976, (+27)11 899 2555 E-mail: dick.joubert@tenova.com