Rajbir Singh is seeking a leadership position after over 15 years of experience managing electrical engineering projects in India. He has worked as an assistant project manager, area project manager, and senior site engineer on rural electrification projects involving installation of overhead and underground power lines. Rajbir Singh's professional experience includes surveying sites, preparing drawings and budgets, erecting power lines, installing substations, training staff, and documenting projects. He holds a diploma in electrical engineering and seeks a salary commensurate with his experience and qualifications.
I am a Civil Planning Engineer by profession with quality experience by working on large scale projects. I am interested in expanding my professional horizons by seeking new challenges. I am self-motivated with a willingness to accept change an challenges, and heightened levels of responsibility. Moreover , I do have good professional knowledge of engineering software like Primavera 6 (v.8.3.2), and excellent working knowledge of other desktop application. I am well versed with Primavera software for the scheduling & controlling of activities involved in the project.
please find the attached resume for more details.
Regards:
Abbas Khan
(+971) 56 6130374
abbas.khan@ghantootogd.ae
abbasjadoon52@gmail.com
I am a Civil Planning Engineer by profession with quality experience by working on large scale projects. I am interested in expanding my professional horizons by seeking new challenges. I am self-motivated with a willingness to accept change an challenges, and heightened levels of responsibility. Moreover , I do have good professional knowledge of engineering software like Primavera 6 (v.8.3.2), and excellent working knowledge of other desktop application. I am well versed with Primavera software for the scheduling & controlling of activities involved in the project.
please find the attached resume for more details.
Regards:
Abbas Khan
(+971) 56 6130374
abbas.khan@ghantootogd.ae
abbasjadoon52@gmail.com
Элар Саперион. Единая корпоративная система управления электронными документа...Корпорация ЭЛАР
ЭЛАР Саперион — программное обеспечение, предназначенное для организации работы с документами, автоматизации их сбора и обработки, создания и управления единым электронным архивом предприятия.
К основным функциям и свойствам системы относятся:
- Централизованная обработка и ввод документов
- Единые принципы хранения документов
- Интеграция документов и данных
- Высокая масштабируемость
- Репликация в территориально распределенных системах
- Синхронизация хранения бумажных и электронных документов
- Версионность и дедубликация
- «Многоквартирный» электронный архив
- Защищенная совместная работа с документами
1. Rajbir Singh
Date of Birth: 11th
December, 1981
JOB OBJECTIVE:
To assume the positions of leadership and responsibility by obtaining the highest level of
satisfaction by giving best to the organization.
PROFESSIONAL EXPERIENCE Aug. 2005-Till date
Presently Working as Assistant Project Manager in KEI Industries Ltd. (May 2015
to Till Date) Regd. Office: D-90, OKHLA INDUSTRIAL AREA PHASE -I,
NEW DELHI -110020, INDIA. Website: info@kei-ind.com ,
(1) Handling the Project of BPL Connection Rural Electrification Work (RGGVY) under
Client DVVNL at Jalaun site.
Job profile:
(a). Survey of site, preparation of BOQ and drawings and take approval from concern
department.
(b).Erection of 11KV HT lines and 440V LT lines, Stringing of conductor and
installation of Pole Mounted Sub-station (25 KVA, 63 KVA, 100 KVA).
(c).Preparation of program, schedule and method statements involved with contract along
with administration of inventory control over the whole Project.
(d) Training and administration of staff (project and Site engineers, supervisors etc.)
(e). Played the role of a motivator and team leader.
(f). Handling of contractors and their issues regarding Project.
(g). Investigate site problems and recommend solutions.
(h). Estimate, Measurement, billing, handling men power, process reporting day to day
to office.
(i).U/G cable laying for both HT& LT lines complete in all respect with quality &
Safety.
(j). Prepared daily, weekly and monthly progress reports, material reports and finance
reports.
(k). Done documentation work such as Billing, Handing & Taken over documents and
maintenance of official records and all other types of documentation work which related
with the whole project.
Worked as Area Project Manager (Aug. 2010 to Till Date) in SHYAM INDUS
POWER SOLUTION PVT.LTD. Regd. Office: 129 Transport centre, Rohakat Road,
Punjabi Bagh, New Delhi-35. Website: www.shyamindus.com
(1) Handled the project of supply and installations of HT lines for HVDS and system
strengthening bifurcation of 11 kv substation and industrious load from domestic load
feeder for Gurgaon city under client DHBVN (HR).
(2) Handled the Project of BPL Connection Rural Electrification Work (RGGVY) under
Client HPSEBL at Nalagarh site.
2. (3) Handled the Project of HVDS for agricultural load at Amritsar Sub Urban Div.
Amritsar circle (APRDP) under client Punjab State power corporation ltd. (PB).
Job profile:
(a). Survey of site, preparation of BOQ and drawings and take approval from concern
department.
(b).Erection of 11KV HT lines and 440V LT lines, Stringing of conductor and
installation of Pole Mounted Sub-station (25 KVA, 63 KVA, 100 KVA).
(c).Preparation of program, schedule and method statements involved with contract along
with administration of inventory control over the whole Project.
(d) Training and administration of staff (project and Site engineers, supervisors etc.)
(e). Played the role of a motivator and team leader.
(f). Handling of contractors and their issues regarding Project.
(g). Investigate site problems and recommend solutions.
(h). Estimate, Measurement, billing, handling men power, process reporting day to day
to office.
(i).U/G cable laying for both HT& LT lines complete in all respect with quality &
safety.
(j). Prepared daily, weekly and monthly progress reports, material reports and finance
reports.
(k). Done documentation work such as Billing, Handing & Taken over documents and
maintenance of official records and all other types of documentation work which related
with the whole project.
Worked as a Sr. Site Engineer (From May 2009 to July 2010) in a Universal Power
Distribution (P) Ltd. This is sister concern company of KLG SYSTEL LTD. Regd. Office
24/9 Moti Nager, New Delhi
(1) Handled the Project of BPL Connection Rural Electrification Work (RGGVY) under
APDRP Department of Punjab State Board of Electricity, Tarn Taran (PB.)
Job profile:
(a). Survey of site, preparation of BOQ and drawings and take approval from concern
department.
(b).Erection of 11KV HT lines and 440V LT lines, Stringing of conductor and
installation of Pole Mounted Sub-station (25 KVA, 63 KVA, 100 KVA).
(c).Preparation of program, schedule and method statements involved with contract along
with administration of inventory control over the whole Project.
(d) Training and administration of staff (project and Site engineers, supervisors etc.)
(e). Played the role of a motivator and team leader.
(f). Handling of contractors and their issues regarding Project.
(g). Prepared daily, weekly and monthly progress reports, material reports and finance
reports.
(h). Done documentation work such as Billing, Handing & Taken over documents and
maintenance of official records and all other types of documentation work which related
with the whole project.
3. Worked as a project engineer (Oct.2006 to Apr. 2009) in A2Z Maintenance & Engg.
Services Pvt. Ltd. 0-116, First Floor, Shopping Mall, Arjun Marg, DLF City, Phase-I,
Gurgaon-122002(HR) having handled the following projects
(I) Handled the Project of segregation of 11KV feeder of rural Supply (For Agriculture
and domestic load) (RGGVY) project in Ambala (HR).
(ii) Handled the Project of Provide 24 hrs. 1 Phase Supply to Dera/Dhani (Under
RGGVY) project in TarnTaran (PB).
Job profile.
(a). Survey of site and approval from operation department.
(b).Erection of 11KV HT lines and 440V LT lines, Stringing of conductor and
installation of Pole Mounted Sub-station 3 Phase and 1 Phase.
(c).Preparation of program, schedule and method statements involved with contract along
with administration of inventory control over the whole Project
(d) Training and administration of staff (project and Site engineers, supervisors etc.)
(e).Played the role of a motivator and team leader
(f). Handling of contractors and their issues regarding Project
(g).Done documentation work such as handing over documents and maintenance of
official records etc.
Worked as a site engineer (Aug. 2005 to March 2006) in Rmec Projects Ltd. at Guru
Gobind Singh Super Thermal Plant, Ropar (PB) of annual maintenance and over-
handling of L.T. Motors, 6.6 K.V. H.T. Motors along with cables, lightening system,
earthing system and control panel switch gear etc. of 6x210 M.W. capacity unit.
Technical Qualification Apr,2001 to May 2005
Three year Diploma in Electrical Engg. From Govt. Polytechnic Batala (Punjab) with
61% marks, Pass out in May 2005
Academic Qualification
QUALIFICATION PASSING
YEAR
UNIVERSITY/BOARD SCHOOL/COLLEGE/
UNIVERSITY
MATRIC 1997 P.S.E.B Govt. Sen. Sec. School,
Ghanupur
SECONDRY
EDUCATION
1999 P.S.E.B Govt. Sen. Sec. School,
Ghanupur
Personal Details
Father’s name: Mr. Kuldip Singh
Address: S. Kuldip Singh, Vill. Ghanupur,
Near Govt. Sen. Sec School, P.O. Chheharta
Amritsar, Punjab-143105
Mob: 09878442904, 08054976548