SlideShare a Scribd company logo
STEVEN J. HOLDER
120 Schoenfeld Blvd.
Patchogue NY 11772
Tel: (631) 627-8661
Cell: 631-624-7985
Email: StevenJHolder@aol.com
AUTO CAD EXPERIENCE: AutoCAD Release-12, AutoCAD 2000,2004,Quikpen 2004, AutoCAD 2007,
2009,2012 Cad Worx 2009 3D and 2014 MEP 3D
HERITAGE MECHANICAL – EMCOR COMPANY
2014 – Present Cad Operator 2014 MEP 3D
Projects: Hospitals and residential buildings
Duties: Provide piping models for BIM 360. Develop piping drawings of new heating and cooling systems per
re-design and submit for approval. Attend BIM coordination meetings and coordinate as per updated
models. Develop piping fabrication sketches for shop.
BOILERMATIC
2013 - 2014 Cad Operator 2014
Projects: Stony Brook University, Brookhaven National Lab
Duties: Stony Brook
Upgrade the east chiller plant with the addition of three new chillers, and four chilled water pumps for
Future volume. Produce complete auto-cad drawings and fabrication sketches for field installation.
Field measure existing conditions to insure installation without interferences.
Duties: Brookhaven Lab
Attend meetings with structural engineers to provide hangers & supports for new steam and
Condensate piping, as per B.N.L,s codes and requirements. Produce piping auto-cad drawings for new
Machine room and underground piping. Attend meetings with B.N.L.s staff to insure that all work
Is being preformed through B.N.L.s safety requirements and all government regulations.
KSW MECHANICAL
2008 - 2010 Cad Operator 2007
Projects: Commercial & Residential Buildings
Duties: Layout piping systems per re-design and submit for approval.
E-mail piping layers to other trades for coordination. Develop sleeve drawings for slab and shear wall
penetrations, and insert drawings. Attend meetings with architects & engineers to review design
modifications, and change orders.
Attend coordination meetings to resolve interferences with other trades.
HERITAGE MECHANICAL – EMCOR COMPANY
2006 – 2008 Cad Operator 2007
Projects: Residential Buildings
Duties: Layout piping systems for coordination with other trades develop sleeve drawings for penetrations
and insert drawing. Submit all drawings for approval.
F.W. SIMS
2003 - 2006 Cad Operator 2004
Projects: Sloan Kettering Hospital, American Airlines JFK, 7 World Trade Center, Albert Einstein College of
Medicine, Montefiore Medical Center, Winthrop Hospital and various renovations.
Duties: Layout piping systems for coordination with other trades .Submit drawings for approval. Develop
sleeve drawings for penetrations and insert drawings. Attend coordination meetings to resolve interferences.
Develop shop drawings from signedoff drawings for fabrication. Develop fabrication sketches,per schedule,
for various systems, to shop. Review new addendums for changes affecting new work and document for
change orders.
Field Assignments: Take field measurements of existing steel for new cooling towers, and piping.
FRESH MEADOW MECHANICAL
1995-2003 Piping Draftsman, Coordinator and Cad Operator
Projects: The Museum of Natural History, AMC Movie Theatres, North Central Bronx Hospital, J.F.K.
Terminal #4, The Whitehall Ferry Terminal, and various renovations.
Duties: Include the layout of piping systems on coordination mylars, and attend meetings to coordinate
with other trades. Develop shop drawings for approval. Make complete piping fabrication books for issue
to shop. Provide construction Hanger, sleeve, and penetration drawings. Auto Cad (2002) Responsibilities:
Develop cad drawings from hand drawn shop drawings and revise drawings for re-submittal. Field
Assignments Review existing conditions on renovation projects to insure clearance of all new work and have
extra work orders approved.
BOTTO MECHANICAL
1993-1995 Piping and Plumbing Draftsman
Project: Commercial and Institutional Buildings. V.A. Hospitals
Duties: Include the layout of new glycol heating and cooling systems, and new hospital plumbing facilities.
Develop piping fabrication drawings for field installation. Develop sleeve drawings for new plumbing facilities
and provide new stacks in pipe chases as per architectural and engineering drawings and existing field
conditions.
Field Assignments: take measurements of existing mechanical room conditions to assure proper installation of piping,
And existing plumbing stack conditions.
MARTIN ASSOCIATES
1989-1993 Piping Coordinator
Project: Columbia Presbyterian Hospital (on site)
Duties: Include the coordination and signoff of piping drawings for HVAC and sprinkler systems, as per
architectural and contract drawings, according to specifications. Attend meetings with G.C.’s and other trades to
provide an updated work schedule and review change orders and engineers and architects approvals. Walk every
job, order material and have extra work orders approved for changes due to existing field conditions and work not
included in the contract.
H. SAND & CO.
1985-1989 Piping Draftsmen
Projects: The Waldoff Astoria, River Bank State Park, Cedar Creek, and various water pollution control
plants.
Duties: Layout piping and equipment for new and existing buildings. Develop sleeve drawings to provide
accessibility to other floors. Develop isometric piping fabrication drawings with a complete material take-
off, for exact pipe cut length’s, including thread engagements, and gap allowances for welded, and Victaulic
fitting’s to be field installed.
Field assignments: Include taking field measurements, and drawing sketches of existing conditions, to
assure accurate installation of new mechanical and piping systems.
UNITED ENGINEERS & CONSTRUCTORS
1982-1985 Sr. Designer 111
Project: Seabrook Nuclear Power Plant (on site)
Duties: Design and layout complete construction isometric piping drawings for first issue,release for
Construction. Revise piping drawings as per engineering change authorization (E.C.A,s) to resolve
installation problems, including interference with other disciplines, and incorporate non –conformance
Reports (N.C.R.s) per Asme & Ansi codes. Verification through walk downs.
M. ROSENBLATT & SON
1979-1982 Sr.Piping Draftsmen
Duties: Prepare complete working drawings from field sketches and from reference drawings of lead ships
for new piping and equipment modifications, as per military standards and military specifications.
Incorporate design change notices (D.C.N.’s) to modify piping that causes interference with other disciplines.
Ship Checks: Include locating machinery in designated areas. Take field measurements and draw sketches
of existing conditions and modify accordingly.
References Available upon request -
Military Service
United States Marine Corp.
Honorable Discharge
M.O.S. 6022 (Aircraft Mechanic)

More Related Content

What's hot

Roger Beck resume
Roger Beck resumeRoger Beck resume
Roger Beck resume
Roger Beck
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal EngineerAhmad Hassan
 
Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015sathiya prabhu
 
resume lloyd guillory06-28-15
resume lloyd guillory06-28-15resume lloyd guillory06-28-15
resume lloyd guillory06-28-15Lloyd Guillory
 
Resume of jeonghoon woo
Resume of jeonghoon wooResume of jeonghoon woo
Resume of jeonghoon woo
Brian(jeonghoon) Woo
 
VG_Lee_CV_2015_1
VG_Lee_CV_2015_1VG_Lee_CV_2015_1
VG_Lee_CV_2015_1Vincent Lee
 
TED_BEERY_RESUME
TED_BEERY_RESUMETED_BEERY_RESUME
TED_BEERY_RESUMETed Beery
 
RonWells m-resume
RonWells m-resumeRonWells m-resume
RonWells m-resumeRon Wells
 
Scbj 0706187-cv
Scbj 0706187-cvScbj 0706187-cv
Rusty Adkins Resume
Rusty Adkins ResumeRusty Adkins Resume
Rusty Adkins ResumeRusty Adkins
 
P. doyle resume
P. doyle resumeP. doyle resume
P. doyle resume
Patrick Doyle
 

What's hot (18)

Roger Beck resume
Roger Beck resumeRoger Beck resume
Roger Beck resume
 
RESUME DJT van der Merwe
RESUME DJT van der MerweRESUME DJT van der Merwe
RESUME DJT van der Merwe
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015
 
resume lloyd guillory06-28-15
resume lloyd guillory06-28-15resume lloyd guillory06-28-15
resume lloyd guillory06-28-15
 
CV_Vijaya Kumar
CV_Vijaya KumarCV_Vijaya Kumar
CV_Vijaya Kumar
 
Resume of jeonghoon woo
Resume of jeonghoon wooResume of jeonghoon woo
Resume of jeonghoon woo
 
VG_Lee_CV_2015_1
VG_Lee_CV_2015_1VG_Lee_CV_2015_1
VG_Lee_CV_2015_1
 
Salah_C.V-2015
Salah_C.V-2015Salah_C.V-2015
Salah_C.V-2015
 
TED_BEERY_RESUME
TED_BEERY_RESUMETED_BEERY_RESUME
TED_BEERY_RESUME
 
Karthik Bodducherla Sundar (Piping Engineer)
Karthik Bodducherla Sundar (Piping Engineer)Karthik Bodducherla Sundar (Piping Engineer)
Karthik Bodducherla Sundar (Piping Engineer)
 
RonWells m-resume
RonWells m-resumeRonWells m-resume
RonWells m-resume
 
Jai Prakash sharma CV
Jai Prakash sharma CVJai Prakash sharma CV
Jai Prakash sharma CV
 
CVAQ5
CVAQ5CVAQ5
CVAQ5
 
Scbj 0706187-cv
Scbj 0706187-cvScbj 0706187-cv
Scbj 0706187-cv
 
Rusty Adkins Resume
Rusty Adkins ResumeRusty Adkins Resume
Rusty Adkins Resume
 
Heathman.Amanda resume
Heathman.Amanda resumeHeathman.Amanda resume
Heathman.Amanda resume
 
P. doyle resume
P. doyle resumeP. doyle resume
P. doyle resume
 

Viewers also liked

Aprendizaje autonomo
Aprendizaje autonomoAprendizaje autonomo
Aprendizaje autonomo
Iván Guzman
 
Communication Plan
Communication PlanCommunication Plan
Communication Planmistyhandy27
 
Dyslexia
DyslexiaDyslexia
Dyslexia
Kelsea MacPhee
 
Minjie shen 201512
Minjie shen 201512Minjie shen 201512
Minjie shen 201512
Minjie Shen
 
ضمان الجودة في التعليم
ضمان الجودة في التعليمضمان الجودة في التعليم
ضمان الجودة في التعليم
HT37
 
The Changing Concept of a Friend
The Changing Concept of a FriendThe Changing Concept of a Friend
The Changing Concept of a Friend
Jocelyn Garcia
 
Class of Ferromagnetic Semiconductors
Class of Ferromagnetic SemiconductorsClass of Ferromagnetic Semiconductors
Class of Ferromagnetic SemiconductorsSergiy Kryukov
 
Trabajo de organigrama
Trabajo de organigramaTrabajo de organigrama
Trabajo de organigrama
grtm132
 
13 review clickers
13 review clickers13 review clickers
13 review clickers
Asma Said,PhD
 
Zyndio france
Zyndio franceZyndio france
Zyndio france
Christophe Delanois
 
Presentatie accountants diner 26-03-2016
Presentatie accountants diner 26-03-2016Presentatie accountants diner 26-03-2016
Presentatie accountants diner 26-03-2016
Frank Bakker
 
Trademarks and copyrights
Trademarks and copyrightsTrademarks and copyrights
Trademarks and copyrights
Sandy Bartlett
 
PLC Nº 3/2016
PLC Nº 3/2016PLC Nº 3/2016
PLC Nº 3/2016
Jerbialdo
 
Catalogue ACB BT3 - Air Circuit Breaker BT3 Fuji - Beeteco.com
Catalogue ACB BT3 - Air Circuit Breaker BT3 Fuji - Beeteco.comCatalogue ACB BT3 - Air Circuit Breaker BT3 Fuji - Beeteco.com
Catalogue ACB BT3 - Air Circuit Breaker BT3 Fuji - Beeteco.com
Beeteco
 
Proyecto final Master Scouting y VideoAnalisis
Proyecto final Master Scouting y VideoAnalisis Proyecto final Master Scouting y VideoAnalisis
Proyecto final Master Scouting y VideoAnalisis
KikoMedarde (@futbolxlasvenas)
 

Viewers also liked (18)

Aprendizaje autonomo
Aprendizaje autonomoAprendizaje autonomo
Aprendizaje autonomo
 
insider-italy_itinerary2016
insider-italy_itinerary2016insider-italy_itinerary2016
insider-italy_itinerary2016
 
Communication Plan
Communication PlanCommunication Plan
Communication Plan
 
Dyslexia
DyslexiaDyslexia
Dyslexia
 
Minjie shen 201512
Minjie shen 201512Minjie shen 201512
Minjie shen 201512
 
ضمان الجودة في التعليم
ضمان الجودة في التعليمضمان الجودة في التعليم
ضمان الجودة في التعليم
 
maltrato animal
maltrato animalmaltrato animal
maltrato animal
 
EONmagasinet2_2015
EONmagasinet2_2015EONmagasinet2_2015
EONmagasinet2_2015
 
The Changing Concept of a Friend
The Changing Concept of a FriendThe Changing Concept of a Friend
The Changing Concept of a Friend
 
Class of Ferromagnetic Semiconductors
Class of Ferromagnetic SemiconductorsClass of Ferromagnetic Semiconductors
Class of Ferromagnetic Semiconductors
 
Trabajo de organigrama
Trabajo de organigramaTrabajo de organigrama
Trabajo de organigrama
 
13 review clickers
13 review clickers13 review clickers
13 review clickers
 
Zyndio france
Zyndio franceZyndio france
Zyndio france
 
Presentatie accountants diner 26-03-2016
Presentatie accountants diner 26-03-2016Presentatie accountants diner 26-03-2016
Presentatie accountants diner 26-03-2016
 
Trademarks and copyrights
Trademarks and copyrightsTrademarks and copyrights
Trademarks and copyrights
 
PLC Nº 3/2016
PLC Nº 3/2016PLC Nº 3/2016
PLC Nº 3/2016
 
Catalogue ACB BT3 - Air Circuit Breaker BT3 Fuji - Beeteco.com
Catalogue ACB BT3 - Air Circuit Breaker BT3 Fuji - Beeteco.comCatalogue ACB BT3 - Air Circuit Breaker BT3 Fuji - Beeteco.com
Catalogue ACB BT3 - Air Circuit Breaker BT3 Fuji - Beeteco.com
 
Proyecto final Master Scouting y VideoAnalisis
Proyecto final Master Scouting y VideoAnalisis Proyecto final Master Scouting y VideoAnalisis
Proyecto final Master Scouting y VideoAnalisis
 

Similar to STEVEN J

Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski
 
EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16Edward Ruebling
 
Cad designer resume
Cad designer resumeCad designer resume
Cad designer resume
Brian Cherry
 
N Miksic Resume 2016
N Miksic Resume 2016N Miksic Resume 2016
N Miksic Resume 2016Norm Miksic
 
I.a.fletcher c.v. may 2016
I.a.fletcher c.v.  may 2016I.a.fletcher c.v.  may 2016
I.a.fletcher c.v. may 2016
ivan fletcher
 
Everett Nichols_Resume_Dec_2015
Everett Nichols_Resume_Dec_2015Everett Nichols_Resume_Dec_2015
Everett Nichols_Resume_Dec_2015Everett Nichols
 
Justin N Drude Resume 10-16
Justin N Drude Resume 10-16Justin N Drude Resume 10-16
Justin N Drude Resume 10-16Justin Drude
 
Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig
 
Rachwal-resume-3_Dec 14Summary
Rachwal-resume-3_Dec 14SummaryRachwal-resume-3_Dec 14Summary
Rachwal-resume-3_Dec 14SummaryJames Rachwal
 
Industrial Refrigeration Drafter - Comfortsystems USA
Industrial Refrigeration Drafter - Comfortsystems USAIndustrial Refrigeration Drafter - Comfortsystems USA
Industrial Refrigeration Drafter - Comfortsystems USABrian Cherry
 
Gennaro Palmieri
Gennaro PalmieriGennaro Palmieri
Gennaro Palmieri
Gennaro Palmieri
 
Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis
 
Current Fluor Resume
Current Fluor ResumeCurrent Fluor Resume
Current Fluor ResumeRoy Firtha
 
Dons Res Mech Des 2012
Dons Res Mech Des 2012Dons Res Mech Des 2012
Dons Res Mech Des 2012
Donald Ghilardi
 
Matt Pahuta Resume 2016
Matt Pahuta Resume 2016Matt Pahuta Resume 2016
Matt Pahuta Resume 2016
Matt Pahuta
 
Resume 5 13 16 months
Resume 5 13 16 monthsResume 5 13 16 months
Resume 5 13 16 months
Bernhard Stonas
 

Similar to STEVEN J (20)

Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16
 
EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16
 
Cad designer resume
Cad designer resumeCad designer resume
Cad designer resume
 
N Miksic Resume 2016
N Miksic Resume 2016N Miksic Resume 2016
N Miksic Resume 2016
 
I.a.fletcher c.v. may 2016
I.a.fletcher c.v.  may 2016I.a.fletcher c.v.  may 2016
I.a.fletcher c.v. may 2016
 
PMC 1.1- 22jul16
PMC 1.1- 22jul16PMC 1.1- 22jul16
PMC 1.1- 22jul16
 
Everett Nichols_Resume_Dec_2015
Everett Nichols_Resume_Dec_2015Everett Nichols_Resume_Dec_2015
Everett Nichols_Resume_Dec_2015
 
Justin N Drude Resume 10-16
Justin N Drude Resume 10-16Justin N Drude Resume 10-16
Justin N Drude Resume 10-16
 
Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16
 
Resume M McAbee
Resume M McAbeeResume M McAbee
Resume M McAbee
 
Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15
 
Rachwal-resume-3_Dec 14Summary
Rachwal-resume-3_Dec 14SummaryRachwal-resume-3_Dec 14Summary
Rachwal-resume-3_Dec 14Summary
 
Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)
 
Industrial Refrigeration Drafter - Comfortsystems USA
Industrial Refrigeration Drafter - Comfortsystems USAIndustrial Refrigeration Drafter - Comfortsystems USA
Industrial Refrigeration Drafter - Comfortsystems USA
 
Gennaro Palmieri
Gennaro PalmieriGennaro Palmieri
Gennaro Palmieri
 
Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017
 
Current Fluor Resume
Current Fluor ResumeCurrent Fluor Resume
Current Fluor Resume
 
Dons Res Mech Des 2012
Dons Res Mech Des 2012Dons Res Mech Des 2012
Dons Res Mech Des 2012
 
Matt Pahuta Resume 2016
Matt Pahuta Resume 2016Matt Pahuta Resume 2016
Matt Pahuta Resume 2016
 
Resume 5 13 16 months
Resume 5 13 16 monthsResume 5 13 16 months
Resume 5 13 16 months
 

STEVEN J

  • 1. STEVEN J. HOLDER 120 Schoenfeld Blvd. Patchogue NY 11772 Tel: (631) 627-8661 Cell: 631-624-7985 Email: StevenJHolder@aol.com AUTO CAD EXPERIENCE: AutoCAD Release-12, AutoCAD 2000,2004,Quikpen 2004, AutoCAD 2007, 2009,2012 Cad Worx 2009 3D and 2014 MEP 3D HERITAGE MECHANICAL – EMCOR COMPANY 2014 – Present Cad Operator 2014 MEP 3D Projects: Hospitals and residential buildings Duties: Provide piping models for BIM 360. Develop piping drawings of new heating and cooling systems per re-design and submit for approval. Attend BIM coordination meetings and coordinate as per updated models. Develop piping fabrication sketches for shop. BOILERMATIC 2013 - 2014 Cad Operator 2014 Projects: Stony Brook University, Brookhaven National Lab Duties: Stony Brook Upgrade the east chiller plant with the addition of three new chillers, and four chilled water pumps for Future volume. Produce complete auto-cad drawings and fabrication sketches for field installation. Field measure existing conditions to insure installation without interferences. Duties: Brookhaven Lab Attend meetings with structural engineers to provide hangers & supports for new steam and Condensate piping, as per B.N.L,s codes and requirements. Produce piping auto-cad drawings for new Machine room and underground piping. Attend meetings with B.N.L.s staff to insure that all work Is being preformed through B.N.L.s safety requirements and all government regulations. KSW MECHANICAL 2008 - 2010 Cad Operator 2007 Projects: Commercial & Residential Buildings Duties: Layout piping systems per re-design and submit for approval. E-mail piping layers to other trades for coordination. Develop sleeve drawings for slab and shear wall penetrations, and insert drawings. Attend meetings with architects & engineers to review design modifications, and change orders. Attend coordination meetings to resolve interferences with other trades. HERITAGE MECHANICAL – EMCOR COMPANY 2006 – 2008 Cad Operator 2007 Projects: Residential Buildings Duties: Layout piping systems for coordination with other trades develop sleeve drawings for penetrations and insert drawing. Submit all drawings for approval. F.W. SIMS 2003 - 2006 Cad Operator 2004 Projects: Sloan Kettering Hospital, American Airlines JFK, 7 World Trade Center, Albert Einstein College of Medicine, Montefiore Medical Center, Winthrop Hospital and various renovations. Duties: Layout piping systems for coordination with other trades .Submit drawings for approval. Develop sleeve drawings for penetrations and insert drawings. Attend coordination meetings to resolve interferences. Develop shop drawings from signedoff drawings for fabrication. Develop fabrication sketches,per schedule, for various systems, to shop. Review new addendums for changes affecting new work and document for change orders. Field Assignments: Take field measurements of existing steel for new cooling towers, and piping.
  • 2. FRESH MEADOW MECHANICAL 1995-2003 Piping Draftsman, Coordinator and Cad Operator Projects: The Museum of Natural History, AMC Movie Theatres, North Central Bronx Hospital, J.F.K. Terminal #4, The Whitehall Ferry Terminal, and various renovations. Duties: Include the layout of piping systems on coordination mylars, and attend meetings to coordinate with other trades. Develop shop drawings for approval. Make complete piping fabrication books for issue to shop. Provide construction Hanger, sleeve, and penetration drawings. Auto Cad (2002) Responsibilities: Develop cad drawings from hand drawn shop drawings and revise drawings for re-submittal. Field Assignments Review existing conditions on renovation projects to insure clearance of all new work and have extra work orders approved. BOTTO MECHANICAL 1993-1995 Piping and Plumbing Draftsman Project: Commercial and Institutional Buildings. V.A. Hospitals Duties: Include the layout of new glycol heating and cooling systems, and new hospital plumbing facilities. Develop piping fabrication drawings for field installation. Develop sleeve drawings for new plumbing facilities and provide new stacks in pipe chases as per architectural and engineering drawings and existing field conditions. Field Assignments: take measurements of existing mechanical room conditions to assure proper installation of piping, And existing plumbing stack conditions. MARTIN ASSOCIATES 1989-1993 Piping Coordinator Project: Columbia Presbyterian Hospital (on site) Duties: Include the coordination and signoff of piping drawings for HVAC and sprinkler systems, as per architectural and contract drawings, according to specifications. Attend meetings with G.C.’s and other trades to provide an updated work schedule and review change orders and engineers and architects approvals. Walk every job, order material and have extra work orders approved for changes due to existing field conditions and work not included in the contract. H. SAND & CO. 1985-1989 Piping Draftsmen Projects: The Waldoff Astoria, River Bank State Park, Cedar Creek, and various water pollution control plants. Duties: Layout piping and equipment for new and existing buildings. Develop sleeve drawings to provide accessibility to other floors. Develop isometric piping fabrication drawings with a complete material take- off, for exact pipe cut length’s, including thread engagements, and gap allowances for welded, and Victaulic fitting’s to be field installed. Field assignments: Include taking field measurements, and drawing sketches of existing conditions, to assure accurate installation of new mechanical and piping systems. UNITED ENGINEERS & CONSTRUCTORS 1982-1985 Sr. Designer 111 Project: Seabrook Nuclear Power Plant (on site) Duties: Design and layout complete construction isometric piping drawings for first issue,release for Construction. Revise piping drawings as per engineering change authorization (E.C.A,s) to resolve installation problems, including interference with other disciplines, and incorporate non –conformance Reports (N.C.R.s) per Asme & Ansi codes. Verification through walk downs.
  • 3. M. ROSENBLATT & SON 1979-1982 Sr.Piping Draftsmen Duties: Prepare complete working drawings from field sketches and from reference drawings of lead ships for new piping and equipment modifications, as per military standards and military specifications. Incorporate design change notices (D.C.N.’s) to modify piping that causes interference with other disciplines. Ship Checks: Include locating machinery in designated areas. Take field measurements and draw sketches of existing conditions and modify accordingly. References Available upon request - Military Service United States Marine Corp. Honorable Discharge M.O.S. 6022 (Aircraft Mechanic)