1. OBJECTIVE
To obtain a job in piping engineering where I can apply the knowledge I have learned in this field and utilize it to
its full potential. To have tasks that will challenge me, and will add more learning as I go on with my career. To be able to
master coordination skillswithin thepipingteam and other disciplines and improvemy decision makingand strategy. To be
able to continue designing piping and layouts, at the same time having on-site experience to have the better understanding
about this field.
EDUCATION
2005–2010 COLLEGE OF ENGINEERING, UNIVERSITY OF THE PHILIPPINES – DILIMAN
Bachelor of Science in Mechanical Engineering
Licensed Mechanical Engineer
College Scholar (2nd Semester 05-06)
2001–2005 REGIONAL SCIENCE HIGH SCHOOL REGION III
WORK EXPERIENCE
SUMMARY
With 4.5 years of professional experience in Piping Engineering. He has experienced leading a team composed of
6-10 piping designers as team’s area leader. He has a wide experience in piping layout and design, vessel orientation,
piping and equipment modeling, and piping general arrangement drawing and piping isometric drawing production using
Smartplant 3D and Intergraph Plant Design System (PDS). He is also well-versed in software like Smart Plant Review (SPR)
and Microstation. He has been involved in model reviews, coordinating effectively with clients and lead engineers
regarding the design, and was recently assigned to Houston, Texas for 2 months for model review and design layout
optimization.
FLUOR DANIEL INC. PHILIPPINES (Jan 2012 - present)
Sasol Lake Charles Chemicals and Facilities Project (Ziegler)– (Sept 2014 – present)
Responsibilities:
EPC
- Area Leader
Handles a team working on Alcohol Distillation Area.
Guides the team in doing piping design and layout based on the project standards.
Coordinates with Houston counterparts and other disciplines regarding design and layout concern.
Attends model review to present the design and layout of the area to the clients.
Two months foreign assignment in Houston, Texas for model reviews and design optimization.
-Piping Designer
Handles the modeling, and vessel orientation study of distillation towers and reactors.
Teaches the members in doing layouts in pumps, exchangers, drums, filters and vacuum pumps and
boosters.
Matthew Erwin P. Tamayo
Address: #1415 Grand Canyon North, Parkhomes Tunasan, Muntinlupa City
Mobile Number: +63923 2228917
Email address: matthew_tamayo@yahoo.com
Permanent Address: #7 Jacaranda St. Blk 12, Gordon Heights, Olongapo City
2. Early Works
- Modeling of equipment such vertical vessels and pumps.
- Vertical Vessel Orientation (Nozzle Orientation, platforms, stairs and ladders)
- Modeling of pipes and other piping components. Incorporates model review comments.
- Coordinates with Houston office regarding the design and tie-in points of existing lines/components.
Software used: Smart Plant 3D, Smartsketch Editor, AutoCad, Smart Plant Review & MS Excel
SANTOS GLNG Upstream Project Phase II– (April 2014 – Aug 2014)
Responsibilities:
Led a team in the creation and production of piping general arrangement drawings
- Distributed tasks for each member. Encouraged and guided the team until the deliverables are issued.
- Helped the team understand the purpose of our deliverables, teaching them the correct procedures required
for the production of drawings.
- Taught the team techniques in using the software and trouble shoot problems that occurred.
- Produced the most number of the drawings among the team as a designer.
- Checked drawings of designers for obvious errors before submitting to checkers to minimize checking time.
- Issued drawings for internal review, client review and AFC. Re-validate comments in squad check.
- Monitored and organized deliverables to meet the schedule.
Collaborated with piping checkers and other disciplines regarding issues on design.
Quality checked all deliverables before issuing it to AFC.
Responsible for the modeling and production of stress and isometric drawings during first few weeks in the
project.
Software used: Smart Plant 3D, Smartsketch Editor, 2D Microstation v8, Smart Plant Review & MS Excel
DOW Propylene Dehydrogenation Project (PDH) – (Sept 2013 – Mar 2014)
Responsibilities:
Piping layout and design of Area B800A North battery limit
- Beginning from scratch, modeled the pipes, piping components, instruments, beams and columns and
platforms of the entire area.
- Coordinated with the clients during model reviews regarding the design.
- Valve access consideration becamea challenge because of having so many valves that needs access in a
limited space area while considering minimum platform usage as per client request.
- Coordinated with other leads and designers in Houston office for concerns regarding the continuation of
the area within their scope of work.
- Created flow diagram change notice (FDCN) and marked it up it in the P&ID using BRAVA software for
Houston office and client’s approval.
Isometric drawing production of Area B800A
- Extracted and released all IFC isometric drawings.
- Monitored all deliverables and reported status of drawings to my lead piping engineer whenever asked.
- Submitted pinked-off P&ID’s and completed MPSU of the area to ensure all lines aremodeled and issued
for construction.
- Submitted close-out reports and necessary documents needed for turnover and for future references.
Isometric drawing production in other areas
- Helped other designers in isometric production whenever possible especially in those priority areas .
Software used: Smart Plant 3D, Smartsketch Editor, Smart Plant Review, Brava, Pip RO Data Pro, & MS Excel
3. Sadara Waste Treatment Project – (Jan 2013– Sept 2013)
Responsibilities:
Modeling and Isometric Drawing Production Area 779 (Knock out pots going up to pipe racks)
- Learned and familiarized modeling sloping lines in SP3D with ease.
- Modeled equipment as per vendor drawings sent by mechanical discipline.
- Modeled equipment nozzle as per vendor drawings sent by mechanical discipline(correct nozzle
orientation determined by piping).
Squad Checking
- Checking and re-validation of vendor drawings sent by mechanical engineer to ensure all the equipment
data are correct and aligned with the latest P&ID. Coordinated with mechanical and process group in
cases of discrepancies in information.
Trims modeling and drawing production
- Modeled and completed all trim drawings of the 52 knock out pots (6 trims each pot) which became
very essential in isometric production weekly since these were used to meet the weekly quota whenever
the project lacks IFC isometric drawings for the week.
2D Drawing production
- Submitted equipment location control plan and utility station location plan drawings of areas 778 and
779.
- Shared my knowledge to other designers and supervisors in using smartsketch.
Model Progress Status Utility (MPSU) closeout
- ensured that all isometric drawings of areas W779ABand W779AD are issued and no one line is missed.
Software used: Smart Plant 3D, Smartsketch Editor, 2D Microstation, Smart Plant Review, Pip RO Data Pro, & MS Excel
SANTOS GLNG Upstream Project – (Jan 2012 – Jan 2013)
Responsibilities:
2D Drawing production
- responsible for the extraction and production of general arrangement drawings, ensuring weekly quota
are met.
- responsible for the production of general index drawings using microstation.
- led a group of 4 Indian expats and 3 other designers in learning how to use smartsketch and guided the
team in delivering 2D drawings.
Isometric drawing production
- assisted in the extraction isometric drawings in wellpads, Fairview IV, and Roma areas.
Software used: Smart Plant 3D, Smartsketch Editor, 2D Microstation v8, Smart Plant Review & MS Excel
CHIYODA PHILIPPINES CORPORATION (May 2011 – Dec 2011)
Papua New Guinea Liquefied Natural Gas Plant Project (PNG)
Responsibilities:
Plant Design System (PDS) operator - scope of work includes piping routing and modeling, equipment modeling,
special piping support (SPS) modeling, and isometric drawing extraction.
4. TRAININGS TAKEN
Fluor Daniels Inc. Phils.
Smart Plant 3D
Piping Supervisor Training
Phase III – Piping Layouts (Facilitator: Edgar Murphy)
Supports
Piping Layouts
Instrument
Horizontal Vessel Orientation
Vertical Vessel Orientation
Exchangers
Pumps
Piping Fabrication Shop – Port Arthur, Houston, Texas
Chiyoda Phil. Corporation
Plant Design System (PDS)
Microstation 2D v7 and v8
University of the Philippines-Diliman
BA 198 – Leadership 101
(Facilitator: Jim Lafferty, current CEO of British American Tobacco,
former CEO of Coca-cola and Procter & Gamble)
CO-CURRICULAR ACTIVITIES
Toast Master Club
Improves communication skillsby deliveringprepared and impromptu speeches in an audience within the room.
This program is made to equip employees the confidence they need when talking with clients and expats.
MER Sports Activities – (basketball, volleyball, badminton, bowling, soccer, and frisbee)
Not only serves as stress reliever from a fully loaded work day but are also significant in building relationships
with co-workers from other disciplines within the company.
SKILLS AND OTHER DATA
Smart Plant3D (SP3D)
Smart PlantReview (SPR)
Smartsketch Editor
3D PlantDesign System (PDS)
2D Microstation (v7 and v8)
Pip RO Data Pro
MS Officeapplications
Adobe PDF
ACHIEVEMENTS
Spotlight Awardee Sasol Ziegler Project