Staff seeks council authorization to accept the low bid of $251,337.71 from Lonestar Paving for the 2016 Street Maintenance Program. The program will repair and resurface sections of 5 streets totaling approximately 14,000 square yards. An engineering firm helped prepare the bid package and recommends awarding the contract to Lonestar Paving as the lowest bidder.
My web based lesson - The Story Behind the Guy Fawkes MaskDianaGMendes
FILMS AND SOCIAL MEDIA
The story behind the Guy Fawkes mask
Reading and Writing for Intermediate level
By the end of this lesson, the learners will be better able to write a short consumer review about a specific film.
My web based lesson - The Story Behind the Guy Fawkes MaskDianaGMendes
FILMS AND SOCIAL MEDIA
The story behind the Guy Fawkes mask
Reading and Writing for Intermediate level
By the end of this lesson, the learners will be better able to write a short consumer review about a specific film.
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)City of Midland
The purpose of this hearing was to present the planned improvements to Fairgrounds Road from State Loop (SL) 250 to Pecan Avenue in the City of Midland, Midland County, Texas, and to receive public comment. Displays will be available for viewing at 6:00 p.m. with the formal hearing commencing at 7:00 p.m.
The existing facility consists of one 12-foot travel lane in each direction with no shoulders. The existing right-of-way (ROW) width varies from approximately 62 feet south of Wadley Avenue to 77 feet historically used for the roadway north of Wadley Avenue.
The proposed project would widen Fairgrounds Road from two lanes to five lanes. South of Wadley Avenue, Fairgrounds Road would consist of one 11-foot lane and one 14-foot shared use lane in each direction and an 11-foot continuous center left-turn lane. There would be five-foot wide sidewalks on each side of the roadway. North of Wadley Avenue, Fairgrounds Road would consist of two 12-foot lanes in each direction with a 12-foot continuous center left-turn lane. An eight-foot bike/pedestrian trail would be constructed on the west side of the roadway. The length of the proposed project is approximately 1.5 miles. The proposed typical ROW width would vary from approximately 80 feet south of Wadley Avenue to approximately 129.5 feet north of Wadley Avenue. The proposed improvements would require approximately 11.4 acres of additional ROW, of which, 10.9 acres are already owned by the City of Midland. The proposed project would not result in any residential relocations or commercial displacements. Information about the tentative schedule for ROW acquisition and construction may be obtained from the City of Midland.
As part of this project, the City of Midland is considering a Section 4(f) de minimis impact determination for impacts to F.T. Hogan Park (Hogan Park). An approximate 10.9 acre strip of land generally located east of Hogan Park Golf Course from Wadley Avenue to Loop 250 would be required for permanent incorporation into the proposed transportation facility. A Section 4(f) de minimis finding means that the proposed project would not adversely affect the activities, features, or attributes that qualify Hogan Park for protection under Section 4(f). The City of Midland and TxDOT will consider comments received during this Public Hearing before making a final Section 4(f) de minimis determination.
This presentation was shown at workshops on August 18 and 22, 2016.
http://www.countyplanning.us/services/grant-programs/state-capital-improvement-program/
January 2016 Service Change Public InformationCOTA BUS
This presentation details COTA service changes that will take effect on Monday, January 4, 2016. Join us for two public meetings on December 10 & 15 at COTA.
Presentation of the Dallas Hike and Bike network made by Peter Bratt at the 10/25/2016 Wilshire Heights Neighborhood Association General Membership Meeting.
January Service Change Public Comment MeetingCOTA BUS
The presentation includes proposed changes for the January 2016 Service Changes. Please join us at two public information meetings, Thursday, September 17 at 12 p.m. (noon), and Tuesday, September 22 at 6 p.m. All interested people are encouraged to attend and participate. Meetings are held at 33 N. High St., Columbus, Ohio, 43215.
Comments will be accepted through October.
Director of Infrastructure and Development Services Lisa Pyles and Parks and Recreation Director Slade Strickland provided City Council with a quarterly update on Addison's Capital Improvement Program and other Town projects on February 10, 2015.
The City of Toronto is studying a series of transportation projects, initiatives and polices to support the vision of the recently completed Highland Creek Village Area Study and re-development of the Highland Creek Village area. The mobility needs of local residents, employees, businesses and all road users will be considered.
What is the point of small housing associations.pptxPaul Smith
Given the small scale of housing associations and their relative high cost per home what is the point of them and how do we justify their continued existance
Many ways to support street children.pptxSERUDS INDIA
By raising awareness, providing support, advocating for change, and offering assistance to children in need, individuals can play a crucial role in improving the lives of street children and helping them realize their full potential
Donate Us
https://serudsindia.org/how-individuals-can-support-street-children-in-india/
#donatefororphan, #donateforhomelesschildren, #childeducation, #ngochildeducation, #donateforeducation, #donationforchildeducation, #sponsorforpoorchild, #sponsororphanage #sponsororphanchild, #donation, #education, #charity, #educationforchild, #seruds, #kurnool, #joyhome
A process server is a authorized person for delivering legal documents, such as summons, complaints, subpoenas, and other court papers, to peoples involved in legal proceedings.
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
Russian anarchist and anti-war movement in the third year of full-scale warAntti Rautiainen
Anarchist group ANA Regensburg hosted my online-presentation on 16th of May 2024, in which I discussed tactics of anti-war activism in Russia, and reasons why the anti-war movement has not been able to make an impact to change the course of events yet. Cases of anarchists repressed for anti-war activities are presented, as well as strategies of support for political prisoners, and modest successes in supporting their struggles.
Thumbnail picture is by MediaZona, you may read their report on anti-war arson attacks in Russia here: https://en.zona.media/article/2022/10/13/burn-map
Links:
Autonomous Action
http://Avtonom.org
Anarchist Black Cross Moscow
http://Avtonom.org/abc
Solidarity Zone
https://t.me/solidarity_zone
Memorial
https://memopzk.org/, https://t.me/pzk_memorial
OVD-Info
https://en.ovdinfo.org/antiwar-ovd-info-guide
RosUznik
https://rosuznik.org/
Uznik Online
http://uznikonline.tilda.ws/
Russian Reader
https://therussianreader.com/
ABC Irkutsk
https://abc38.noblogs.org/
Send mail to prisoners from abroad:
http://Prisonmail.online
YouTube: https://youtu.be/c5nSOdU48O8
Spotify: https://podcasters.spotify.com/pod/show/libertarianlifecoach/episodes/Russian-anarchist-and-anti-war-movement-in-the-third-year-of-full-scale-war-e2k8ai4
ZGB - The Role of Generative AI in Government transformation.pdfSaeed Al Dhaheri
This keynote was presented during the the 7th edition of the UAE Hackathon 2024. It highlights the role of AI and Generative AI in addressing government transformation to achieve zero government bureaucracy
1. 1
Presented By: Patrick Sullivan
Public Works Director
Item # 5
August 8, 2016
Acceptance of “Low Bid Proposal” for 2016
Street Maintenance Program (SMP)
2. 2
• Staff seeks Council’s authorization in
accepting low bid for the 2016 Street
Maintenance Program (SMP)
SUMMARY
3. 3
BACKGROUND INFO.
• The Public Works Department requested Freese and
Nichols Inc. provide engineering services in securing bids
for the 2016 SMP at a cost of $22,820. Freese and Nichols
helped staff prepare a bid package that was issued in June
2016.
• On July 20, 2016 2016, the City received three bids:
• LoneStar Paving in the amount of $251,337.71
• Clark Construction in the amount of $253,411.27
• Austin Materials LLC in the amount of $259,542.15
4. 4
BACKGROUND INFO. cont’d.
• Streets included in this year’s program are;
• Alta, from Alamo Heights Blvd. to St. Luke’s
• Morse, from Patterson to Grant
• Chichester, from N. New Braunfels to Cleveland Court
• Castano, from Ciruela to Loveta
• Projects consists of approximately 14,000 Square Yards of
roadway improvements, utilizing both milling and overlay of
existing surfaces and full depth reconstruction.
5. 5
POLICY ANALYSIS
• Lonestar Paving was the lowest bidder. Following a
background search Freese and Nichols recommends
that the contract be awarded to Lonestar Paving.
6. 6
FISCAL IMPACT
• The contract cost is $251,337.71 with a 5% contingency
of $12,566.88 totaling $263,904.59 which is currently
budgeted under the Capital Expense for SMP.