SUMMARY
 Authorize City Manager to negotiate and
execute contract
 The Goodman Corporation
 2 Study Areas
 Alamo Heights High School
 Lower Broadway
BACKGROUND
 RFP Process
 Released: Sept. 11th
 Closed: Oct. 11th
 Responses
 The Goodman Corp
 Walker Consultants
 Wantman Group, Inc
 Kimley Horn
 TJKM Trans Consultant
 Walter P Moore
 Evaluation Committee
 City Manager
 Police Chief
 Community Development Director
 Criteria
 Experience
 Project Scope
 Key staff
 Project timeline
 Project Cost
POLICY ANALYSIS
 Follow-up Interviews
 The Goodman Corporation
 Walker Consultants
 The Goodman Corporation
 HQ – Houston w/ Austin office
 Established in 1980 – 20 employees
 Project Manager: Robert McHaney (Austin)
 Downtown Fredericksburg Parking Study
POLICY ANALYSIS
 Scope of Work
 Identify existing facilities and policies
 Assess current capacity against projected demand
 Propose a parking management strategy
 Recommend implementation plan and financing options
 Timeline
 3 months
FISCAL IMPACT
 The Goodman Corporation bid: $35,000
 Contract not to exceed $40,000
 Included in FY2020 Budget

More Related Content

Similar to Alamo Heights CCM 11.12.19 Item #5 ppt parking study

Design Build Requirements In Washington State By Michael E Purdy
Design Build Requirements In Washington State   By Michael E PurdyDesign Build Requirements In Washington State   By Michael E Purdy
Design Build Requirements In Washington State By Michael E Purdy
Mike Purdy
 
Practical project management based on PMBOK5
Practical project management based on PMBOK5Practical project management based on PMBOK5
Practical project management based on PMBOK5
Omer Alsayed PhD,MBA, PMP®
 
Police Facility Construction Manager at Risk
Police Facility Construction Manager at RiskPolice Facility Construction Manager at Risk
Police Facility Construction Manager at Risk
City of College Station
 
Miami-Dade MPO FPC Meeting
Miami-Dade MPO FPC MeetingMiami-Dade MPO FPC Meeting
ROUTES: USDOT’s New Rural Transportation Initiative
ROUTES: USDOT’s New Rural Transportation InitiativeROUTES: USDOT’s New Rural Transportation Initiative
ROUTES: USDOT’s New Rural Transportation Initiative
nado-web
 
Katie Nash -Street map for Frederick
Katie Nash -Street map for FrederickKatie Nash -Street map for Frederick
Katie Nash -Street map for FrederickMike Catoe
 
Landsmiths Projects India
Landsmiths Projects IndiaLandsmiths Projects India
Landsmiths Projects India
Ajaypal s Randhawa
 
Cv kanai deb nath, project economist dec- 2021
Cv kanai deb nath, project economist dec- 2021Cv kanai deb nath, project economist dec- 2021
Cv kanai deb nath, project economist dec- 2021
ssuser8943fd
 
Private finance in the roads sector
Private finance in the roads sectorPrivate finance in the roads sector
Private finance in the roads sector
Institute for Transport Studies (ITS)
 
Pricing to Win: Lowest-Priced Technically Acceptable (LPTA) vs Best-Value Str...
Pricing to Win: Lowest-Priced Technically Acceptable (LPTA) vs Best-Value Str...Pricing to Win: Lowest-Priced Technically Acceptable (LPTA) vs Best-Value Str...
Pricing to Win: Lowest-Priced Technically Acceptable (LPTA) vs Best-Value Str...
Government Contract Pricing Summit
 
L harsha challenges of managing public projects - pmi format
L harsha   challenges of managing public projects - pmi formatL harsha   challenges of managing public projects - pmi format
L harsha challenges of managing public projects - pmi formatPMInstituteIndia
 
2 risk lender assume (j drew) hsbc (1)
2  risk lender assume (j drew) hsbc (1)2  risk lender assume (j drew) hsbc (1)
2 risk lender assume (j drew) hsbc (1)Anish Bhatnagar
 
The Channel Tunnel
The Channel TunnelThe Channel Tunnel
The Channel Tunnel
Priya Raj
 
Arizona P3 Workshop 092909
Arizona P3 Workshop 092909Arizona P3 Workshop 092909
Arizona P3 Workshop 092909anxora
 
Project Management for Marketers
Project Management for MarketersProject Management for Marketers
Project Management for Marketers
Jeff Thaler
 
Kick off meeting challenge grant revised final
Kick off meeting challenge grant revised finalKick off meeting challenge grant revised final
Kick off meeting challenge grant revised finalpbcgov
 
NCAPA LYNX BLE Blue Print for Change
NCAPA LYNX BLE Blue Print for ChangeNCAPA LYNX BLE Blue Print for Change
NCAPA LYNX BLE Blue Print for Change
Meghan Makoid
 

Similar to Alamo Heights CCM 11.12.19 Item #5 ppt parking study (20)

Design Build Requirements In Washington State By Michael E Purdy
Design Build Requirements In Washington State   By Michael E PurdyDesign Build Requirements In Washington State   By Michael E Purdy
Design Build Requirements In Washington State By Michael E Purdy
 
Practical project management based on PMBOK5
Practical project management based on PMBOK5Practical project management based on PMBOK5
Practical project management based on PMBOK5
 
Police Facility Construction Manager at Risk
Police Facility Construction Manager at RiskPolice Facility Construction Manager at Risk
Police Facility Construction Manager at Risk
 
SSC2011_Richard Manson PPT
SSC2011_Richard Manson PPTSSC2011_Richard Manson PPT
SSC2011_Richard Manson PPT
 
Miami-Dade MPO FPC Meeting
Miami-Dade MPO FPC MeetingMiami-Dade MPO FPC Meeting
Miami-Dade MPO FPC Meeting
 
TSE Process Model
TSE Process ModelTSE Process Model
TSE Process Model
 
ROUTES: USDOT’s New Rural Transportation Initiative
ROUTES: USDOT’s New Rural Transportation InitiativeROUTES: USDOT’s New Rural Transportation Initiative
ROUTES: USDOT’s New Rural Transportation Initiative
 
Katie Nash -Street map for Frederick
Katie Nash -Street map for FrederickKatie Nash -Street map for Frederick
Katie Nash -Street map for Frederick
 
Landsmiths Projects India
Landsmiths Projects IndiaLandsmiths Projects India
Landsmiths Projects India
 
Cv kanai deb nath, project economist dec- 2021
Cv kanai deb nath, project economist dec- 2021Cv kanai deb nath, project economist dec- 2021
Cv kanai deb nath, project economist dec- 2021
 
Private finance in the roads sector
Private finance in the roads sectorPrivate finance in the roads sector
Private finance in the roads sector
 
Bradley R Johnson Resume
Bradley R Johnson ResumeBradley R Johnson Resume
Bradley R Johnson Resume
 
Pricing to Win: Lowest-Priced Technically Acceptable (LPTA) vs Best-Value Str...
Pricing to Win: Lowest-Priced Technically Acceptable (LPTA) vs Best-Value Str...Pricing to Win: Lowest-Priced Technically Acceptable (LPTA) vs Best-Value Str...
Pricing to Win: Lowest-Priced Technically Acceptable (LPTA) vs Best-Value Str...
 
L harsha challenges of managing public projects - pmi format
L harsha   challenges of managing public projects - pmi formatL harsha   challenges of managing public projects - pmi format
L harsha challenges of managing public projects - pmi format
 
2 risk lender assume (j drew) hsbc (1)
2  risk lender assume (j drew) hsbc (1)2  risk lender assume (j drew) hsbc (1)
2 risk lender assume (j drew) hsbc (1)
 
The Channel Tunnel
The Channel TunnelThe Channel Tunnel
The Channel Tunnel
 
Arizona P3 Workshop 092909
Arizona P3 Workshop 092909Arizona P3 Workshop 092909
Arizona P3 Workshop 092909
 
Project Management for Marketers
Project Management for MarketersProject Management for Marketers
Project Management for Marketers
 
Kick off meeting challenge grant revised final
Kick off meeting challenge grant revised finalKick off meeting challenge grant revised final
Kick off meeting challenge grant revised final
 
NCAPA LYNX BLE Blue Print for Change
NCAPA LYNX BLE Blue Print for ChangeNCAPA LYNX BLE Blue Print for Change
NCAPA LYNX BLE Blue Print for Change
 

More from Marian Vargas Mendoza

AH CCM 01.27.20 Item #8 PPT - Second Amendment Verizon
AH CCM 01.27.20 Item #8  PPT - Second Amendment VerizonAH CCM 01.27.20 Item #8  PPT - Second Amendment Verizon
AH CCM 01.27.20 Item #8 PPT - Second Amendment Verizon
Marian Vargas Mendoza
 
AH CCM 01.27.20 Item #7 PPT Purchase of Dump Truck
AH CCM 01.27.20 Item #7 PPT Purchase of Dump TruckAH CCM 01.27.20 Item #7 PPT Purchase of Dump Truck
AH CCM 01.27.20 Item #7 PPT Purchase of Dump Truck
Marian Vargas Mendoza
 
AH CCM 01.27.20 Item #6 PPT Purchase of Backhoe
AH CCM 01.27.20 Item #6  PPT Purchase of BackhoeAH CCM 01.27.20 Item #6  PPT Purchase of Backhoe
AH CCM 01.27.20 Item #6 PPT Purchase of Backhoe
Marian Vargas Mendoza
 
AH CCM 01.27.20 Item #5 PPT Sublease AHLL
AH CCM 01.27.20 Item #5  PPT Sublease AHLL AH CCM 01.27.20 Item #5  PPT Sublease AHLL
AH CCM 01.27.20 Item #5 PPT Sublease AHLL
Marian Vargas Mendoza
 
AH CCM 01.27.20 Item #4 PPT ARB Amendments
AH CCM 01.27.20 Item #4   PPT ARB AmendmentsAH CCM 01.27.20 Item #4   PPT ARB Amendments
AH CCM 01.27.20 Item #4 PPT ARB Amendments
Marian Vargas Mendoza
 
AH CCM 11.25.19 Item #4 ppt pool renovation
AH CCM 11.25.19 Item #4   ppt pool renovationAH CCM 11.25.19 Item #4   ppt pool renovation
AH CCM 11.25.19 Item #4 ppt pool renovation
Marian Vargas Mendoza
 
AH CCM 11.25.19 - Item #9 ppt Pool Renovation
AH CCM 11.25.19 - Item #9   ppt Pool RenovationAH CCM 11.25.19 - Item #9   ppt Pool Renovation
AH CCM 11.25.19 - Item #9 ppt Pool Renovation
Marian Vargas Mendoza
 
Alamo Heights CCM 11.12.19 Item #7 ppt insurance renewals
Alamo Heights CCM 11.12.19 Item #7   ppt insurance renewalsAlamo Heights CCM 11.12.19 Item #7   ppt insurance renewals
Alamo Heights CCM 11.12.19 Item #7 ppt insurance renewals
Marian Vargas Mendoza
 
Alamo Heights CCM 11.12.19 Item #2 announcements ppt
Alamo Heights CCM 11.12.19 Item #2   announcements pptAlamo Heights CCM 11.12.19 Item #2   announcements ppt
Alamo Heights CCM 11.12.19 Item #2 announcements ppt
Marian Vargas Mendoza
 
Alamo Heights CCM 11.12.19 Item #9 ppt staff report - judson nature trails
Alamo Heights CCM 11.12.19 Item #9   ppt staff report - judson nature trailsAlamo Heights CCM 11.12.19 Item #9   ppt staff report - judson nature trails
Alamo Heights CCM 11.12.19 Item #9 ppt staff report - judson nature trails
Marian Vargas Mendoza
 
Alamo Heights CCM 11.12.19 Item #8 PPT 4th qtrly financial report
Alamo Heights CCM 11.12.19 Item #8   PPT 4th qtrly financial reportAlamo Heights CCM 11.12.19 Item #8   PPT 4th qtrly financial report
Alamo Heights CCM 11.12.19 Item #8 PPT 4th qtrly financial report
Marian Vargas Mendoza
 
(Updated) AHISD Athletics web packet
(Updated) AHISD Athletics web packet (Updated) AHISD Athletics web packet
(Updated) AHISD Athletics web packet
Marian Vargas Mendoza
 
CCM 09.24.18 - Item #7 ppt SRO Program
CCM 09.24.18 - Item #7   ppt SRO ProgramCCM 09.24.18 - Item #7   ppt SRO Program
CCM 09.24.18 - Item #7 ppt SRO Program
Marian Vargas Mendoza
 
CCM 09.24.18 - Item #6 ppt Inspector Approval
CCM 09.24.18 - Item #6  ppt Inspector ApprovalCCM 09.24.18 - Item #6  ppt Inspector Approval
CCM 09.24.18 - Item #6 ppt Inspector Approval
Marian Vargas Mendoza
 
CCM 09.24.18 - Item #5 ppt Budget Amendment
CCM 09.24.18 - Item #5   ppt Budget AmendmentCCM 09.24.18 - Item #5   ppt Budget Amendment
CCM 09.24.18 - Item #5 ppt Budget Amendment
Marian Vargas Mendoza
 
CCM 09.24.18 - Item # 4 ppt FY19 Budget + Tax Adoption
CCM 09.24.18 - Item # 4  ppt FY19 Budget + Tax AdoptionCCM 09.24.18 - Item # 4  ppt FY19 Budget + Tax Adoption
CCM 09.24.18 - Item # 4 ppt FY19 Budget + Tax Adoption
Marian Vargas Mendoza
 
CCM 09.24.18 - Item # 2 ppt announcements
CCM 09.24.18 - Item # 2 ppt announcementsCCM 09.24.18 - Item # 2 ppt announcements
CCM 09.24.18 - Item # 2 ppt announcements
Marian Vargas Mendoza
 
AH CCM 04.09.18 Item #5 402 Argo
AH CCM 04.09.18 Item #5  402 ArgoAH CCM 04.09.18 Item #5  402 Argo
AH CCM 04.09.18 Item #5 402 Argo
Marian Vargas Mendoza
 
AH CCM 04.09.18 Item #4 1001Townsend - Cambridge
AH CCM 04.09.18 Item #4   1001Townsend - CambridgeAH CCM 04.09.18 Item #4   1001Townsend - Cambridge
AH CCM 04.09.18 Item #4 1001Townsend - Cambridge
Marian Vargas Mendoza
 
AH CCM 04.09.18 Item # 2 Announcements ppt
AH CCM 04.09.18 Item # 2 Announcements pptAH CCM 04.09.18 Item # 2 Announcements ppt
AH CCM 04.09.18 Item # 2 Announcements ppt
Marian Vargas Mendoza
 

More from Marian Vargas Mendoza (20)

AH CCM 01.27.20 Item #8 PPT - Second Amendment Verizon
AH CCM 01.27.20 Item #8  PPT - Second Amendment VerizonAH CCM 01.27.20 Item #8  PPT - Second Amendment Verizon
AH CCM 01.27.20 Item #8 PPT - Second Amendment Verizon
 
AH CCM 01.27.20 Item #7 PPT Purchase of Dump Truck
AH CCM 01.27.20 Item #7 PPT Purchase of Dump TruckAH CCM 01.27.20 Item #7 PPT Purchase of Dump Truck
AH CCM 01.27.20 Item #7 PPT Purchase of Dump Truck
 
AH CCM 01.27.20 Item #6 PPT Purchase of Backhoe
AH CCM 01.27.20 Item #6  PPT Purchase of BackhoeAH CCM 01.27.20 Item #6  PPT Purchase of Backhoe
AH CCM 01.27.20 Item #6 PPT Purchase of Backhoe
 
AH CCM 01.27.20 Item #5 PPT Sublease AHLL
AH CCM 01.27.20 Item #5  PPT Sublease AHLL AH CCM 01.27.20 Item #5  PPT Sublease AHLL
AH CCM 01.27.20 Item #5 PPT Sublease AHLL
 
AH CCM 01.27.20 Item #4 PPT ARB Amendments
AH CCM 01.27.20 Item #4   PPT ARB AmendmentsAH CCM 01.27.20 Item #4   PPT ARB Amendments
AH CCM 01.27.20 Item #4 PPT ARB Amendments
 
AH CCM 11.25.19 Item #4 ppt pool renovation
AH CCM 11.25.19 Item #4   ppt pool renovationAH CCM 11.25.19 Item #4   ppt pool renovation
AH CCM 11.25.19 Item #4 ppt pool renovation
 
AH CCM 11.25.19 - Item #9 ppt Pool Renovation
AH CCM 11.25.19 - Item #9   ppt Pool RenovationAH CCM 11.25.19 - Item #9   ppt Pool Renovation
AH CCM 11.25.19 - Item #9 ppt Pool Renovation
 
Alamo Heights CCM 11.12.19 Item #7 ppt insurance renewals
Alamo Heights CCM 11.12.19 Item #7   ppt insurance renewalsAlamo Heights CCM 11.12.19 Item #7   ppt insurance renewals
Alamo Heights CCM 11.12.19 Item #7 ppt insurance renewals
 
Alamo Heights CCM 11.12.19 Item #2 announcements ppt
Alamo Heights CCM 11.12.19 Item #2   announcements pptAlamo Heights CCM 11.12.19 Item #2   announcements ppt
Alamo Heights CCM 11.12.19 Item #2 announcements ppt
 
Alamo Heights CCM 11.12.19 Item #9 ppt staff report - judson nature trails
Alamo Heights CCM 11.12.19 Item #9   ppt staff report - judson nature trailsAlamo Heights CCM 11.12.19 Item #9   ppt staff report - judson nature trails
Alamo Heights CCM 11.12.19 Item #9 ppt staff report - judson nature trails
 
Alamo Heights CCM 11.12.19 Item #8 PPT 4th qtrly financial report
Alamo Heights CCM 11.12.19 Item #8   PPT 4th qtrly financial reportAlamo Heights CCM 11.12.19 Item #8   PPT 4th qtrly financial report
Alamo Heights CCM 11.12.19 Item #8 PPT 4th qtrly financial report
 
(Updated) AHISD Athletics web packet
(Updated) AHISD Athletics web packet (Updated) AHISD Athletics web packet
(Updated) AHISD Athletics web packet
 
CCM 09.24.18 - Item #7 ppt SRO Program
CCM 09.24.18 - Item #7   ppt SRO ProgramCCM 09.24.18 - Item #7   ppt SRO Program
CCM 09.24.18 - Item #7 ppt SRO Program
 
CCM 09.24.18 - Item #6 ppt Inspector Approval
CCM 09.24.18 - Item #6  ppt Inspector ApprovalCCM 09.24.18 - Item #6  ppt Inspector Approval
CCM 09.24.18 - Item #6 ppt Inspector Approval
 
CCM 09.24.18 - Item #5 ppt Budget Amendment
CCM 09.24.18 - Item #5   ppt Budget AmendmentCCM 09.24.18 - Item #5   ppt Budget Amendment
CCM 09.24.18 - Item #5 ppt Budget Amendment
 
CCM 09.24.18 - Item # 4 ppt FY19 Budget + Tax Adoption
CCM 09.24.18 - Item # 4  ppt FY19 Budget + Tax AdoptionCCM 09.24.18 - Item # 4  ppt FY19 Budget + Tax Adoption
CCM 09.24.18 - Item # 4 ppt FY19 Budget + Tax Adoption
 
CCM 09.24.18 - Item # 2 ppt announcements
CCM 09.24.18 - Item # 2 ppt announcementsCCM 09.24.18 - Item # 2 ppt announcements
CCM 09.24.18 - Item # 2 ppt announcements
 
AH CCM 04.09.18 Item #5 402 Argo
AH CCM 04.09.18 Item #5  402 ArgoAH CCM 04.09.18 Item #5  402 Argo
AH CCM 04.09.18 Item #5 402 Argo
 
AH CCM 04.09.18 Item #4 1001Townsend - Cambridge
AH CCM 04.09.18 Item #4   1001Townsend - CambridgeAH CCM 04.09.18 Item #4   1001Townsend - Cambridge
AH CCM 04.09.18 Item #4 1001Townsend - Cambridge
 
AH CCM 04.09.18 Item # 2 Announcements ppt
AH CCM 04.09.18 Item # 2 Announcements pptAH CCM 04.09.18 Item # 2 Announcements ppt
AH CCM 04.09.18 Item # 2 Announcements ppt
 

Recently uploaded

PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
ahcitycouncil
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
JSchaus & Associates
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
ehbuaw
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
oklahomajudicialproc1
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
ahcitycouncil
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
ehbuaw
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
GrantManagementInsti
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
uptheratios
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
JSchaus & Associates
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
ahcitycouncil
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
ILC- UK
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
Paul Smith
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
ahcitycouncil
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
Mohammed325561
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
Antti Rautiainen
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
evkovas
 

Recently uploaded (20)

PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
 

Alamo Heights CCM 11.12.19 Item #5 ppt parking study

  • 1. COMMUNITY DEVELOPMENT Presented by: Nina Shealey Director PARKING STUDY CONSULTANT ITEM # 5 NOVEMBER 12, 2019
  • 2. SUMMARY  Authorize City Manager to negotiate and execute contract  The Goodman Corporation  2 Study Areas  Alamo Heights High School  Lower Broadway
  • 3. BACKGROUND  RFP Process  Released: Sept. 11th  Closed: Oct. 11th  Responses  The Goodman Corp  Walker Consultants  Wantman Group, Inc  Kimley Horn  TJKM Trans Consultant  Walter P Moore  Evaluation Committee  City Manager  Police Chief  Community Development Director  Criteria  Experience  Project Scope  Key staff  Project timeline  Project Cost
  • 4. POLICY ANALYSIS  Follow-up Interviews  The Goodman Corporation  Walker Consultants  The Goodman Corporation  HQ – Houston w/ Austin office  Established in 1980 – 20 employees  Project Manager: Robert McHaney (Austin)  Downtown Fredericksburg Parking Study
  • 5. POLICY ANALYSIS  Scope of Work  Identify existing facilities and policies  Assess current capacity against projected demand  Propose a parking management strategy  Recommend implementation plan and financing options  Timeline  3 months
  • 6. FISCAL IMPACT  The Goodman Corporation bid: $35,000  Contract not to exceed $40,000  Included in FY2020 Budget