CITY OF ALAMO HEIGHTS
ADMINISTRATION AND FINANCE DEPARTMENT
CITY COUNCIL AGENDA MEMORANDUM
TO: Mayor and City Council
FROM: Phillip Laney, Assistant City Manager
SUBJECT: Approval of Low Bid Contract for the 2023 Street Maintenance Program (SMP)
DATE: April 24, 2023
SUMMARY
Staff seeks Council’s authorization in accepting the low bid for the 2023 Street Maintenance
Program in an amount not to exceed $798,090.
BACKGROUND INFORMATION
On November 21, 2022 City Manager Buddy Kuhn authorized Freese and Nichols Inc. to provide
engineering services in securing bids for the 2023 SMP in the amount of $44,992.00. Contract cost
estimates were $1,000,000.00, which includes a five percent contingency. This contract cost
estimate was based on 2022’s low bid quantity for similar repairs performed.
The City requested bids through advertisements in the San Antonio Express-News on March 8th
and March 15th
, 2023. A pre-bid submittal meeting was held on March 22, 2023 with bids opening
April 6, 2023.
City staff secured and opened four bids which were submitted as follows:
 Clark Construction in the amount of $602,534.42
 CK Newberry LLC in the amount of $841,939.00
 Texas Materials in the amount of $871,960.71
 BK Paving LLC in the amount of 1,036,526.84
This project consists of approximately 33,125 square yards of roadway improvements, utilizing
both milling and overlay of existing surfaces, and full-depth pavement repair. Streets identified
for improvements are:
1. Broadway, from Austin Hwy to Albany
2. E. Fair Oaks, from Broadway to N. New Braunfels
Due to the favorable pricing by Clark Construction, the City will be approaching the contractor to
provide additional street maintenance work to extend the project area north past Albany to Blue
Bonnet. State law authorizes local municipalities to increase the original contract amount up to
25% to maximize favorable pricing. The additional work will be negotiated with the selected
vendor.
2
POLICY ANALYSIS
Local Government Code Sec. 252.048 provides municipalities the ability to submit change order
requests to increase the original contract amount by up to 25 percent, with authorization by
Council. Freese and Nichols Inc. and City staff recommends the bid contract be awarded to Clark
Construction as the lowest bidder that is qualified. The City Attorney and City Manager were also
consulted on this recommendation.
FISCAL IMPACT
Costs for the 2023 Street Maintenance Project include the contract cost with Clark Construction
in an amount of $602,534.42 and $44,922.00 for engineering fees by Freese and Nichols Inc. The
City has an option to add 25% to a favorable contract in the amount of $150,633.60, totaling a not
to exceed amount of $798,090.00. Funds are currently available under the FY 2023 Capital
Expense of $1,000,000 for the Street Maintenance Project.
ATTACHMENT
Attachment A – Recommendation of Award
_________________________
Phillip Laney
Assistant City Manager
___________________________
Buddy Kuhn
City Manager
9601 McAllister Fwy, Suite 1008 San Antonio, Texas 78216 210-298-3800 FAX 817-735-7491 www.freese.com
April 17, 2023
Mr. Pat Sullivan
Public Works Director
City of Alamo Heights
6116 Broadway
San Antonio, TX 78209
Re: Recommendation of Award of Contract
2023 Street Maintenance Program
FNI Project No. ALH22938
Mr. Sullivan,
Four bids were received for the above-referenced project on Thursday, April 6th, 2023. The bids were evaluated
and checked for responsiveness. The four bidders included the required documents and were deemed responsive.
The bidders from lowest bid to highest bid based on the total bid amount are as follows: Clark Construction of
Texas, Inc., CK Newberry, LLC., Texas Materials Group, and BK Paving LLC. A summary of the bids received is
provided in the table below and the detailed bid tabulation is attached to this letter.
Contractor Total Bid
Clark Construction of Texas, Inc. $ 602,534.42
CK Newberry, LLC. $ 841,939.00
Texas Materials Group, Inc. $ 871,960.25
BK Paving LLC. $ 1,036,526.84
Freese and Nichols, Inc. (FNI) performed a reference check for Clark Construction of Texas Inc. FNI contacted two
references with the provided information, but did not receive a response. The Contractor has performed favorably
in the past with the City.
Having submitted the lowest bid on the project and based upon previous performance with the City of Alamo
Heights, FNI recommends that the Street Maintenance Program be awarded to Clark Construction of Texas, Inc. for
the Total Bid amount of $602,534.42.
If you have any questions concerning this recommendation, please contact me at your convenience.
Sincerely,
Chris Trevino, PE, CCM
Freese and Nichols, Inc.
Attachment A

More Related Content

Similar to Item # 4 - 2023 Street Maintenance Program Award

Similar to Item # 4 - 2023 Street Maintenance Program Award (20)

Construction Meets Texas Law: Selected Statutory Overrides
Construction Meets Texas Law: Selected Statutory OverridesConstruction Meets Texas Law: Selected Statutory Overrides
Construction Meets Texas Law: Selected Statutory Overrides
 
Item # 1b August 28, 2023 CCM Minutes
Item # 1b August 28, 2023 CCM MinutesItem # 1b August 28, 2023 CCM Minutes
Item # 1b August 28, 2023 CCM Minutes
 
AH CCM 06.26.17 Item #4 ppt 2017 smp
AH CCM 06.26.17 Item #4   ppt 2017 smpAH CCM 06.26.17 Item #4   ppt 2017 smp
AH CCM 06.26.17 Item #4 ppt 2017 smp
 
Item # 4 - COSA ILA Sidewalk Improvements
Item # 4 - COSA ILA Sidewalk ImprovementsItem # 4 - COSA ILA Sidewalk Improvements
Item # 4 - COSA ILA Sidewalk Improvements
 
Item # 4 - Street Maintenance Program Contract Award
Item # 4 - Street Maintenance Program Contract AwardItem # 4 - Street Maintenance Program Contract Award
Item # 4 - Street Maintenance Program Contract Award
 
Item # 1b - July 24, 2023 CCM Minutes
Item # 1b - July 24, 2023 CCM MinutesItem # 1b - July 24, 2023 CCM Minutes
Item # 1b - July 24, 2023 CCM Minutes
 
Item # 1a - Sept. 25, 2023 CCM Minutes
Item # 1a - Sept. 25, 2023 CCM MinutesItem # 1a - Sept. 25, 2023 CCM Minutes
Item # 1a - Sept. 25, 2023 CCM Minutes
 
PPT Item # 5 - Water Main Installation HDD
PPT Item # 5 - Water Main Installation HDDPPT Item # 5 - Water Main Installation HDD
PPT Item # 5 - Water Main Installation HDD
 
Item # 4 - Engineering Services WA #2
Item # 4 - Engineering Services WA #2Item # 4 - Engineering Services WA #2
Item # 4 - Engineering Services WA #2
 
Item # 1a January 24, 2022 City Council Meeting Minutes
Item # 1a   January 24, 2022 City Council Meeting MinutesItem # 1a   January 24, 2022 City Council Meeting Minutes
Item # 1a January 24, 2022 City Council Meeting Minutes
 
Item # 1a - 3.22.21 CC Minutes
Item # 1a - 3.22.21 CC MinutesItem # 1a - 3.22.21 CC Minutes
Item # 1a - 3.22.21 CC Minutes
 
Item # 8 Sewer Rehab Contract - Ogden
Item # 8   Sewer Rehab Contract - OgdenItem # 8   Sewer Rehab Contract - Ogden
Item # 8 Sewer Rehab Contract - Ogden
 
Item # 1a - August 8, 2022 City Council Meeting Minutes
Item # 1a - August 8, 2022 City Council Meeting  MinutesItem # 1a - August 8, 2022 City Council Meeting  Minutes
Item # 1a - August 8, 2022 City Council Meeting Minutes
 
Item # 1a - January 9, 2023 CCM Minutes
Item # 1a - January 9, 2023 CCM MinutesItem # 1a - January 9, 2023 CCM Minutes
Item # 1a - January 9, 2023 CCM Minutes
 
Item # 1 - December 12, 2022 CCM Minutes
Item # 1 - December 12, 2022 CCM MinutesItem # 1 - December 12, 2022 CCM Minutes
Item # 1 - December 12, 2022 CCM Minutes
 
Item # 1 - December 12, 2022 CCM Minutes
Item # 1 - December 12, 2022 CCM MinutesItem # 1 - December 12, 2022 CCM Minutes
Item # 1 - December 12, 2022 CCM Minutes
 
Item # 1 - December 12, 2022 CCM Minutes.pdf
Item # 1 - December 12, 2022 CCM Minutes.pdfItem # 1 - December 12, 2022 CCM Minutes.pdf
Item # 1 - December 12, 2022 CCM Minutes.pdf
 
Item # 1 - Sept. 27, 2021 City Council Meeting Minutes
Item # 1 - Sept. 27, 2021 City Council Meeting MinutesItem # 1 - Sept. 27, 2021 City Council Meeting Minutes
Item # 1 - Sept. 27, 2021 City Council Meeting Minutes
 
Item # 2 - April 24, 2023 CCM Minutes
Item # 2 - April 24, 2023 CCM MinutesItem # 2 - April 24, 2023 CCM Minutes
Item # 2 - April 24, 2023 CCM Minutes
 
Item # 7 - WGI Austin Hwy Broadway Improvement Project + Budget Amendment
Item # 7 - WGI Austin Hwy Broadway Improvement Project + Budget AmendmentItem # 7 - WGI Austin Hwy Broadway Improvement Project + Budget Amendment
Item # 7 - WGI Austin Hwy Broadway Improvement Project + Budget Amendment
 

More from ahcitycouncil

More from ahcitycouncil (20)

PPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements PowerpointPPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements Powerpoint
 
PPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. ReportPPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. Report
 
Item # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. ReportItem # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. Report
 
PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438
 
Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438
 
Item ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM MinutesItem ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM Minutes
 
PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23
 
Item # 8 - FY23 Annual Comprehensive Financial Report
Item # 8 - FY23 Annual Comprehensive Financial ReportItem # 8 - FY23 Annual Comprehensive Financial Report
Item # 8 - FY23 Annual Comprehensive Financial Report
 
Item # 7 - Adoption of Bexar County Hazard Mitigation Plan
Item # 7 - Adoption of Bexar County Hazard Mitigation PlanItem # 7 - Adoption of Bexar County Hazard Mitigation Plan
Item # 7 - Adoption of Bexar County Hazard Mitigation Plan
 
PPT Item # 7 - Bexar County Hazard Mitigation Plan
PPT Item # 7 - Bexar County Hazard Mitigation PlanPPT Item # 7 - Bexar County Hazard Mitigation Plan
PPT Item # 7 - Bexar County Hazard Mitigation Plan
 
PPT Item # 6 - Designation of Health Authority.pdf
PPT Item # 6 - Designation of Health Authority.pdfPPT Item # 6 - Designation of Health Authority.pdf
PPT Item # 6 - Designation of Health Authority.pdf
 
Item # 6 - Public Health Authority Designation
Item # 6 - Public Health Authority DesignationItem # 6 - Public Health Authority Designation
Item # 6 - Public Health Authority Designation
 
Item # 5 - VIA Telecom Tax Exemption Repeal
Item # 5 - VIA Telecom Tax Exemption RepealItem # 5 - VIA Telecom Tax Exemption Repeal
Item # 5 - VIA Telecom Tax Exemption Repeal
 
PPT Item # 5 - VIA Repeal Telecom Tax Exemption
PPT Item # 5 - VIA Repeal Telecom Tax ExemptionPPT Item # 5 - VIA Repeal Telecom Tax Exemption
PPT Item # 5 - VIA Repeal Telecom Tax Exemption
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
 
Item # 1a - April 09, 2024 CCM Minutes.pdf
Item # 1a - April 09, 2024 CCM Minutes.pdfItem # 1a - April 09, 2024 CCM Minutes.pdf
Item # 1a - April 09, 2024 CCM Minutes.pdf
 
PPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure ProcessesPPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure Processes
 
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfPPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
 

Recently uploaded

Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
HyderabadDolls
 
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Menggugurkan Kandungan 087776558899
 

Recently uploaded (20)

BioandPicforRepKendrick_LastUpdatedMay2024
BioandPicforRepKendrick_LastUpdatedMay2024BioandPicforRepKendrick_LastUpdatedMay2024
BioandPicforRepKendrick_LastUpdatedMay2024
 
Vasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In MumbaiVasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
 
Women Call Girls in gaya 8250092165 Call Girls Advance Cash On Delivery Service
Women Call Girls in gaya  8250092165 Call Girls Advance Cash On Delivery ServiceWomen Call Girls in gaya  8250092165 Call Girls Advance Cash On Delivery Service
Women Call Girls in gaya 8250092165 Call Girls Advance Cash On Delivery Service
 
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
 
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.
 
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
 
Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...
Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...
Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...
 
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
 
independent Call Girls Tiruvannamalai 9332606886Call Girls Advance Cash On D...
independent Call Girls Tiruvannamalai  9332606886Call Girls Advance Cash On D...independent Call Girls Tiruvannamalai  9332606886Call Girls Advance Cash On D...
independent Call Girls Tiruvannamalai 9332606886Call Girls Advance Cash On D...
 
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
 
Call Girl Service in West Tripura 9332606886Call Girls Advance Cash On Deliv...
Call Girl Service in West Tripura  9332606886Call Girls Advance Cash On Deliv...Call Girl Service in West Tripura  9332606886Call Girls Advance Cash On Deliv...
Call Girl Service in West Tripura 9332606886Call Girls Advance Cash On Deliv...
 
Erotic Meerut Call Girls 💯Call Us 🔝 6378878445 🔝 💃 Top Class Call Girl Servi...
Erotic  Meerut Call Girls 💯Call Us 🔝 6378878445 🔝 💃 Top Class Call Girl Servi...Erotic  Meerut Call Girls 💯Call Us 🔝 6378878445 🔝 💃 Top Class Call Girl Servi...
Erotic Meerut Call Girls 💯Call Us 🔝 6378878445 🔝 💃 Top Class Call Girl Servi...
 
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie WhitehouseTime, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 

Item # 4 - 2023 Street Maintenance Program Award

  • 1. 1 CITY OF ALAMO HEIGHTS ADMINISTRATION AND FINANCE DEPARTMENT CITY COUNCIL AGENDA MEMORANDUM TO: Mayor and City Council FROM: Phillip Laney, Assistant City Manager SUBJECT: Approval of Low Bid Contract for the 2023 Street Maintenance Program (SMP) DATE: April 24, 2023 SUMMARY Staff seeks Council’s authorization in accepting the low bid for the 2023 Street Maintenance Program in an amount not to exceed $798,090. BACKGROUND INFORMATION On November 21, 2022 City Manager Buddy Kuhn authorized Freese and Nichols Inc. to provide engineering services in securing bids for the 2023 SMP in the amount of $44,992.00. Contract cost estimates were $1,000,000.00, which includes a five percent contingency. This contract cost estimate was based on 2022’s low bid quantity for similar repairs performed. The City requested bids through advertisements in the San Antonio Express-News on March 8th and March 15th , 2023. A pre-bid submittal meeting was held on March 22, 2023 with bids opening April 6, 2023. City staff secured and opened four bids which were submitted as follows:  Clark Construction in the amount of $602,534.42  CK Newberry LLC in the amount of $841,939.00  Texas Materials in the amount of $871,960.71  BK Paving LLC in the amount of 1,036,526.84 This project consists of approximately 33,125 square yards of roadway improvements, utilizing both milling and overlay of existing surfaces, and full-depth pavement repair. Streets identified for improvements are: 1. Broadway, from Austin Hwy to Albany 2. E. Fair Oaks, from Broadway to N. New Braunfels Due to the favorable pricing by Clark Construction, the City will be approaching the contractor to provide additional street maintenance work to extend the project area north past Albany to Blue Bonnet. State law authorizes local municipalities to increase the original contract amount up to 25% to maximize favorable pricing. The additional work will be negotiated with the selected vendor.
  • 2. 2 POLICY ANALYSIS Local Government Code Sec. 252.048 provides municipalities the ability to submit change order requests to increase the original contract amount by up to 25 percent, with authorization by Council. Freese and Nichols Inc. and City staff recommends the bid contract be awarded to Clark Construction as the lowest bidder that is qualified. The City Attorney and City Manager were also consulted on this recommendation. FISCAL IMPACT Costs for the 2023 Street Maintenance Project include the contract cost with Clark Construction in an amount of $602,534.42 and $44,922.00 for engineering fees by Freese and Nichols Inc. The City has an option to add 25% to a favorable contract in the amount of $150,633.60, totaling a not to exceed amount of $798,090.00. Funds are currently available under the FY 2023 Capital Expense of $1,000,000 for the Street Maintenance Project. ATTACHMENT Attachment A – Recommendation of Award _________________________ Phillip Laney Assistant City Manager ___________________________ Buddy Kuhn City Manager
  • 3. 9601 McAllister Fwy, Suite 1008 San Antonio, Texas 78216 210-298-3800 FAX 817-735-7491 www.freese.com April 17, 2023 Mr. Pat Sullivan Public Works Director City of Alamo Heights 6116 Broadway San Antonio, TX 78209 Re: Recommendation of Award of Contract 2023 Street Maintenance Program FNI Project No. ALH22938 Mr. Sullivan, Four bids were received for the above-referenced project on Thursday, April 6th, 2023. The bids were evaluated and checked for responsiveness. The four bidders included the required documents and were deemed responsive. The bidders from lowest bid to highest bid based on the total bid amount are as follows: Clark Construction of Texas, Inc., CK Newberry, LLC., Texas Materials Group, and BK Paving LLC. A summary of the bids received is provided in the table below and the detailed bid tabulation is attached to this letter. Contractor Total Bid Clark Construction of Texas, Inc. $ 602,534.42 CK Newberry, LLC. $ 841,939.00 Texas Materials Group, Inc. $ 871,960.25 BK Paving LLC. $ 1,036,526.84 Freese and Nichols, Inc. (FNI) performed a reference check for Clark Construction of Texas Inc. FNI contacted two references with the provided information, but did not receive a response. The Contractor has performed favorably in the past with the City. Having submitted the lowest bid on the project and based upon previous performance with the City of Alamo Heights, FNI recommends that the Street Maintenance Program be awarded to Clark Construction of Texas, Inc. for the Total Bid amount of $602,534.42. If you have any questions concerning this recommendation, please contact me at your convenience. Sincerely, Chris Trevino, PE, CCM Freese and Nichols, Inc. Attachment A