The document provides an overview of key changes between the ISO 9001:2008 and ISO 9001:2015 standards and suggestions for addressing these changes. Some of the major changes discussed include a shift to a process-based approach, consideration of interested parties and risks, and expanded leadership responsibilities. The presentation recommends implementing process mapping, collecting stakeholder needs and expectations, conducting risk assessments, and clarifying roles and responsibilities to meet the new standard requirements. It also provides guidance on specific clauses and how different roles within an organization should view the standard. The intent is to help organizations understand and address the new provisions in ISO 9001:2015.
The new ISO 9001:2015 committee draft is published and distributed. There are changes which affect organizations who applied this standard. As it is among most famous ISO standards, follow up the changes would be critical and it is time to consider changes which might affect organizations' management systems.
This presentation gives a bried overview of the various parts & purpose of the ISO 9001:2015 QMS.
It revolves around the PDCA Cycle and useful in Manufacture & construction Industry.
Presented for ASQ India on 3/22/2016 7PM - 8PM IST (6.30 AM -7.30AM PST). Govind will briefly discuss key changes, new requirements and a high level transition plan. The new standard is more aligned with business than ever. However this new standard also bring challenges for auditing. As a QMS manager, auditor or even a practitioner you will be expected to apply this management system standard at work.
A brief Introduction to ISO 9001 2015-Quality Management SystemSARWAR SALAM
Introduction to Quality Management System ISO 9001-2015 as outlined in EDC Romfor's IMS. Preparation, role and resposibility allocation for Audit purposes.
The new ISO 9001:2015 committee draft is published and distributed. There are changes which affect organizations who applied this standard. As it is among most famous ISO standards, follow up the changes would be critical and it is time to consider changes which might affect organizations' management systems.
This presentation gives a bried overview of the various parts & purpose of the ISO 9001:2015 QMS.
It revolves around the PDCA Cycle and useful in Manufacture & construction Industry.
Presented for ASQ India on 3/22/2016 7PM - 8PM IST (6.30 AM -7.30AM PST). Govind will briefly discuss key changes, new requirements and a high level transition plan. The new standard is more aligned with business than ever. However this new standard also bring challenges for auditing. As a QMS manager, auditor or even a practitioner you will be expected to apply this management system standard at work.
A brief Introduction to ISO 9001 2015-Quality Management SystemSARWAR SALAM
Introduction to Quality Management System ISO 9001-2015 as outlined in EDC Romfor's IMS. Preparation, role and resposibility allocation for Audit purposes.
Quality Management System awareness for all ANUPAM RAY
I covered benefit and utilization ISO 9001:2015 standard, 8 quality principle, Root cause analysis, what is ISO, and basic auditing principle. Kindly comment and let me know how I can improve this.
ISO 9001-2015 Revision Training PresentationDQS Inc.
ISO 9001 is a great tool that is used for managing an organization and implementing continuous improvement. More than one million organizations worldwide are certified to ISO 9001 in order to help ensure that good quality products and services are provided to customers.
Get an in-depth overview of the upcoming changes to ISO 9001:2015, including:
- Revision timing and roll out
- Details on structure change
- In-depth review of changes including risk assessment
- Transitioning from ISO 9001:2008 to ISO 9001:2015 timing and requirements
- and more.
Use this ppt presentation to educate groups on what is ISO 9001:2015 standard, what are the requirements of ISO 9001:2015 certification, etc.
For more information visit: https://www.globalmanagergroup.com/
ISO 9001, 14001, 45001 (IMS) basics training materialRanganathanR9
This training material contains Basics of integrated management system on ISO 9001:2015, ISO 14001:2015 & ISO 45001:2018.
This training material will benefit the beginners who wants to learn about integrated management system & it benefits.
Also it will be useful to understand the benefit of integrate all 3 system in one.
The ISO 9000 family addresses various aspects of quality management and contains some of ISO’s best known standards. The standards provide guidance and tools for companies and organizations who want to ensure that their products and services consistently meet customer’s requirements, and that quality is consistently improved.
ISO 9001 is defined as the international standard that specifies requirements for a quality management system (QMS). Organizations use the standard to demonstrate the ability to consistently provide products and services that meet customer and regulatory requirements. It is the most popular standard in the ISO 9000 series and the only standard in the series to which organizations can certify.
ISO 9001 was first published in 1987 by the International Organization for Standardization (ISO), an international agency composed of the national standards bodies of more than 160 countries. The current version of ISO 9001 was released in September 2015.
Over a million organizations in 170 countries have adopted ISO 9001:2015 as their quality management standard. Many more are pursuing this certification. Why? Because ISO 9001 helps your company assure quality, save money and customers expect it. ISO 9001 applies to all types of organizations.
This presentation can be used to brief your employees, new hires and potential auditees so as to create awareness of the ISO 9001:2015 standard. Alternatively, the presentation may be used to supplement your materials for the training of QA professionals and internal auditors.
It covers the what and why of ISO 9001, the QMS clause structure, the audit approach and also offers practical tips on how to handle an audit session. When you are done teaching this material to your employees, they will be much more informed and comfortable with ISO 9001.
LEARNING OBJECTIVES
1. Provide background knowledge on ISO 9001
2. Gain an overview of ISO 9001 structure and the certification process
3. Understand the audit approach
4. Gather useful tips on handling an audit session
CONTENTS
1. Overview of ISO 9001
2. ISO 9001 Structure
3. ISO 9001 Certification Process
4. Audit Approach
5. Handling an Audit Session
To download this complete presentation, please go to: https://www.oeconsulting.com.sg
Quality Management System awareness for all ANUPAM RAY
I covered benefit and utilization ISO 9001:2015 standard, 8 quality principle, Root cause analysis, what is ISO, and basic auditing principle. Kindly comment and let me know how I can improve this.
ISO 9001-2015 Revision Training PresentationDQS Inc.
ISO 9001 is a great tool that is used for managing an organization and implementing continuous improvement. More than one million organizations worldwide are certified to ISO 9001 in order to help ensure that good quality products and services are provided to customers.
Get an in-depth overview of the upcoming changes to ISO 9001:2015, including:
- Revision timing and roll out
- Details on structure change
- In-depth review of changes including risk assessment
- Transitioning from ISO 9001:2008 to ISO 9001:2015 timing and requirements
- and more.
Use this ppt presentation to educate groups on what is ISO 9001:2015 standard, what are the requirements of ISO 9001:2015 certification, etc.
For more information visit: https://www.globalmanagergroup.com/
ISO 9001, 14001, 45001 (IMS) basics training materialRanganathanR9
This training material contains Basics of integrated management system on ISO 9001:2015, ISO 14001:2015 & ISO 45001:2018.
This training material will benefit the beginners who wants to learn about integrated management system & it benefits.
Also it will be useful to understand the benefit of integrate all 3 system in one.
The ISO 9000 family addresses various aspects of quality management and contains some of ISO’s best known standards. The standards provide guidance and tools for companies and organizations who want to ensure that their products and services consistently meet customer’s requirements, and that quality is consistently improved.
ISO 9001 is defined as the international standard that specifies requirements for a quality management system (QMS). Organizations use the standard to demonstrate the ability to consistently provide products and services that meet customer and regulatory requirements. It is the most popular standard in the ISO 9000 series and the only standard in the series to which organizations can certify.
ISO 9001 was first published in 1987 by the International Organization for Standardization (ISO), an international agency composed of the national standards bodies of more than 160 countries. The current version of ISO 9001 was released in September 2015.
Over a million organizations in 170 countries have adopted ISO 9001:2015 as their quality management standard. Many more are pursuing this certification. Why? Because ISO 9001 helps your company assure quality, save money and customers expect it. ISO 9001 applies to all types of organizations.
This presentation can be used to brief your employees, new hires and potential auditees so as to create awareness of the ISO 9001:2015 standard. Alternatively, the presentation may be used to supplement your materials for the training of QA professionals and internal auditors.
It covers the what and why of ISO 9001, the QMS clause structure, the audit approach and also offers practical tips on how to handle an audit session. When you are done teaching this material to your employees, they will be much more informed and comfortable with ISO 9001.
LEARNING OBJECTIVES
1. Provide background knowledge on ISO 9001
2. Gain an overview of ISO 9001 structure and the certification process
3. Understand the audit approach
4. Gather useful tips on handling an audit session
CONTENTS
1. Overview of ISO 9001
2. ISO 9001 Structure
3. ISO 9001 Certification Process
4. Audit Approach
5. Handling an Audit Session
To download this complete presentation, please go to: https://www.oeconsulting.com.sg
In the event of an emergency, many businesses and organizations must have the ability to mitigate damage and continue operating. ISO 22301 is the international standard for Business Continuity Management (BCM). Published by the International Organization for Standardization, ISO 22301 is designed to help organizations prevent, prepare for, respond to and recover from unexpected and disruptive incidents.
Use this ISO 22301 checklist to help when implementing a business continuity management system.
Three Key Methods to Unlock Continuous Improvement across Your PlantSafetyChain Software
How should you identify and address opportunities for improvement across your facility?
From Six Sigma to Kaizen, there are a variety of strategies and approaches to introducing Continuous Improvement (CI) across your organization. But which ones are the most effective and best suited for your organization? And how might you implement them at the plant level?
Join SafetyChain for our upcoming webinar, Three Key Methods to Unlock Continuous Improvement across Your Plant, to gain an overview of three essential CI programs, popular use cases and implementation tactics. Learn how to identify and act upon opportunities for incremental improvement to minimize costs, reduce waste and streamline workflows, while also maintaining quality and high customer satisfaction.
Register for the webinar to learn:
Three essential lean improvement techniques and common applications for these methodologies
How to identify and address inefficiencies as part of the Continuous Improvement (CI) cycle
How to reduce operating overhead and prevent overages – while improving visibility and collaboration
Strategies for approaching CI implementation at your organization
How to create a strong team that is constantly trying to impriove processes and productivity.
Enables teams to determine how they would want to begin and maintain the journey.
An easy read plus descriptive materials to help teams setup strong improvement culture within the company and also within departments.
This webinar will focus on the significant changes between the previous and 2015 revisions of both ISO9001 and ISO14001 and review/clarify the transition process.
QMS Effectiveness: Tracking and Trending Quality Data - OMTEC 2017April Bright
What measurements are useful, and which metrics’ baseline makes sense to show the effectiveness of your quality management system? This presentation takes an ISO 13485 and 21 CFR, Part 820 approach to deciding what measurements are important, how trending makes an impact on risk-based decision-making, and why management review is just one of the ways to discuss and document your Quality Data activities.
Attending a job Interview for B1 and B2 Englsih learnersErika906060
It is a sample of an interview for a business english class for pre-intermediate and intermediate english students with emphasis on the speking ability.
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraAvirahi City Dholera
The Tata Group, a titan of Indian industry, is making waves with its advanced talks with Taiwanese chipmakers Powerchip Semiconductor Manufacturing Corporation (PSMC) and UMC Group. The goal? Establishing a cutting-edge semiconductor fabrication unit (fab) in Dholera, Gujarat. This isn’t just any project; it’s a potential game changer for India’s chipmaking aspirations and a boon for investors seeking promising residential projects in dholera sir.
Visit : https://www.avirahi.com/blog/tata-group-dials-taiwan-for-its-chipmaking-ambition-in-gujarats-dholera/
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. You’ll also learn
• Four (4) workplace discipline methods you should consider
• The best and most practical approach to implementing workplace discipline.
• Three (3) key tips to maintain a disciplined workplace.
Skye Residences | Extended Stay Residences Near Toronto Airportmarketingjdass
Experience unparalleled EXTENDED STAY and comfort at Skye Residences located just minutes from Toronto Airport. Discover sophisticated accommodations tailored for discerning travelers.
Website Link :
https://skyeresidences.com/
https://skyeresidences.com/about-us/
https://skyeresidences.com/gallery/
https://skyeresidences.com/rooms/
https://skyeresidences.com/near-by-attractions/
https://skyeresidences.com/commute/
https://skyeresidences.com/contact/
https://skyeresidences.com/queen-suite-with-sofa-bed/
https://skyeresidences.com/queen-suite-with-sofa-bed-and-balcony/
https://skyeresidences.com/queen-suite-with-sofa-bed-accessible/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-king-queen-suite-with-sofa-bed/
https://skyeresidences.com/2-bedroom-deluxe-queen-suite-with-sofa-bed-accessible/
#Skye Residences Etobicoke, #Skye Residences Near Toronto Airport, #Skye Residences Toronto, #Skye Hotel Toronto, #Skye Hotel Near Toronto Airport, #Hotel Near Toronto Airport, #Near Toronto Airport Accommodation, #Suites Near Toronto Airport, #Etobicoke Suites Near Airport, #Hotel Near Toronto Pearson International Airport, #Toronto Airport Suite Rentals, #Pearson Airport Hotel Suites
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
Implicitly or explicitly all competing businesses employ a strategy to select a mix
of marketing resources. Formulating such competitive strategies fundamentally
involves recognizing relationships between elements of the marketing mix (e.g.,
price and product quality), as well as assessing competitive and market conditions
(i.e., industry structure in the language of economics).
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
Improving profitability for small businessBen Wann
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
"𝑩𝑬𝑮𝑼𝑵 𝑾𝑰𝑻𝑯 𝑻𝑱 𝑰𝑺 𝑯𝑨𝑳𝑭 𝑫𝑶𝑵𝑬"
𝐓𝐉 𝐂𝐨𝐦𝐬 (𝐓𝐉 𝐂𝐨𝐦𝐦𝐮𝐧𝐢𝐜𝐚𝐭𝐢𝐨𝐧𝐬) is a professional event agency that includes experts in the event-organizing market in Vietnam, Korea, and ASEAN countries. We provide unlimited types of events from Music concerts, Fan meetings, and Culture festivals to Corporate events, Internal company events, Golf tournaments, MICE events, and Exhibitions.
𝐓𝐉 𝐂𝐨𝐦𝐬 provides unlimited package services including such as Event organizing, Event planning, Event production, Manpower, PR marketing, Design 2D/3D, VIP protocols, Interpreter agency, etc.
Sports events - Golf competitions/billiards competitions/company sports events: dynamic and challenging
⭐ 𝐅𝐞𝐚𝐭𝐮𝐫𝐞𝐝 𝐩𝐫𝐨𝐣𝐞𝐜𝐭𝐬:
➢ 2024 BAEKHYUN [Lonsdaleite] IN HO CHI MINH
➢ SUPER JUNIOR-L.S.S. THE SHOW : Th3ee Guys in HO CHI MINH
➢FreenBecky 1st Fan Meeting in Vietnam
➢CHILDREN ART EXHIBITION 2024: BEYOND BARRIERS
➢ WOW K-Music Festival 2023
➢ Winner [CROSS] Tour in HCM
➢ Super Show 9 in HCM with Super Junior
➢ HCMC - Gyeongsangbuk-do Culture and Tourism Festival
➢ Korean Vietnam Partnership - Fair with LG
➢ Korean President visits Samsung Electronics R&D Center
➢ Vietnam Food Expo with Lotte Wellfood
"𝐄𝐯𝐞𝐫𝐲 𝐞𝐯𝐞𝐧𝐭 𝐢𝐬 𝐚 𝐬𝐭𝐨𝐫𝐲, 𝐚 𝐬𝐩𝐞𝐜𝐢𝐚𝐥 𝐣𝐨𝐮𝐫𝐧𝐞𝐲. 𝐖𝐞 𝐚𝐥𝐰𝐚𝐲𝐬 𝐛𝐞𝐥𝐢𝐞𝐯𝐞 𝐭𝐡𝐚𝐭 𝐬𝐡𝐨𝐫𝐭𝐥𝐲 𝐲𝐨𝐮 𝐰𝐢𝐥𝐥 𝐛𝐞 𝐚 𝐩𝐚𝐫𝐭 𝐨𝐟 𝐨𝐮𝐫 𝐬𝐭𝐨𝐫𝐢𝐞𝐬."
What is the TDS Return Filing Due Date for FY 2024-25.pdfseoforlegalpillers
It is crucial for the taxpayers to understand about the TDS Return Filing Due Date, so that they can fulfill your TDS obligations efficiently. Taxpayers can avoid penalties by sticking to the deadlines and by accurate filing of TDS. Timely filing of TDS will make sure about the availability of tax credits. You can also seek the professional guidance of experts like Legal Pillers for timely filing of the TDS Return.
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
1. ISO 9001 : 2015
INTERPRETATION AND SUGGESTED
CHANGES TO SYSTEM
C P CHANDRASEKARAN 1
2. Agenda for the programme
• What are the new things in the standard
(2015 Edition as compared to 2008 Edition) ?
• What is the intent behind these changes?
• What should we do to address these new
provisions?
• Questions and Answers
• Total number of slides 40
C P CHANDRASEKARAN 2
3. Structural Changes in clauses from
2008 to 2015
• 2008
• 4. Quality Management
system
• 5. Management
responsibility
• 6. Resource Management
• 7. Product Realisation
• 8. Measurement ,
Analysis and
Improvement
• 2015
• 4. Context of the
Organisation
• 5. Leadership
• 6. Planning
• 7. Support
• 8. Operation
• 9. Performance
evaluation
• 10. Improvement
C P CHANDRASEKARAN 3
4. 1. Standard is taking a view of your organisation
not as a set of departments but as a system
system
process
process
process
process
process
process
Multiple
processes can
be identified
within a system
C P CHANDRASEKARAN 4
This is not a
physical
boundary
5. Since system is built of processes, Describe
each process t understand the system
• A clear description of process is included in
ISO standard with the terminology as sources
of Inputs, Inputs, activities, Outputs and
Receiver of Outputs.
• The organisation may take note of this though
there is no explicit need to document this.
C P CHANDRASEKARAN 5
6. Articulate a Process within a system
with SINACOURE diagram
Process is the building block of Quality.
And can be mapped as in next slide
C P CHANDRASEKARAN 6
7. Further detailing in terms of eight
Dimensions of the process
• Scope
• Sequence
• People
• Role
• Input
• Output
• Controls
• Measures
• Tick mark here whether each of
these is described in your process
map. Then you will find the word
document or the flow chart
becomes in adequate to capture
these eight. Only way is to go to xl.
C P CHANDRASEKARAN 7
8. A sample process map
C P CHANDRASEKARAN
Process
PIP
Process Owner: Dr Sindhu
Scope of the process:
This process starts with the 3rd cycle SBU output GIL and includes the setting of goals at all levels of officers and ends with
the decision on reward and recognition and deciding the development of people in areas which will impact business goals.
Targeted
Stakeholders
Empl
oyee
Busin
ess
Outcome of the
process
1. Employee perception about fairness of the process 2. Capability improvement at individual level 3.Creation of a Learning
organisation
Objectives of the Process
Employee satisfaction on fair rewards : 75% of people should choose good or better. 2) Positive correlation between employee
payouts financial results of company
S No Sequence
GIL
Corp
SBU
Head
Function
Head
Dept
Head
Mana
ger
Assoc
iates
Ex
Com
Control
doc measure Link from Link to
Rema
rks
10
Release of BSC defining
goals for the SBU
P
BSC Strategic
goals from
SBU
Strategic
Planning
20
1st cycle (long term
qualitiative) meeting
Discussions on broad trends
affecting business while taking
into account the BSC. P
30
2nd cylce (long term
quantitative) meeting: Arriving
at specific numbers relevant to
each SBU
8
9. Install Process mapping in your
organisation with xl sheets
• A robust system of mapping the processes is
need to be introduced.
• Many make flow charts mechanically which
serves no purpose.
• The maps have to make all the dimensions of
the process explicit.
• These maps also should be easy to revise and
amend.
C P CHANDRASEKARAN 9
10. 2. Standard defines the beneficiaries of
system as stakeholders/Interested parties
• As the standard expands it scope from
customer to interested parties inputs also
have been shown to be emanating from
interested parties.
• The second new arrow mark is for
organisation and its context which must
incorporate risks and opportunities.
C P CHANDRASEKARAN 10
11. The 2008 standard had this picture
Compare and discuss the changes
C P CHANDRASEKARAN 11
12. PDCA Cycle and the standard
How can
this be
done?
C P CHANDRASEKARAN 12
13. Collect needs and expectations of
stakeholders/interested parties
• A business can survive only if interested
parties willingly support. If any of the
interested parties starts working against the
business it will get destroyed in due course. So
standard now wants this to be done for
sustainability of your business.
• Who are the interested parties to your
business?
• What are their needs and expectations?
C P CHANDRASEKARAN 13
14. How system should be defined to
address this change
• A mechanism to review latest regulatory
requirements and market changes.
• Nomination of suitable agencies or managers
to identify the needs of interested parties
• After considering issues, needs of interested
parties, products and services of the
organisation the scope of QMS should be
defined/modified.
C P CHANDRASEKARAN 14
15. 3.Risk based thinking
• In every process which is followed, there are
inherent risks. They could be due to changes in
materials, changes in people, customer or source
of power etc. which suddenly impact on the
process.(differentiate between systemic failures
and risks)
• Are these considered while implementing the
standard?
• If so, what are the counter measures proposed?
• Again, there is no requirement for documentation
of this exercise.
C P CHANDRASEKARAN 15
16. A risk assessment frame work
process Expecte
d
outcom
e of the
process
In what
ways the
outcome
may not be
achieved
What would
the
economic
impact
(1-10 )?
What is the
probability
that this
may happen
? (1-10)
Risk
assessment
= Impact *
Probability
Core processes
1 Stores of
Inflammable
materials
Safe
working
in
factory
Fire in stores 10 2 20
2
3
C P CHANDRASEKARAN 16
17. NOTE 1 Options to address risks can include
1. avoiding risk,: example stop using nickel
2. taking risk in order to pursue an opportunity,: example export
equipment to Europe with tough laws
3. eliminating the risk source, : example stop importing leather from an
illegal source
4. changing the likelihood or consequences : example increase post
supply monitoring
5. sharing the risk : example use a service contractor for repair
6. or retaining risk by informed decision : example an airbag may not
open in the event of collision and insurer should be aware of it.
NOTE 2
Opportunities can lead to the adoption of new practices,
launching new products, opening new markets, addressing
new customers, building partnerships, using new technology
example export of ayurvedic products to health conscious
Americans C P CHANDRASEKARAN 17
18. Planning of counter measures
Risks where the
product of impact
and probability is >
20
Avoidance Mitigation Acceptance of
risk or sharing
of risk
Responsibility
for actions
Key People leaving
the project
Not Possible Keep one Back
up trained for
each role
Communicate
to the client
HR Manager
C P CHANDRASEKARAN 18
19. Role wise important clauses for HODs
C P CHANDRASEKARAN 19
title
Clause
no CEO
Finance
Head
HR
Head
Mktg
head
Engineering
Head
Manufactu
ring Head
Quality
Head
Procureme
nt Head
Shipping
Head
Admin
Head services
Context 4.1
4.2
4.3
4.4
Leadership 5.1
5.2
5.3
Planning 6.1
6.2
6.3
Support 7.1 7.1.3 7.1.2 7.1.4 7.1.5 7.1.3
7.1.6 7.1.5.2 7.1.5.2
7.2
7.3
7.4
20. Role wise important clauses
C P CHANDRASEKARAN 20
title
Claus
e no CEO
Finance
Head
HR
Head
Mktg
head
Engineering
Head
Manufactu
ring Head
Quality
Head
Procurem
ent Head
Shipping
Head
Admin
Head
service
s
Operation 8.1
8.2
8.3
8.4
8.5 8.5.3
8.6
8.7
Evaluation 9.1
9.2
9.3
Improveme
nt 10.1
10.2
10.3
21. Dept wise important clauses for all employees
C P CHANDRASEKARAN 21
title
Clause
no
Materia
ls
Executi
on sales
Mech
Engg
Innovati
on Admin
Service
s
Manufact
uring Quality Stores
Shippin
g
Support 7.17.1.1 7.1.1 7.1.3 7.1.6 7.1.3
7.1.1.to
7.1.4 7.1.5
7.2
7.3
7.4
7.5
Operati
on 8.1
8.2
8.3 8.3
8.4
8.4.1,.2,
.3 8.4.1
8.5 8.5.1,.5 8.5.1 8.5.4
8.6
8.7
22. Clause
no
2015 2008 Actions required for upgrade
programme
4.1
4.2
4.3
4.4
Understanding Internal
and external issues
affecting the organisation
Identifying the interested
parties and their
requirements
Determining the scope of
the Quality Management
system
Define QMS in terms of its
processes
New
Constantly evaluate the external
environment and internal system
Keep in touch with interested
parties to know their requirements
directly/indirectly
Determine the scope accordingly
Install process approach
Context
C P CHANDRASEKARAN 22
2
23. C P CHANDRASEKARAN 23
External issues
Internal issues
Needs of
Interested Parties
Define
Scope of
QMS
Define
Processes
Clause no 4 Context
24. Clause
no
2015 2008 Actions required for upgrade
programme
5.1.1 Scope of commitment
enhanced to include
especially
a) accountability for
effectiveness of QMS
b) integration of QMS into
business processes
c) promoting the use of
process approach and risk
based thinking
d) promoting
improvement
e) supporting other
management roles
Restricted to
communicating,
establishing
policy, objectives
etc
Accountability of Top Management
needs to be understood as “Buck
stops here” . Theoretically, any
lapse in QMS implementation now
can be attributed to management .
Top management people need to
get visibly involved in QMS and
ensure integration of QMS and day
to day activities.
Since there is no MR, CEO should
now function as de facto MR and
encourage a team to supervise
QMS not on an audit to audit basis
but on daily basis.
Leadership
C P CHANDRASEKARAN 24
2
25. Clause
no
2015 2008 Actions required for upgrade
programme
5.1.2 Scope of customer focus
enhanced to include
especially
a) customer, statutory and
regulatory requirements
are understood (D)
b) Risks and
opportunities in
products are
determined and
addressed.
It was 5.2
Restricted to
ensuring
customer
requirements are
met and
enhancing
customer
satisfaction
Top Management should
document all statutory and
regulatory requirements for the
products and services in the
markets they serve. Now this
cannot be left to a routine
departmental functionary.
As Risk management is new in the
standard, the risk assessment
exercise for the products and
services should be led by top
management. The latest is the
Product Liability Law in developed
countries.
Leadership
When the business is small, the risks are quite low. When it grows, the risks due to failure of
products or services can be huge.
C P CHANDRASEKARAN 25
26. Clause
no
2015 2008 Actions required for upgrade
programme
5.2.1
5.2.2
Establishing Quality policy
Addition
Policy should
support its
strategic direction
Addition
Communication should not
only be for employees but
the policy should be made
available to interested
parties also (D)
It was 5.3 earlier Policy should support strategic
direction-. This means that after
every strategic meeting the
Management must review the
Quality policy (not just
periodically).
New businesses, new services and
new collaborations may demand
change in the policy.
Just like EMS standard, ISO 9001
also has asked the policy to be
made available to interested
parties through website or through
news letters.
Leadership
C P CHANDRASEKARAN 26
27. 5.3
Roles
and
responsi
bilities
This clause now combines
what was earlier under
Management Representative.
QMS planning is also
combined.
Emphasis
a) Ensuring that processes
are delivering their
intended outputs.
b)
It was 5.5 earlier Management representative
post can be dissolved and can
be replaced by Quality systems
Manager assisted by a team.
This team should have 4
functions to enable that
processes will deliver the
intended outputs.
1) Quality Planning
2) Quality system Audits
3) Process Measurement and
analysis
4) Product Quality
measurement and analysis
Leadership
C P CHANDRASEKARAN 27
28. C P CHANDRASEKARAN 28
Clause 5 Leadership
Create Customer focus
Establish and communicate
Quality Policy
Determine roles and
responsibilitiesLeadership
29. Clause
no
2015 2008 Actions required for upgrade programme
6.1
Actions
to
address
risks
and
opportu
nities
Determine risks and
opportunities which
would
a) Enhance
desirable effects
b) Reduce
undesirable
effects
c) Achieve
improvement
This was not
there
In the context of the external issues and
internal challenges, a risk assessment frame
work should be developed which would
evaluate the risks and opportunities.
A severity rating of 1-10 can also be defined so
that those who are of high risks can be
selected. The counter measures for these risks
(avoidance is the best) should be given so that
they can be followed.
Example
Diesel cars to be banned – counter measure
divert the plant capacity for diesel generator
production.
It would require intense work to work on
opportunities in the horizon. Note 1 and Note 2
given in the standard can help.
Planning
C P CHANDRASEKARAN 29
30. Clause no 2015 2008 Actions required for upgrade programme
6.2
Quality
Objective
s and
planning
to
achieve
them
Objectives shall be
monitored and
updated.
Planning now has
been made clear
with what, when,
how etc (every
function) (D)
Earlier it was
covered
under 5.4.2
Objectives should be monitored and progress
reported.
Similarly, the objectives shall be updated if the
situation warrants.
Planning
C P CHANDRASEKARAN 30
31. Clause no 2015 2008 Actions required for upgrade programme
6.3
Planning
of
changes
Planning of changes
Emphasis
Allocation and
reallocation of
responsibilitie
s
Somewhat
covered
under 5.4.2
Change Management should be now a defined
process.
This will help proper implementation.
Planning
C P CHANDRASEKARAN 31
32. C P CHANDRASEKARAN 32
Clause 6 Planning
Actions to address risks
and opportunities
Setting Quality Objectives
and planning to achieve
them
33. Clause no 2015 2008 Actions required for upgrade
programme
7.1
Resources
7.1.1
7.1.2 People
7.1.3
Infrastructure
7.1.4
Environment
for the
operation of
processes
In 7.1.1 emphasis is on
Capabilities and
constraints on internal
resources and also
external providers
(D)
Providing people for
processes (D)
Nothing much added (D)
Social,
psychological and
physical now
included (D)
Similar to 6.1
Similar to 6.2
Similar to 6.3
Only physical
Constant updation of position of
resources and external providers is
needed.
--Emphasis from products to
processes
---
It is going to be a challenge to know
how social and psychological
environment will be determined
and provided and maintained. This
is the toughest clause in standard.
Support
C P CHANDRASEKARAN 33
3
34. Clause no 2015 2008 Actions required for upgrade
programme
7.1.5
Monitoring
and measuring
resources
7.1.5.1 general
7.1.5.2
Traceability
7.1.6
organisational
knowledge
Resources should be
provided for monitoring
and measurement.
Surprisingly, Knowledge
is separate clause under
7.1 resources and
competence is separate.
Partly replaces
7.6 for
calibration
and also
traceability
7.5.3
Identification
and
traceability
New
Apart from calibration of
equipment and devices, the entire
monitoring of products and services
should be governed with proper
resources.
No extra requirement as far as the
calibration is concerned.
Knowledge management via
Libraries, standards, technical
bulletins and web sites (intra
company) are required to preserve
and spread knowledge as a
resource.
Leadership
C P CHANDRASEKARAN 34
35. Clause no 2015 2008 Actions required for upgrade
programme
7.2
Competence
7.3 awareness
7.4
communication
By and large same with
determination of
competence required
and ensuring that the
competence is
maintained.
Except that now it says
“ performance and
effectiveness of Quality
Management system”
instead of product. (D)
Specifically highlighted
for quality policy and
objectives.
Internal and external
communication (D)
Earlier 6.2.2
but that time
it was only for
product.
Earlier part of
6.2.2
Internal was
5.5.3
Competence should be
determined not only for those
affecting product quality but also
for all activities concerned with
QMS. This will expand the
requirement of competence for
areas like Admin, Vendor
development and HR.
Nothing much added.
New system needs to be
developed for external
communication
People
C P CHANDRASEKARAN 35
36. Clause no 2015 2008 Actions required for upgrade
programme
7. 5
Documented
Information
7.5.1 general
7.5.2 Creating
and updating
7.5.3 Control
of
documented
information
All types of documents
namely procedures,
documents and records
are covered
Quality Manual is no
more mandated.
Pretty much the same
Protection of documents
and access control is now
included in the control.
Mention of obsolete
documents is deleted.
Earlier 4.2.1
Earlier 4.2.3
4.2.3 and
4.2.4
Unification of the treatment for all
documented information would be
required. The debate on what is a
record and want is a document is no
more relevant.
The clause now embraces electronic
versions more than paper versions
and hence it is needed to switch
over the implementation to
electronic documents.
Information
C P CHANDRASEKARAN 36
37. C P CHANDRASEKARAN 37
Clause no 7 support
People, Knowledge,
competence, awareness
Infrastructure Environment Measuring resources
Organisational
KnowledgeCommunication
38. Clause no 2015 2008 Actions required for upgrade
programme
8
8.1
Operational
Planning and
control
Determine how to
control the processes in
line with planning done
in clause no 6.
Criteria for both
processes and products
mentioned.
Documented information
necessary to the extent
of creating confidence
that processes have been
carried out and for
conformity of products.
It covers outsourced
processes also. (D)
Link to higher
level plan was
absent.
Outsourced
processes was
not covered.
Operational plan has to be in
alignment with the plan for the QMS
or business.
Operational planning extends to
processes and products which
means those processes which are
not linked an output like a product
but which are essential for QMS like
Training are also covered now.
Operation
C P CHANDRASEKARAN 38
39. Clause no 2015 2008 Actions required for upgrade
programme
8.2
Requirements
for Products and
services
8.2.1 customer
communication
8.2.2
Determining
requirements
8.2.3
Review of
requirements
8.2.4 changes to
requirements
Customer property now merged
in this clause. Establishing
contingency actions is new.
No addition
No addition
Changes should be intimated to
all
Earlier 7.2.1
7.2.2 and
7.2.3
This is for sales to get the
information
What are contingency
actions?
Change notification to be
strengthened
Operation
C P CHANDRASEKARAN 39
40. Clause no 2015 2008 Actions required for upgrade
programme
8.3 Design and
development of
products and
services
8.3.1 General
8.3.2 Design and
Development
planning
8.3.3 Design and
Development
Inputs
8.3.4 Design and
Development
Controls
8.3.5 Design and
Development
outputs
Involvement of customers and
users in the design process
mentioned
No additional requirement
The requirements in Design are
consolidated and explained in one
clause (D)
7.3
7.3.1
7.3.2
---
System to involve users and
customers to be
strengthened
operation
C P CHANDRASEKARAN 40
41. Clause no 2015 2008 Actions required for upgrade
programme
8.3.5 Design and
Development
outputs
8.3.6 Design and
development
changes
“include monitoring and
measuring requirements for
products and services” added
instead of only acceptance
criteria
No addition
Actions taken to adverse
impacts added explicitly
7.3.3
7.3.7
Acceptance criteria was only for
product whereas monitoring
and measuring will encompass
Operation
C P CHANDRASEKARAN 41
42. Clause no 2015 2008 Actions required for upgrade
programme
8.4 Control of
Externally provided
processes , products
and services
8.4.1 General
8.4.2 type and
extent of control
8.4.3 information
for external
providers
Expanded to
externally provided
processes instead of
limiting to
purchasing activity
External process should
remain within control of
QMS
No significant addition
7.4
7.4.2
This needs efforts to bring
outsourced processes within the
ambit of QMS.
Consolidated review is required to
be done to cover the
communication to vendors
operation
C P CHANDRASEKARAN 42
43. Types of External providers
C P CHANDRASEKARAN 43
QMS of the
company
External providers
of products and
services
Incorporated in
to product or
service given
to customer
External providers
of products and
services
customer
External providers
of process
44. Clause no 2015 2008 Actions required for upgrade
programme
8.5 production
and service
provision
8.5.1 control of
production and
service
provision
8.5.2
Identification
and traceability
8.5.3 Property
belonging to
customers
Implementation of
actions to prevent
human error added
Identify all products and keep
traceability when needed
No additional requirement
(D)
Protect property of customer
and if damaged inform the
customer (D)
No additional requirement
7.5
7.5.1
7.5.3
7.5.4
Poka Yoke to be started
Operation
C P CHANDRASEKARAN 44
45. Clause no 2015 2008 Actions required for upgrade
programme
8.5.4
Preservation
8.5.5 Post
Delivery
activities
8.5.6 Control
of changes
8.6 Release of
products and
services
No additional requirement
Ne requirements explicitly stated now
that the company should carry out
post delivery activities as agreed or as
required by regulatory requirements.
Obvious requirement stated for
emphasis.
No addition
Keep record of the releases
7.5.5
8.2.4
System for warranty provision
exists however system for
recycling and disposal need to
be developed.
Changes not only in design but
in production documents need
to be regulated
operation
C P CHANDRASEKARAN 45
46. Clause no 2015 2008 Actions required for upgrade
programme
8.7 Control of
non
conforming
products
8.7.1
8.7.2
Terminological change done
as
Correction, segregation,
containment informing the
customer and obtaining
permission
Retain documented
information about the non
conformity and resolution of
the same (D)
8.3
8.3
Suitable changes need to be done in
documents
operation
C P CHANDRASEKARAN 46
47. C P CHANDRASEKARAN 47
Customer
requirements
Design and
Development
Control on
External
providers
Production Preservation
Release of
product and
post delivery
activities
Clause no 8 Operation
48. Clause no 2015 2008 Actions required for upgrade
programme
9 Performance
evaluation
9.1 Monitoring ,
measurement,
analysis and
evaluation
9.1.1 General
9.1.2 Customer
satisfaction
9.1.3 Analysis and
evaluation
Language simpler and more
clear to indicate the way
measurement needs to be
organised.
No additional requirement
Language made clear about
analysis
8.1
8.2.1
8.4
Quality plans can be synchronised
with the requirement. Those having
Control plans may not require any
action.
Statistical techniques mentioned
Performance
Evaluation
C P CHANDRASEKARAN 48
49. Clause no 2015 2008 Actions required for upgrade
programme
9.2 Internal
audit
9.2.1
9.2.2
9.3
Management
review
9.3.1
9.3.2 Inputs
9.3.3 outputs
No significant addition
No significant addition
Effectiveness of actions taken to
address risks and opportunities
No addition
8.2.2
5.6
As a logical step management
review needs to review status of
counter measures to risks
Performance
Evaluation
C P CHANDRASEKARAN 49
50. C P CHANDRASEKARAN 50
Clause no 9 Performance Evaluation
Customer satisfaction
survey
Internal audit
Day to day monitoring
and measurement
Analysis and
evaluation
Management
review
51. Clause no 2015 2008 Actions required for upgrade
programme
10 Improvement
10.1 General
10.1.1
10.2.1 Non
conformity and
corrective action
10.2.2
Documentation
10.3 Continual
improvement
Preventing and reducing
undesired effects added
Corrective action explained
clearly
The intent behind this clause
is not clear. Earlier the
preventive action was clear
but now we need to debate
and find suitable way to
implement the clause.
8.5.1
Some take a view that since the
risks are already identified, the
preventive action clause is no ore
needed. Then the preventive
action can be maintained under
10.3
Improvement
C P CHANDRASEKARAN 51
52. C P CHANDRASEKARAN 52
Non conformity
from monitoring
and measurement
and complaints
Clause 10 Improvement
React to the non
conformity and
correct it
Eliminate the
causes for non
conformity to
prevent
recurrence
53. C P CHANDRASEKARAN 53
• Scope of QMS
• Quality Policy
• Quality Objectives
• Training of personnel
• Monitoring and measurement resources
• Competence
• Customer’s requirements
• Design and development inputs
• Design and Development outputs
• Evaluation of external providers
• Traceability
• Changes to Production Provision
• Release of product
• Non conformity review
• Measurement and evaluation of QMS
• Internal audits
• Corrective actions on non conformity
• Management Review outputs
Documented
information
Required
54. C P CHANDRASEKARAN 54
Please take the 15 minute test now
End of the Programme
THANK YOU
for any clarification contact
cpchandrasekaran@gmail.com
56. 0.3 Risk based thinking
C P CHANDRASEKARAN 56
Risk-based thinking (see Clause A.4) is essential for achieving an effective quality management
system. The concept of risk-based thinking has been implicit in previous editions of this
International Standard including, for example, carrying out preventive action to eliminate
potential nonconformities, analysing any nonconformities that do occur, and taking action to
prevent recurrence that is appropriate for the effects of the nonconformity. To conform to the
requirements of this International Standard, an organization needs to plan and implement
actions to address risks and opportunities. Addressing both risks and opportunities establishes a
basis for increasing the effectiveness of the quality management system, achieving improved
results and preventing negative effects. Opportunities can arise as a result of a situation
favourable to achieving an intended result, for example, a set of circumstances that allow the
organization to attract customers, develop new products and services, reduce waste or improve
productivity. Actions to address opportunities can also include consideration of associated risks.
Risk is the effect
57. 7.1.4
C P CHANDRASEKARAN 57
7.1.4 Environment for the operation of processes The organization shall determine,
provide and maintain the environment necessary for the operation of its processes
and to achieve conformity of products and services. NOTE A suitable environment
can be a combination of human and physical factors, such as: a) social (e.g. non-
discriminatory, calm, non-confrontational); b) psychological (e.g. stress-reducing,
burnout prevention, emotionally protective); c) physical (e.g. temperature, heat,
humidity, light, airflow, hygiene, noise). These factors can differ substantially
depending on the products and services provided.
58. 7.1.6
C P CHANDRASEKARAN 58
7.1.6 Organizational knowledge The organization shall determine the knowledge
necessary for the operation of its processes and to achieve conformity of products and
services. This knowledge shall be maintained and be made available to the extent
necessary. When addressing changing needs and trends, the organization shall consider
its current knowledge and determine how to acquire or access any necessary additional
knowledge and required updates. NOTE 1 Organizational knowledge is knowledge
specific to the organization; it is generally gained by experience. It is information that is
used and shared to achieve the organization’s objectives. NOTE 2 Organizational
knowledge can be based on: a) internal sources (e.g. intellectual property; knowledge
gained from experience; lessons learned from failures and successful projects;
capturing and sharing undocumented knowledge and experience; the results of
improvements in processes, products and services); b) external sources (e.g. standards
59. 8.4
C P CHANDRASEKARAN 59
The organization shall ensure that externally provided processes, products and services
conform to requirements. The organization shall determine the controls to be applied to
externally provided processes, products and services when: a) products and services
from external providers are intended for incorporation into the organization’s own
products and services;b) products and services are provided directly to the customer(s)
by external providers on behalf of the organization;c) a process, or part of a process, is
provided by an external provider as a result of a decision by the organization. The
organization shall determine and apply criteria for the evaluation, selection, monitoring
of performance, and re-evaluation of external providers, based on their ability
60. 8.5.5
C P CHANDRASEKARAN 60
8.5.5 Post-delivery activities The organization shall meet requirements for post-
delivery activities associated with the products and services. In determining the extent
of post-delivery activities that are required, the organization shall consider: a)
statutory and regulatory requirements; b) the potential undesired consequences
associated with its products and services; c) the nature, use and intended lifetime of
its products and services; d) customer requirements; e) customer feedback. NOTE
Post-delivery activities can include actions under warranty provisions, contractual
61. 10.3
C P CHANDRASEKARAN 61
10.3 Continual improvement The organization shall continually improve the
suitability, adequacy and effectiveness of the quality
10.3 Continual improvement The organization shall continually improve the
suitability, adequacy and effectiveness of the quality
Editor's Notes
Look at the organisation interms of processes and not in terms of depts