ISO 9001:2015
Introduction to International standard for Quality Management System
LEARNING OBJECTIVES
Understand
Understand the basic
concepts and
terminology of ISO
9001:2015
Identify
Identify approaches to
implement the
requirements of ISO
9001:2015
Appreciate
Appreciate the
significance of
organizational context,
leadership and
adopting a risk-based
approach in process
management
Create
Create an action plan to
prepare for
implementation and
certification
WHAT ‘ISO’ IS
World’s largest developer of voluntary
international standards
Central Secretariat in Geneva, Switzerland
- An independent, non-governmental
organization
Operations began in February 1947 -
Membership of national standards bodies
of 162 countries
Since then around 20,500 International
Standards have been developed covering
almost all aspects of technology and
business
3
ISO 9000 SERIES
ISO 9001:2015
• sets out the
requirements
of a quality
management
system
ISO 9000:2015
• covers the
basic concepts
and language
ISO 9004:2009
• focuses on how
to make a
quality
management
system more
efficient and
effective
ISO
19011:2018
• sets out
guidance on
internal and
external audits
of quality
management
systems
ISO 9001 REVISIONS
INSERT TOPIC HERE 5
1987
First published
1994
First revision
2000
Second revision
2008
Third revision
2015
Fourth and the latest revision (Fifth
edition)
ISO 9001:2015 CERTIFICATION – HIGH LEVEL PROJECT PLAN
Nov
August
August
Dec.
Jan.
1. Management
Commitment
2. Organizational
Preparation
3. Process Designing, Analysis
and Implementation
4. Internal Assessment and
Review
5. External Assessment
6. Continual Improvement
Ongoing Activity
06 Months approx.
Start
• Finalization of Certification Project Plan, Kick-off Meeting & Core team
(Quality Leaders / Champions) Selection
• Team Orientation and Process / Scope Identification
• Development & Implementation of Quality Frameworks, Polices,
Manuals, System & Functional SOPs / WI / RISK / KPIs / Templates to
meet ISO 9001:2015 Requirements
• Internal Compliance/KPIs Monitoring, Internal
Audits, Management Review, Corrective and
Preventive actions.
• Transition Audit by Certification
Body & Annual Re-assessment.
ISO 9001 EXPLAINED …
VERBAL FORMS - EXPLAINED
“shall” indicates a requirement (needs to be done)
“should” indicates a recommendation
“may” indicates a permission
“can” indicates a possibility or a capability
4 CONTEXT OF THE ORGANIZATION
4.1 Understanding the organization and its context
Identify, monitor and review external and internal issues that are relevant to the purpose of
organization and that can have an impact on the effectiveness of its quality management system.
4.2 Understanding the needs and expectations of interested parties
Determine the interested parties that are relevant to the quality management system and the
requirements of these interested parties.
4 CONTEXT OF THE ORGANIZATION
4.3 Determining the scope of the quality management system
Scope will be established considering:
external and internal issues
requirements of interested parties
products and services of the organization
Justification in case a requirement of the standard cannot be applied
Context of OrganizationContext of the Organization.docx
4.4 QUALITY MANAGEMENT SYSTEM AND ITS PROCESSES
Regarding the processes needed for the QMS, the organization is required to:
a)determine the inputs required and the outputs expected
b)determine the sequence and interaction of the processes
c)determine and apply the criteria and methods (including monitoring, measurements and related
performance indicators)
d)determine the resources needed and ensure their availability
e)assign responsibilities and authorities for these processes
f)address the risks and opportunities
g)evaluate the processes and implement any changes to achieve intended results
h)improve the processes and the QMS
PROCESS APPROACH - ELEMENTS OF A SINGLE PROCESS
PROCESS APPROACH
The key aspect of ‘Process Approach’ is actually understanding a process and it’s component
parts, i.e.
What are the inputs?
Who does the work?
What with?
How do they do it (and how monitored)?
What is the objective/target of the process?
What are the outputs?
What other processes support this process
Process Approach1. Sample Process Matrix.doc
5 LEADERSHIP
‘Management Responsibility’ now becomes ‘Leadership’
Top Management need to demonstrate engagement in key QMS activities
A number of QMS requirements placed under the head of Leadership including the following:
 accountability for the effectiveness of the QMS
 quality policy and quality objectives are established
 integration of the QMS requirements into the organization’s business processes
 promoting the use of the process approach & risk based thinking.
 resources needed for QMS are available
 promoting improvement
 supporting other relevant management roles to demonstrate their leadership as it applies to their areas of responsibility.
5 LEADERSHIP
5.1.2 Customer focus
Top management shall demonstrate leadership and commitment with respect to customer focus by
ensuring that:
a. customer and applicable statutory and regulatory requirements are determined, understood and
consistently met
b. risks & opportunities that can affect conformity of products and services and the ability to enhance
customer satisfaction are determined
c. focus on enhancing customer satisfaction is maintained.
5 LEADERSHIP
5.2 Quality policy
Top management shall establish, review and maintain a quality policy that:
is appropriate to the purpose and context of the organization,
provides framework for setting of quality objectives,
includes commitment to satisfy applicable requirements.
Includes commitment to continual improvement of the QMS.
The policy shall be communicated to relevant interested parties.
5 LEADERSHIP
5.3 Organizational roles, responsibilities and authorities
Top management shall assign the responsibility and authority for:
ensuring that the quality management system conforms to the requirements of this International
Standard,
ensuring that the processes are delivering their intended outputs,
reporting on the performance of QMS and opportunities for improvement, in particular to top
management,
ensuring promotion of customer focus throughout the organization,
ensuring that the integrity and effectiveness of the quality management system is maintained.
6 - PLANNING
6.1 Actions to address risks and opportunities
 Determine the risks and opportunities that can impact QMS, considering the organization’s
context and requirements of interested parties
 Risk management methodology to be decided
 Actions taken to address risks and realize opportunities
 It is advisable for the risk assessments to be carried out by a team so that there are inputs from the functions that
could be affected.
WHAT IS “RISK-BASED THINKING”?
 Risk-based thinking is something we all do automatically and often sub-consciously
 The concept of risk has always been implicit in ISO 9001 – this revision makes it more explicit and
builds it into the whole management system
 Risk-based thinking is already part of the process approach
 Risk-based thinking makes preventive action part of the routine
 Risk is often thought of only in the negative sense, risk-based thinking can also help to identify
opportunities - this can be considered to be the positive side of risk
WHAT SHOULD WE DO?
 Analyze and prioritize the risks and
opportunities in your functional processes
 What is acceptable?
 What is unacceptable?
 Plan actions to address the risks
 How can I avoid or eliminate the risk?
 How can I mitigate the risk?
 Implement the plan – take action
 Check the effectiveness of the actions – does it
work?
 Learn from experience – continual
improvement
Descriptio
n
Rati
ng
Description
Major Non-
Conformanc
e
5
Cancelation of registration/affiliation,
Cancelation of Certification (Hold Certification
until Non Conformance is not removed), and/or
Legal action against organization.
Minor Non-
Conformanc
e
4
Compliance to procedures will get affected,
Warnings from regulatory authorities, and
interested parties satisfaction level will
decrease.
Opportunity
for
Improveme
nt
3 Objectives and Targets will not be achieved.
Acceptable 2
Slight effect on Quality Management System or
Quality of Services
Negligible 1
No Effect on Quality Management System or Quality
of Services
Risk Identification Chart
Rating Description Description
5 Almost Certain If activity occurs on Daily / Hourly basis
4 Likely If activity occurs on Weekly or Monthly basis
3 Possible If activity occurs on bi-annually basis
2 Unlikely If activity occurs on annually basis
1 Rare If activity occurred or can occur once in history
‹---
CO
NS
EQ
UE
NC
E--
-›
5
5 10 15 20 25
17-25 Unacceptable
Stop Activity & Make Immediate Improvements
4 4 8 12 16 20 10-16 High Risk
Look to Improve within specified time scale
3 3 6 9 12 15 5-9 Moderate Risk
Look to Improve at next review
2 2 4 6 8 10 3-4 Very Low Risk
Ensure controls are maintained
1 1 2 3 4 5 1-2 Acceptable Risk
No Further Action Required
1 2 3 4 5
Risk Scoring = Likelihood score (L) × Consequence score (C)
Risk Assessment Matrix Risk Category
Consequence (C )
Likelihood (L) score
6 PLANNING
6.2 Quality objectives and planning to achieve them
Measureable quality objectives to be established at relevant functions, levels
and processes
be relevant to conformity of products and services and the enhancement of
customer satisfaction
be monitored, communicated and updated as appropriate
Quality Objectives & Action Plans
Department: Lab
Respective Section: Common for all sections
Objective No.: IDC-QO-01-2018
Objective Statement: Improve the Patient Satisfaction Level up to 95% by end of December 2018
Accountability & Responsibility: CEO/Director Lab & Manager Laboratory
Action Plan:
6 PLANNING
Action Step Description
(What will be Done)
Responsibility / Performer Key Resources & Support Needs
Target
Timelines for
Completion
Desired Outcome
(Targeted Value)
Monitoring &
Evaluation
Steps
Related Record
Team Discussion & Way Forward
Manager Lab & Functional
Heads
Management Plan and Approval of Key
Tasks. Admin Support
May 2018 Finalized Plan
Monthly
review
QOHB/Reports
Monitoring, Analysis and Reduction in number of
errors at registration / accession / phlebotomy
Supervisor Lab /
Phlebotomist
IT support /
Monitoring Tool / Training / New
Administrative Initiatives
June 2018 Reports / Stats
Monthly
review QOHB/Reports
Monitoring and improvement of examination
processes efficiency to achieve 99% reporting in
due time
Supervisor Lab / Lab Tech. IT support /
Monitoring Tool / Training / New
Administrative Initiatives
Aug 2018
Reports /
Stats
Monthly
review QOHB/Reports
Reduce the error in report / number of corrected
reports <01%
Supervisor Lab / Lab Tech.
IT support /
Monitoring Tool / Training / New
Administrative Initiatives
Sept. 2018
Reports /
Stats
Monthly
review QOHB/Reports
Improve timely and accurate retrieval of the
stored samples up to 90% in 1 hours & 100% in 2
hours
Supervisor Lab / Lab Tech.
IT support /
Monitoring Tool / Training / New
Administrative Initiatives
Sept. 2018
Reports /
Stats
Monthly
review QOHB/Reports
Monitor %age of urgent examinations reporting
in due time
Supervisor Lab / Lab Tech.
IT support /
Monitoring Tool / Training / New
Administrative Initiatives
Sept. 2018
Reports /
Stats
Monthly
review QOHB/Reports
Monitor %age of complaints resolved in due
time
Sales & Marketing
IT support /
Monitoring Tool / Training / New
Administrative Initiatives
Sept. 2018
Reports /
Stats
Monthly
review QOHB/Reports
Finalize the above action stats and presentation
of report the management
Manager Lab
IT support /
Monitoring Tool / Training / New
Administrative Initiatives
Sept. 2018
Reports /
Stats
Monthly
review QOHB/Reports
6 PLANNING
6.3 Planning of changes
Changes to the QMS shall be carried out in a planned and systematic manner considering:
the purpose of the change and its potential consequences
the integrity of the quality management system
the availability of resources
the allocation or reallocation of responsibilities & authorities
7 SUPPORT : 7.1 RESOURCES
7.1.1 General
The organization shall determine and provide the resources for an effective QMS
considering:
a) the capabilities of, and constraints on, existing internal resources
b) what needs to be obtained from external providers
7 SUPPORT : 7.1 RESOURCES
7.1.2 People
The organization shall provide persons for an effective QMS considering customer and
applicable statutory and regulatory requirements.
7 SUPPORT : 7.1 RESOURCES
7.1.3 Infrastructure
Determine, provide and maintain infrastructure including:
building and associated utilities
equipment including hardware and software
transportation
information and communication technology
7 SUPPORT : 7.1 RESOURCES
7.1.4 Environment for the operation of processes
“Work environment” now becomes “environment” necessary for the operation of processes
Environment for the operation of processes can include physical, social, and psychological
factors
7 SUPPORT : 7.1 RESOURCES
7.1.5 Monitoring and measuring resources
Monitoring and measuring ‘equipment’ now becomes ‘resources’ which includes humans as well
Monitoring and measuring equipment to be calibrated at specified intervals against (national
or international) traceable standards
Provided resources are suitable for the specific type of monitoring & measurement activities
being undertaken
Equipment are identified in order to determine their status
Equipment shall be safeguarded from adjustments, damage or deterioration that would
invalidate the calibration status & subsequent measurement results.
7 SUPPORT : 7.1 RESOURCES
7.1.6 Organizational Knowledge
Determine the knowledge necessary for the
operation of processes and to achieve
conformity of products and services
This knowledge shall be maintained, and
made available to the extent necessary
7 SUPPORT
7.2 Competence
No significant change here, however, existing system needs to be reviewed in order to
ensure that:
competence requirements are established for person(s) doing work under the control of the
organization that affects its quality performance
actions are taken to acquire the necessary competence, and their effectiveness evaluated
Applicable actions can include, for example, the provision of training to, the mentoring of, or the re-assignment of currently employed
persons; or the hiring or contracting of competent persons
7 - SUPPORT
7.3 Awareness
 Now a separate clause and covers all persons doing work under organization’s control. Persons
will be aware of:
 Quality policy
 Relevant quality objectives
Their contribution to the effectiveness of the quality management system, including the benefits of
improved performance
The implications of not conforming with the quality management system requirements
7 SUPPORT
7.4 Communication
Explicit requirements on both internal and external communication processes:
a)on what it will communicate
b)when to communicate
c)with whom to communicate
d)how to communicate
e)who communicates
7 SUPPORT
7.5 Documented information
All sort of documentation (manual, procedures and records) now replaced with the term
‘documented information’
Requirements now explained with more clarity including very much needed aspects like
medium of documents and confidentiality
Contd.
7.5 DOCUMENTED INFORMATION
identification and description of documented information (e.g. a title, date, author, or reference
number)
format (e.g. language, software version, graphics) and media (e.g. paper, electronic)
available and suitable for use, where and when it is needed
adequately protected (e.g. from loss of confidentiality, improper use, or loss of integrity)
distribution, access, retrieval and use
storage and preservation, including preservation of legibility
other requirements remain the same as in ISO 9001:2008.
QMS – DOCUMENTATION STRUCTURE
Level 01
• Enterprise Level Policies
• Articles
• Memomrandums
• Business Plan
• Vision, Mission
• Diagnostic Services &
Quality Management
Framework
• Quality Policy
• Organogram
Level 02
• SOPs
• STPs
• Handbooks
Level 03
• Work Instructions
• Guidelines
• Quality Plans
• Operational Plans
Level 04
• Operational Record
• Reports
• Dashboards
• Presentations
• Minutes
• Memo
• Flyers
• QMS Record
8 OPERATION
8.1 Operational planning and control
‘Planning of product realization’ replaced with ‘Operational planning and control’
Requirements generally remain the same as in ISO 9001:2008 but now with more
emphasis on process approach
8 OPERATION
8.1 Operational planning and control
determine requirements for products & services
establish criteria for the processes and the acceptance of products & services
determine resources
implement control of the processes in accordance with the criteria
determine / maintain / retain documented information
8 OPERATION
8.2 Requirements for products and services
8.2.1 Customer communication
The organization shall establish processes for communicating with customers for:
providing information relating to products and services
handling enquires/orders/contracts, including changes
obtaining customer feedback including complaints
handling or controlling customer property
establishing specific requirements for contingency actions
8 OPERATION
8.2.2 & 8.2.3 Determination and review of requirements
The organization shall determine the requirements for the products and services to be offered to
customers
Product and service requirements include those considered necessary by the organization,
applicable statutory and regulatory requirements, those of customers and interested parties
The organization shall ensure that it has the ability to meet the requirements, by conducting a
review, before making any commitment
8.3 DESIGN AND DEVELOPMENT OF PRODUCTS
AND SERVICES
Organization shall establish, implement and maintain a design and development
process including the following aspects:
Planning
Inputs
Controls (reviews, verification and validation activities)
Outputs
Changes
8.4 CONTROL OF EXTERNALLY PROVIDED PRODUCTS
AND SERVICES
The standard requires to apply controls to the following types of externally provided
products and services:
a)products and services provided by external providers for incorporation into the
organization’s own products and services
b)products and services provided directly to the customer(s) by external providers on
behalf of the organization
c)a process or part of a process is provided by an external provider as a result of a
decision by the organization to outsource a process
8.4 CONTROL OF EXTERNALLY PROVIDED PRODUCTS
AND SERVICES
Type and extent of control will depend upon the potential impact of the externally provided processes,
products and services on the organization’s processes, products and services
Processes of the organization which have been outsourced to an external provider shall remain within the
control of the organization’s quality management system
The organization shall communicate complete information to external providers regarding the processes,
products and services to be provided
Criteria to be established for evaluation, selection, performance monitoring and re-evaluation of external
providers
8.5 PRODUCTION AND SERVICE PROVISION
8.5.1 Control of production and service provision
Previous clauses 7.5.1 and 7.5.2 have been combined in this one clause with the following aspects:
products and services criteria and standards
documented information that defines the activities to be performed (previously work instructions)
suitable infrastructure, process environment and suitable monitoring and measuring resources
appointment of competent persons
validation and revalidation of special processes
implementation of actions to prevent human error
implementation of release, delivery & post delivery activities
8.5 PRODUCTION AND SERVICE PROVISION
8.5.2 Identification and traceability
Requirements remain the same as in ISO 9001:2008, however, the term ‘product’ is now
replaced by ‘process output’
Process outputs are the results of any activities which are ready for delivery to the
organization’s customer or to an internal customer (e.g. receiver of the inputs to the next
process); these may include products, services, intermediate parts, components, etc.
8.5 PRODUCTION AND SERVICE PROVISION
8.5.3 Property belonging to customers or external providers
Customer property now extended with property of external providers. Property
further explained as:
Property can include materials, components, tools and equipment, premises, intellectual
property and personal data.
8.5 PRODUCTION AND SERVICE PROVISION
8.5.4 Preservation
Again the term ‘product’ is replaced by ‘process output’. Scope of preservation now
explained in the form of following note, previously part of the clause:
“Preservation can include identification, handling, contamination control, packaging,
storage, transmission or transportation, and protection”
8.5 PRODUCTION AND SERVICE PROVISION
8.5.5 Post-delivery activities (New clause)
The organization shall meet requirements for post-delivery activities associated with the products and services.
In determining the extent of post-delivery activities that are required, the organization shall consider:
a)statutory and regulatory requirements
b)the potential undesired consequences associated with its product & services
c)the nature, use & intended lifetime of its products & services
d)customer requirements
e)customer feedback
NOTE: Post-delivery activities can include actions under warranty provisions, contractual obligations such as maintenance services, and supplementary services
such as recycling or final disposal.
8.5 PRODUCTION AND SERVICE PROVISION
8.5.6 Control of changes
(New clause)
The organization shall review and control
changes essential for production or service
provision, to the extent necessary to ensure
continuing conformity with requirements.
The organization shall retain documented
information describing the results of the
review of changes, the person(s) authorizing
the change, and any necessary actions
arising from the review.
8.6 RELEASE OF PRODUCTS AND SERVICES
Previous clause (as in ISO 9001:2008) ‘Monitoring and measurement of product’
rephrased as ‘Release of products and services’ with no change in requirements.
8.7 CONTROL OF NONCONFORMING OUTPUTS
Take appropriate action based on the nature of the nonconformity and its
effect on the conformity of products and services
This would also include the scenario when nonconformity detected after
product delivery, during or after service provision
Retain records
9.1 MONITORING, MEASUREMENT, ANALYSIS
AND EVALUATION
9.1.1 General
The organization shall determine:
a)what needs to be monitored and measured
b)the methods for monitoring, measurement, analysis and evaluation needed to ensure valid results
c)when the monitoring and measuring shall be performed
d)when the results from monitoring and measurement shall be analyzed and evaluated
9.1 MONITORING, MEASUREMENT, ANALYSIS
AND EVALUATION
9.1.2 Customer satisfaction
The organization shall monitor customers’ perception of the degree to which their
needs and expectations have been fulfilled.
Methods for obtaining, monitoring and reviewing this information shall be determined
9.1 MONITORING, MEASUREMENT, ANALYSIS
AND EVALUATION
9.1.3 Analysis and evaluation
Appropriate data and information arising from monitoring and measurement shall
be analyzed. The results of analysis shall be used to evaluate:
conformity of products and services
degree of customer satisfaction
performance and effectiveness of QMS
effective implementation of planning
performance of external provider(s)
effectiveness of actions taken to address risks & opportunities
need for improvement to the QMS
9.2 INTERNAL AUDIT
The organization shall:
conduct audits at planned intervals
have detailed audit programme(s)
define criteria and scope for each audit
provide competent auditors
ensure impartiality
ensure reporting of results to relevant management
take appropriate corrections and corrective actions without undue delay
retain documented information
Internal auditors should be trained on the process approach, risk assessment etc.
9.3 MANAGEMENT REVIEW
Input requirements have been enhanced and made more explicit, including:
changes in external and internal issues that are relevant to the QMS
information on the performance and effectiveness of the QMS, including trends in:
- feedback from relevant interested parties
- performance of external providers
- monitoring and measurement results
adequacy of resources
the effectiveness of actions taken to address risks and opportunities
9.3 MANAGEMENT REVIEW
Outputs of the management review shall include decisions and actions related to:
a)opportunities for improvement
b)any need for changes to the QMS
c)resource needs
Documented information to be retained
10 IMPROVEMENT
10.1 General (New clause)
‘Continual improvement’ now modified as ‘improvement’ - more broader concept
The new approach includes:
a)improving products and services to meet requirements as well as to address future needs and expectations
b)correcting, preventing or reducing undesired effects
c)improving the performance and effectiveness of the QMS
Note: Improvement can be effected reactively (corrective action), incrementally (continual improvement), by step change (breakthrough), creatively
(innovation) or by re-organization (transformation).
10 IMPROVEMENT
10.2 Nonconformity and corrective action
More explicit requirements given with respect to handling a nonconformity, the changes include:
take action to control and correct it (correction)
deal with the consequences
evaluate the need for action to eliminate the cause(s) of the nonconformity, in order that it does not
recur or occur elsewhere
update risks and opportunities determined during planning
make changes to the quality management system, if necessary
10 IMPROVEMENT
10.3 Continual improvement
The organization shall continually
improve the suitability, adequacy, and
effectiveness of the quality management
system.
The organization shall consider the
results of analysis and evaluation, and
the outputs from management review, to
determine if there are needs or
opportunities that shall be addressed as
part of continual improvement.
ISO 45001:2018 OVERVIEW
ISO 45001:2018 is the international standard for Occupational Health and Safety
Management Systems (OHSMS).
- Replaces OHSAS 18001.
- Provides a framework to manage OH&S risks and opportunities.
- Integrates with other ISO standards like ISO 9001.
- Emphasizes leadership, worker participation, and risk-based thinking.
- Aims to improve employee safety, reduce workplace risks, and create better
working conditions.
ISO 45001:2018 STANDARD CLAUSES
Core Clauses of ISO 45001:2018:
1. Scope
2. Normative references
3. Terms and definitions
4. Context of the organization
5. Leadership and worker participation
6. Planning (including hazard identification and risk assessment)
7. Support
8. Operation (including emergency preparedness and response)
9. Performance evaluation
10. Improvement
ISO 9001:2015 VS ISO 45001:2018
Key Differences:
- Focus: ISO 9001 is for quality management; ISO 45001 is for occupational health & safety.
- Clause 5: ISO 45001 includes 'worker participation'; ISO 9001 focuses on 'customer
satisfaction'.
- Clause 6: ISO 45001 includes hazard identification; ISO 9001 focuses on risks to
product/service quality.
- ISO 45001 emphasizes legal and regulatory OH&S compliance more heavily.
- Leadership in ISO 45001 is responsible for OH&S culture and worker consultation.
Both use High-Level Structure (Annex SL) and risk-based thinking.
ISO 45001:2018 – CLAUSE 4. CONTEXT OF THE
ORGANIZATION
- Understand internal and external OH&S issues (e.g., regulatory changes, workplace
culture).
- Identify interested parties: employees, contractors, regulators.
- Define OHSMS scope clearly based on risk exposure and operational control.
ISO 45001:2018 – CLAUSE 5. LEADERSHIP AND
WORKER PARTICIPATION
- Top management must demonstrate leadership in OH&S, integrating it into the
organization’s strategy.
- Establish OH&S policy and objectives.
- Ensure worker consultation and participation in decision-making (e.g., safety
committees).
ISO 45001:2018 – CLAUSE 6. PLANNING
- Identify OH&S risks and opportunities.
- Conduct hazard identification and risk assessments (e.g., using Job Hazard Analysis).
- Plan for legal compliance and emergency preparedness.
- Define measurable OH&S objectives (e.g., reduce injury rate by 10%).
ISO 45001:2018 – CLAUSE 7. SUPPORT
- Ensure competent personnel (e.g., safety training and certification).
- Promote awareness of OH&S responsibilities.
- Maintain OH&S documentation and ensure effective communication (e.g., toolbox
talks).
ISO 45001:2018 – CLAUSE 8. OPERATION
- Implement operational controls to eliminate hazards (e.g., engineering controls).
- Prepare and test emergency response procedures (e.g., fire drills).
- Control of outsourced work that impacts OH&S (e.g., third-party maintenance).
ISO 45001:2018 – CLAUSE 9. PERFORMANCE
EVALUATION
- Monitor and measure OH&S performance (e.g., incident rates, near misses).
- Conduct internal audits and management reviews focused on OH&S outcomes.
ISO 45001:2018 – CLAUSE 10. IMPROVEMENT
- Address incidents and nonconformities (e.g., root cause analysis of workplace
accidents).
- Continuously improve OH&S performance through worker feedback and lessons
learned.
THANK YOU

_ISO_Presentation_ISO 9001 and 45001.pptx

  • 1.
    ISO 9001:2015 Introduction toInternational standard for Quality Management System
  • 2.
    LEARNING OBJECTIVES Understand Understand thebasic concepts and terminology of ISO 9001:2015 Identify Identify approaches to implement the requirements of ISO 9001:2015 Appreciate Appreciate the significance of organizational context, leadership and adopting a risk-based approach in process management Create Create an action plan to prepare for implementation and certification
  • 3.
    WHAT ‘ISO’ IS World’slargest developer of voluntary international standards Central Secretariat in Geneva, Switzerland - An independent, non-governmental organization Operations began in February 1947 - Membership of national standards bodies of 162 countries Since then around 20,500 International Standards have been developed covering almost all aspects of technology and business 3
  • 4.
    ISO 9000 SERIES ISO9001:2015 • sets out the requirements of a quality management system ISO 9000:2015 • covers the basic concepts and language ISO 9004:2009 • focuses on how to make a quality management system more efficient and effective ISO 19011:2018 • sets out guidance on internal and external audits of quality management systems
  • 5.
    ISO 9001 REVISIONS INSERTTOPIC HERE 5 1987 First published 1994 First revision 2000 Second revision 2008 Third revision 2015 Fourth and the latest revision (Fifth edition)
  • 6.
    ISO 9001:2015 CERTIFICATION– HIGH LEVEL PROJECT PLAN Nov August August Dec. Jan. 1. Management Commitment 2. Organizational Preparation 3. Process Designing, Analysis and Implementation 4. Internal Assessment and Review 5. External Assessment 6. Continual Improvement Ongoing Activity 06 Months approx. Start • Finalization of Certification Project Plan, Kick-off Meeting & Core team (Quality Leaders / Champions) Selection • Team Orientation and Process / Scope Identification • Development & Implementation of Quality Frameworks, Polices, Manuals, System & Functional SOPs / WI / RISK / KPIs / Templates to meet ISO 9001:2015 Requirements • Internal Compliance/KPIs Monitoring, Internal Audits, Management Review, Corrective and Preventive actions. • Transition Audit by Certification Body & Annual Re-assessment.
  • 7.
  • 8.
    VERBAL FORMS -EXPLAINED “shall” indicates a requirement (needs to be done) “should” indicates a recommendation “may” indicates a permission “can” indicates a possibility or a capability
  • 9.
    4 CONTEXT OFTHE ORGANIZATION 4.1 Understanding the organization and its context Identify, monitor and review external and internal issues that are relevant to the purpose of organization and that can have an impact on the effectiveness of its quality management system. 4.2 Understanding the needs and expectations of interested parties Determine the interested parties that are relevant to the quality management system and the requirements of these interested parties.
  • 10.
    4 CONTEXT OFTHE ORGANIZATION 4.3 Determining the scope of the quality management system Scope will be established considering: external and internal issues requirements of interested parties products and services of the organization Justification in case a requirement of the standard cannot be applied Context of OrganizationContext of the Organization.docx
  • 11.
    4.4 QUALITY MANAGEMENTSYSTEM AND ITS PROCESSES Regarding the processes needed for the QMS, the organization is required to: a)determine the inputs required and the outputs expected b)determine the sequence and interaction of the processes c)determine and apply the criteria and methods (including monitoring, measurements and related performance indicators) d)determine the resources needed and ensure their availability e)assign responsibilities and authorities for these processes f)address the risks and opportunities g)evaluate the processes and implement any changes to achieve intended results h)improve the processes and the QMS
  • 12.
    PROCESS APPROACH -ELEMENTS OF A SINGLE PROCESS
  • 13.
    PROCESS APPROACH The keyaspect of ‘Process Approach’ is actually understanding a process and it’s component parts, i.e. What are the inputs? Who does the work? What with? How do they do it (and how monitored)? What is the objective/target of the process? What are the outputs? What other processes support this process Process Approach1. Sample Process Matrix.doc
  • 14.
    5 LEADERSHIP ‘Management Responsibility’now becomes ‘Leadership’ Top Management need to demonstrate engagement in key QMS activities A number of QMS requirements placed under the head of Leadership including the following:  accountability for the effectiveness of the QMS  quality policy and quality objectives are established  integration of the QMS requirements into the organization’s business processes  promoting the use of the process approach & risk based thinking.  resources needed for QMS are available  promoting improvement  supporting other relevant management roles to demonstrate their leadership as it applies to their areas of responsibility.
  • 15.
    5 LEADERSHIP 5.1.2 Customerfocus Top management shall demonstrate leadership and commitment with respect to customer focus by ensuring that: a. customer and applicable statutory and regulatory requirements are determined, understood and consistently met b. risks & opportunities that can affect conformity of products and services and the ability to enhance customer satisfaction are determined c. focus on enhancing customer satisfaction is maintained.
  • 16.
    5 LEADERSHIP 5.2 Qualitypolicy Top management shall establish, review and maintain a quality policy that: is appropriate to the purpose and context of the organization, provides framework for setting of quality objectives, includes commitment to satisfy applicable requirements. Includes commitment to continual improvement of the QMS. The policy shall be communicated to relevant interested parties.
  • 17.
    5 LEADERSHIP 5.3 Organizationalroles, responsibilities and authorities Top management shall assign the responsibility and authority for: ensuring that the quality management system conforms to the requirements of this International Standard, ensuring that the processes are delivering their intended outputs, reporting on the performance of QMS and opportunities for improvement, in particular to top management, ensuring promotion of customer focus throughout the organization, ensuring that the integrity and effectiveness of the quality management system is maintained.
  • 18.
    6 - PLANNING 6.1Actions to address risks and opportunities  Determine the risks and opportunities that can impact QMS, considering the organization’s context and requirements of interested parties  Risk management methodology to be decided  Actions taken to address risks and realize opportunities  It is advisable for the risk assessments to be carried out by a team so that there are inputs from the functions that could be affected.
  • 19.
    WHAT IS “RISK-BASEDTHINKING”?  Risk-based thinking is something we all do automatically and often sub-consciously  The concept of risk has always been implicit in ISO 9001 – this revision makes it more explicit and builds it into the whole management system  Risk-based thinking is already part of the process approach  Risk-based thinking makes preventive action part of the routine  Risk is often thought of only in the negative sense, risk-based thinking can also help to identify opportunities - this can be considered to be the positive side of risk
  • 20.
    WHAT SHOULD WEDO?  Analyze and prioritize the risks and opportunities in your functional processes  What is acceptable?  What is unacceptable?  Plan actions to address the risks  How can I avoid or eliminate the risk?  How can I mitigate the risk?  Implement the plan – take action  Check the effectiveness of the actions – does it work?  Learn from experience – continual improvement
  • 21.
    Descriptio n Rati ng Description Major Non- Conformanc e 5 Cancelation ofregistration/affiliation, Cancelation of Certification (Hold Certification until Non Conformance is not removed), and/or Legal action against organization. Minor Non- Conformanc e 4 Compliance to procedures will get affected, Warnings from regulatory authorities, and interested parties satisfaction level will decrease. Opportunity for Improveme nt 3 Objectives and Targets will not be achieved. Acceptable 2 Slight effect on Quality Management System or Quality of Services Negligible 1 No Effect on Quality Management System or Quality of Services Risk Identification Chart Rating Description Description 5 Almost Certain If activity occurs on Daily / Hourly basis 4 Likely If activity occurs on Weekly or Monthly basis 3 Possible If activity occurs on bi-annually basis 2 Unlikely If activity occurs on annually basis 1 Rare If activity occurred or can occur once in history ‹--- CO NS EQ UE NC E-- -› 5 5 10 15 20 25 17-25 Unacceptable Stop Activity & Make Immediate Improvements 4 4 8 12 16 20 10-16 High Risk Look to Improve within specified time scale 3 3 6 9 12 15 5-9 Moderate Risk Look to Improve at next review 2 2 4 6 8 10 3-4 Very Low Risk Ensure controls are maintained 1 1 2 3 4 5 1-2 Acceptable Risk No Further Action Required 1 2 3 4 5 Risk Scoring = Likelihood score (L) × Consequence score (C) Risk Assessment Matrix Risk Category Consequence (C ) Likelihood (L) score
  • 22.
    6 PLANNING 6.2 Qualityobjectives and planning to achieve them Measureable quality objectives to be established at relevant functions, levels and processes be relevant to conformity of products and services and the enhancement of customer satisfaction be monitored, communicated and updated as appropriate
  • 23.
    Quality Objectives &Action Plans Department: Lab Respective Section: Common for all sections Objective No.: IDC-QO-01-2018 Objective Statement: Improve the Patient Satisfaction Level up to 95% by end of December 2018 Accountability & Responsibility: CEO/Director Lab & Manager Laboratory Action Plan: 6 PLANNING Action Step Description (What will be Done) Responsibility / Performer Key Resources & Support Needs Target Timelines for Completion Desired Outcome (Targeted Value) Monitoring & Evaluation Steps Related Record Team Discussion & Way Forward Manager Lab & Functional Heads Management Plan and Approval of Key Tasks. Admin Support May 2018 Finalized Plan Monthly review QOHB/Reports Monitoring, Analysis and Reduction in number of errors at registration / accession / phlebotomy Supervisor Lab / Phlebotomist IT support / Monitoring Tool / Training / New Administrative Initiatives June 2018 Reports / Stats Monthly review QOHB/Reports Monitoring and improvement of examination processes efficiency to achieve 99% reporting in due time Supervisor Lab / Lab Tech. IT support / Monitoring Tool / Training / New Administrative Initiatives Aug 2018 Reports / Stats Monthly review QOHB/Reports Reduce the error in report / number of corrected reports <01% Supervisor Lab / Lab Tech. IT support / Monitoring Tool / Training / New Administrative Initiatives Sept. 2018 Reports / Stats Monthly review QOHB/Reports Improve timely and accurate retrieval of the stored samples up to 90% in 1 hours & 100% in 2 hours Supervisor Lab / Lab Tech. IT support / Monitoring Tool / Training / New Administrative Initiatives Sept. 2018 Reports / Stats Monthly review QOHB/Reports Monitor %age of urgent examinations reporting in due time Supervisor Lab / Lab Tech. IT support / Monitoring Tool / Training / New Administrative Initiatives Sept. 2018 Reports / Stats Monthly review QOHB/Reports Monitor %age of complaints resolved in due time Sales & Marketing IT support / Monitoring Tool / Training / New Administrative Initiatives Sept. 2018 Reports / Stats Monthly review QOHB/Reports Finalize the above action stats and presentation of report the management Manager Lab IT support / Monitoring Tool / Training / New Administrative Initiatives Sept. 2018 Reports / Stats Monthly review QOHB/Reports
  • 24.
    6 PLANNING 6.3 Planningof changes Changes to the QMS shall be carried out in a planned and systematic manner considering: the purpose of the change and its potential consequences the integrity of the quality management system the availability of resources the allocation or reallocation of responsibilities & authorities
  • 25.
    7 SUPPORT :7.1 RESOURCES 7.1.1 General The organization shall determine and provide the resources for an effective QMS considering: a) the capabilities of, and constraints on, existing internal resources b) what needs to be obtained from external providers
  • 26.
    7 SUPPORT :7.1 RESOURCES 7.1.2 People The organization shall provide persons for an effective QMS considering customer and applicable statutory and regulatory requirements.
  • 27.
    7 SUPPORT :7.1 RESOURCES 7.1.3 Infrastructure Determine, provide and maintain infrastructure including: building and associated utilities equipment including hardware and software transportation information and communication technology
  • 28.
    7 SUPPORT :7.1 RESOURCES 7.1.4 Environment for the operation of processes “Work environment” now becomes “environment” necessary for the operation of processes Environment for the operation of processes can include physical, social, and psychological factors
  • 29.
    7 SUPPORT :7.1 RESOURCES 7.1.5 Monitoring and measuring resources Monitoring and measuring ‘equipment’ now becomes ‘resources’ which includes humans as well Monitoring and measuring equipment to be calibrated at specified intervals against (national or international) traceable standards Provided resources are suitable for the specific type of monitoring & measurement activities being undertaken Equipment are identified in order to determine their status Equipment shall be safeguarded from adjustments, damage or deterioration that would invalidate the calibration status & subsequent measurement results.
  • 30.
    7 SUPPORT :7.1 RESOURCES 7.1.6 Organizational Knowledge Determine the knowledge necessary for the operation of processes and to achieve conformity of products and services This knowledge shall be maintained, and made available to the extent necessary
  • 31.
    7 SUPPORT 7.2 Competence Nosignificant change here, however, existing system needs to be reviewed in order to ensure that: competence requirements are established for person(s) doing work under the control of the organization that affects its quality performance actions are taken to acquire the necessary competence, and their effectiveness evaluated Applicable actions can include, for example, the provision of training to, the mentoring of, or the re-assignment of currently employed persons; or the hiring or contracting of competent persons
  • 32.
    7 - SUPPORT 7.3Awareness  Now a separate clause and covers all persons doing work under organization’s control. Persons will be aware of:  Quality policy  Relevant quality objectives Their contribution to the effectiveness of the quality management system, including the benefits of improved performance The implications of not conforming with the quality management system requirements
  • 33.
    7 SUPPORT 7.4 Communication Explicitrequirements on both internal and external communication processes: a)on what it will communicate b)when to communicate c)with whom to communicate d)how to communicate e)who communicates
  • 34.
    7 SUPPORT 7.5 Documentedinformation All sort of documentation (manual, procedures and records) now replaced with the term ‘documented information’ Requirements now explained with more clarity including very much needed aspects like medium of documents and confidentiality Contd.
  • 35.
    7.5 DOCUMENTED INFORMATION identificationand description of documented information (e.g. a title, date, author, or reference number) format (e.g. language, software version, graphics) and media (e.g. paper, electronic) available and suitable for use, where and when it is needed adequately protected (e.g. from loss of confidentiality, improper use, or loss of integrity) distribution, access, retrieval and use storage and preservation, including preservation of legibility other requirements remain the same as in ISO 9001:2008.
  • 36.
    QMS – DOCUMENTATIONSTRUCTURE Level 01 • Enterprise Level Policies • Articles • Memomrandums • Business Plan • Vision, Mission • Diagnostic Services & Quality Management Framework • Quality Policy • Organogram Level 02 • SOPs • STPs • Handbooks Level 03 • Work Instructions • Guidelines • Quality Plans • Operational Plans Level 04 • Operational Record • Reports • Dashboards • Presentations • Minutes • Memo • Flyers • QMS Record
  • 37.
    8 OPERATION 8.1 Operationalplanning and control ‘Planning of product realization’ replaced with ‘Operational planning and control’ Requirements generally remain the same as in ISO 9001:2008 but now with more emphasis on process approach
  • 38.
    8 OPERATION 8.1 Operationalplanning and control determine requirements for products & services establish criteria for the processes and the acceptance of products & services determine resources implement control of the processes in accordance with the criteria determine / maintain / retain documented information
  • 39.
    8 OPERATION 8.2 Requirementsfor products and services 8.2.1 Customer communication The organization shall establish processes for communicating with customers for: providing information relating to products and services handling enquires/orders/contracts, including changes obtaining customer feedback including complaints handling or controlling customer property establishing specific requirements for contingency actions
  • 40.
    8 OPERATION 8.2.2 &8.2.3 Determination and review of requirements The organization shall determine the requirements for the products and services to be offered to customers Product and service requirements include those considered necessary by the organization, applicable statutory and regulatory requirements, those of customers and interested parties The organization shall ensure that it has the ability to meet the requirements, by conducting a review, before making any commitment
  • 41.
    8.3 DESIGN ANDDEVELOPMENT OF PRODUCTS AND SERVICES Organization shall establish, implement and maintain a design and development process including the following aspects: Planning Inputs Controls (reviews, verification and validation activities) Outputs Changes
  • 42.
    8.4 CONTROL OFEXTERNALLY PROVIDED PRODUCTS AND SERVICES The standard requires to apply controls to the following types of externally provided products and services: a)products and services provided by external providers for incorporation into the organization’s own products and services b)products and services provided directly to the customer(s) by external providers on behalf of the organization c)a process or part of a process is provided by an external provider as a result of a decision by the organization to outsource a process
  • 43.
    8.4 CONTROL OFEXTERNALLY PROVIDED PRODUCTS AND SERVICES Type and extent of control will depend upon the potential impact of the externally provided processes, products and services on the organization’s processes, products and services Processes of the organization which have been outsourced to an external provider shall remain within the control of the organization’s quality management system The organization shall communicate complete information to external providers regarding the processes, products and services to be provided Criteria to be established for evaluation, selection, performance monitoring and re-evaluation of external providers
  • 44.
    8.5 PRODUCTION ANDSERVICE PROVISION 8.5.1 Control of production and service provision Previous clauses 7.5.1 and 7.5.2 have been combined in this one clause with the following aspects: products and services criteria and standards documented information that defines the activities to be performed (previously work instructions) suitable infrastructure, process environment and suitable monitoring and measuring resources appointment of competent persons validation and revalidation of special processes implementation of actions to prevent human error implementation of release, delivery & post delivery activities
  • 45.
    8.5 PRODUCTION ANDSERVICE PROVISION 8.5.2 Identification and traceability Requirements remain the same as in ISO 9001:2008, however, the term ‘product’ is now replaced by ‘process output’ Process outputs are the results of any activities which are ready for delivery to the organization’s customer or to an internal customer (e.g. receiver of the inputs to the next process); these may include products, services, intermediate parts, components, etc.
  • 46.
    8.5 PRODUCTION ANDSERVICE PROVISION 8.5.3 Property belonging to customers or external providers Customer property now extended with property of external providers. Property further explained as: Property can include materials, components, tools and equipment, premises, intellectual property and personal data.
  • 47.
    8.5 PRODUCTION ANDSERVICE PROVISION 8.5.4 Preservation Again the term ‘product’ is replaced by ‘process output’. Scope of preservation now explained in the form of following note, previously part of the clause: “Preservation can include identification, handling, contamination control, packaging, storage, transmission or transportation, and protection”
  • 48.
    8.5 PRODUCTION ANDSERVICE PROVISION 8.5.5 Post-delivery activities (New clause) The organization shall meet requirements for post-delivery activities associated with the products and services. In determining the extent of post-delivery activities that are required, the organization shall consider: a)statutory and regulatory requirements b)the potential undesired consequences associated with its product & services c)the nature, use & intended lifetime of its products & services d)customer requirements e)customer feedback NOTE: Post-delivery activities can include actions under warranty provisions, contractual obligations such as maintenance services, and supplementary services such as recycling or final disposal.
  • 49.
    8.5 PRODUCTION ANDSERVICE PROVISION 8.5.6 Control of changes (New clause) The organization shall review and control changes essential for production or service provision, to the extent necessary to ensure continuing conformity with requirements. The organization shall retain documented information describing the results of the review of changes, the person(s) authorizing the change, and any necessary actions arising from the review.
  • 50.
    8.6 RELEASE OFPRODUCTS AND SERVICES Previous clause (as in ISO 9001:2008) ‘Monitoring and measurement of product’ rephrased as ‘Release of products and services’ with no change in requirements.
  • 51.
    8.7 CONTROL OFNONCONFORMING OUTPUTS Take appropriate action based on the nature of the nonconformity and its effect on the conformity of products and services This would also include the scenario when nonconformity detected after product delivery, during or after service provision Retain records
  • 52.
    9.1 MONITORING, MEASUREMENT,ANALYSIS AND EVALUATION 9.1.1 General The organization shall determine: a)what needs to be monitored and measured b)the methods for monitoring, measurement, analysis and evaluation needed to ensure valid results c)when the monitoring and measuring shall be performed d)when the results from monitoring and measurement shall be analyzed and evaluated
  • 53.
    9.1 MONITORING, MEASUREMENT,ANALYSIS AND EVALUATION 9.1.2 Customer satisfaction The organization shall monitor customers’ perception of the degree to which their needs and expectations have been fulfilled. Methods for obtaining, monitoring and reviewing this information shall be determined
  • 54.
    9.1 MONITORING, MEASUREMENT,ANALYSIS AND EVALUATION 9.1.3 Analysis and evaluation Appropriate data and information arising from monitoring and measurement shall be analyzed. The results of analysis shall be used to evaluate: conformity of products and services degree of customer satisfaction performance and effectiveness of QMS effective implementation of planning performance of external provider(s) effectiveness of actions taken to address risks & opportunities need for improvement to the QMS
  • 55.
    9.2 INTERNAL AUDIT Theorganization shall: conduct audits at planned intervals have detailed audit programme(s) define criteria and scope for each audit provide competent auditors ensure impartiality ensure reporting of results to relevant management take appropriate corrections and corrective actions without undue delay retain documented information Internal auditors should be trained on the process approach, risk assessment etc.
  • 56.
    9.3 MANAGEMENT REVIEW Inputrequirements have been enhanced and made more explicit, including: changes in external and internal issues that are relevant to the QMS information on the performance and effectiveness of the QMS, including trends in: - feedback from relevant interested parties - performance of external providers - monitoring and measurement results adequacy of resources the effectiveness of actions taken to address risks and opportunities
  • 57.
    9.3 MANAGEMENT REVIEW Outputsof the management review shall include decisions and actions related to: a)opportunities for improvement b)any need for changes to the QMS c)resource needs Documented information to be retained
  • 58.
    10 IMPROVEMENT 10.1 General(New clause) ‘Continual improvement’ now modified as ‘improvement’ - more broader concept The new approach includes: a)improving products and services to meet requirements as well as to address future needs and expectations b)correcting, preventing or reducing undesired effects c)improving the performance and effectiveness of the QMS Note: Improvement can be effected reactively (corrective action), incrementally (continual improvement), by step change (breakthrough), creatively (innovation) or by re-organization (transformation).
  • 59.
    10 IMPROVEMENT 10.2 Nonconformityand corrective action More explicit requirements given with respect to handling a nonconformity, the changes include: take action to control and correct it (correction) deal with the consequences evaluate the need for action to eliminate the cause(s) of the nonconformity, in order that it does not recur or occur elsewhere update risks and opportunities determined during planning make changes to the quality management system, if necessary
  • 60.
    10 IMPROVEMENT 10.3 Continualimprovement The organization shall continually improve the suitability, adequacy, and effectiveness of the quality management system. The organization shall consider the results of analysis and evaluation, and the outputs from management review, to determine if there are needs or opportunities that shall be addressed as part of continual improvement.
  • 61.
    ISO 45001:2018 OVERVIEW ISO45001:2018 is the international standard for Occupational Health and Safety Management Systems (OHSMS). - Replaces OHSAS 18001. - Provides a framework to manage OH&S risks and opportunities. - Integrates with other ISO standards like ISO 9001. - Emphasizes leadership, worker participation, and risk-based thinking. - Aims to improve employee safety, reduce workplace risks, and create better working conditions.
  • 62.
    ISO 45001:2018 STANDARDCLAUSES Core Clauses of ISO 45001:2018: 1. Scope 2. Normative references 3. Terms and definitions 4. Context of the organization 5. Leadership and worker participation 6. Planning (including hazard identification and risk assessment) 7. Support 8. Operation (including emergency preparedness and response) 9. Performance evaluation 10. Improvement
  • 63.
    ISO 9001:2015 VSISO 45001:2018 Key Differences: - Focus: ISO 9001 is for quality management; ISO 45001 is for occupational health & safety. - Clause 5: ISO 45001 includes 'worker participation'; ISO 9001 focuses on 'customer satisfaction'. - Clause 6: ISO 45001 includes hazard identification; ISO 9001 focuses on risks to product/service quality. - ISO 45001 emphasizes legal and regulatory OH&S compliance more heavily. - Leadership in ISO 45001 is responsible for OH&S culture and worker consultation. Both use High-Level Structure (Annex SL) and risk-based thinking.
  • 64.
    ISO 45001:2018 –CLAUSE 4. CONTEXT OF THE ORGANIZATION - Understand internal and external OH&S issues (e.g., regulatory changes, workplace culture). - Identify interested parties: employees, contractors, regulators. - Define OHSMS scope clearly based on risk exposure and operational control.
  • 65.
    ISO 45001:2018 –CLAUSE 5. LEADERSHIP AND WORKER PARTICIPATION - Top management must demonstrate leadership in OH&S, integrating it into the organization’s strategy. - Establish OH&S policy and objectives. - Ensure worker consultation and participation in decision-making (e.g., safety committees).
  • 66.
    ISO 45001:2018 –CLAUSE 6. PLANNING - Identify OH&S risks and opportunities. - Conduct hazard identification and risk assessments (e.g., using Job Hazard Analysis). - Plan for legal compliance and emergency preparedness. - Define measurable OH&S objectives (e.g., reduce injury rate by 10%).
  • 67.
    ISO 45001:2018 –CLAUSE 7. SUPPORT - Ensure competent personnel (e.g., safety training and certification). - Promote awareness of OH&S responsibilities. - Maintain OH&S documentation and ensure effective communication (e.g., toolbox talks).
  • 68.
    ISO 45001:2018 –CLAUSE 8. OPERATION - Implement operational controls to eliminate hazards (e.g., engineering controls). - Prepare and test emergency response procedures (e.g., fire drills). - Control of outsourced work that impacts OH&S (e.g., third-party maintenance).
  • 69.
    ISO 45001:2018 –CLAUSE 9. PERFORMANCE EVALUATION - Monitor and measure OH&S performance (e.g., incident rates, near misses). - Conduct internal audits and management reviews focused on OH&S outcomes.
  • 70.
    ISO 45001:2018 –CLAUSE 10. IMPROVEMENT - Address incidents and nonconformities (e.g., root cause analysis of workplace accidents). - Continuously improve OH&S performance through worker feedback and lessons learned.
  • 71.

Editor's Notes

  • #9 Interested party: person or organization that can affect, be affected by, or perceive itself to be affected by a decision or activity. Interested parties can be external and/or internal