• Part of the Commonwealth Department
of the Environment
• Annual budget: $120 million
• 380 staff
• HQ Kingston Tasmania
• 500 expeditioners per year
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
5595 km
Mawson
King Island
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
Data Collection &
Analysis
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
Katabatic winds – cold dense air
moves down the ice cap under gravity
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
Key Project Facts
• Tech partners Enercon & Powercorp
• 2 summers
• 20 people
• $14.8 million
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
 Tech partners Enercon & Powercorp  2 summers  20 people  $14.8 million
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
 Tech partners Enercon & Powercorp  2 summers  20 people  $14.8 million
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
 Tech partners Enercon & Powercorp  2 summers  20 people  $14.8 million
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
 Tech partners Enercon & Powercorp  2 summers  20 people  $14.8 million
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
 Tech partners Enercon & Powercorp  2 summers  20 people  $14.8 million
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
 Tech partners Enercon & Powercorp  2 summers  20 people  $14.8 million
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
Heating Hot Water
4 x 140kW Diesel Gensets
Diesel Boiler
Station Electrical Load
2 x 300kW Wind Turbines
Electric Boiler & BGI
Control
System
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
Low Load Diesel
• CAT 3306 engines
• 140 kW rating
• Single genset mode
• Minimum power set point 50kW (36%)
• 70% of duty at low load
• Some increase in glazing issues
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
Operating Parameters
• 2 winter electricians + 1 summer
• 2 winter mechanics + 1 summer
• 12 month contracts
• Training
• Support, spares, SCADA
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
Benefits
• 2.8 million litres diesel, 7000 tonnes
CO2 saved since 2003
• $263,000 direct annual savings
• Endurance and energy security
• Shipping flexibility
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
2014 Energy Saving Initiatives
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
2014 Energy Saving Initiatives
• Challenged existing practices
• Temperature reductions
• Switched off buildings
• Community awareness
• Heating load management
• Manual load management
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
2014 Energy Saving Initiatives
• Challenged existing practices
• Temperature reductions
• Switched off buildings
• Community awareness
• Heating load management
• Manual load management
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
2014 Energy Saving Initiatives
• Challenged existing practices
• Temperature reductions
• Switched off buildings
• Community awareness
• Heating load management
• Manual load management
51.4% Wind
Penetration
Images © Copyright Australian Antarctic Division
I S O L AT E D P O W E R S Y S T E M
C O N N E C T 2 0 1 5
Challenges for the Future
• Antarctic program priorities
• Proven technology
• Flexible, scalable, supportable
Images © Copyright Australian Antarctic Division
Mawson Station Antarctica
I S O L A T E D P O W E R S Y S T E M C O N N E C T 2 0 1 5
David Waterhouse
Images © Copyright Australian Antarctic Division

More Related Content

Similar to Ips connect 2015 david waterhouse

An Architect Engineers Response to Fukushima
An Architect Engineers Response to FukushimaAn Architect Engineers Response to Fukushima
An Architect Engineers Response to Fukushima
Alexander Wolski
 
Painel 3 – Ocean Energy: The British Experience
Painel 3 – Ocean Energy: The British ExperiencePainel 3 – Ocean Energy: The British Experience
Painel 3 – Ocean Energy: The British Experience
UKinBrazilNetwork
 
День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...
День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...
День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...
НАЕК «Енергоатом»
 
Electricity Overview
Electricity OverviewElectricity Overview
Electricity Overview
Parthosb
 
James hamilton ips connect-hamilton
James hamilton   ips connect-hamiltonJames hamilton   ips connect-hamilton
James hamilton ips connect-hamilton
james_hamilton
 
Global environmental data for sustainable shipping
Global environmental data for sustainable shippingGlobal environmental data for sustainable shipping
Global environmental data for sustainable shipping
Tidetech Haire
 
40461.pdf
40461.pdf40461.pdf
40461.pdf
IzzatTammam
 
03-hydro.ppt
03-hydro.ppt03-hydro.ppt
Nick Lewis - Garbage in, Garbage out in Antarctica
Nick Lewis - Garbage in, Garbage out in AntarcticaNick Lewis - Garbage in, Garbage out in Antarctica
Nick Lewis - Garbage in, Garbage out in Antarctica
Sustainable Summits Initiative
 
The Resilience of the Electric Power Delivery System in Response to Bushfires...
The Resilience of the Electric Power Delivery System in Response to Bushfires...The Resilience of the Electric Power Delivery System in Response to Bushfires...
The Resilience of the Electric Power Delivery System in Response to Bushfires...
Ian McLeod
 
Resume of Bruce Lane
Resume of Bruce LaneResume of Bruce Lane
Resume of Bruce Lane
Bruce Lane
 
Solar Power for Saipan - Incredibly Cost-Effective
Solar Power for Saipan - Incredibly Cost-EffectiveSolar Power for Saipan - Incredibly Cost-Effective
Solar Power for Saipan - Incredibly Cost-Effective
John Farrell
 
Solar Power for Saipan - Incredibly Cost-Effective
Solar Power for Saipan - Incredibly Cost-EffectiveSolar Power for Saipan - Incredibly Cost-Effective
Solar Power for Saipan - Incredibly Cost-Effective
John Farrell
 
S Burke CV 2015
S Burke CV 2015S Burke CV 2015
S Burke CV 2015
Sean Burke
 
New and renewable energy policy and investment in thailand 05-jun-13
New and renewable energy policy and investment in thailand 05-jun-13New and renewable energy policy and investment in thailand 05-jun-13
New and renewable energy policy and investment in thailand 05-jun-13
Peerasak C.
 
LiDAR Technologies at AGRG
LiDAR Technologies at AGRGLiDAR Technologies at AGRG
LiDAR Technologies at AGRG
COGS Presentations
 
BZE Stationery Energy
BZE Stationery EnergyBZE Stationery Energy
BZE Stationery Energy
Gillian King
 

Similar to Ips connect 2015 david waterhouse (17)

An Architect Engineers Response to Fukushima
An Architect Engineers Response to FukushimaAn Architect Engineers Response to Fukushima
An Architect Engineers Response to Fukushima
 
Painel 3 – Ocean Energy: The British Experience
Painel 3 – Ocean Energy: The British ExperiencePainel 3 – Ocean Energy: The British Experience
Painel 3 – Ocean Energy: The British Experience
 
День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...
День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...
День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...
 
Electricity Overview
Electricity OverviewElectricity Overview
Electricity Overview
 
James hamilton ips connect-hamilton
James hamilton   ips connect-hamiltonJames hamilton   ips connect-hamilton
James hamilton ips connect-hamilton
 
Global environmental data for sustainable shipping
Global environmental data for sustainable shippingGlobal environmental data for sustainable shipping
Global environmental data for sustainable shipping
 
40461.pdf
40461.pdf40461.pdf
40461.pdf
 
03-hydro.ppt
03-hydro.ppt03-hydro.ppt
03-hydro.ppt
 
Nick Lewis - Garbage in, Garbage out in Antarctica
Nick Lewis - Garbage in, Garbage out in AntarcticaNick Lewis - Garbage in, Garbage out in Antarctica
Nick Lewis - Garbage in, Garbage out in Antarctica
 
The Resilience of the Electric Power Delivery System in Response to Bushfires...
The Resilience of the Electric Power Delivery System in Response to Bushfires...The Resilience of the Electric Power Delivery System in Response to Bushfires...
The Resilience of the Electric Power Delivery System in Response to Bushfires...
 
Resume of Bruce Lane
Resume of Bruce LaneResume of Bruce Lane
Resume of Bruce Lane
 
Solar Power for Saipan - Incredibly Cost-Effective
Solar Power for Saipan - Incredibly Cost-EffectiveSolar Power for Saipan - Incredibly Cost-Effective
Solar Power for Saipan - Incredibly Cost-Effective
 
Solar Power for Saipan - Incredibly Cost-Effective
Solar Power for Saipan - Incredibly Cost-EffectiveSolar Power for Saipan - Incredibly Cost-Effective
Solar Power for Saipan - Incredibly Cost-Effective
 
S Burke CV 2015
S Burke CV 2015S Burke CV 2015
S Burke CV 2015
 
New and renewable energy policy and investment in thailand 05-jun-13
New and renewable energy policy and investment in thailand 05-jun-13New and renewable energy policy and investment in thailand 05-jun-13
New and renewable energy policy and investment in thailand 05-jun-13
 
LiDAR Technologies at AGRG
LiDAR Technologies at AGRGLiDAR Technologies at AGRG
LiDAR Technologies at AGRG
 
BZE Stationery Energy
BZE Stationery EnergyBZE Stationery Energy
BZE Stationery Energy
 

More from james_hamilton

Ips connect 2015 seiapi
Ips connect 2015 seiapiIps connect 2015 seiapi
Ips connect 2015 seiapi
james_hamilton
 
Ips connect 2015 deva de silva
Ips connect 2015 deva de silvaIps connect 2015 deva de silva
Ips connect 2015 deva de silva
james_hamilton
 
Ips connect 2015 nikolasi fonua
Ips connect 2015 nikolasi fonuaIps connect 2015 nikolasi fonua
Ips connect 2015 nikolasi fonua
james_hamilton
 
Ips connect 2015 andrew daka
Ips connect 2015 andrew dakaIps connect 2015 andrew daka
Ips connect 2015 andrew daka
james_hamilton
 
Ips connect 2015 kamleshwar khelawan
Ips connect 2015 kamleshwar khelawanIps connect 2015 kamleshwar khelawan
Ips connect 2015 kamleshwar khelawan
james_hamilton
 
Ips connect 2015 francisco gafaro
Ips connect 2015 francisco gafaroIps connect 2015 francisco gafaro
Ips connect 2015 francisco gafaro
james_hamilton
 
Ips connect 2015 marc mueller stoffels
Ips connect 2015 marc mueller stoffelsIps connect 2015 marc mueller stoffels
Ips connect 2015 marc mueller stoffels
james_hamilton
 
Ips connect 2015 geoff stapleton
Ips connect 2015 geoff stapletonIps connect 2015 geoff stapleton
Ips connect 2015 geoff stapleton
james_hamilton
 
Ips connect 2015 sohail hasnie
Ips connect 2015 sohail hasnieIps connect 2015 sohail hasnie
Ips connect 2015 sohail hasnie
james_hamilton
 
Ips connect 2015 simon franklin
Ips connect 2015 simon franklinIps connect 2015 simon franklin
Ips connect 2015 simon franklin
james_hamilton
 
Ips connect 2015 simon gamble
Ips connect 2015 simon gambleIps connect 2015 simon gamble
Ips connect 2015 simon gamble
james_hamilton
 
Ips connect 2015 chris smith
Ips connect 2015 chris smithIps connect 2015 chris smith
Ips connect 2015 chris smith
james_hamilton
 
Ips connect 2015 richard rocheleau
Ips connect 2015 richard rocheleauIps connect 2015 richard rocheleau
Ips connect 2015 richard rocheleau
james_hamilton
 
Emergent Energy Futures
Emergent Energy FuturesEmergent Energy Futures
Emergent Energy Futures
james_hamilton
 
Utas lld-presentation-arena oct9-final
Utas lld-presentation-arena oct9-finalUtas lld-presentation-arena oct9-final
Utas lld-presentation-arena oct9-final
james_hamilton
 

More from james_hamilton (15)

Ips connect 2015 seiapi
Ips connect 2015 seiapiIps connect 2015 seiapi
Ips connect 2015 seiapi
 
Ips connect 2015 deva de silva
Ips connect 2015 deva de silvaIps connect 2015 deva de silva
Ips connect 2015 deva de silva
 
Ips connect 2015 nikolasi fonua
Ips connect 2015 nikolasi fonuaIps connect 2015 nikolasi fonua
Ips connect 2015 nikolasi fonua
 
Ips connect 2015 andrew daka
Ips connect 2015 andrew dakaIps connect 2015 andrew daka
Ips connect 2015 andrew daka
 
Ips connect 2015 kamleshwar khelawan
Ips connect 2015 kamleshwar khelawanIps connect 2015 kamleshwar khelawan
Ips connect 2015 kamleshwar khelawan
 
Ips connect 2015 francisco gafaro
Ips connect 2015 francisco gafaroIps connect 2015 francisco gafaro
Ips connect 2015 francisco gafaro
 
Ips connect 2015 marc mueller stoffels
Ips connect 2015 marc mueller stoffelsIps connect 2015 marc mueller stoffels
Ips connect 2015 marc mueller stoffels
 
Ips connect 2015 geoff stapleton
Ips connect 2015 geoff stapletonIps connect 2015 geoff stapleton
Ips connect 2015 geoff stapleton
 
Ips connect 2015 sohail hasnie
Ips connect 2015 sohail hasnieIps connect 2015 sohail hasnie
Ips connect 2015 sohail hasnie
 
Ips connect 2015 simon franklin
Ips connect 2015 simon franklinIps connect 2015 simon franklin
Ips connect 2015 simon franklin
 
Ips connect 2015 simon gamble
Ips connect 2015 simon gambleIps connect 2015 simon gamble
Ips connect 2015 simon gamble
 
Ips connect 2015 chris smith
Ips connect 2015 chris smithIps connect 2015 chris smith
Ips connect 2015 chris smith
 
Ips connect 2015 richard rocheleau
Ips connect 2015 richard rocheleauIps connect 2015 richard rocheleau
Ips connect 2015 richard rocheleau
 
Emergent Energy Futures
Emergent Energy FuturesEmergent Energy Futures
Emergent Energy Futures
 
Utas lld-presentation-arena oct9-final
Utas lld-presentation-arena oct9-finalUtas lld-presentation-arena oct9-final
Utas lld-presentation-arena oct9-final
 

Recently uploaded

Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
gaafergoudaay7aga
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
shadow0702a
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
bijceesjournal
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
IJECEIAES
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
Data Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptxData Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptx
ramrag33
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
riddhimaagrawal986
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
Mahmoud Morsy
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 

Recently uploaded (20)

Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
Data Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptxData Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptx
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 

Ips connect 2015 david waterhouse

  • 1. Mawson Station Antarctica I S O L A T E D P O W E R S Y S T E M C O N N E C T 2 0 1 5 David Waterhouse Images © Copyright Australian Antarctic Division
  • 2. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5 Australian Antarctic Division • Part of the Commonwealth Department of the Environment • Annual budget: $120 million • 380 staff • HQ Kingston Tasmania • 500 expeditioners per year Images © Copyright Australian Antarctic Division
  • 3. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5 Images © Copyright Australian Antarctic Division
  • 4. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5 Images © Copyright Australian Antarctic Division
  • 5. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5 5595 km Mawson King Island Images © Copyright Australian Antarctic Division
  • 6. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5 Images © Copyright Australian Antarctic Division
  • 7. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5 Data Collection & Analysis Images © Copyright Australian Antarctic Division
  • 8. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5 Katabatic winds – cold dense air moves down the ice cap under gravity Images © Copyright Australian Antarctic Division
  • 9. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5 Key Project Facts • Tech partners Enercon & Powercorp • 2 summers • 20 people • $14.8 million Images © Copyright Australian Antarctic Division
  • 10. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5  Tech partners Enercon & Powercorp  2 summers  20 people  $14.8 million Images © Copyright Australian Antarctic Division
  • 11. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5  Tech partners Enercon & Powercorp  2 summers  20 people  $14.8 million Images © Copyright Australian Antarctic Division
  • 12. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5  Tech partners Enercon & Powercorp  2 summers  20 people  $14.8 million Images © Copyright Australian Antarctic Division
  • 13. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5  Tech partners Enercon & Powercorp  2 summers  20 people  $14.8 million Images © Copyright Australian Antarctic Division
  • 14. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5  Tech partners Enercon & Powercorp  2 summers  20 people  $14.8 million Images © Copyright Australian Antarctic Division
  • 15. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5  Tech partners Enercon & Powercorp  2 summers  20 people  $14.8 million Images © Copyright Australian Antarctic Division
  • 16. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5 Heating Hot Water 4 x 140kW Diesel Gensets Diesel Boiler Station Electrical Load 2 x 300kW Wind Turbines Electric Boiler & BGI Control System Images © Copyright Australian Antarctic Division
  • 17. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5 Low Load Diesel • CAT 3306 engines • 140 kW rating • Single genset mode • Minimum power set point 50kW (36%) • 70% of duty at low load • Some increase in glazing issues Images © Copyright Australian Antarctic Division
  • 18. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5 Operating Parameters • 2 winter electricians + 1 summer • 2 winter mechanics + 1 summer • 12 month contracts • Training • Support, spares, SCADA Images © Copyright Australian Antarctic Division
  • 19. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5 Images © Copyright Australian Antarctic Division
  • 20. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5 Benefits • 2.8 million litres diesel, 7000 tonnes CO2 saved since 2003 • $263,000 direct annual savings • Endurance and energy security • Shipping flexibility Images © Copyright Australian Antarctic Division
  • 21. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5 2014 Energy Saving Initiatives Images © Copyright Australian Antarctic Division
  • 22. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5 2014 Energy Saving Initiatives • Challenged existing practices • Temperature reductions • Switched off buildings • Community awareness • Heating load management • Manual load management Images © Copyright Australian Antarctic Division
  • 23. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5 2014 Energy Saving Initiatives • Challenged existing practices • Temperature reductions • Switched off buildings • Community awareness • Heating load management • Manual load management Images © Copyright Australian Antarctic Division
  • 24. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5 2014 Energy Saving Initiatives • Challenged existing practices • Temperature reductions • Switched off buildings • Community awareness • Heating load management • Manual load management 51.4% Wind Penetration Images © Copyright Australian Antarctic Division
  • 25. I S O L AT E D P O W E R S Y S T E M C O N N E C T 2 0 1 5 Challenges for the Future • Antarctic program priorities • Proven technology • Flexible, scalable, supportable Images © Copyright Australian Antarctic Division