PV Penetration on Island Mini-Grid or Grid!- Niue
King Island Connect 2015
Geoff Stapleton
creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
The Pacific Ocean
• The Pacific Ocean
covers:
– 32.4 % of the
Earth’s total area
– 45.76 % of the total
surface area of all
of Earth’s water
• Earth’s total landmass is
only 90.13 % of the
Pacific Ocean.
creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
Population-Over 22 countries
4
creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
Many Grids in Pacific would be considered by some as ―micro-grids‖,
however for the Government and Utilities—this is there Grid.
What is a micro-grid?
creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
• Tokelau: country powered by three Hybrid systems-
with PV being main source of supply
• Tuvalu:
– 3 x 600kW generators- base load about 900kW—
– PV 500kW connected with SMA fuel saver plus
270kW
– Planning 1MW with storage
Example of PV Penetration in Pacific
creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
• Tonga
– Tongatapu - instantaneous penetration up to 45%
8.4MW peak demand and 3.5 to 4MW min demand
(Sunday mid afternoon when Solar is most effective)
– Vava'u - instantaneous penetration up to 65% 1.4 MW
peak demand and 700 kW demand during day
• Samoa—
– Peak Demand 20MW
– PV 6MW and more planned
Example of PV Penetration in Pacific-
Continued
creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
Niue
creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
Statistics
• Population approx. 1400
• Generation : 4 x 508kW
generators
• Evening peak approx. 580kW
• Daytime 400-500kW
• 8.2 to 10 MWh per day
creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
Distribution and Generation Operation and
overview
• Two Feeders
• There is a capacitive effect on the two feeders such that shunt reactors
were installed across the distribution system conductors and perform a
variety of functions including power factor compensation, network voltage
regulation and assist with the management of power system
disturbances.
• Operation :
– 1 generator at low peak and 2 generators during evening peak, but 2
required when rock crusher (50kW) turned on. Also both turned on as a
safety reason for the crane at wharf (11kW).
– 2nd unit typically started when first generator is 75% loaded (380k)
creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
• Niue High School 24kW
(2009)
• Hospital 30.6kW (2009)
• Power Station -200kW
with 158kWh battery
storage (200kVA Inverter)
(Feb 2014)
• Airport 92kW (May 2014)
• 1.7kW NPC Office
TOTAL 348kW
PV Systems
creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
• EasyPower model
• 384kW of solar and 180kW of batteries
Kema Dynamic Stability Study-Sep 2012
creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
• There must always be at least one diesel generator operating to provide
the system frequency and voltage signals used by the solar power plants.
This means that the island cannot rely on 100% solar generation at any
time during the day.
• The maximum amount of solar (renewable) generation is limited by the
minimum load on the diesel generators (about 80 kW).
• With a typical peak load of 480 kW, the maximum solar generation would
be 400 kW.
• The planned solar generation (384 kW) will be very close to this maximum
limit.
•
Kema Dynamic Stability Study-
Recommendations 1
creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
• Based on a sample of solar output during January 2012, solar generation
on Niue should produce less than 5% of Niue annual energy (fuel).
• All the prospective (future) cases showed that one diesel should handle
normal renewable output variations.
• The inverters used with solar generation are susceptible to low-voltage
drop-out during certain extreme events; the voltage ride-through for the
inverters should reduce the low voltage set point for the 0.20-2.0 sec
period from 0.65 to 0.50 pu. All existing and future inverters should use
these settings.
Kema Dynamic Stability Study-
Recommendations 2
creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
• KEMA noted during their stability
study that when the crusher started
that the inverters tripped out caused
by frequency fluctuations.
• This was also observed by Mr.
Crowley while undertaking his
masters study.
• The battery storage with the 200kW
airport system was installed to help
maintain frequency stability when the
crusher started.
• However it emphasizes why the
frequency windows need to widened
to allow a minimum down to 45hz.
Issue with crusher
creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
Intermittent Solar Output
creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
From his simulations, Warren recommended the following additional
equipment :
• 200kW Solar PV.
• 300kW By-directional Inverter charger system.
• 1472kWh Battery System.
• Control Unit.
This option provides diesel savings of between 6.74% and 9.45% and cost
savings of between 12.93% and 19.44% relative to the Power system. The
variations in savings are dependent on the fuel price and island load at the
time.
Warren Crowley’s Masters Study 2013
Homer Simulations
creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
• In May 2014, feeder
with no solar had a fault;
this led to generator
being under loaded
because of the solar;
and it turned off -
complete Island
blackout!
• Some of the solar then
switched off to prevent it
happening again
Status: May 2014
creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
• Monitoring and data logging systems are installed, including monitoring of
power quality not just energy.
• A study should be undertaken that determines the size of PV array and
energy storage required for Niue to achieve 100% solar target, and then
outline how this should be achieved in manageable stages. This would
also require a study of the utility tariffs to keep NPC viable.
• The recommended study should also provide the size of the storage
immediately required in order to meet the current stability issue, but the
size as recommended in Mr Crawley’s report would be sufficient. Further
study is required on what the recommended inverter/battery solution
should be.
GSES’ Recommendations at the time
creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
Current situation
creating sustainable change through education, communication and leadership © 2014 GSES P/L
THANK YOU
Geoff Stapleton
Global Sustainable Energy Solutions Pty Ltd
p 1300 265 525| f +61 2 9024 5316 | m +61 418 429 255
gses@bigpond.com| www.gses.com.au

More Related Content

Similar to Ips connect 2015 geoff stapleton

Renewable energy in Rwanda – 2014
Renewable energy  in Rwanda – 2014Renewable energy  in Rwanda – 2014
Renewable energy in Rwanda – 2014Marcel Gakuba
 
Opportunities and Challenges of Renewable Energy Integration with Hydrogen Pr...
Opportunities and Challenges of Renewable Energy Integration with Hydrogen Pr...Opportunities and Challenges of Renewable Energy Integration with Hydrogen Pr...
Opportunities and Challenges of Renewable Energy Integration with Hydrogen Pr...OECD Environment
 
HZGD#23 Lara Esser - Small Hydro Power & Sustainability Goals v1c
HZGD#23 Lara Esser - Small Hydro Power & Sustainability Goals v1cHZGD#23 Lara Esser - Small Hydro Power & Sustainability Goals v1c
HZGD#23 Lara Esser - Small Hydro Power & Sustainability Goals v1cHangzhouGreenDrinks
 
Ips connect 2015 richard rocheleau
Ips connect 2015 richard rocheleauIps connect 2015 richard rocheleau
Ips connect 2015 richard rocheleaujames_hamilton
 
Ips connect 2015 deva de silva
Ips connect 2015 deva de silvaIps connect 2015 deva de silva
Ips connect 2015 deva de silvajames_hamilton
 
Flinders Island Isolated Power System (IPS) Connect 2016 R ROCHELEAU HNEI
Flinders Island Isolated Power System (IPS) Connect 2016 R ROCHELEAU HNEIFlinders Island Isolated Power System (IPS) Connect 2016 R ROCHELEAU HNEI
Flinders Island Isolated Power System (IPS) Connect 2016 R ROCHELEAU HNEIjames hamilton
 
Benefits of doing an energy masterplan workshop
Benefits of doing an energy masterplan workshop Benefits of doing an energy masterplan workshop
Benefits of doing an energy masterplan workshop SustainableEnergyAut
 
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...OECD Environment
 
Guest Lecture at University of Mataram (UNRAM).pdf
Guest Lecture at University of Mataram (UNRAM).pdfGuest Lecture at University of Mataram (UNRAM).pdf
Guest Lecture at University of Mataram (UNRAM).pdfParyantoDS
 
4-RE Status.Phils (1).pdf
4-RE Status.Phils (1).pdf4-RE Status.Phils (1).pdf
4-RE Status.Phils (1).pdfgccanis
 
Gef p acific iwrm gw integration dialogue pres
Gef p acific iwrm gw integration dialogue presGef p acific iwrm gw integration dialogue pres
Gef p acific iwrm gw integration dialogue presgroundwatercop
 
Bunaken Island | Nov-15 | Tonga off-grid electrification
Bunaken Island | Nov-15 | Tonga off-grid electrificationBunaken Island | Nov-15 | Tonga off-grid electrification
Bunaken Island | Nov-15 | Tonga off-grid electrificationSmart Villages
 
Bunaken Island | Nov-15 | Melanesia Million Miracle Programme (M3P)
Bunaken Island | Nov-15 | Melanesia Million Miracle Programme (M3P)Bunaken Island | Nov-15 | Melanesia Million Miracle Programme (M3P)
Bunaken Island | Nov-15 | Melanesia Million Miracle Programme (M3P)Smart Villages
 
Presentation by Dr. Shrikrishna Sane- Hydro Kinetic Renewable Energy Resource
Presentation by Dr. Shrikrishna Sane- Hydro Kinetic Renewable Energy ResourcePresentation by Dr. Shrikrishna Sane- Hydro Kinetic Renewable Energy Resource
Presentation by Dr. Shrikrishna Sane- Hydro Kinetic Renewable Energy ResourceIITBAA
 
IRENA - Renewable energy in islands
IRENA - Renewable energy in islandsIRENA - Renewable energy in islands
IRENA - Renewable energy in islandsIRENAslides
 
Bunaken Island | Nov-15 | The Sumba Iconic Island Initiative
Bunaken Island | Nov-15 | The Sumba Iconic Island InitiativeBunaken Island | Nov-15 | The Sumba Iconic Island Initiative
Bunaken Island | Nov-15 | The Sumba Iconic Island InitiativeSmart Villages
 
Ips connect 2015 andrew daka
Ips connect 2015 andrew dakaIps connect 2015 andrew daka
Ips connect 2015 andrew dakajames_hamilton
 

Similar to Ips connect 2015 geoff stapleton (20)

Lecture on Ghana re unido isec
Lecture on Ghana re unido isecLecture on Ghana re unido isec
Lecture on Ghana re unido isec
 
Renewable energy in Rwanda – 2014
Renewable energy  in Rwanda – 2014Renewable energy  in Rwanda – 2014
Renewable energy in Rwanda – 2014
 
Opportunities and Challenges of Renewable Energy Integration with Hydrogen Pr...
Opportunities and Challenges of Renewable Energy Integration with Hydrogen Pr...Opportunities and Challenges of Renewable Energy Integration with Hydrogen Pr...
Opportunities and Challenges of Renewable Energy Integration with Hydrogen Pr...
 
HZGD#23 Lara Esser - Small Hydro Power & Sustainability Goals v1c
HZGD#23 Lara Esser - Small Hydro Power & Sustainability Goals v1cHZGD#23 Lara Esser - Small Hydro Power & Sustainability Goals v1c
HZGD#23 Lara Esser - Small Hydro Power & Sustainability Goals v1c
 
Ips connect 2015 richard rocheleau
Ips connect 2015 richard rocheleauIps connect 2015 richard rocheleau
Ips connect 2015 richard rocheleau
 
Ips connect 2015 deva de silva
Ips connect 2015 deva de silvaIps connect 2015 deva de silva
Ips connect 2015 deva de silva
 
Flinders Island Isolated Power System (IPS) Connect 2016 R ROCHELEAU HNEI
Flinders Island Isolated Power System (IPS) Connect 2016 R ROCHELEAU HNEIFlinders Island Isolated Power System (IPS) Connect 2016 R ROCHELEAU HNEI
Flinders Island Isolated Power System (IPS) Connect 2016 R ROCHELEAU HNEI
 
K-Solar Program Overview
K-Solar Program OverviewK-Solar Program Overview
K-Solar Program Overview
 
Benefits of doing an energy masterplan workshop
Benefits of doing an energy masterplan workshop Benefits of doing an energy masterplan workshop
Benefits of doing an energy masterplan workshop
 
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
 
Guest Lecture at University of Mataram (UNRAM).pdf
Guest Lecture at University of Mataram (UNRAM).pdfGuest Lecture at University of Mataram (UNRAM).pdf
Guest Lecture at University of Mataram (UNRAM).pdf
 
The future is renewable energy
The future is renewable energyThe future is renewable energy
The future is renewable energy
 
4-RE Status.Phils (1).pdf
4-RE Status.Phils (1).pdf4-RE Status.Phils (1).pdf
4-RE Status.Phils (1).pdf
 
Gef p acific iwrm gw integration dialogue pres
Gef p acific iwrm gw integration dialogue presGef p acific iwrm gw integration dialogue pres
Gef p acific iwrm gw integration dialogue pres
 
Bunaken Island | Nov-15 | Tonga off-grid electrification
Bunaken Island | Nov-15 | Tonga off-grid electrificationBunaken Island | Nov-15 | Tonga off-grid electrification
Bunaken Island | Nov-15 | Tonga off-grid electrification
 
Bunaken Island | Nov-15 | Melanesia Million Miracle Programme (M3P)
Bunaken Island | Nov-15 | Melanesia Million Miracle Programme (M3P)Bunaken Island | Nov-15 | Melanesia Million Miracle Programme (M3P)
Bunaken Island | Nov-15 | Melanesia Million Miracle Programme (M3P)
 
Presentation by Dr. Shrikrishna Sane- Hydro Kinetic Renewable Energy Resource
Presentation by Dr. Shrikrishna Sane- Hydro Kinetic Renewable Energy ResourcePresentation by Dr. Shrikrishna Sane- Hydro Kinetic Renewable Energy Resource
Presentation by Dr. Shrikrishna Sane- Hydro Kinetic Renewable Energy Resource
 
IRENA - Renewable energy in islands
IRENA - Renewable energy in islandsIRENA - Renewable energy in islands
IRENA - Renewable energy in islands
 
Bunaken Island | Nov-15 | The Sumba Iconic Island Initiative
Bunaken Island | Nov-15 | The Sumba Iconic Island InitiativeBunaken Island | Nov-15 | The Sumba Iconic Island Initiative
Bunaken Island | Nov-15 | The Sumba Iconic Island Initiative
 
Ips connect 2015 andrew daka
Ips connect 2015 andrew dakaIps connect 2015 andrew daka
Ips connect 2015 andrew daka
 

More from james_hamilton

James hamilton ips connect-hamilton
James hamilton   ips connect-hamiltonJames hamilton   ips connect-hamilton
James hamilton ips connect-hamiltonjames_hamilton
 
Ips connect 2015 seiapi
Ips connect 2015 seiapiIps connect 2015 seiapi
Ips connect 2015 seiapijames_hamilton
 
Ips connect 2015 kamleshwar khelawan
Ips connect 2015 kamleshwar khelawanIps connect 2015 kamleshwar khelawan
Ips connect 2015 kamleshwar khelawanjames_hamilton
 
Ips connect 2015 marc mueller stoffels
Ips connect 2015 marc mueller stoffelsIps connect 2015 marc mueller stoffels
Ips connect 2015 marc mueller stoffelsjames_hamilton
 
Ips connect 2015 simon franklin
Ips connect 2015 simon franklinIps connect 2015 simon franklin
Ips connect 2015 simon franklinjames_hamilton
 
Ips connect 2015 simon gamble
Ips connect 2015 simon gambleIps connect 2015 simon gamble
Ips connect 2015 simon gamblejames_hamilton
 
Ips connect 2015 chris smith
Ips connect 2015 chris smithIps connect 2015 chris smith
Ips connect 2015 chris smithjames_hamilton
 
Ips connect 2015 david waterhouse
Ips connect 2015 david waterhouseIps connect 2015 david waterhouse
Ips connect 2015 david waterhousejames_hamilton
 
Emergent Energy Futures
Emergent Energy FuturesEmergent Energy Futures
Emergent Energy Futuresjames_hamilton
 
Utas lld-presentation-arena oct9-final
Utas lld-presentation-arena oct9-finalUtas lld-presentation-arena oct9-final
Utas lld-presentation-arena oct9-finaljames_hamilton
 

More from james_hamilton (10)

James hamilton ips connect-hamilton
James hamilton   ips connect-hamiltonJames hamilton   ips connect-hamilton
James hamilton ips connect-hamilton
 
Ips connect 2015 seiapi
Ips connect 2015 seiapiIps connect 2015 seiapi
Ips connect 2015 seiapi
 
Ips connect 2015 kamleshwar khelawan
Ips connect 2015 kamleshwar khelawanIps connect 2015 kamleshwar khelawan
Ips connect 2015 kamleshwar khelawan
 
Ips connect 2015 marc mueller stoffels
Ips connect 2015 marc mueller stoffelsIps connect 2015 marc mueller stoffels
Ips connect 2015 marc mueller stoffels
 
Ips connect 2015 simon franklin
Ips connect 2015 simon franklinIps connect 2015 simon franklin
Ips connect 2015 simon franklin
 
Ips connect 2015 simon gamble
Ips connect 2015 simon gambleIps connect 2015 simon gamble
Ips connect 2015 simon gamble
 
Ips connect 2015 chris smith
Ips connect 2015 chris smithIps connect 2015 chris smith
Ips connect 2015 chris smith
 
Ips connect 2015 david waterhouse
Ips connect 2015 david waterhouseIps connect 2015 david waterhouse
Ips connect 2015 david waterhouse
 
Emergent Energy Futures
Emergent Energy FuturesEmergent Energy Futures
Emergent Energy Futures
 
Utas lld-presentation-arena oct9-final
Utas lld-presentation-arena oct9-finalUtas lld-presentation-arena oct9-final
Utas lld-presentation-arena oct9-final
 

Recently uploaded

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 

Recently uploaded (20)

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 

Ips connect 2015 geoff stapleton

  • 1. creating sustainable change through education, communication and leadership © 2014 GSES P/L Training • Consulting • Engineering • Publications PV Penetration on Island Mini-Grid or Grid!- Niue King Island Connect 2015 Geoff Stapleton
  • 2. creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L
  • 3. creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L The Pacific Ocean • The Pacific Ocean covers: – 32.4 % of the Earth’s total area – 45.76 % of the total surface area of all of Earth’s water • Earth’s total landmass is only 90.13 % of the Pacific Ocean.
  • 4. creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L Population-Over 22 countries 4
  • 5. creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L Many Grids in Pacific would be considered by some as ―micro-grids‖, however for the Government and Utilities—this is there Grid. What is a micro-grid?
  • 6. creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L • Tokelau: country powered by three Hybrid systems- with PV being main source of supply • Tuvalu: – 3 x 600kW generators- base load about 900kW— – PV 500kW connected with SMA fuel saver plus 270kW – Planning 1MW with storage Example of PV Penetration in Pacific
  • 7. creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L • Tonga – Tongatapu - instantaneous penetration up to 45% 8.4MW peak demand and 3.5 to 4MW min demand (Sunday mid afternoon when Solar is most effective) – Vava'u - instantaneous penetration up to 65% 1.4 MW peak demand and 700 kW demand during day • Samoa— – Peak Demand 20MW – PV 6MW and more planned Example of PV Penetration in Pacific- Continued
  • 8. creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L Niue
  • 9. creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L Statistics • Population approx. 1400 • Generation : 4 x 508kW generators • Evening peak approx. 580kW • Daytime 400-500kW • 8.2 to 10 MWh per day
  • 10. creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L Distribution and Generation Operation and overview • Two Feeders • There is a capacitive effect on the two feeders such that shunt reactors were installed across the distribution system conductors and perform a variety of functions including power factor compensation, network voltage regulation and assist with the management of power system disturbances. • Operation : – 1 generator at low peak and 2 generators during evening peak, but 2 required when rock crusher (50kW) turned on. Also both turned on as a safety reason for the crane at wharf (11kW). – 2nd unit typically started when first generator is 75% loaded (380k)
  • 11. creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L • Niue High School 24kW (2009) • Hospital 30.6kW (2009) • Power Station -200kW with 158kWh battery storage (200kVA Inverter) (Feb 2014) • Airport 92kW (May 2014) • 1.7kW NPC Office TOTAL 348kW PV Systems
  • 12. creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L • EasyPower model • 384kW of solar and 180kW of batteries Kema Dynamic Stability Study-Sep 2012
  • 13. creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L • There must always be at least one diesel generator operating to provide the system frequency and voltage signals used by the solar power plants. This means that the island cannot rely on 100% solar generation at any time during the day. • The maximum amount of solar (renewable) generation is limited by the minimum load on the diesel generators (about 80 kW). • With a typical peak load of 480 kW, the maximum solar generation would be 400 kW. • The planned solar generation (384 kW) will be very close to this maximum limit. • Kema Dynamic Stability Study- Recommendations 1
  • 14. creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L • Based on a sample of solar output during January 2012, solar generation on Niue should produce less than 5% of Niue annual energy (fuel). • All the prospective (future) cases showed that one diesel should handle normal renewable output variations. • The inverters used with solar generation are susceptible to low-voltage drop-out during certain extreme events; the voltage ride-through for the inverters should reduce the low voltage set point for the 0.20-2.0 sec period from 0.65 to 0.50 pu. All existing and future inverters should use these settings. Kema Dynamic Stability Study- Recommendations 2
  • 15. creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L • KEMA noted during their stability study that when the crusher started that the inverters tripped out caused by frequency fluctuations. • This was also observed by Mr. Crowley while undertaking his masters study. • The battery storage with the 200kW airport system was installed to help maintain frequency stability when the crusher started. • However it emphasizes why the frequency windows need to widened to allow a minimum down to 45hz. Issue with crusher
  • 16. creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L Intermittent Solar Output
  • 17. creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L From his simulations, Warren recommended the following additional equipment : • 200kW Solar PV. • 300kW By-directional Inverter charger system. • 1472kWh Battery System. • Control Unit. This option provides diesel savings of between 6.74% and 9.45% and cost savings of between 12.93% and 19.44% relative to the Power system. The variations in savings are dependent on the fuel price and island load at the time. Warren Crowley’s Masters Study 2013 Homer Simulations
  • 18. creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L • In May 2014, feeder with no solar had a fault; this led to generator being under loaded because of the solar; and it turned off - complete Island blackout! • Some of the solar then switched off to prevent it happening again Status: May 2014
  • 19. creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L • Monitoring and data logging systems are installed, including monitoring of power quality not just energy. • A study should be undertaken that determines the size of PV array and energy storage required for Niue to achieve 100% solar target, and then outline how this should be achieved in manageable stages. This would also require a study of the utility tariffs to keep NPC viable. • The recommended study should also provide the size of the storage immediately required in order to meet the current stability issue, but the size as recommended in Mr Crawley’s report would be sufficient. Further study is required on what the recommended inverter/battery solution should be. GSES’ Recommendations at the time
  • 20. creating sustainable change through education, communication and leadership © 2014 GSES P/Lcreating sustainable change through education, communication and leadership © 2014 GSES P/L Current situation
  • 21. creating sustainable change through education, communication and leadership © 2014 GSES P/L THANK YOU Geoff Stapleton Global Sustainable Energy Solutions Pty Ltd p 1300 265 525| f +61 2 9024 5316 | m +61 418 429 255 gses@bigpond.com| www.gses.com.au