SlideShare a Scribd company logo
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
1 | P a g e
Table of Content
1.0 ACKNOWLEDGEMENT……………………………………………………. 1
2.0 INTRODUCTION………………………………………………………… 2 - 3
2.1 Module Objective……………………………………………………….. 2
2.2 Intern-Working Environment………………………………………....... 3
3.0 General Scope of Training…………………………………………………. 4
4.0 Project 5…………………………………………………………………. 5 - 41
4.1 Mix-Development on lot 3065 & 3085……………………..……… 5 - 8
4.1.1 Learning Outcome……………………………………………….. 9
4.2 D’Marina International Trade Center…………………………… 10 - 19
4.2.1 Jewel of East Coast Malaysia……………………………. 10 – 11
4.2.2 Beachfront Villa…………………………………………………. 12
4.2.3 Semenyik…………………………………………………………. 13
4.2.4 Road and Pedestrian walkway…………………………………. 14
4.2.5 Parcel 3…………………………………………………………… 15
4.2.6 Parcel 1 – 11…………………………………………………….. 16
4.2.7 Render………………………………………………………. 17 – 18
4.2.8 Learning Outcome……………………………………………….. 19
4.3 Lutheran Church…………………………………………………… 20 - 34
4.3.1 Gate Design Proposal 1……………………………………. 20 - 23
4.3.2 Gate Design Proposal 2……………………………………. 24 - 27
4.3.3 Gate Design Proposal 3……………………………………. 28 - 30
4.3.4 Gate Design Proposal 4……………………………………. 31 - 33
4.3.5 Learning Outcome……………………………………………….. 34
4.4 Mix-Development on PT7258 ( Johnny Ong )……………………35 - 37
4.4.1 Emergency Lighting and Fire Wall………….…………….. 35 - 37
4.4.2 Learning Outcome……………………………………………….. 37
4.5 Jason Tan’s Bungalow……………………….…………………….38 - 41
4.5.1 Window Schedule, Bathroom detail………………………. 38 – 41
4.5.2 Learning Outcome…………………………………...…………… 41
5.0 Site Visitation……………………………………………………………. 42 - 47
5.1 Lot 495, 41 Units 3 Storey Terrace House………………………….. 42
5.1.1 Site Photoes………………………………………………… 42 – 43
5.1.2 Client Consultant Meeting and Site Meeting…………….. 44 – 46
5.1.3 Construction Documents………………………………………… 47
5.1.4 Learning Outcome………………………………………………... 47
6.0 Conclusion…………………………………………………………………… 48
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
2 | P a g e
1.0 ACKNOWLEDGEMENT
I would like to express my sincerest gratitude to my colleagues at Clement Wong
Architecture for guiding me throughout the duration of my entire internship, which was 8
weeks. Their constant guidance & support had taught me as well as allowed me to
experience the working environment of what I would call it as, “The architecture life”.
During my time interning here, I was definitely given a lot of opportunities and chances
to learn and develop new talents at professional skills. Our seniors were also always
there to answer our questions & help us along the way. “AS LONG AS WE ASK” to
what we want to do and learn, our seniors will try their best to guide us. They also like
giving us the more difficult tasks, though we might have complained, we now are
thankful for the things we’ve learnt and for the experiences we have gotten from
completing the tasks. Thanks to their guidance and mentorship, they were able to
encourage me to be professional during the entire internship programme.
Sincerely,
Hern-Hymn Devinchi Ng
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
3 | P a g e
2.0 INTRODUCTION
2.1 Module Objective
This internship is aimed at introducing students to the requirements, activities and
operations involved in working in architectural / construction practices. The purpose is to
facilitate the involvement of students in professional attachments to architectural
practices in order to develop an understanding of the general nature, principles and
procedure of law and legislation as applied to architectural drawings, especially the
Building by laws. Students will also be exposed to the process of authority submission
for various drawings from an architectural practice and the range of contract
documentation produced to support these drawings. Via a full-time internship
attachment, students will further appreciate the documentation and report writing skill
required of an employee in an architect’s firm.
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
4 | P a g e
2.2 Intern-Working Environment
2.2.1. Company Background
Company
Name
Clement Wong Architecture
Address 56D & 57D, Jalan Desa Bakti, Taman Desa, 58100 Kuala Lumpur
Email Cwarch.hr@gmail.com / clementwongarch@gmail.com
Contact
Number
+603 7984 0128
Clement Wong started his own practice called Clement Wong Architecture in
2009 registered under the Board of Architect, Malaysia. His current work
include Eco-tech Vertical Farming in China; REHDA new headquarter in PJ;
several housing estate development and bungalows around Klang Valley
which emphasis on “green features” and sustainable designs including his own
home office retrofit. Clement Wong is also a Green Building Facilitator under
the newly formed Green Building Index rating tool specific for Malaysian
buildings.
2.2.2 Period of Training
The total required training period is 8 weeks, from January 3rd 2016 to March
3rd 2016, however I ended my training period at March 6th 2016.
2.2.3 Working Hours
Monday to Friday
9am to 6pm
*( Lunch Hour: 1pm to 2pm)*
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
5 | P a g e
3.0 General Scope of Training
Overall Task and Practices
1. Design Sketch, Drafting.
2. AutoCAD Drawing, 3D modeling.
3. Comment, Modifications & Amendments of Architectural Drawings.
4. Preparation of presentation slides.
5. Observed and assessed regulatory context with Building By – Laws, Set Back,
and Fire Escape.
6. Prepared architectural drawing with regard to location, building elements,
finishes, and fittings.
7. Establish requirements for co-ordinate, consultants and product suppliers.
8. Preparation for tender documents and participated in the process
Software Applications
1. Autodesk AutoCAD
2. SketchUp
3. Rhino 5
4. Photoshop
5. Lumion 6 Pro
6. Adobe
7. Microsoft ( Word, and PowerPoint )
8. Google Chrome
Training Program Schedule
We are to do the projects that are given or requires upon our self and expected to be
self-discipline and to multitask our given task and to be completed on time without
procrastinating. Our given task didn’t have a rushing due date, but when one of our
colleague give us another task, we have to complete that new given task first, because
it’s near to dead line. That is why we have a lot of stuff to do and learn coming from it.
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
6 | P a g e
4.0 Project
4.1 Mix-Development on lot 3065 & 3085
Overview
Project: Mix-Development on lot 3065 & 3085
Site location: Sungai Penchala, Mukim, Kuala Lumpur, Malaysia
Specification: Mix-used, Shopping Complex, Residential, Office, Public Gathering
Supervisor: Oilver Tan
Task: Technical drawing of fire-staircase ( Tender Drawing )
Mix-Development on lot 3065 &3085 is a project that is consisting of 500 units of
residential, 5 floor of basement carpark, and 2 floor of shopping complex. This high rise
features greenery and double volume of some units. This Mix-Development area of land
ranging from 3800𝑚2
to 3900𝑚2
of boundary line. The estimated prince to complete
building this high rise, cost round RM80,000,000. This project to scheduled to be
completed by the end of 2018. The current stage of his project is on the pile foundation,
and it already costed RM20,000,000. The total of number fire-escape/ staircase of this
building in the building are 8, and I have completed 5 of the drawing, thankful for my
colleague Winnie Ang ( Taylor’s intern ) for completed her first task fast, and her second
task for to assist me on this Technical drawing of fire-staircase. If it wasn’t for her, I think
that I will stuck on drawing this my whole intern. Our supervisor Oilver Tan was in-
charge of this project, and he taught us a lot. By drawing it so that the person who will
read it next understand it well. The gird-line way so, that if people want to look back the
staircase, they can just see back where the grid-line at. Most-important that is the stair-
case must basic on UBBL. So each step maximum of 180mm per rises.
On Day 1, that is what I did (Figure
4.1.1 ) and completed on the next day,
but later we found a problem that is each
rises are only 155mm that is very
following according to the floor plan step.
So that my supervisor told me to
decrease the number of step, and as
long as the match back the floor level,
then is fine. So, we decided to decrease
the number of step, and my new task to
make sure the floor plan step is correct
with the technical section. The below
image of staircase is I draw.
Figure 4.1.1
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
7 | P a g e
This is my first product work in my internship program. ( figure 4.1.2 ) This staircase is
staircase number 2. My supervisor told me to start from complicated one first so that the
next one will be more easily for me.
This is staircase number 3. ( Figure 4.1.3)
Figure 4.1.2
Figure 4.1.3
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
8 | P a g e
This is staircase number 6 ( figure 4.1.4 )
This is staircase number 7 ( figure 4.1.5 )
Figure 4.1.4
Figure 4.1.5
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
9 | P a g e
This is staircase number 8. ( Figure 4.1.6 )
Figure 4.1.6
Figure 4.1.7
This is the floor plan, and the location of staircase. ( Figure 4.1.7 ) The red box is the one I
draw, and the blue box is Winnie Ang who draw it.
#2 #3 #6 #7 #8
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
10 | P a g e
4.1.1 Learning Outcome:
After Completing this technical drawing of fire-escape staircase, given from my
supervisor Oilver Tan, I now managed to enhance my knowledge of the Fire-escape
staircase, and the UBBL of fire-escape staircase. Furthermore, now I have a better
understanding of how to do a technical drawing, basic on the UBBL step and railing.
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
11 | P a g e
4.2 D’Marina International Trade Center
For this project, it’s split into many part, due to it’s 500 acres. And all the work still on
proposal stage. And the total estimate development cost RM10,006,507,578.
4.2.1 Jewel of East Coast Malaysia
Overview
Project: Jewel of East Coast Malaysia
Site location: Kuantan, Pahang, Malaysia
Specification: 500 acres
Supervisor: Bovi
Task: Update the slide to 2017 version
For this task, I was assign to update the slide at latest as possible, due to some info are
out to date and some have new info regarding of it. This PowerPoint slide are mainly to
intro the bullet train from China to Malaysia, the distance and timing of it. And mainly it
informs the contractor to understand more and update why this location we planning to
built is the suitable spot.
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
12 | P a g e
This is the total slide of it, ( figure 4.2.1.1 ) and I tried my best to update it as update as
possible.
Figure 4.2.1.1
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
13 | P a g e
4.2.2 Beachfront Villa
Overview
Project: Beachfront Villa
Site location: Kuantan, Pahang, Malaysia
Specification: 500 acres
Supervisor: Saidu
Task: 3d modeling
For this task, I was assign built the 3d model, repaint to other material, and make the 3d
model as simple as possible. So, that when we are doing the perspective view for the
master planning render. The building wouldn’t effect it. So that we can focus on what we
want too. This Beachfront Villa consist of 3 different style and design of the bungalow.
That is the 3d model I did, and make it as simple as possible. ( Figure 4.2.2.1 )
Figure 4.2.2.1
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
14 | P a g e
4.2.3 Semenyik
Overview
Project: Semenyik
Site location: Kuantan, Pahang, Malaysia
Specification: 500 acres
Supervisor: Saidu
Task: 3d modeling
For this task, I was assign built the 3d model, repaint to other material, and make the 3d
model as simple as possible. So, that when we are doing the perspective view for the
master planning render. The building wouldn’t effect it. So that we can focus on what we
want too. This is the 4 storey of Semi-D housing.
The front perspective view ( figure 4.2.3.1 ) and, the back view ( figure 4.2.3.2 )
Figure 4.2.3.1 Figure 4.2.3.2
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
15 | P a g e
4.2.4 Road and Pedestrian walkway
Overview
Project: Road and Pedestrian walkway
Site location: Kuantan, Pahang, Malaysia
Specification: 500 acres
Supervisor: Saidu
Task: 3d modeling
For this task, I was assign built the 3d model, repaint to other material, and make the 3d
model as simple as possible. So, that when we are doing the perspective view for the
master planning render. The building wouldn’t effect it. So that we can focus on what we
want to render. This is the road and pedestrian walkway for D’Marina.
For this task, I overnight to complete it during the Chinese new year break. Cause I was
informed that it’s very in rush. ( figure 4.2.4.2 )
Figure 4.2.4.1 Figure 4.2.4.2
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
16 | P a g e
4.2.5 Parcel 3
Overview
Project: Parcel 3
Site location: Kuantan, Pahang, Malaysia
Specification: 500 acres
Supervisor: Clive
Task: Photoshop
For this task, I was assign to Cad the drawing and Photoshop Parcel 3, and color it in
red. So that it’s easier for the supervisor to present and the highlight of the area.
Figure 4.2.5.1
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
17 | P a g e
4.2.6 Parcel 1 - 11
Overview
Project: Parcel 1 - 11
Site location: Kuantan, Pahang, Malaysia
Specification: 500 acres
Supervisor: Saidu
Task: Update the slide to 2017 version
For this task, I was assign to update the slide at latest as possible, due to some info are
out to date and some have new info regarding of it. This PowerPoint slide are mainly to
about the Parcel 1 to 11, where to intro each and every parcel unique design and idea.
Figure 4.2.6.1
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
18 | P a g e
4.2.7 Render
Overview
Project: Render
Site location: Kuantan, Pahang, Malaysia
Specification: 500 acres
Supervisor: Saidu
Task: Adding human figure and trees
For this task, I told my colleague I was free, so that I can help him to do it, when he was
doing it himself, and rushing for another work.
Figure 4.2.7.1
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
19 | P a g e
For theses are the human figure and tree on the render view that I did. for
( figure 4.2.7.1, figure 4.2.7.2 , figure 4.2.7.3 )
Figure 4.2.7.2
Figure 4.2.7.3
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
20 | P a g e
4.2.8 Learning Outcome
After Completing so many stuff for D’Marina project, I have learned how to do a
proposal PowerPoint slide better, and how does it attract the attention of the human.
Making 3D-model as simple as possible so that it can the master perspective view won’t
not look so irritating. And that Photoshop the image so that it will look better and to be
more presentable. Furthermore, now I have a better understanding of how to do a
Multitask better and to work in very efficiently way.
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
21 | P a g e
4.3 Lutheran Church
4.3.1 Gate Design Proposal 1
Overview
Project: Lutheran Church
Site location: Mont Kiara, Kuala Lumpur, Malaysia
Specification: Church
Supervisor: Sunil
Task: Designing Gate
Lutheran Church is a project that is a public space for private realm. This Mix-
Development area of land ranging from 3155𝑚2
of boundary line. The estimated prince
to complete building this high rise, cost round RM8,000,000. But they reduce the cost to
RM6,000,000 so that the design of the building didn’t look as nice as what we had
present in the beginning. This project to scheduled to be completed by the end of
September 2017. For this is the first during my internship, I took a measurement tape,
and measure the site. So that our gate proposal can be basic on the site drawing. For
this Task, I was to do sketches, AutoCAD, SketchUP, and Photoshop.
This is the Site picture that I took. ( Figure 4.3.1.1 )
Figure 4.3.1.1
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
22 | P a g e
Figure 4.3.1.2
Figure 4.3.1.3
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
23 | P a g e
Figure 4.3.1.4
Figure 4.3.1.5
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
24 | P a g e
This is the Full set of the gate design proposal 1 from ( Figure 4.3.1.1 to Figure 4.3.1.6 )
Figure 4.3.1.6
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
25 | P a g e
4.3 Lutheran Church
4.3.2 Gate Design Proposal 2
Overview
Project: Lutheran Church
Site location: Mont Kiara, Kuala Lumpur, Malaysia
Specification: Church
Supervisor: Sunil
Task: Designing Gate
Lutheran Church is a project that is a public space for private realm. This Mix-
Development area of land ranging from 3155𝑚2
of boundary line. The estimated prince
to complete building this high rise, cost round RM8,000,000. But they reduce the cost to
RM6,000,000 so that the design of the building didn’t look as nice as what we had
present in the beginning. This project to scheduled to be completed by the end of
September 2017. For this Task, I was to do sketches, AutoCAD, SketchUP, and
Photoshop. Proposal 2 include with the refuses compartment, and the letter box. Went
to revisit site again to measure the refuse compartment area.
Figure 4.3.2.1
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
26 | P a g e
Figure 4.3.2.2
Figure 4.3.2.3
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
27 | P a g e
Figure 4.3.2.4
Figure 4.3.2.5
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
28 | P a g e
This is the Full set of the gate design proposal 2 from ( Figure 4.3.2.1 to Figure 4.3.2.6 )
Figure 4.3.2.6
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
29 | P a g e
4.3 Lutheran Church
4.3.3Gate Design Proposal 3
Overview
Project: Lutheran Church
Site location: Mont Kiara, Kuala Lumpur, Malaysia
Specification: Church
Supervisor: Sunil
Task: Designing Gate
Lutheran Church is a project that is a public space for private realm. This Mix-
Development area of land ranging from 3155𝑚2
of boundary line. The estimated prince
to complete building this high rise, cost round RM8,000,000. But they reduce the cost to
RM6,000,000 so that the design of the building didn’t look as nice as what we had
present in the beginning. This project to scheduled to be completed by the end of
September 2017. For this Task, I was to do sketches, AutoCAD, SketchUP, and
Photoshop. Proposal 3, after knowing the gate is over-weight, and Clement told us to
change the design to a simpler one. Which is more cost saving.
Figure 4.3.3.1
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
30 | P a g e
Figure 4.3.3.2
Figure 4.3.3.3
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
31 | P a g e
This is the Full set of the gate design proposal 2 from ( Figure 4.3.3.1 to Figure 4.3.3.5 )
Figure 4.3.3.4
Figure 4.3.3.5
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
32 | P a g e
4.3 Lutheran Church
4.3.4Gate Design Proposal 4
Overview
Project: Lutheran Church
Site location: Mont Kiara, Kuala Lumpur, Malaysia
Specification: Church
Supervisor: Sunil
Task: Designing Gate
Lutheran Church is a project that is a public space for private realm. This Mix-
Development area of land ranging from 3155𝑚2
of boundary line. The estimated prince
to complete building this high rise, cost round RM8,000,000. But they reduce the cost to
RM6,000,000 so that the design of the building didn’t look as nice as what we had
present in the beginning. This project to scheduled to be completed by the end of
September 2017. For this Task, I was to do sketches, AutoCAD, SketchUP, and
Photoshop. Proposal 4, because they have no budget now, they are reducing a lot of
stuff, and it’s back to follow the first tender set.
Figure 4.3.4.1
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
33 | P a g e
Figure 4.3.4.2
Figure 4.3.4.3
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
34 | P a g e
Figure 4.3.4.4
Figure 4.3.4.5
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
35 | P a g e
4.3.5 Learning Outcome:
After Completing so many different gate design proposals for Lutheran Church, I have
learned that how to do a better work in a proposals drawing, as in once we having a
meeting on site, a drawing and dimension must state it very clear so that people don’t
have to flip thru out the page just to find that single dimension, and working drawing that
is suppose to be more efficiently so that it will look more neat. Furthermore, now I have
a better understanding of how to a tender drawing that has to be properly organized.
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
36 | P a g e
4.4 Mix-Development on PT7258 ( Johnny Ong )
4.4.1 Emergency Lighting and Fire Wall
Overview
Project: Mix-Development on PT7258 ( Johnny Ong )
Site location: Country Homes, Mukim Rawang, Selangor, Malaysia
Specification: Shopping Complex
Supervisor: Sunil
Task: Emergency Lighting and Fire Wall
Mix-Development on PT7258 ( Johnny Ong ) is a project that is developing a shopping
complex. This Mix-Development area of land ranging from 12150𝑚2
of boundary line.
The estimated prince to complete building this high rise, cost round RM5,000,000. This
project to scheduled to be completed by the end of August 2017. Since it’s a Bomba
drawing, for this task I had to do is to know the UBBL fire wall, and Emergency Lighting
Figure 4.4.1.1
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
37 | P a g e
Figure 4.4.1.2
Figure 4.4.1.3
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
38 | P a g e
Figure 4.4.1.1 to figure 4.4.1.4 are the image of fire wall and emergency lighting.
4.4.2 Learning Outcome:
After Completing so this task, it helped me to understand more of a bomba drawing.
Furthermore, now I have a better understanding of how to a bomba drawing that has to
be properly organized.
Figure 4.4.1.4
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
39 | P a g e
4.5 Jason Tan’s Bungalow
4.5.1 Window schedule, bathroom detail.
Overview
Project: Jason Tan’s Bungalow
Site location: Klang, Selangor, Malaysia
Specification: Bungalow
Supervisor: Sunil
Task: Update floor plan, elevation, 3d model, and washroom detail.
Jason Tan’s Bungalow is a project that is building a Private Bungalow. This Mix-
Development area of land ranging from 9250𝑚2
of boundary line. The estimated cost to
complete this bungalow round RM4,000,000. This project to scheduled to be completed
by the end of end of June 2018. The current stage it’s on now is pre-casting the
skeleton structure. For this task, I was assign to update the window schedule to the
elevation, and than update the 3d model, and after than update the washroom detail line
weight isn’t correct I was told to do that too.
Figure 4.5.1.1
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
40 | P a g e
Figure 4.5.1.1 and figure 4.5.1.2 are the updated elevation, and the figure 4.5.1.3 are
the update 3d model of the window.
Figure 4.5.1.2
Figure 4.5.1.3
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
41 | P a g e
Figure 4.5.1.4
Figure 4.5.1.5
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
42 | P a g e
These are the bathroom detail and finishes figure 4.5.1.4 to figure 4.5.1.6
4.5.2 Learning Outcome:
After Completing so this task, as an intern, this is my first bathroom detail I did. and I
learned that once we update an drawing we must highlight it so the following next
person will know about it, and pay more attention to it.
Figure 4.5.1.6
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
43 | P a g e
5.0 Site Visitation
5.1 Lot 495, 41 Units 3 Storey Terrace House
5.1.1 Site Photos
Overview
Project: Lot 495, 41 Units 3 Storey Terrace House
Site location: Jalan Gombak, Setapak, Kuala Lumpur Malaysia
Specification: Terrace House
Supervisor: Ling Siang
Task: Going to site, and taking picture,
Lot 495, 41 Units 3 Storey Terrace House is a project that are developing a Terrace
Houses. The estimated cost to complete this bungalow round RM8,000,000. This
project to scheduled to be completed by the end of end of this year. For this task, I was
assign to go to site with my colleague, as she is also my supervisor for site visit. My
main job is the go and understand the feeling of having a meeting on site, and taking
picture as backup. Once we are back to the office, I will also try my best to do Client
Consultant Meeting (ccm), and Site Meeting (sm), even thought I know my
understanding is not as well as my supervisor, she is still willing to learn me do it, and
than teach me later about me.
Figure 5.1.1.1
On site meeting
Figure 5.1.1.2
Terrace Houses
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
44 | P a g e
Figure 5.1.1.1 to Figure 5.1.1.6 are all on site photo.
Figure 5.1.1.3
Conctractor sketch on finihes titles.
Figure 5.1.1.4
.
Figure 5.1.1.5
.
Figure 5.1.1.6
.
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
45 | P a g e
5.1.2 Client Consultant Meeting (ccm), and Site Meeting (sm),
Overview
Project: Lot 495, 41 Units 3 Storey Terrace House
Site location: Jalan Gombak, Setapak, Kuala Lumpur Malaysia
Specification: Terrace House
Supervisor: Ling Siang
Task: typing the Client Consultant Meeting (ccm), and Site Meeting (sm)
Figure 5.1.2.1 and figure 5.1.2.2 are the image of the CCM minutes.
Figure 5.1.2.2
Febuary 23th 2017
Figure 5.1.2.1
January 19th2017
.
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
46 | P a g e
Figure 5.1.2.3
January 19th2017
.
Figure 5.1.2.4
February 10th2017
.
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
47 | P a g e
Figure 5.1.2.5
February 24th2017
.
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
48 | P a g e
5.1.3 Construction Documents
Overview
Project: Lot 495, 41 Units 3 Storey Terrace House
Site location: Jalan Gombak, Setapak, Kuala Lumpur Malaysia
Specification: Terrace House
Supervisor: Ling Siang
Task: Plotting Construction Documents for Contractor
5.1.4 Learning Outcome:
After Going to site, and typing out CCM, and SM, I know that going site is easy, bur
typing CCM and SM are hard because there are still a lot of element that I still didn’t
know off.
Figure 5.1.3.1
.
[AR2615] INTERSHIP TRAINNING AND REPORT
NAME: HERN-HYMN DEVINCHI NG ( 0320526 )
49 | P a g e
6.0 Conclusion
For the past 8 Week I have learned a lot that I couldn’t had learn in education, would
like to thank you Clement Wong Architecture colleague again, and thank ms, balkish for
spending your time to come visit us during your busy day.

More Related Content

What's hot

cnh 2
cnh 2 cnh 2
cnh 2
Pei Di
 
Pinak Sawhney - Internship Completion Certificate
Pinak Sawhney  - Internship Completion CertificatePinak Sawhney  - Internship Completion Certificate
Pinak Sawhney - Internship Completion CertificatePINAK SAWHNEY
 
computer training certificate
computer training certificatecomputer training certificate
computer training certificateRobert Kamau
 
Laporan Latihan Industri Bab 5 & 6
Laporan Latihan Industri Bab 5 & 6Laporan Latihan Industri Bab 5 & 6
Laporan Latihan Industri Bab 5 & 6
CikBeyla Nabiella
 
Internship certificate hbl
Internship certificate hblInternship certificate hbl
Internship certificate hbl
Mujib ur Rahman
 
Internship Report and Logsheet - Taylor's University Lakeside Campus
Internship Report and Logsheet - Taylor's University Lakeside CampusInternship Report and Logsheet - Taylor's University Lakeside Campus
Internship Report and Logsheet - Taylor's University Lakeside Campus
Lovie Tey
 
Naita training report Electro serv
Naita training report Electro servNaita training report Electro serv
Naita training report Electro serv
VishanMadushanka
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
Hayat Denzi
 
Internship report
Internship reportInternship report
Internship report
Sheau Hui Tan
 
Internship Report
Internship Report Internship Report
Internship Report
RK Pandit
 
Siddharth Banerjee - Internship Completion Certificate
Siddharth Banerjee - Internship Completion CertificateSiddharth Banerjee - Internship Completion Certificate
Siddharth Banerjee - Internship Completion CertificateSiddhartha Banerjee
 
CULTURE Compilation report
CULTURE Compilation reportCULTURE Compilation report
CULTURE Compilation report
Shiko Foo
 
Internship Wso2
Internship Wso2Internship Wso2
Internship Wso2
A.Y Dissanayake
 
Computer Science Internship Report PDF Leena AI
Computer Science Internship Report PDF Leena AIComputer Science Internship Report PDF Leena AI
Computer Science Internship Report PDF Leena AI
shadowhazard77
 
MMU INTERNSHIP REPORT JAAYNE JEEVITA A / P RONALD ALFRED
MMU INTERNSHIP REPORT JAAYNE JEEVITA A / P RONALD ALFREDMMU INTERNSHIP REPORT JAAYNE JEEVITA A / P RONALD ALFRED
MMU INTERNSHIP REPORT JAAYNE JEEVITA A / P RONALD ALFRED
JaayneWilliam
 
Internship report
Internship reportInternship report
Internship reportUCC
 
Construction work tutorial of small RC Building
Construction work tutorial of small RC BuildingConstruction work tutorial of small RC Building
Construction work tutorial of small RC Building
firdaus Muhammad Adnan
 
Internship Completion Letter
Internship Completion LetterInternship Completion Letter
Internship Completion LetterNaved Mohammad
 
Cognitive Mapping of Brickfield
Cognitive Mapping of Brickfield Cognitive Mapping of Brickfield
Cognitive Mapping of Brickfield
JoyeeLee0131
 
My Internship Document part1
My Internship Document part1My Internship Document part1
My Internship Document part1
Shashi_S_S
 

What's hot (20)

cnh 2
cnh 2 cnh 2
cnh 2
 
Pinak Sawhney - Internship Completion Certificate
Pinak Sawhney  - Internship Completion CertificatePinak Sawhney  - Internship Completion Certificate
Pinak Sawhney - Internship Completion Certificate
 
computer training certificate
computer training certificatecomputer training certificate
computer training certificate
 
Laporan Latihan Industri Bab 5 & 6
Laporan Latihan Industri Bab 5 & 6Laporan Latihan Industri Bab 5 & 6
Laporan Latihan Industri Bab 5 & 6
 
Internship certificate hbl
Internship certificate hblInternship certificate hbl
Internship certificate hbl
 
Internship Report and Logsheet - Taylor's University Lakeside Campus
Internship Report and Logsheet - Taylor's University Lakeside CampusInternship Report and Logsheet - Taylor's University Lakeside Campus
Internship Report and Logsheet - Taylor's University Lakeside Campus
 
Naita training report Electro serv
Naita training report Electro servNaita training report Electro serv
Naita training report Electro serv
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Internship report
Internship reportInternship report
Internship report
 
Internship Report
Internship Report Internship Report
Internship Report
 
Siddharth Banerjee - Internship Completion Certificate
Siddharth Banerjee - Internship Completion CertificateSiddharth Banerjee - Internship Completion Certificate
Siddharth Banerjee - Internship Completion Certificate
 
CULTURE Compilation report
CULTURE Compilation reportCULTURE Compilation report
CULTURE Compilation report
 
Internship Wso2
Internship Wso2Internship Wso2
Internship Wso2
 
Computer Science Internship Report PDF Leena AI
Computer Science Internship Report PDF Leena AIComputer Science Internship Report PDF Leena AI
Computer Science Internship Report PDF Leena AI
 
MMU INTERNSHIP REPORT JAAYNE JEEVITA A / P RONALD ALFRED
MMU INTERNSHIP REPORT JAAYNE JEEVITA A / P RONALD ALFREDMMU INTERNSHIP REPORT JAAYNE JEEVITA A / P RONALD ALFRED
MMU INTERNSHIP REPORT JAAYNE JEEVITA A / P RONALD ALFRED
 
Internship report
Internship reportInternship report
Internship report
 
Construction work tutorial of small RC Building
Construction work tutorial of small RC BuildingConstruction work tutorial of small RC Building
Construction work tutorial of small RC Building
 
Internship Completion Letter
Internship Completion LetterInternship Completion Letter
Internship Completion Letter
 
Cognitive Mapping of Brickfield
Cognitive Mapping of Brickfield Cognitive Mapping of Brickfield
Cognitive Mapping of Brickfield
 
My Internship Document part1
My Internship Document part1My Internship Document part1
My Internship Document part1
 

Viewers also liked

INTERNSHIP REPORT
INTERNSHIP REPORTINTERNSHIP REPORT
INTERNSHIP REPORT
Ee Dong Chen
 
logsheets devinchi
logsheets devinchi logsheets devinchi
logsheets devinchi
Devinchi
 
Building science ii project 1 compiled
Building science ii project 1 compiledBuilding science ii project 1 compiled
Building science ii project 1 compiled
Devinchi
 
B.TECH P1 - IBS Score
B.TECH P1 - IBS ScoreB.TECH P1 - IBS Score
B.TECH P1 - IBS Score
Devinchi
 
Curcumin brand plan. 1st cut
Curcumin brand plan. 1st cutCurcumin brand plan. 1st cut
Curcumin brand plan. 1st cut
RANJAN BHUYAN
 
INTEGRATION TO C.LIBRARY
INTEGRATION TO C.LIBRARY INTEGRATION TO C.LIBRARY
INTEGRATION TO C.LIBRARY
Devinchi
 
Intership report on nbp
Intership report on nbpIntership report on nbp
Intership report on nbpGCUF
 
Practical training report
Practical training reportPractical training report
Practical training report
Nicolai Sidek
 
Arc2625 report file nik afiq amadi 0317749 final.pdf
Arc2625 report file nik afiq amadi 0317749 final.pdfArc2625 report file nik afiq amadi 0317749 final.pdf
Arc2625 report file nik afiq amadi 0317749 final.pdf
Afiq Knick
 
Summer internship project report
Summer internship project reportSummer internship project report
Summer internship project reportManish Singh
 
Environmental ethics
Environmental ethicsEnvironmental ethics
Environmental ethics
laraibmasood10
 
Reflection in Go
Reflection in GoReflection in Go
Reflection in Go
strikr .
 
Curcumin brand plan. 1st cut
Curcumin brand plan. 1st cutCurcumin brand plan. 1st cut
Curcumin brand plan. 1st cut
RANJAN BHUYAN
 
Estratégias de Negociação
Estratégias de NegociaçãoEstratégias de Negociação
Estratégias de Negociação
guestcda5ca
 
Our interim management value proposition in romania and belgium
Our interim management value proposition in romania and belgiumOur interim management value proposition in romania and belgium
Our interim management value proposition in romania and belgium
Freddy Jacobs
 
Україна у вогні.
Україна у вогні.Україна у вогні.
Україна у вогні.
Наталія Миклуш
 
[DSC x TAAI 2016] 林守德 / 人工智慧與機器學習在推薦系統上的應用
[DSC x TAAI 2016] 林守德 / 人工智慧與機器學習在推薦系統上的應用[DSC x TAAI 2016] 林守德 / 人工智慧與機器學習在推薦系統上的應用
[DSC x TAAI 2016] 林守德 / 人工智慧與機器學習在推薦系統上的應用
台灣資料科學年會
 
добро починається з тебе
добро починається з тебедобро починається з тебе
добро починається з тебе
kopanki2015
 

Viewers also liked (20)

INTERNSHIP REPORT
INTERNSHIP REPORTINTERNSHIP REPORT
INTERNSHIP REPORT
 
logsheets devinchi
logsheets devinchi logsheets devinchi
logsheets devinchi
 
Building science ii project 1 compiled
Building science ii project 1 compiledBuilding science ii project 1 compiled
Building science ii project 1 compiled
 
B.TECH P1 - IBS Score
B.TECH P1 - IBS ScoreB.TECH P1 - IBS Score
B.TECH P1 - IBS Score
 
Curcumin brand plan. 1st cut
Curcumin brand plan. 1st cutCurcumin brand plan. 1st cut
Curcumin brand plan. 1st cut
 
INTEGRATION TO C.LIBRARY
INTEGRATION TO C.LIBRARY INTEGRATION TO C.LIBRARY
INTEGRATION TO C.LIBRARY
 
Intership report on nbp
Intership report on nbpIntership report on nbp
Intership report on nbp
 
Internship report
Internship reportInternship report
Internship report
 
Practical training report
Practical training reportPractical training report
Practical training report
 
Arc2625 report file nik afiq amadi 0317749 final.pdf
Arc2625 report file nik afiq amadi 0317749 final.pdfArc2625 report file nik afiq amadi 0317749 final.pdf
Arc2625 report file nik afiq amadi 0317749 final.pdf
 
Summer internship project report
Summer internship project reportSummer internship project report
Summer internship project report
 
internship report
internship reportinternship report
internship report
 
Environmental ethics
Environmental ethicsEnvironmental ethics
Environmental ethics
 
Reflection in Go
Reflection in GoReflection in Go
Reflection in Go
 
Curcumin brand plan. 1st cut
Curcumin brand plan. 1st cutCurcumin brand plan. 1st cut
Curcumin brand plan. 1st cut
 
Estratégias de Negociação
Estratégias de NegociaçãoEstratégias de Negociação
Estratégias de Negociação
 
Our interim management value proposition in romania and belgium
Our interim management value proposition in romania and belgiumOur interim management value proposition in romania and belgium
Our interim management value proposition in romania and belgium
 
Україна у вогні.
Україна у вогні.Україна у вогні.
Україна у вогні.
 
[DSC x TAAI 2016] 林守德 / 人工智慧與機器學習在推薦系統上的應用
[DSC x TAAI 2016] 林守德 / 人工智慧與機器學習在推薦系統上的應用[DSC x TAAI 2016] 林守德 / 人工智慧與機器學習在推薦系統上的應用
[DSC x TAAI 2016] 林守德 / 人工智慧與機器學習在推薦系統上的應用
 
добро починається з тебе
добро починається з тебедобро починається з тебе
добро починається з тебе
 

Similar to INTERN report file devinchi 0320526

BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINALBSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
jolynnTJL
 
Arc2625 report file ngejiachen0317738
Arc2625 report file ngejiachen0317738Arc2625 report file ngejiachen0317738
Arc2625 report file ngejiachen0317738
Nge Chen
 
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
jolynnTJL
 
internship report on architecture
internship report on architectureinternship report on architecture
internship report on architecture
biruktigistu1
 
Internship report
Internship reportInternship report
Internship report
cocongkening
 
Internship final report 2017
Internship final report 2017Internship final report 2017
Internship final report 2017
James Jia Chuen Tay
 
Super-Structural Construction Work of a Six Storied Residential Building
Super-Structural Construction Work of a Six Storied Residential BuildingSuper-Structural Construction Work of a Six Storied Residential Building
Super-Structural Construction Work of a Six Storied Residential Building
Shariful Haque Robin
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
PRIYANSHU KUMAR
 
Arc2625 report file
Arc2625 report fileArc2625 report file
Arc2625 report file
Lynnstyles
 
Arc2625 report file
Arc2625 report fileArc2625 report file
Arc2625 report file
Yen Min Khor
 
ContentsTeam Work Schedule3Team Task Assignment3Project .docx
ContentsTeam Work Schedule3Team Task Assignment3Project .docxContentsTeam Work Schedule3Team Task Assignment3Project .docx
ContentsTeam Work Schedule3Team Task Assignment3Project .docx
bobbywlane695641
 
Lecture 05 project_time_and_schedule_management
Lecture 05 project_time_and_schedule_managementLecture 05 project_time_and_schedule_management
Lecture 05 project_time_and_schedule_management
Sayed Ahmed
 
PMO Daily Operations using Scrum Methodology
PMO Daily Operations using Scrum MethodologyPMO Daily Operations using Scrum Methodology
PMO Daily Operations using Scrum Methodology
Prof. Akram Hassan PhD,MBA,PMP,OPM3
 
ACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL JOSHI
 
My 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project ManagementMy 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project Management
SHAZEBALIKHAN1
 
Internship Training Report
Internship Training ReportInternship Training Report
Internship Training Report
jiahui331
 
Last planner system
Last planner systemLast planner system
Last planner system
Anshi Verma
 
project management
project managementproject management
project management
Trade Expert
 
Ar2615 report
Ar2615 report Ar2615 report
Ar2615 report
kychong1105
 
Product Design Team6
Product Design Team6Product Design Team6
Product Design Team6Kienho Chan
 

Similar to INTERN report file devinchi 0320526 (20)

BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINALBSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
 
Arc2625 report file ngejiachen0317738
Arc2625 report file ngejiachen0317738Arc2625 report file ngejiachen0317738
Arc2625 report file ngejiachen0317738
 
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT
 
internship report on architecture
internship report on architectureinternship report on architecture
internship report on architecture
 
Internship report
Internship reportInternship report
Internship report
 
Internship final report 2017
Internship final report 2017Internship final report 2017
Internship final report 2017
 
Super-Structural Construction Work of a Six Storied Residential Building
Super-Structural Construction Work of a Six Storied Residential BuildingSuper-Structural Construction Work of a Six Storied Residential Building
Super-Structural Construction Work of a Six Storied Residential Building
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
 
Arc2625 report file
Arc2625 report fileArc2625 report file
Arc2625 report file
 
Arc2625 report file
Arc2625 report fileArc2625 report file
Arc2625 report file
 
ContentsTeam Work Schedule3Team Task Assignment3Project .docx
ContentsTeam Work Schedule3Team Task Assignment3Project .docxContentsTeam Work Schedule3Team Task Assignment3Project .docx
ContentsTeam Work Schedule3Team Task Assignment3Project .docx
 
Lecture 05 project_time_and_schedule_management
Lecture 05 project_time_and_schedule_managementLecture 05 project_time_and_schedule_management
Lecture 05 project_time_and_schedule_management
 
PMO Daily Operations using Scrum Methodology
PMO Daily Operations using Scrum MethodologyPMO Daily Operations using Scrum Methodology
PMO Daily Operations using Scrum Methodology
 
ACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_Profile
 
My 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project ManagementMy 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project Management
 
Internship Training Report
Internship Training ReportInternship Training Report
Internship Training Report
 
Last planner system
Last planner systemLast planner system
Last planner system
 
project management
project managementproject management
project management
 
Ar2615 report
Ar2615 report Ar2615 report
Ar2615 report
 
Product Design Team6
Product Design Team6Product Design Team6
Product Design Team6
 

Recently uploaded

Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Po-Chuan Chen
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 

Recently uploaded (20)

Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 

INTERN report file devinchi 0320526

  • 1.
  • 2. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 1 | P a g e Table of Content 1.0 ACKNOWLEDGEMENT……………………………………………………. 1 2.0 INTRODUCTION………………………………………………………… 2 - 3 2.1 Module Objective……………………………………………………….. 2 2.2 Intern-Working Environment………………………………………....... 3 3.0 General Scope of Training…………………………………………………. 4 4.0 Project 5…………………………………………………………………. 5 - 41 4.1 Mix-Development on lot 3065 & 3085……………………..……… 5 - 8 4.1.1 Learning Outcome……………………………………………….. 9 4.2 D’Marina International Trade Center…………………………… 10 - 19 4.2.1 Jewel of East Coast Malaysia……………………………. 10 – 11 4.2.2 Beachfront Villa…………………………………………………. 12 4.2.3 Semenyik…………………………………………………………. 13 4.2.4 Road and Pedestrian walkway…………………………………. 14 4.2.5 Parcel 3…………………………………………………………… 15 4.2.6 Parcel 1 – 11…………………………………………………….. 16 4.2.7 Render………………………………………………………. 17 – 18 4.2.8 Learning Outcome……………………………………………….. 19 4.3 Lutheran Church…………………………………………………… 20 - 34 4.3.1 Gate Design Proposal 1……………………………………. 20 - 23 4.3.2 Gate Design Proposal 2……………………………………. 24 - 27 4.3.3 Gate Design Proposal 3……………………………………. 28 - 30 4.3.4 Gate Design Proposal 4……………………………………. 31 - 33 4.3.5 Learning Outcome……………………………………………….. 34 4.4 Mix-Development on PT7258 ( Johnny Ong )……………………35 - 37 4.4.1 Emergency Lighting and Fire Wall………….…………….. 35 - 37 4.4.2 Learning Outcome……………………………………………….. 37 4.5 Jason Tan’s Bungalow……………………….…………………….38 - 41 4.5.1 Window Schedule, Bathroom detail………………………. 38 – 41 4.5.2 Learning Outcome…………………………………...…………… 41 5.0 Site Visitation……………………………………………………………. 42 - 47 5.1 Lot 495, 41 Units 3 Storey Terrace House………………………….. 42 5.1.1 Site Photoes………………………………………………… 42 – 43 5.1.2 Client Consultant Meeting and Site Meeting…………….. 44 – 46 5.1.3 Construction Documents………………………………………… 47 5.1.4 Learning Outcome………………………………………………... 47 6.0 Conclusion…………………………………………………………………… 48
  • 3. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 2 | P a g e 1.0 ACKNOWLEDGEMENT I would like to express my sincerest gratitude to my colleagues at Clement Wong Architecture for guiding me throughout the duration of my entire internship, which was 8 weeks. Their constant guidance & support had taught me as well as allowed me to experience the working environment of what I would call it as, “The architecture life”. During my time interning here, I was definitely given a lot of opportunities and chances to learn and develop new talents at professional skills. Our seniors were also always there to answer our questions & help us along the way. “AS LONG AS WE ASK” to what we want to do and learn, our seniors will try their best to guide us. They also like giving us the more difficult tasks, though we might have complained, we now are thankful for the things we’ve learnt and for the experiences we have gotten from completing the tasks. Thanks to their guidance and mentorship, they were able to encourage me to be professional during the entire internship programme. Sincerely, Hern-Hymn Devinchi Ng
  • 4. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 3 | P a g e 2.0 INTRODUCTION 2.1 Module Objective This internship is aimed at introducing students to the requirements, activities and operations involved in working in architectural / construction practices. The purpose is to facilitate the involvement of students in professional attachments to architectural practices in order to develop an understanding of the general nature, principles and procedure of law and legislation as applied to architectural drawings, especially the Building by laws. Students will also be exposed to the process of authority submission for various drawings from an architectural practice and the range of contract documentation produced to support these drawings. Via a full-time internship attachment, students will further appreciate the documentation and report writing skill required of an employee in an architect’s firm.
  • 5. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 4 | P a g e 2.2 Intern-Working Environment 2.2.1. Company Background Company Name Clement Wong Architecture Address 56D & 57D, Jalan Desa Bakti, Taman Desa, 58100 Kuala Lumpur Email Cwarch.hr@gmail.com / clementwongarch@gmail.com Contact Number +603 7984 0128 Clement Wong started his own practice called Clement Wong Architecture in 2009 registered under the Board of Architect, Malaysia. His current work include Eco-tech Vertical Farming in China; REHDA new headquarter in PJ; several housing estate development and bungalows around Klang Valley which emphasis on “green features” and sustainable designs including his own home office retrofit. Clement Wong is also a Green Building Facilitator under the newly formed Green Building Index rating tool specific for Malaysian buildings. 2.2.2 Period of Training The total required training period is 8 weeks, from January 3rd 2016 to March 3rd 2016, however I ended my training period at March 6th 2016. 2.2.3 Working Hours Monday to Friday 9am to 6pm *( Lunch Hour: 1pm to 2pm)*
  • 6. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 5 | P a g e 3.0 General Scope of Training Overall Task and Practices 1. Design Sketch, Drafting. 2. AutoCAD Drawing, 3D modeling. 3. Comment, Modifications & Amendments of Architectural Drawings. 4. Preparation of presentation slides. 5. Observed and assessed regulatory context with Building By – Laws, Set Back, and Fire Escape. 6. Prepared architectural drawing with regard to location, building elements, finishes, and fittings. 7. Establish requirements for co-ordinate, consultants and product suppliers. 8. Preparation for tender documents and participated in the process Software Applications 1. Autodesk AutoCAD 2. SketchUp 3. Rhino 5 4. Photoshop 5. Lumion 6 Pro 6. Adobe 7. Microsoft ( Word, and PowerPoint ) 8. Google Chrome Training Program Schedule We are to do the projects that are given or requires upon our self and expected to be self-discipline and to multitask our given task and to be completed on time without procrastinating. Our given task didn’t have a rushing due date, but when one of our colleague give us another task, we have to complete that new given task first, because it’s near to dead line. That is why we have a lot of stuff to do and learn coming from it.
  • 7. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 6 | P a g e 4.0 Project 4.1 Mix-Development on lot 3065 & 3085 Overview Project: Mix-Development on lot 3065 & 3085 Site location: Sungai Penchala, Mukim, Kuala Lumpur, Malaysia Specification: Mix-used, Shopping Complex, Residential, Office, Public Gathering Supervisor: Oilver Tan Task: Technical drawing of fire-staircase ( Tender Drawing ) Mix-Development on lot 3065 &3085 is a project that is consisting of 500 units of residential, 5 floor of basement carpark, and 2 floor of shopping complex. This high rise features greenery and double volume of some units. This Mix-Development area of land ranging from 3800𝑚2 to 3900𝑚2 of boundary line. The estimated prince to complete building this high rise, cost round RM80,000,000. This project to scheduled to be completed by the end of 2018. The current stage of his project is on the pile foundation, and it already costed RM20,000,000. The total of number fire-escape/ staircase of this building in the building are 8, and I have completed 5 of the drawing, thankful for my colleague Winnie Ang ( Taylor’s intern ) for completed her first task fast, and her second task for to assist me on this Technical drawing of fire-staircase. If it wasn’t for her, I think that I will stuck on drawing this my whole intern. Our supervisor Oilver Tan was in- charge of this project, and he taught us a lot. By drawing it so that the person who will read it next understand it well. The gird-line way so, that if people want to look back the staircase, they can just see back where the grid-line at. Most-important that is the stair- case must basic on UBBL. So each step maximum of 180mm per rises. On Day 1, that is what I did (Figure 4.1.1 ) and completed on the next day, but later we found a problem that is each rises are only 155mm that is very following according to the floor plan step. So that my supervisor told me to decrease the number of step, and as long as the match back the floor level, then is fine. So, we decided to decrease the number of step, and my new task to make sure the floor plan step is correct with the technical section. The below image of staircase is I draw. Figure 4.1.1
  • 8. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 7 | P a g e This is my first product work in my internship program. ( figure 4.1.2 ) This staircase is staircase number 2. My supervisor told me to start from complicated one first so that the next one will be more easily for me. This is staircase number 3. ( Figure 4.1.3) Figure 4.1.2 Figure 4.1.3
  • 9. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 8 | P a g e This is staircase number 6 ( figure 4.1.4 ) This is staircase number 7 ( figure 4.1.5 ) Figure 4.1.4 Figure 4.1.5
  • 10. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 9 | P a g e This is staircase number 8. ( Figure 4.1.6 ) Figure 4.1.6 Figure 4.1.7 This is the floor plan, and the location of staircase. ( Figure 4.1.7 ) The red box is the one I draw, and the blue box is Winnie Ang who draw it. #2 #3 #6 #7 #8
  • 11. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 10 | P a g e 4.1.1 Learning Outcome: After Completing this technical drawing of fire-escape staircase, given from my supervisor Oilver Tan, I now managed to enhance my knowledge of the Fire-escape staircase, and the UBBL of fire-escape staircase. Furthermore, now I have a better understanding of how to do a technical drawing, basic on the UBBL step and railing.
  • 12. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 11 | P a g e 4.2 D’Marina International Trade Center For this project, it’s split into many part, due to it’s 500 acres. And all the work still on proposal stage. And the total estimate development cost RM10,006,507,578. 4.2.1 Jewel of East Coast Malaysia Overview Project: Jewel of East Coast Malaysia Site location: Kuantan, Pahang, Malaysia Specification: 500 acres Supervisor: Bovi Task: Update the slide to 2017 version For this task, I was assign to update the slide at latest as possible, due to some info are out to date and some have new info regarding of it. This PowerPoint slide are mainly to intro the bullet train from China to Malaysia, the distance and timing of it. And mainly it informs the contractor to understand more and update why this location we planning to built is the suitable spot.
  • 13. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 12 | P a g e This is the total slide of it, ( figure 4.2.1.1 ) and I tried my best to update it as update as possible. Figure 4.2.1.1
  • 14. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 13 | P a g e 4.2.2 Beachfront Villa Overview Project: Beachfront Villa Site location: Kuantan, Pahang, Malaysia Specification: 500 acres Supervisor: Saidu Task: 3d modeling For this task, I was assign built the 3d model, repaint to other material, and make the 3d model as simple as possible. So, that when we are doing the perspective view for the master planning render. The building wouldn’t effect it. So that we can focus on what we want too. This Beachfront Villa consist of 3 different style and design of the bungalow. That is the 3d model I did, and make it as simple as possible. ( Figure 4.2.2.1 ) Figure 4.2.2.1
  • 15. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 14 | P a g e 4.2.3 Semenyik Overview Project: Semenyik Site location: Kuantan, Pahang, Malaysia Specification: 500 acres Supervisor: Saidu Task: 3d modeling For this task, I was assign built the 3d model, repaint to other material, and make the 3d model as simple as possible. So, that when we are doing the perspective view for the master planning render. The building wouldn’t effect it. So that we can focus on what we want too. This is the 4 storey of Semi-D housing. The front perspective view ( figure 4.2.3.1 ) and, the back view ( figure 4.2.3.2 ) Figure 4.2.3.1 Figure 4.2.3.2
  • 16. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 15 | P a g e 4.2.4 Road and Pedestrian walkway Overview Project: Road and Pedestrian walkway Site location: Kuantan, Pahang, Malaysia Specification: 500 acres Supervisor: Saidu Task: 3d modeling For this task, I was assign built the 3d model, repaint to other material, and make the 3d model as simple as possible. So, that when we are doing the perspective view for the master planning render. The building wouldn’t effect it. So that we can focus on what we want to render. This is the road and pedestrian walkway for D’Marina. For this task, I overnight to complete it during the Chinese new year break. Cause I was informed that it’s very in rush. ( figure 4.2.4.2 ) Figure 4.2.4.1 Figure 4.2.4.2
  • 17. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 16 | P a g e 4.2.5 Parcel 3 Overview Project: Parcel 3 Site location: Kuantan, Pahang, Malaysia Specification: 500 acres Supervisor: Clive Task: Photoshop For this task, I was assign to Cad the drawing and Photoshop Parcel 3, and color it in red. So that it’s easier for the supervisor to present and the highlight of the area. Figure 4.2.5.1
  • 18. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 17 | P a g e 4.2.6 Parcel 1 - 11 Overview Project: Parcel 1 - 11 Site location: Kuantan, Pahang, Malaysia Specification: 500 acres Supervisor: Saidu Task: Update the slide to 2017 version For this task, I was assign to update the slide at latest as possible, due to some info are out to date and some have new info regarding of it. This PowerPoint slide are mainly to about the Parcel 1 to 11, where to intro each and every parcel unique design and idea. Figure 4.2.6.1
  • 19. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 18 | P a g e 4.2.7 Render Overview Project: Render Site location: Kuantan, Pahang, Malaysia Specification: 500 acres Supervisor: Saidu Task: Adding human figure and trees For this task, I told my colleague I was free, so that I can help him to do it, when he was doing it himself, and rushing for another work. Figure 4.2.7.1
  • 20. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 19 | P a g e For theses are the human figure and tree on the render view that I did. for ( figure 4.2.7.1, figure 4.2.7.2 , figure 4.2.7.3 ) Figure 4.2.7.2 Figure 4.2.7.3
  • 21. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 20 | P a g e 4.2.8 Learning Outcome After Completing so many stuff for D’Marina project, I have learned how to do a proposal PowerPoint slide better, and how does it attract the attention of the human. Making 3D-model as simple as possible so that it can the master perspective view won’t not look so irritating. And that Photoshop the image so that it will look better and to be more presentable. Furthermore, now I have a better understanding of how to do a Multitask better and to work in very efficiently way.
  • 22. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 21 | P a g e 4.3 Lutheran Church 4.3.1 Gate Design Proposal 1 Overview Project: Lutheran Church Site location: Mont Kiara, Kuala Lumpur, Malaysia Specification: Church Supervisor: Sunil Task: Designing Gate Lutheran Church is a project that is a public space for private realm. This Mix- Development area of land ranging from 3155𝑚2 of boundary line. The estimated prince to complete building this high rise, cost round RM8,000,000. But they reduce the cost to RM6,000,000 so that the design of the building didn’t look as nice as what we had present in the beginning. This project to scheduled to be completed by the end of September 2017. For this is the first during my internship, I took a measurement tape, and measure the site. So that our gate proposal can be basic on the site drawing. For this Task, I was to do sketches, AutoCAD, SketchUP, and Photoshop. This is the Site picture that I took. ( Figure 4.3.1.1 ) Figure 4.3.1.1
  • 23. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 22 | P a g e Figure 4.3.1.2 Figure 4.3.1.3
  • 24. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 23 | P a g e Figure 4.3.1.4 Figure 4.3.1.5
  • 25. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 24 | P a g e This is the Full set of the gate design proposal 1 from ( Figure 4.3.1.1 to Figure 4.3.1.6 ) Figure 4.3.1.6
  • 26. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 25 | P a g e 4.3 Lutheran Church 4.3.2 Gate Design Proposal 2 Overview Project: Lutheran Church Site location: Mont Kiara, Kuala Lumpur, Malaysia Specification: Church Supervisor: Sunil Task: Designing Gate Lutheran Church is a project that is a public space for private realm. This Mix- Development area of land ranging from 3155𝑚2 of boundary line. The estimated prince to complete building this high rise, cost round RM8,000,000. But they reduce the cost to RM6,000,000 so that the design of the building didn’t look as nice as what we had present in the beginning. This project to scheduled to be completed by the end of September 2017. For this Task, I was to do sketches, AutoCAD, SketchUP, and Photoshop. Proposal 2 include with the refuses compartment, and the letter box. Went to revisit site again to measure the refuse compartment area. Figure 4.3.2.1
  • 27. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 26 | P a g e Figure 4.3.2.2 Figure 4.3.2.3
  • 28. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 27 | P a g e Figure 4.3.2.4 Figure 4.3.2.5
  • 29. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 28 | P a g e This is the Full set of the gate design proposal 2 from ( Figure 4.3.2.1 to Figure 4.3.2.6 ) Figure 4.3.2.6
  • 30. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 29 | P a g e 4.3 Lutheran Church 4.3.3Gate Design Proposal 3 Overview Project: Lutheran Church Site location: Mont Kiara, Kuala Lumpur, Malaysia Specification: Church Supervisor: Sunil Task: Designing Gate Lutheran Church is a project that is a public space for private realm. This Mix- Development area of land ranging from 3155𝑚2 of boundary line. The estimated prince to complete building this high rise, cost round RM8,000,000. But they reduce the cost to RM6,000,000 so that the design of the building didn’t look as nice as what we had present in the beginning. This project to scheduled to be completed by the end of September 2017. For this Task, I was to do sketches, AutoCAD, SketchUP, and Photoshop. Proposal 3, after knowing the gate is over-weight, and Clement told us to change the design to a simpler one. Which is more cost saving. Figure 4.3.3.1
  • 31. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 30 | P a g e Figure 4.3.3.2 Figure 4.3.3.3
  • 32. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 31 | P a g e This is the Full set of the gate design proposal 2 from ( Figure 4.3.3.1 to Figure 4.3.3.5 ) Figure 4.3.3.4 Figure 4.3.3.5
  • 33. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 32 | P a g e 4.3 Lutheran Church 4.3.4Gate Design Proposal 4 Overview Project: Lutheran Church Site location: Mont Kiara, Kuala Lumpur, Malaysia Specification: Church Supervisor: Sunil Task: Designing Gate Lutheran Church is a project that is a public space for private realm. This Mix- Development area of land ranging from 3155𝑚2 of boundary line. The estimated prince to complete building this high rise, cost round RM8,000,000. But they reduce the cost to RM6,000,000 so that the design of the building didn’t look as nice as what we had present in the beginning. This project to scheduled to be completed by the end of September 2017. For this Task, I was to do sketches, AutoCAD, SketchUP, and Photoshop. Proposal 4, because they have no budget now, they are reducing a lot of stuff, and it’s back to follow the first tender set. Figure 4.3.4.1
  • 34. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 33 | P a g e Figure 4.3.4.2 Figure 4.3.4.3
  • 35. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 34 | P a g e Figure 4.3.4.4 Figure 4.3.4.5
  • 36. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 35 | P a g e 4.3.5 Learning Outcome: After Completing so many different gate design proposals for Lutheran Church, I have learned that how to do a better work in a proposals drawing, as in once we having a meeting on site, a drawing and dimension must state it very clear so that people don’t have to flip thru out the page just to find that single dimension, and working drawing that is suppose to be more efficiently so that it will look more neat. Furthermore, now I have a better understanding of how to a tender drawing that has to be properly organized.
  • 37. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 36 | P a g e 4.4 Mix-Development on PT7258 ( Johnny Ong ) 4.4.1 Emergency Lighting and Fire Wall Overview Project: Mix-Development on PT7258 ( Johnny Ong ) Site location: Country Homes, Mukim Rawang, Selangor, Malaysia Specification: Shopping Complex Supervisor: Sunil Task: Emergency Lighting and Fire Wall Mix-Development on PT7258 ( Johnny Ong ) is a project that is developing a shopping complex. This Mix-Development area of land ranging from 12150𝑚2 of boundary line. The estimated prince to complete building this high rise, cost round RM5,000,000. This project to scheduled to be completed by the end of August 2017. Since it’s a Bomba drawing, for this task I had to do is to know the UBBL fire wall, and Emergency Lighting Figure 4.4.1.1
  • 38. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 37 | P a g e Figure 4.4.1.2 Figure 4.4.1.3
  • 39. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 38 | P a g e Figure 4.4.1.1 to figure 4.4.1.4 are the image of fire wall and emergency lighting. 4.4.2 Learning Outcome: After Completing so this task, it helped me to understand more of a bomba drawing. Furthermore, now I have a better understanding of how to a bomba drawing that has to be properly organized. Figure 4.4.1.4
  • 40. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 39 | P a g e 4.5 Jason Tan’s Bungalow 4.5.1 Window schedule, bathroom detail. Overview Project: Jason Tan’s Bungalow Site location: Klang, Selangor, Malaysia Specification: Bungalow Supervisor: Sunil Task: Update floor plan, elevation, 3d model, and washroom detail. Jason Tan’s Bungalow is a project that is building a Private Bungalow. This Mix- Development area of land ranging from 9250𝑚2 of boundary line. The estimated cost to complete this bungalow round RM4,000,000. This project to scheduled to be completed by the end of end of June 2018. The current stage it’s on now is pre-casting the skeleton structure. For this task, I was assign to update the window schedule to the elevation, and than update the 3d model, and after than update the washroom detail line weight isn’t correct I was told to do that too. Figure 4.5.1.1
  • 41. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 40 | P a g e Figure 4.5.1.1 and figure 4.5.1.2 are the updated elevation, and the figure 4.5.1.3 are the update 3d model of the window. Figure 4.5.1.2 Figure 4.5.1.3
  • 42. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 41 | P a g e Figure 4.5.1.4 Figure 4.5.1.5
  • 43. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 42 | P a g e These are the bathroom detail and finishes figure 4.5.1.4 to figure 4.5.1.6 4.5.2 Learning Outcome: After Completing so this task, as an intern, this is my first bathroom detail I did. and I learned that once we update an drawing we must highlight it so the following next person will know about it, and pay more attention to it. Figure 4.5.1.6
  • 44. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 43 | P a g e 5.0 Site Visitation 5.1 Lot 495, 41 Units 3 Storey Terrace House 5.1.1 Site Photos Overview Project: Lot 495, 41 Units 3 Storey Terrace House Site location: Jalan Gombak, Setapak, Kuala Lumpur Malaysia Specification: Terrace House Supervisor: Ling Siang Task: Going to site, and taking picture, Lot 495, 41 Units 3 Storey Terrace House is a project that are developing a Terrace Houses. The estimated cost to complete this bungalow round RM8,000,000. This project to scheduled to be completed by the end of end of this year. For this task, I was assign to go to site with my colleague, as she is also my supervisor for site visit. My main job is the go and understand the feeling of having a meeting on site, and taking picture as backup. Once we are back to the office, I will also try my best to do Client Consultant Meeting (ccm), and Site Meeting (sm), even thought I know my understanding is not as well as my supervisor, she is still willing to learn me do it, and than teach me later about me. Figure 5.1.1.1 On site meeting Figure 5.1.1.2 Terrace Houses
  • 45. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 44 | P a g e Figure 5.1.1.1 to Figure 5.1.1.6 are all on site photo. Figure 5.1.1.3 Conctractor sketch on finihes titles. Figure 5.1.1.4 . Figure 5.1.1.5 . Figure 5.1.1.6 .
  • 46. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 45 | P a g e 5.1.2 Client Consultant Meeting (ccm), and Site Meeting (sm), Overview Project: Lot 495, 41 Units 3 Storey Terrace House Site location: Jalan Gombak, Setapak, Kuala Lumpur Malaysia Specification: Terrace House Supervisor: Ling Siang Task: typing the Client Consultant Meeting (ccm), and Site Meeting (sm) Figure 5.1.2.1 and figure 5.1.2.2 are the image of the CCM minutes. Figure 5.1.2.2 Febuary 23th 2017 Figure 5.1.2.1 January 19th2017 .
  • 47. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 46 | P a g e Figure 5.1.2.3 January 19th2017 . Figure 5.1.2.4 February 10th2017 .
  • 48. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 47 | P a g e Figure 5.1.2.5 February 24th2017 .
  • 49. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 48 | P a g e 5.1.3 Construction Documents Overview Project: Lot 495, 41 Units 3 Storey Terrace House Site location: Jalan Gombak, Setapak, Kuala Lumpur Malaysia Specification: Terrace House Supervisor: Ling Siang Task: Plotting Construction Documents for Contractor 5.1.4 Learning Outcome: After Going to site, and typing out CCM, and SM, I know that going site is easy, bur typing CCM and SM are hard because there are still a lot of element that I still didn’t know off. Figure 5.1.3.1 .
  • 50. [AR2615] INTERSHIP TRAINNING AND REPORT NAME: HERN-HYMN DEVINCHI NG ( 0320526 ) 49 | P a g e 6.0 Conclusion For the past 8 Week I have learned a lot that I couldn’t had learn in education, would like to thank you Clement Wong Architecture colleague again, and thank ms, balkish for spending your time to come visit us during your busy day.