THE PRODUCTIVITY ADVANTAGE
Agenda




 The Case for Interactive Quality




 Qsys and IBS Overview




 PDCA Process Walk-Through




 Q&A



                                    IBS Overview   THE PRODUCTIVITY ADVANTAGE
The Case for Interactive Quality



   ๏ฎ   Solve Quality Issues Early in the Cycle


           ๏ฎ    Warranty and Recall costs $$$$


           ๏ฎ    Scrap and Rework $$$


           ๏ฎ    Non Conforming Purchased Items $$


           ๏ฎ    Interruptions in Production $$$




ยฉ IBS AG       Slide 3                            IBS Overview   THE PRODUCTIVITY ADVANTAGE
The Case for Interactive Shop Floor Quality


      ๏ฎ    Solve Quality Issues Early in the Cycle: How?
             ๏ฎ   Design and Plan for reliability, quality $$$$
             ๏ฎ   Verify Supplier Quality
             ๏ฎ   Monitor Production Quality
             ๏ฎ   Use Proven Improvement Processes Continuously:
                     ๏ฎ   SPC
                     ๏ฎ   CAPA
                     ๏ฎ   FMEA
                     ๏ฎ   PDCA




ยฉ IBS AG   Slide 4                             IBS Overview       THE PRODUCTIVITY ADVANTAGE
The Case for Interactive Shop Floor Quality


      ๏ฎ    Examples of Savings From This Approach
             ๏ฎ   TRW Warranty Cost Savings $3 Mill


             ๏ฎ   BP Increased Production Rates ROI < 1 Year


             ๏ฎ Delphi ROI < 12 Months plus reduced materials cost and
             increased production


             ๏ฎ   BMW Reduced Assembly Costs by $30 Mill


             ๏ฎ   Ceramtec ROI < 12 Months + reduced liability
ยฉ IBS AG   Slide 5                       IBS Overview           THE PRODUCTIVITY ADVANTAGE
Reduce Costs


           ๏ฎ   Design Quality Issues Out
           ๏ฎ   Increase Production
           ๏ฎ   Ship 100% Quality
           ๏ฎStop Adding Value to Non-
           Conformities
           ๏ฎ   Efficiently Handle Complaints
           ๏ฎ   Use SPC
           ๏ฎ   Identify Non-Conforming Purchases
           ๏ฎ   Root Cause Analysis
           ๏ฎ   Corrective actions
           ๏ฎ   Maintain Control
ยฉ IBS AG       Slide 6                     IBS Overview   THE PRODUCTIVITY ADVANTAGE
Reduce Costs


      Strategy                                   Implement:
  ๏ฎ   Design Quality Issues Out                      APQP/FEMA
  ๏ฎ   Increase Production                            Inspection Planning/First Article
  ๏ฎ   Ship 100% Quality                              Outgoing Goods Inspection
  ๏ฎStop Adding Value to Non-                         In Process Inspection
  Conformities
  ๏ฎ   Efficiently Handle Complaints                  Complaint Management Process
  ๏ฎ   Use SPC                                        SPC Analysis
  ๏ฎIdentify Non-Conforming                           Incoming Goods Inspection
  Purchases
  ๏ฎ   Root Cause Analysis                            CAPA
  ๏ฎ   Corrective actions                             CAPA
  ๏ฎ   Maintain Control                               Audits/Alerts
ยฉ IBS AG   Slide 7                    IBS Overview                   THE PRODUCTIVITY ADVANTAGE
Agenda




 Agenda and Introduction



 Customer Case Studies / Benefit Analysis



 Solution Overview



 Company Overview



 Discussion / Goals



                                 IBS Overview   THE PRODUCTIVITY ADVANTAGE
IBS Quality Management Solution: PDCA-cycle




                       Action
                     Management                               Project         FMEA
  Problem                                                   Management     Control Plan
  Solving                                                                   Flowchart
  Process                         Act                  Plan
               Audit
            Management                                               Inspection
                                                                      Planning




                                                                              Incoming Goods
         SPC
                               Check                   Do      โ€ข
Quality Control                                                              Production
    Panel          Supplier                               Outgoing Goods
                  Assessment

                                        IBS Overview                     THE PRODUCTIVITY ADVANTAGE
IBS Quality Execution Management Solution: PDCA-cycle




                          Action                                                                                                       Order
                        Management                                                                                                                                                                 Resource
                                                                                                                                     Management                                                    Planning
     Problem
     Solving
     Process                         Act                  Plan
                   Audit
                Management                                                                                                                                                                Fine planning




 Process Overview /
 Online-Visualization                                                                                                                                                                         Paperless
                                Check                     Do                                                                                                                                   Repair
                                                                                                                      PRISMA                        Auswertung

                                                                                                                        DB                             ...
                                                                                            LiTab




                                                                                                                               ACC
                                                                                                                                     Handy
                                                                                                                                                             Docking-
                                                                                                                                                             Station
                                                                                      Admin/Konfig.   Koppel-PC




                                                                                                                                      Diagnose-
                                                                                                                                      Touch Panel

                                                                                                                  Koppel-SPS
                                                                              Andon Board                                                                        Info-Point
                                                               Prozess-Netz
                                                               (Ethernet)




         KPI (OEE, FPY)
                                                                                                                                                                              Mobil-
                                                               Masch.-SPS                                                                                                     Scanner




      Analysing (PAA, CPK)                                                                                        MDA                                                                          ODA
ยฉ IBS AG   Slide 10                        IBS Overview                                                                                                                                 THE PRODUCTIVITY ADVANTAGE
IBS Traceability solutions for product and process traceability



                                                              Purchased
                                                                Parts




           Transport
                          Customer              Supplier
                                   Traceability
                                      KPIโ€žs
                                     Cockpit
                                                                 Standard
                                                                Components
     Standard Assembly
          Groups
                           Plant n                  Plant 1




ยฉ IBS AG   Slide 11                  IBS Overview             THE PRODUCTIVITY ADVANTAGE
Agenda




 Agenda and Introduction



 Customer Case Studies / Benefit Analysis



 Solution Overview



 Company Overview



 Discussion / Goals



                                 IBS Overview   THE PRODUCTIVITY ADVANTAGE
IBS America, Inc.


๏‚ง Group with 5 companies
๏‚ง Germany, USA, Lithuania plus
   Support office in in China




 ๏‚ง Publicly traded since 2000
 ๏‚ง Revenue 2008: ~ $30 million




๏‚ง Founded in 1982
๏‚ง Today about 180 employees



 ๏‚ง Supporting over 4000 customer installations globally
   (spanning over 50 countries and 5 continents)


                                          IBS Overview    THE PRODUCTIVITY ADVANTAGE
Key Competences & Positioning


                         Innovative                   Integration with
      Services            Software                       corporate
                          Solutions                     IT-Systems

                                         Directors
๏‚ง Industry independent                                                           MIS


  Process consulting                                                            ERP


๏‚ง Implementation                         Company mgmt.
                                                                                MES

                                                                             Process
๏‚ง Training                                                                    control



๏‚ง Project Management                     Production
                                                                             Machine
                                                                              control




                                         Implementation    Operation   Maintenance




                          IBS Overview                 THE PRODUCTIVITY ADVANTAGE
IBS Customers Save Money


           The Cost of Quality as % of Revenue
                                                    Source: Aberdeen Group 2009



        100%            18%                24%               29%


         50%


          0%
                  IBS Average        Average           Laggard


IBS customers achieve substantial cost reductions
with better than average performance (e.g. first pass yields, on time shipments).

                                    IBS Overview                   THE PRODUCTIVITY ADVANTAGE
IBS Quality Management Solution: PDCA-cycle




                           Action
                         Management                                   Project           FMEA
    Problem                                                         Management       Control Plan
Solving Process                                                                       Flowchart
                                      Act                      Plan
                   Audit                                                         Inspection
                Management                                                        Planning




                                                                                        Incoming Goods
             SPC
                                   Check                       Do        โ€ข
  Quality Control                                                                      Production
      Panel            Supplier                                     Outgoing Goods
                      Assessment

ยฉ IBS AG   Slide 16                         IBS Presentation                      THE PRODUCTIVITY ADVANTAGE
One Knowledge Database for Engineering


          Customer                                                          Design Engineering
          Requirements


APQP/First Article
Inspection
                       Project plan and
                       Checklists
                                           First Sample
                                           Inspection        Design FMEA       Part Master         Customer Drawing




                                          Control Plan       Process FMEA     Process Flow Chart   Operations




  Spend time on the
  โ€œfloorโ€ = Identify and
  gather data                                                               Process Engineering
                                                IBS Presentation                        THE PRODUCTIVITY ADVANTAGE
APQP - Data flow between Process Flow Chart, FMEA, Control Plan



                                                                                2
1




                                                       3




                                    IBS Presentation         THE PRODUCTIVITY ADVANTAGE
IBS Presentation   THE PRODUCTIVITY ADVANTAGE
Statistical Process Control - Analytics


SPC Evaluation




                                                                  Control Chart




                                       Shopfloor data is immediately available
Single Value Chart                     for evaluation
                                    IBS Presentation           THE PRODUCTIVITY ADVANTAGE
Supplier Assessment


 Suppliers are assessed on four main criteria:


                                         Supplier Assessment



    Product               Accurate                 Accurate                  Soft
    Quality             delivery dates        delivery quantities           criteria
                                                                    Data valid for a
  Data collected for each delivery                                  pre-defined period.




                                           IBS Presentation           THE PRODUCTIVITY ADVANTAGE
Supplier Portal


Supplier Complaint passed to the Supplier Portal



                                         Supplier completes analysis and actions




                                                                       Optional:
                                                                  Display key
                                                                  quality indicators
         Error analysis and corrective actions                    from the Supplier
                                                                  Assessment module




                                          IBS Presentation         THE PRODUCTIVITY ADVANTAGE
Concern and Complaint Management



Action items
                                             Create actions with a due
                                             date, escalation profile and
                                             responsible person


                                                                 Email integration




               Insert documents or
               photos of any type




                                     IBS Presentation                 THE PRODUCTIVITY ADVANTAGE
Concern and Complaint Management - Reporting



                                   Define reporting periods and
                                   get immediate visual results




                                                     Drill-Down and Drill-Up
                                                           functionality




     Export into Excel




                          IBS Presentation                THE PRODUCTIVITY ADVANTAGE
QSYS Modules - Overview




                          IBS Presentation   THE PRODUCTIVITY ADVANTAGE

More Related Content

What's hot

07 Ace 2010 Aras Innovator For Quality Systems
07 Ace 2010 Aras Innovator For Quality Systems07 Ace 2010 Aras Innovator For Quality Systems
07 Ace 2010 Aras Innovator For Quality Systems
Prodeos
ย 
Using Six Sigma to Drive Service Desk Improvements
Using Six Sigma to Drive Service Desk ImprovementsUsing Six Sigma to Drive Service Desk Improvements
Using Six Sigma to Drive Service Desk Improvements
kirkholmes11
ย 
Collaborative Quality Management
Collaborative Quality ManagementCollaborative Quality Management
Collaborative Quality Management
Strongback Consulting
ย 
Design For Rapid Product Realization (DFRPR)
Design For Rapid Product Realization (DFRPR)Design For Rapid Product Realization (DFRPR)
Design For Rapid Product Realization (DFRPR)
Michael Haessly - SSBB, CQE, CRE, CQM, CSQE, CQA
ย 
Measuring the Results of your Agile Adoption
Measuring the Results of your Agile AdoptionMeasuring the Results of your Agile Adoption
Measuring the Results of your Agile Adoption
Software Guru
ย 
Processes and Performance
Processes and PerformanceProcesses and Performance
Processes and Performance
pwa81497
ย 
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft UpgradeAstute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft UpgradeArvind Rajan
ย 
Measurement and Analysis, where do I Start? - Enrique Morey (Proqua)
Measurement and Analysis, where do I Start? - Enrique Morey (Proqua)Measurement and Analysis, where do I Start? - Enrique Morey (Proqua)
Measurement and Analysis, where do I Start? - Enrique Morey (Proqua)Paula Gomes
ย 
PRODUCT DEVELOPMENT METHODOLOGY
PRODUCT DEVELOPMENT METHODOLOGYPRODUCT DEVELOPMENT METHODOLOGY
PRODUCT DEVELOPMENT METHODOLOGYArul Nambi
ย 
Chapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_servicesChapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_services
Nรชn Trแบงn Ngแปc
ย 
Chapter 07 process_strategy
Chapter 07 process_strategyChapter 07 process_strategy
Chapter 07 process_strategy
Nรชn Trแบงn Ngแปc
ย 
Candidate Profile DW 2015
Candidate Profile DW 2015Candidate Profile DW 2015
Candidate Profile DW 2015Daryl Wirges
ย 
Set up reduction
Set up reductionSet up reduction
Set up reduction
Anand Subramaniam
ย 
The Fundamentals Of BPM Innovation In Telecommunications
The Fundamentals Of BPM Innovation In TelecommunicationsThe Fundamentals Of BPM Innovation In Telecommunications
The Fundamentals Of BPM Innovation In Telecommunications
Nathaniel Palmer
ย 
Heizer 06
Heizer 06Heizer 06
Heizer 06shagitu
ย 
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENTSUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENTAlpha Sirius
ย 
Product Life Cycle Management
Product Life Cycle ManagementProduct Life Cycle Management
Product Life Cycle Management
Anand Subramaniam
ย 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration
Anand Subramaniam
ย 
Cai apo clients activity
Cai   apo clients activityCai   apo clients activity
Cai apo clients activityComputer Aid, Inc
ย 

What's hot (19)

07 Ace 2010 Aras Innovator For Quality Systems
07 Ace 2010 Aras Innovator For Quality Systems07 Ace 2010 Aras Innovator For Quality Systems
07 Ace 2010 Aras Innovator For Quality Systems
ย 
Using Six Sigma to Drive Service Desk Improvements
Using Six Sigma to Drive Service Desk ImprovementsUsing Six Sigma to Drive Service Desk Improvements
Using Six Sigma to Drive Service Desk Improvements
ย 
Collaborative Quality Management
Collaborative Quality ManagementCollaborative Quality Management
Collaborative Quality Management
ย 
Design For Rapid Product Realization (DFRPR)
Design For Rapid Product Realization (DFRPR)Design For Rapid Product Realization (DFRPR)
Design For Rapid Product Realization (DFRPR)
ย 
Measuring the Results of your Agile Adoption
Measuring the Results of your Agile AdoptionMeasuring the Results of your Agile Adoption
Measuring the Results of your Agile Adoption
ย 
Processes and Performance
Processes and PerformanceProcesses and Performance
Processes and Performance
ย 
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft UpgradeAstute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
ย 
Measurement and Analysis, where do I Start? - Enrique Morey (Proqua)
Measurement and Analysis, where do I Start? - Enrique Morey (Proqua)Measurement and Analysis, where do I Start? - Enrique Morey (Proqua)
Measurement and Analysis, where do I Start? - Enrique Morey (Proqua)
ย 
PRODUCT DEVELOPMENT METHODOLOGY
PRODUCT DEVELOPMENT METHODOLOGYPRODUCT DEVELOPMENT METHODOLOGY
PRODUCT DEVELOPMENT METHODOLOGY
ย 
Chapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_servicesChapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_services
ย 
Chapter 07 process_strategy
Chapter 07 process_strategyChapter 07 process_strategy
Chapter 07 process_strategy
ย 
Candidate Profile DW 2015
Candidate Profile DW 2015Candidate Profile DW 2015
Candidate Profile DW 2015
ย 
Set up reduction
Set up reductionSet up reduction
Set up reduction
ย 
The Fundamentals Of BPM Innovation In Telecommunications
The Fundamentals Of BPM Innovation In TelecommunicationsThe Fundamentals Of BPM Innovation In Telecommunications
The Fundamentals Of BPM Innovation In Telecommunications
ย 
Heizer 06
Heizer 06Heizer 06
Heizer 06
ย 
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENTSUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
ย 
Product Life Cycle Management
Product Life Cycle ManagementProduct Life Cycle Management
Product Life Cycle Management
ย 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration
ย 
Cai apo clients activity
Cai   apo clients activityCai   apo clients activity
Cai apo clients activity
ย 

Viewers also liked

Effective shop floor oranization
Effective shop floor oranizationEffective shop floor oranization
Effective shop floor oranization
Colin Porter
ย 
Shop Floor Management
Shop Floor ManagementShop Floor Management
Shop Floor ManagementSoe Lu Kyaw
ย 
Awareness of qms
Awareness of qmsAwareness of qms
Awareness of qmsalabs
ย 
Introduction to Shop Floor management - Janaury 2017
Introduction to Shop Floor management - Janaury 2017Introduction to Shop Floor management - Janaury 2017
Introduction to Shop Floor management - Janaury 2017
W3 Group Canada Inc.
ย 
Shop-floor Control
Shop-floor ControlShop-floor Control
Shop-floor Control
Manish kumar
ย 
Quality management principles
Quality management principlesQuality management principles
Quality management principlesMohit Singla
ย 
Shop Floor Management I I
Shop  Floor  Management  I IShop  Floor  Management  I I
Shop Floor Management I ISoe Lu Kyaw
ย 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & Forecasting
Jenฤฑstรถn Delฤฑmรค
ย 
Shop Floor Planning & Control
Shop Floor Planning & ControlShop Floor Planning & Control
SAP Production Planning
SAP Production PlanningSAP Production Planning
SAP Production Planning
Rupesh Brahmankar
ย 

Viewers also liked (10)

Effective shop floor oranization
Effective shop floor oranizationEffective shop floor oranization
Effective shop floor oranization
ย 
Shop Floor Management
Shop Floor ManagementShop Floor Management
Shop Floor Management
ย 
Awareness of qms
Awareness of qmsAwareness of qms
Awareness of qms
ย 
Introduction to Shop Floor management - Janaury 2017
Introduction to Shop Floor management - Janaury 2017Introduction to Shop Floor management - Janaury 2017
Introduction to Shop Floor management - Janaury 2017
ย 
Shop-floor Control
Shop-floor ControlShop-floor Control
Shop-floor Control
ย 
Quality management principles
Quality management principlesQuality management principles
Quality management principles
ย 
Shop Floor Management I I
Shop  Floor  Management  I IShop  Floor  Management  I I
Shop Floor Management I I
ย 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & Forecasting
ย 
Shop Floor Planning & Control
Shop Floor Planning & ControlShop Floor Planning & Control
Shop Floor Planning & Control
ย 
SAP Production Planning
SAP Production PlanningSAP Production Planning
SAP Production Planning
ย 

Similar to Interactive Quality on the Shop Floor

Corrective Action โ€“ The Heart of Continuous Quality
Corrective Action โ€“ The Heart of Continuous QualityCorrective Action โ€“ The Heart of Continuous Quality
Corrective Action โ€“ The Heart of Continuous Quality
IBS America
ย 
Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)Beth Perez
ย 
Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)Beth Perez
ย 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the GainLeanleaders.org
ย 
Lean Logistics Operations Process Map
Lean Logistics Operations Process MapLean Logistics Operations Process Map
Lean Logistics Operations Process Map
LeanCor Supply Chain Group
ย 
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula GomesBalanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula GomesPaula Gomes
ย 
Is101 business project management copy
Is101 business project management  copyIs101 business project management  copy
Is101 business project management copy
kurnias2012
ย 
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie Thomas
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie ThomasIBM Rational Software Conference 2009 Day 1 Keynote: Jamie Thomas
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie Thomas
Kathy (Kat) Mandelstein
ย 
Process assessment sample
Process assessment sampleProcess assessment sample
Process assessment sampleDynamic Systems
ย 
Process assessment sample
Process assessment sampleProcess assessment sample
Process assessment sampleDynamic Systems
ย 
ITbuzz introduction Slides
ITbuzz introduction SlidesITbuzz introduction Slides
ITbuzz introduction SlidesComputer Aid, Inc
ย 
Services Of Exercise Lean Group
Services Of Exercise Lean GroupServices Of Exercise Lean Group
Services Of Exercise Lean Group
ExerciseLeanLLC
ย 
Bridging the gap between pre-production testing and production monitoring
Bridging the gap between pre-production testing and production monitoringBridging the gap between pre-production testing and production monitoring
Bridging the gap between pre-production testing and production monitoringfsyed
ย 
Linkroad Corporate Snapshot
Linkroad Corporate SnapshotLinkroad Corporate Snapshot
Linkroad Corporate Snapshotmelvinyou
ย 
Bridging the gap between manufacturing and engineering
Bridging the gap between manufacturing and engineeringBridging the gap between manufacturing and engineering
Bridging the gap between manufacturing and engineering
Jordan Berkley, MBA,PMP,CSM
ย 
Pmp an introduction
Pmp an introductionPmp an introduction
Pmp an introduction
Pradeep Patel, PMPยฎ
ย 
NG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapNG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapLeanleaders.org
ย 
Skyward Erp Presentation
Skyward Erp PresentationSkyward Erp Presentation
Skyward Erp Presentation
vishalnvora1
ย 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case studyKobi Vider
ย 
Axis Bank - SAS Forum India: Automation of Compliance Management โ€“ Implementa...
Axis Bank - SAS Forum India: Automation of Compliance Management โ€“ Implementa...Axis Bank - SAS Forum India: Automation of Compliance Management โ€“ Implementa...
Axis Bank - SAS Forum India: Automation of Compliance Management โ€“ Implementa...
SAS Institute India Pvt. Ltd
ย 

Similar to Interactive Quality on the Shop Floor (20)

Corrective Action โ€“ The Heart of Continuous Quality
Corrective Action โ€“ The Heart of Continuous QualityCorrective Action โ€“ The Heart of Continuous Quality
Corrective Action โ€“ The Heart of Continuous Quality
ย 
Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)
ย 
Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)
ย 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the Gain
ย 
Lean Logistics Operations Process Map
Lean Logistics Operations Process MapLean Logistics Operations Process Map
Lean Logistics Operations Process Map
ย 
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula GomesBalanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
Balanced Scorecard for CMMI Implementations - Eduardo Espinheira e Paula Gomes
ย 
Is101 business project management copy
Is101 business project management  copyIs101 business project management  copy
Is101 business project management copy
ย 
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie Thomas
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie ThomasIBM Rational Software Conference 2009 Day 1 Keynote: Jamie Thomas
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie Thomas
ย 
Process assessment sample
Process assessment sampleProcess assessment sample
Process assessment sample
ย 
Process assessment sample
Process assessment sampleProcess assessment sample
Process assessment sample
ย 
ITbuzz introduction Slides
ITbuzz introduction SlidesITbuzz introduction Slides
ITbuzz introduction Slides
ย 
Services Of Exercise Lean Group
Services Of Exercise Lean GroupServices Of Exercise Lean Group
Services Of Exercise Lean Group
ย 
Bridging the gap between pre-production testing and production monitoring
Bridging the gap between pre-production testing and production monitoringBridging the gap between pre-production testing and production monitoring
Bridging the gap between pre-production testing and production monitoring
ย 
Linkroad Corporate Snapshot
Linkroad Corporate SnapshotLinkroad Corporate Snapshot
Linkroad Corporate Snapshot
ย 
Bridging the gap between manufacturing and engineering
Bridging the gap between manufacturing and engineeringBridging the gap between manufacturing and engineering
Bridging the gap between manufacturing and engineering
ย 
Pmp an introduction
Pmp an introductionPmp an introduction
Pmp an introduction
ย 
NG BB 52 CONTROL Roadmap
NG BB 52 CONTROL RoadmapNG BB 52 CONTROL Roadmap
NG BB 52 CONTROL Roadmap
ย 
Skyward Erp Presentation
Skyward Erp PresentationSkyward Erp Presentation
Skyward Erp Presentation
ย 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case study
ย 
Axis Bank - SAS Forum India: Automation of Compliance Management โ€“ Implementa...
Axis Bank - SAS Forum India: Automation of Compliance Management โ€“ Implementa...Axis Bank - SAS Forum India: Automation of Compliance Management โ€“ Implementa...
Axis Bank - SAS Forum India: Automation of Compliance Management โ€“ Implementa...
ย 

Recently uploaded

BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
DerekIwanaka1
ย 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
ย 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
ย 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
ย 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
ย 
Bร i tแบญp - Tiแบฟng anh 11 Global Success UNIT 1 - Bแบฃn HS.doc
Bร i tแบญp - Tiแบฟng anh 11 Global Success UNIT 1 - Bแบฃn HS.docBร i tแบญp - Tiแบฟng anh 11 Global Success UNIT 1 - Bแบฃn HS.doc
Bร i tแบญp - Tiแบฟng anh 11 Global Success UNIT 1 - Bแบฃn HS.doc
daothibichhang1
ย 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
ย 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
ย 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
ย 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
ย 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
ย 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
ย 
An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
Any kyc Account
ย 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
ย 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
ย 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Boris Ziegler
ย 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
ย 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
ย 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
ย 
Bร i tแบญp - Tiแบฟng anh 11 Global Success UNIT 1 - Bแบฃn HS.doc.pdf
Bร i tแบญp - Tiแบฟng anh 11 Global Success UNIT 1 - Bแบฃn HS.doc.pdfBร i tแบญp - Tiแบฟng anh 11 Global Success UNIT 1 - Bแบฃn HS.doc.pdf
Bร i tแบญp - Tiแบฟng anh 11 Global Success UNIT 1 - Bแบฃn HS.doc.pdf
daothibichhang1
ย 

Recently uploaded (20)

BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
ย 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
ย 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
ย 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
ย 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
ย 
Bร i tแบญp - Tiแบฟng anh 11 Global Success UNIT 1 - Bแบฃn HS.doc
Bร i tแบญp - Tiแบฟng anh 11 Global Success UNIT 1 - Bแบฃn HS.docBร i tแบญp - Tiแบฟng anh 11 Global Success UNIT 1 - Bแบฃn HS.doc
Bร i tแบญp - Tiแบฟng anh 11 Global Success UNIT 1 - Bแบฃn HS.doc
ย 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
ย 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
ย 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
ย 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
ย 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
ย 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
ย 
An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
ย 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ย 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
ย 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
ย 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
ย 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
ย 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
ย 
Bร i tแบญp - Tiแบฟng anh 11 Global Success UNIT 1 - Bแบฃn HS.doc.pdf
Bร i tแบญp - Tiแบฟng anh 11 Global Success UNIT 1 - Bแบฃn HS.doc.pdfBร i tแบญp - Tiแบฟng anh 11 Global Success UNIT 1 - Bแบฃn HS.doc.pdf
Bร i tแบญp - Tiแบฟng anh 11 Global Success UNIT 1 - Bแบฃn HS.doc.pdf
ย 

Interactive Quality on the Shop Floor

  • 1. IBS: Interactive Quality Management June 2011 IBS America THE PRODUCTIVITY ADVANTAGE
  • 2. Agenda The Case for Interactive Quality Qsys and IBS Overview PDCA Process Walk-Through Q&A IBS Overview THE PRODUCTIVITY ADVANTAGE
  • 3. The Case for Interactive Quality ๏ฎ Solve Quality Issues Early in the Cycle ๏ฎ Warranty and Recall costs $$$$ ๏ฎ Scrap and Rework $$$ ๏ฎ Non Conforming Purchased Items $$ ๏ฎ Interruptions in Production $$$ ยฉ IBS AG Slide 3 IBS Overview THE PRODUCTIVITY ADVANTAGE
  • 4. The Case for Interactive Shop Floor Quality ๏ฎ Solve Quality Issues Early in the Cycle: How? ๏ฎ Design and Plan for reliability, quality $$$$ ๏ฎ Verify Supplier Quality ๏ฎ Monitor Production Quality ๏ฎ Use Proven Improvement Processes Continuously: ๏ฎ SPC ๏ฎ CAPA ๏ฎ FMEA ๏ฎ PDCA ยฉ IBS AG Slide 4 IBS Overview THE PRODUCTIVITY ADVANTAGE
  • 5. The Case for Interactive Shop Floor Quality ๏ฎ Examples of Savings From This Approach ๏ฎ TRW Warranty Cost Savings $3 Mill ๏ฎ BP Increased Production Rates ROI < 1 Year ๏ฎ Delphi ROI < 12 Months plus reduced materials cost and increased production ๏ฎ BMW Reduced Assembly Costs by $30 Mill ๏ฎ Ceramtec ROI < 12 Months + reduced liability ยฉ IBS AG Slide 5 IBS Overview THE PRODUCTIVITY ADVANTAGE
  • 6. Reduce Costs ๏ฎ Design Quality Issues Out ๏ฎ Increase Production ๏ฎ Ship 100% Quality ๏ฎStop Adding Value to Non- Conformities ๏ฎ Efficiently Handle Complaints ๏ฎ Use SPC ๏ฎ Identify Non-Conforming Purchases ๏ฎ Root Cause Analysis ๏ฎ Corrective actions ๏ฎ Maintain Control ยฉ IBS AG Slide 6 IBS Overview THE PRODUCTIVITY ADVANTAGE
  • 7. Reduce Costs Strategy Implement: ๏ฎ Design Quality Issues Out APQP/FEMA ๏ฎ Increase Production Inspection Planning/First Article ๏ฎ Ship 100% Quality Outgoing Goods Inspection ๏ฎStop Adding Value to Non- In Process Inspection Conformities ๏ฎ Efficiently Handle Complaints Complaint Management Process ๏ฎ Use SPC SPC Analysis ๏ฎIdentify Non-Conforming Incoming Goods Inspection Purchases ๏ฎ Root Cause Analysis CAPA ๏ฎ Corrective actions CAPA ๏ฎ Maintain Control Audits/Alerts ยฉ IBS AG Slide 7 IBS Overview THE PRODUCTIVITY ADVANTAGE
  • 8. Agenda Agenda and Introduction Customer Case Studies / Benefit Analysis Solution Overview Company Overview Discussion / Goals IBS Overview THE PRODUCTIVITY ADVANTAGE
  • 9. IBS Quality Management Solution: PDCA-cycle Action Management Project FMEA Problem Management Control Plan Solving Flowchart Process Act Plan Audit Management Inspection Planning Incoming Goods SPC Check Do โ€ข Quality Control Production Panel Supplier Outgoing Goods Assessment IBS Overview THE PRODUCTIVITY ADVANTAGE
  • 10. IBS Quality Execution Management Solution: PDCA-cycle Action Order Management Resource Management Planning Problem Solving Process Act Plan Audit Management Fine planning Process Overview / Online-Visualization Paperless Check Do Repair PRISMA Auswertung DB ... LiTab ACC Handy Docking- Station Admin/Konfig. Koppel-PC Diagnose- Touch Panel Koppel-SPS Andon Board Info-Point Prozess-Netz (Ethernet) KPI (OEE, FPY) Mobil- Masch.-SPS Scanner Analysing (PAA, CPK) MDA ODA ยฉ IBS AG Slide 10 IBS Overview THE PRODUCTIVITY ADVANTAGE
  • 11. IBS Traceability solutions for product and process traceability Purchased Parts Transport Customer Supplier Traceability KPIโ€žs Cockpit Standard Components Standard Assembly Groups Plant n Plant 1 ยฉ IBS AG Slide 11 IBS Overview THE PRODUCTIVITY ADVANTAGE
  • 12. Agenda Agenda and Introduction Customer Case Studies / Benefit Analysis Solution Overview Company Overview Discussion / Goals IBS Overview THE PRODUCTIVITY ADVANTAGE
  • 13. IBS America, Inc. ๏‚ง Group with 5 companies ๏‚ง Germany, USA, Lithuania plus Support office in in China ๏‚ง Publicly traded since 2000 ๏‚ง Revenue 2008: ~ $30 million ๏‚ง Founded in 1982 ๏‚ง Today about 180 employees ๏‚ง Supporting over 4000 customer installations globally (spanning over 50 countries and 5 continents) IBS Overview THE PRODUCTIVITY ADVANTAGE
  • 14. Key Competences & Positioning Innovative Integration with Services Software corporate Solutions IT-Systems Directors ๏‚ง Industry independent MIS Process consulting ERP ๏‚ง Implementation Company mgmt. MES Process ๏‚ง Training control ๏‚ง Project Management Production Machine control Implementation Operation Maintenance IBS Overview THE PRODUCTIVITY ADVANTAGE
  • 15. IBS Customers Save Money The Cost of Quality as % of Revenue Source: Aberdeen Group 2009 100% 18% 24% 29% 50% 0% IBS Average Average Laggard IBS customers achieve substantial cost reductions with better than average performance (e.g. first pass yields, on time shipments). IBS Overview THE PRODUCTIVITY ADVANTAGE
  • 16. IBS Quality Management Solution: PDCA-cycle Action Management Project FMEA Problem Management Control Plan Solving Process Flowchart Act Plan Audit Inspection Management Planning Incoming Goods SPC Check Do โ€ข Quality Control Production Panel Supplier Outgoing Goods Assessment ยฉ IBS AG Slide 16 IBS Presentation THE PRODUCTIVITY ADVANTAGE
  • 17. One Knowledge Database for Engineering Customer Design Engineering Requirements APQP/First Article Inspection Project plan and Checklists First Sample Inspection Design FMEA Part Master Customer Drawing Control Plan Process FMEA Process Flow Chart Operations Spend time on the โ€œfloorโ€ = Identify and gather data Process Engineering IBS Presentation THE PRODUCTIVITY ADVANTAGE
  • 18. APQP - Data flow between Process Flow Chart, FMEA, Control Plan 2 1 3 IBS Presentation THE PRODUCTIVITY ADVANTAGE
  • 19. IBS Presentation THE PRODUCTIVITY ADVANTAGE
  • 20. Statistical Process Control - Analytics SPC Evaluation Control Chart Shopfloor data is immediately available Single Value Chart for evaluation IBS Presentation THE PRODUCTIVITY ADVANTAGE
  • 21. Supplier Assessment Suppliers are assessed on four main criteria: Supplier Assessment Product Accurate Accurate Soft Quality delivery dates delivery quantities criteria Data valid for a Data collected for each delivery pre-defined period. IBS Presentation THE PRODUCTIVITY ADVANTAGE
  • 22. Supplier Portal Supplier Complaint passed to the Supplier Portal Supplier completes analysis and actions Optional: Display key quality indicators Error analysis and corrective actions from the Supplier Assessment module IBS Presentation THE PRODUCTIVITY ADVANTAGE
  • 23. Concern and Complaint Management Action items Create actions with a due date, escalation profile and responsible person Email integration Insert documents or photos of any type IBS Presentation THE PRODUCTIVITY ADVANTAGE
  • 24. Concern and Complaint Management - Reporting Define reporting periods and get immediate visual results Drill-Down and Drill-Up functionality Export into Excel IBS Presentation THE PRODUCTIVITY ADVANTAGE
  • 25. QSYS Modules - Overview IBS Presentation THE PRODUCTIVITY ADVANTAGE

Editor's Notes

  1. Once you create a Process Flow Chart you can easily import this in the FMEA and re-use the same data in the Control ChartThis eliminates the need for re-keying this informationIn addition this information is saved as master data and is retained for future use.
  2. Supplier Assessment is based on key characteristics. These can be weighted and customized by the customer.Supplier Scorecard and other reports are available.
  3. Complaints are automatically generated if the inspection was done in one of the shop-floor modules.SPC data normally generates an internal complaint, IGC a supplier complaint.
  4. Lessons Learned and Continues Improvement are supported.8-D report with supplier interaction.- FMEA updated if Root Cause Analyses provides a finding.
  5. Various forms of reports available.Personal Reports can be used to create customer unique reports (e.g. 3-Panel report, 4-Panel, etc.).Look-Across and Read- Across functionality Multiple plant viewsExport capabilities -&gt; into Crystal Reports for exampleCockpit functionality allows special reports to update themselves on the desktop of an executive in real-time.