IPD – A Project Delivery Approach

“Integrated Project Delivery (IPD) is a project
 delivery approach that integrates people, systems,
 business structures and practices into a process
 that collaboratively harnesses the talents and
 insights of all participants to optimize project
 results, increase value to the owner, reduce waste,
 and maximize efficiency through all phases of
 design, fabrication, and construction.”



[“Integrated Project Delivery: A Guide,” published jointly by the
  American Institute of Architects California Council and the American
  Institute of Architects.]
                                                                         1
IPD approach


                                                                          100%


                          Pre-Construction Services        Construction
Understanding
  Common




                Architect Hired

                CM/GC Hired
                Engineers Hired

                Major Trades Hired


                                  SD     DD           CD

                                              Time

                                                                                 2
                                                                                 2
                                                                                     2
Traditional approach




                       3
The big room – UCSF Mission Bay




                                  4
Cost Transparency


 Detailed Cost of Work estimates are developed
               “in the light of day”




                                                 5
Risks/Rewards
IPD Contract Resources

• AIA Contracts
 – Transitional Forms: A195, A295 and B195
 – Multi-Party Agreements: C191
 – The Single Purpose Entity: C195, C196 and C197


• ConsensusDOCS 300 Contracts
 – Supported by the AGC
 – “Relational” agreement example




                                                    7
Case Studies –
Sutter Medical Centers

Milestones                Sacramento (Traditional)   Castro Valley (Lean/IPD)
Total project duration:              12                         5

OSHPD Permit for                     24                         6
Foundation/Structure:

OSHPD Permit for TI:                 36                         6

RFI’s:                              640                         51

Change Orders:                      159                         12

OSHPD Post Approval                 181                         19
Docs:




                                                                                8

More Related Content

Viewers also liked

Integrated Project Delivery
Integrated Project DeliveryIntegrated Project Delivery
Integrated Project DeliveryMike Purdy
 
Integrated Project Delivery White Paper
Integrated Project Delivery   White PaperIntegrated Project Delivery   White Paper
Integrated Project Delivery White Paper
Mike Purdy
 
Integrated Project Delivery and Building Information Modeling
Integrated Project Delivery and  Building Information ModelingIntegrated Project Delivery and  Building Information Modeling
Integrated Project Delivery and Building Information Modeling
robnjoro
 
Consensus Docs: Introduction to Integrated Project Delivery in Construction
Consensus Docs: Introduction to Integrated Project Delivery in ConstructionConsensus Docs: Introduction to Integrated Project Delivery in Construction
Consensus Docs: Introduction to Integrated Project Delivery in Construction
DBL Law
 
PDC_2015_Lean_IPD
PDC_2015_Lean_IPDPDC_2015_Lean_IPD
PDC_2015_Lean_IPD
Upali Nanda
 
Bim Enabled Ipd
Bim Enabled IpdBim Enabled Ipd
Bim Enabled Ipdmarybk
 
Innovative Design and Delivery Strategies
Innovative Design and Delivery StrategiesInnovative Design and Delivery Strategies
Innovative Design and Delivery Strategies
Array Architects
 
Innovative Design and Delivery Strategies
Innovative Design and Delivery StrategiesInnovative Design and Delivery Strategies
Innovative Design and Delivery Strategies
Array Architects
 
Project Delivery Approaches: "Which one is right for my Parking Facility?" Wa...
Project Delivery Approaches: "Which one is right for my Parking Facility?" Wa...Project Delivery Approaches: "Which one is right for my Parking Facility?" Wa...
Project Delivery Approaches: "Which one is right for my Parking Facility?" Wa...
Jacob H. Gonzalez, P.E.
 
Contenidodelplano
ContenidodelplanoContenidodelplano
Contenidodelplano
Mirla Crespo
 
Role of Procurement Professional in Public Private Partnerships (PPPs)
Role of Procurement Professional in Public Private Partnerships (PPPs)Role of Procurement Professional in Public Private Partnerships (PPPs)
Role of Procurement Professional in Public Private Partnerships (PPPs)
Mwiza Helen
 
PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...
PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...
PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...
Pedram Danesh-Mand
 
Last planner s
Last planner sLast planner s
Last planner s
sonia123tlv
 
IPD and Sustainable Design at Trapelo Road
IPD and Sustainable Design at Trapelo RoadIPD and Sustainable Design at Trapelo Road
IPD and Sustainable Design at Trapelo Road
Toronto 2030 District
 
6 Alternative Construction Project Delivery Methods
6 Alternative Construction Project Delivery Methods6 Alternative Construction Project Delivery Methods
6 Alternative Construction Project Delivery Methods
McCarthy Holdings, Inc.
 
Public-Private Partnerships (PPP): Funding Infrastructure for Ghana
Public-Private Partnerships (PPP): Funding Infrastructure for GhanaPublic-Private Partnerships (PPP): Funding Infrastructure for Ghana
Public-Private Partnerships (PPP): Funding Infrastructure for Ghana
A Hagan
 
Public private partnerships
Public private partnershipsPublic private partnerships
Public private partnerships
pasicUganda
 
Last planner system
Last planner systemLast planner system
Last planner system
Juan Felipe Pons Achell
 

Viewers also liked (20)

Integrated Project Delivery
Integrated Project DeliveryIntegrated Project Delivery
Integrated Project Delivery
 
Integrated Project Delivery White Paper
Integrated Project Delivery   White PaperIntegrated Project Delivery   White Paper
Integrated Project Delivery White Paper
 
Integrated Project Delivery and Building Information Modeling
Integrated Project Delivery and  Building Information ModelingIntegrated Project Delivery and  Building Information Modeling
Integrated Project Delivery and Building Information Modeling
 
Consensus Docs: Introduction to Integrated Project Delivery in Construction
Consensus Docs: Introduction to Integrated Project Delivery in ConstructionConsensus Docs: Introduction to Integrated Project Delivery in Construction
Consensus Docs: Introduction to Integrated Project Delivery in Construction
 
PDC_2015_Lean_IPD
PDC_2015_Lean_IPDPDC_2015_Lean_IPD
PDC_2015_Lean_IPD
 
Bim Enabled Ipd
Bim Enabled IpdBim Enabled Ipd
Bim Enabled Ipd
 
Integrated project-delivery
Integrated project-deliveryIntegrated project-delivery
Integrated project-delivery
 
Innovative Design and Delivery Strategies
Innovative Design and Delivery StrategiesInnovative Design and Delivery Strategies
Innovative Design and Delivery Strategies
 
Innovative Design and Delivery Strategies
Innovative Design and Delivery StrategiesInnovative Design and Delivery Strategies
Innovative Design and Delivery Strategies
 
Project Delivery Approaches: "Which one is right for my Parking Facility?" Wa...
Project Delivery Approaches: "Which one is right for my Parking Facility?" Wa...Project Delivery Approaches: "Which one is right for my Parking Facility?" Wa...
Project Delivery Approaches: "Which one is right for my Parking Facility?" Wa...
 
Contenidodelplano
ContenidodelplanoContenidodelplano
Contenidodelplano
 
Role of Procurement Professional in Public Private Partnerships (PPPs)
Role of Procurement Professional in Public Private Partnerships (PPPs)Role of Procurement Professional in Public Private Partnerships (PPPs)
Role of Procurement Professional in Public Private Partnerships (PPPs)
 
PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...
PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...
PD - Contract and Risk Conference - Integrated Schedule Cost Risk Analysis fo...
 
integrated-project-delivery-constru
integrated-project-delivery-construintegrated-project-delivery-constru
integrated-project-delivery-constru
 
Last planner s
Last planner sLast planner s
Last planner s
 
IPD and Sustainable Design at Trapelo Road
IPD and Sustainable Design at Trapelo RoadIPD and Sustainable Design at Trapelo Road
IPD and Sustainable Design at Trapelo Road
 
6 Alternative Construction Project Delivery Methods
6 Alternative Construction Project Delivery Methods6 Alternative Construction Project Delivery Methods
6 Alternative Construction Project Delivery Methods
 
Public-Private Partnerships (PPP): Funding Infrastructure for Ghana
Public-Private Partnerships (PPP): Funding Infrastructure for GhanaPublic-Private Partnerships (PPP): Funding Infrastructure for Ghana
Public-Private Partnerships (PPP): Funding Infrastructure for Ghana
 
Public private partnerships
Public private partnershipsPublic private partnerships
Public private partnerships
 
Last planner system
Last planner systemLast planner system
Last planner system
 

Similar to Integrated project delivery for more effective development

5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM
BIM User Day
 
Projects in less time; 3 secrets to reducing project lead time, on time
Projects in less time; 3 secrets to reducing project lead time, on timeProjects in less time; 3 secrets to reducing project lead time, on time
Projects in less time; 3 secrets to reducing project lead time, on time
Pinnacle Strategies
 
ACE Team 2 - WK6 - IPD Presentation
ACE Team 2 - WK6 - IPD PresentationACE Team 2 - WK6 - IPD Presentation
ACE Team 2 - WK6 - IPD Presentation
Ausrine Rakauskaite
 
MY C.V final 2000
MY C.V final 2000MY C.V final 2000
MY C.V final 2000Ahmed Adel
 
Hatem El Karnshawy . BSc, PMP, MASCE
Hatem El Karnshawy . BSc, PMP, MASCEHatem El Karnshawy . BSc, PMP, MASCE
Hatem El Karnshawy . BSc, PMP, MASCE
enghatem
 
六合彩,香港六合彩
六合彩,香港六合彩六合彩,香港六合彩
六合彩,香港六合彩
pcdylwd
 
Jorge luis sousa escandon cv february 2020
Jorge luis sousa escandon cv february 2020Jorge luis sousa escandon cv february 2020
Jorge luis sousa escandon cv february 2020
Jorge Luis Sousa Escandòn
 
Ode Consultants Pvt. Ltd.
Ode Consultants Pvt. Ltd.Ode Consultants Pvt. Ltd.
Ode Consultants Pvt. Ltd.
Kushagra Singh
 
Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011
Paul Allen
 
Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Paul Allen
 
APM Hinkley Point C - how to build a power station, Ken Owen, presentation
APM Hinkley Point C - how to build a power station, Ken Owen, presentationAPM Hinkley Point C - how to build a power station, Ken Owen, presentation
APM Hinkley Point C - how to build a power station, Ken Owen, presentation
Association for Project Management
 
Clinical Document Architecture Implementations - Lessons Learnt to Date
Clinical Document Architecture Implementations - Lessons Learnt to DateClinical Document Architecture Implementations - Lessons Learnt to Date
Clinical Document Architecture Implementations - Lessons Learnt to Date
Health Informatics New Zealand
 
CCRG 2005 Alberta Assessors Association Conference Seminar
CCRG 2005 Alberta Assessors Association Conference SeminarCCRG 2005 Alberta Assessors Association Conference Seminar
CCRG 2005 Alberta Assessors Association Conference Seminar
Salvador Carlos Hernandez Ramirez
 
ABDUL HAKEEM_PROJECT ENGINEER_RESUME
ABDUL HAKEEM_PROJECT ENGINEER_RESUMEABDUL HAKEEM_PROJECT ENGINEER_RESUME
ABDUL HAKEEM_PROJECT ENGINEER_RESUMEAbdul Hakeem
 
Operations class project
Operations class projectOperations class project
Operations class project
Christopher Powers
 
Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM
Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM
Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM
Lenka Larson
 
THE GLOBAL ENGINEERING PROCUREMENT & CONSTRUCTION PROJECT MANAGEMENT FOR THE ...
THE GLOBAL ENGINEERING PROCUREMENT & CONSTRUCTION PROJECT MANAGEMENT FOR THE ...THE GLOBAL ENGINEERING PROCUREMENT & CONSTRUCTION PROJECT MANAGEMENT FOR THE ...
THE GLOBAL ENGINEERING PROCUREMENT & CONSTRUCTION PROJECT MANAGEMENT FOR THE ...
Lenka Larson
 
香港六合彩|六合彩
香港六合彩|六合彩香港六合彩|六合彩
香港六合彩|六合彩
ykscnm
 

Similar to Integrated project delivery for more effective development (20)

5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM
 
Projects in less time; 3 secrets to reducing project lead time, on time
Projects in less time; 3 secrets to reducing project lead time, on timeProjects in less time; 3 secrets to reducing project lead time, on time
Projects in less time; 3 secrets to reducing project lead time, on time
 
ACE Team 2 - WK6 - IPD Presentation
ACE Team 2 - WK6 - IPD PresentationACE Team 2 - WK6 - IPD Presentation
ACE Team 2 - WK6 - IPD Presentation
 
MY C.V final 2000
MY C.V final 2000MY C.V final 2000
MY C.V final 2000
 
Hatem El Karnshawy . BSc, PMP, MASCE
Hatem El Karnshawy . BSc, PMP, MASCEHatem El Karnshawy . BSc, PMP, MASCE
Hatem El Karnshawy . BSc, PMP, MASCE
 
六合彩,香港六合彩
六合彩,香港六合彩六合彩,香港六合彩
六合彩,香港六合彩
 
Jorge luis sousa escandon cv february 2020
Jorge luis sousa escandon cv february 2020Jorge luis sousa escandon cv february 2020
Jorge luis sousa escandon cv february 2020
 
Ode Consultants Pvt. Ltd.
Ode Consultants Pvt. Ltd.Ode Consultants Pvt. Ltd.
Ode Consultants Pvt. Ltd.
 
A8 construction management bill downs - usda
A8 construction management   bill downs - usdaA8 construction management   bill downs - usda
A8 construction management bill downs - usda
 
Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011
 
Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011
 
APM Hinkley Point C - how to build a power station, Ken Owen, presentation
APM Hinkley Point C - how to build a power station, Ken Owen, presentationAPM Hinkley Point C - how to build a power station, Ken Owen, presentation
APM Hinkley Point C - how to build a power station, Ken Owen, presentation
 
Clinical Document Architecture Implementations - Lessons Learnt to Date
Clinical Document Architecture Implementations - Lessons Learnt to DateClinical Document Architecture Implementations - Lessons Learnt to Date
Clinical Document Architecture Implementations - Lessons Learnt to Date
 
CCRG 2005 Alberta Assessors Association Conference Seminar
CCRG 2005 Alberta Assessors Association Conference SeminarCCRG 2005 Alberta Assessors Association Conference Seminar
CCRG 2005 Alberta Assessors Association Conference Seminar
 
ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4
ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4
ASSET LIFE CYCLE COST ESTIMATING AND THE CCRG Rev4
 
ABDUL HAKEEM_PROJECT ENGINEER_RESUME
ABDUL HAKEEM_PROJECT ENGINEER_RESUMEABDUL HAKEEM_PROJECT ENGINEER_RESUME
ABDUL HAKEEM_PROJECT ENGINEER_RESUME
 
Operations class project
Operations class projectOperations class project
Operations class project
 
Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM
Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM
Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM
 
THE GLOBAL ENGINEERING PROCUREMENT & CONSTRUCTION PROJECT MANAGEMENT FOR THE ...
THE GLOBAL ENGINEERING PROCUREMENT & CONSTRUCTION PROJECT MANAGEMENT FOR THE ...THE GLOBAL ENGINEERING PROCUREMENT & CONSTRUCTION PROJECT MANAGEMENT FOR THE ...
THE GLOBAL ENGINEERING PROCUREMENT & CONSTRUCTION PROJECT MANAGEMENT FOR THE ...
 
香港六合彩|六合彩
香港六合彩|六合彩香港六合彩|六合彩
香港六合彩|六合彩
 

More from Allen Matkins

Real Estate Development Law Update
Real Estate Development Law UpdateReal Estate Development Law Update
Real Estate Development Law Update
Allen Matkins
 
Basics: Rights to Groundwater
Basics: Rights to GroundwaterBasics: Rights to Groundwater
Basics: Rights to Groundwater
Allen Matkins
 
Recent Developments in Environmental Due Diligence
Recent Developments in Environmental Due DiligenceRecent Developments in Environmental Due Diligence
Recent Developments in Environmental Due Diligence
Allen Matkins
 
Recent Legal Developments for Commercial Landlords
Recent Legal Developments for Commercial LandlordsRecent Legal Developments for Commercial Landlords
Recent Legal Developments for Commercial LandlordsAllen Matkins
 
The Ghost of Christmas Yet to Come: Five Holiday Season Tips for Retail Landl...
The Ghost of Christmas Yet to Come: Five Holiday Season Tips for Retail Landl...The Ghost of Christmas Yet to Come: Five Holiday Season Tips for Retail Landl...
The Ghost of Christmas Yet to Come: Five Holiday Season Tips for Retail Landl...
Allen Matkins
 
Bankruptcy in a Bull Market: What Commercial Landlords Should Do Now to Prepa...
Bankruptcy in a Bull Market: What Commercial Landlords Should Do Now to Prepa...Bankruptcy in a Bull Market: What Commercial Landlords Should Do Now to Prepa...
Bankruptcy in a Bull Market: What Commercial Landlords Should Do Now to Prepa...
Allen Matkins
 
Five Critical Issues for Commerical Landlords
Five Critical Issues for Commerical LandlordsFive Critical Issues for Commerical Landlords
Five Critical Issues for Commerical Landlords
Allen Matkins
 
Sd #816779-v1-networking presentation-_4-2-14
Sd #816779-v1-networking presentation-_4-2-14Sd #816779-v1-networking presentation-_4-2-14
Sd #816779-v1-networking presentation-_4-2-14Allen Matkins
 
Audit Right v. No Audit Right: Common Area Expenses
Audit Right v. No Audit Right: Common Area Expenses Audit Right v. No Audit Right: Common Area Expenses
Audit Right v. No Audit Right: Common Area Expenses Allen Matkins
 
Recent Developments in Environmental Due Diligence
Recent Developments in Environmental Due DiligenceRecent Developments in Environmental Due Diligence
Recent Developments in Environmental Due DiligenceAllen Matkins
 
2014 Real Estate Development Law Update
2014 Real Estate Development Law Update2014 Real Estate Development Law Update
2014 Real Estate Development Law Update
Allen Matkins
 
Allen Matkins Real Estate Development Law Update: Jeff Meyers
Allen Matkins Real Estate Development Law Update: Jeff MeyersAllen Matkins Real Estate Development Law Update: Jeff Meyers
Allen Matkins Real Estate Development Law Update: Jeff Meyers
Allen Matkins
 
Legal Issues In Real Estate Development Introduction to Environmental Law
Legal Issues In Real Estate Development Introduction to Environmental LawLegal Issues In Real Estate Development Introduction to Environmental Law
Legal Issues In Real Estate Development Introduction to Environmental Law
Allen Matkins
 
2011 Northern California Real Estate Women of Influence
2011 Northern California Real Estate Women of Influence2011 Northern California Real Estate Women of Influence
2011 Northern California Real Estate Women of Influence
Allen Matkins
 
Land and Home(s) No Longer Four Letter Words?
Land and Home(s) No Longer Four Letter Words?Land and Home(s) No Longer Four Letter Words?
Land and Home(s) No Longer Four Letter Words?
Allen Matkins
 
2013 Real Estate Law Update
2013 Real Estate Law Update2013 Real Estate Law Update
2013 Real Estate Law Update
Allen Matkins
 
The FCRA, ECOA and the Consumer Financial Protection Bureau
The FCRA, ECOA and the Consumer Financial Protection BureauThe FCRA, ECOA and the Consumer Financial Protection Bureau
The FCRA, ECOA and the Consumer Financial Protection BureauAllen Matkins
 
The Entrepreneur's Guide to Negotiating a Venture Capital Financing
The Entrepreneur's Guide to Negotiating a Venture Capital FinancingThe Entrepreneur's Guide to Negotiating a Venture Capital Financing
The Entrepreneur's Guide to Negotiating a Venture Capital FinancingAllen Matkins
 
Hildebrandt Social and Digital Media for Lawyers - Metrics Panel
Hildebrandt Social and Digital Media for Lawyers - Metrics PanelHildebrandt Social and Digital Media for Lawyers - Metrics Panel
Hildebrandt Social and Digital Media for Lawyers - Metrics PanelAllen Matkins
 
Private Shopping Malls - The "Not-So-Private" Private Property
Private Shopping Malls -The "Not-So-Private" Private PropertyPrivate Shopping Malls -The "Not-So-Private" Private Property
Private Shopping Malls - The "Not-So-Private" Private Property
Allen Matkins
 

More from Allen Matkins (20)

Real Estate Development Law Update
Real Estate Development Law UpdateReal Estate Development Law Update
Real Estate Development Law Update
 
Basics: Rights to Groundwater
Basics: Rights to GroundwaterBasics: Rights to Groundwater
Basics: Rights to Groundwater
 
Recent Developments in Environmental Due Diligence
Recent Developments in Environmental Due DiligenceRecent Developments in Environmental Due Diligence
Recent Developments in Environmental Due Diligence
 
Recent Legal Developments for Commercial Landlords
Recent Legal Developments for Commercial LandlordsRecent Legal Developments for Commercial Landlords
Recent Legal Developments for Commercial Landlords
 
The Ghost of Christmas Yet to Come: Five Holiday Season Tips for Retail Landl...
The Ghost of Christmas Yet to Come: Five Holiday Season Tips for Retail Landl...The Ghost of Christmas Yet to Come: Five Holiday Season Tips for Retail Landl...
The Ghost of Christmas Yet to Come: Five Holiday Season Tips for Retail Landl...
 
Bankruptcy in a Bull Market: What Commercial Landlords Should Do Now to Prepa...
Bankruptcy in a Bull Market: What Commercial Landlords Should Do Now to Prepa...Bankruptcy in a Bull Market: What Commercial Landlords Should Do Now to Prepa...
Bankruptcy in a Bull Market: What Commercial Landlords Should Do Now to Prepa...
 
Five Critical Issues for Commerical Landlords
Five Critical Issues for Commerical LandlordsFive Critical Issues for Commerical Landlords
Five Critical Issues for Commerical Landlords
 
Sd #816779-v1-networking presentation-_4-2-14
Sd #816779-v1-networking presentation-_4-2-14Sd #816779-v1-networking presentation-_4-2-14
Sd #816779-v1-networking presentation-_4-2-14
 
Audit Right v. No Audit Right: Common Area Expenses
Audit Right v. No Audit Right: Common Area Expenses Audit Right v. No Audit Right: Common Area Expenses
Audit Right v. No Audit Right: Common Area Expenses
 
Recent Developments in Environmental Due Diligence
Recent Developments in Environmental Due DiligenceRecent Developments in Environmental Due Diligence
Recent Developments in Environmental Due Diligence
 
2014 Real Estate Development Law Update
2014 Real Estate Development Law Update2014 Real Estate Development Law Update
2014 Real Estate Development Law Update
 
Allen Matkins Real Estate Development Law Update: Jeff Meyers
Allen Matkins Real Estate Development Law Update: Jeff MeyersAllen Matkins Real Estate Development Law Update: Jeff Meyers
Allen Matkins Real Estate Development Law Update: Jeff Meyers
 
Legal Issues In Real Estate Development Introduction to Environmental Law
Legal Issues In Real Estate Development Introduction to Environmental LawLegal Issues In Real Estate Development Introduction to Environmental Law
Legal Issues In Real Estate Development Introduction to Environmental Law
 
2011 Northern California Real Estate Women of Influence
2011 Northern California Real Estate Women of Influence2011 Northern California Real Estate Women of Influence
2011 Northern California Real Estate Women of Influence
 
Land and Home(s) No Longer Four Letter Words?
Land and Home(s) No Longer Four Letter Words?Land and Home(s) No Longer Four Letter Words?
Land and Home(s) No Longer Four Letter Words?
 
2013 Real Estate Law Update
2013 Real Estate Law Update2013 Real Estate Law Update
2013 Real Estate Law Update
 
The FCRA, ECOA and the Consumer Financial Protection Bureau
The FCRA, ECOA and the Consumer Financial Protection BureauThe FCRA, ECOA and the Consumer Financial Protection Bureau
The FCRA, ECOA and the Consumer Financial Protection Bureau
 
The Entrepreneur's Guide to Negotiating a Venture Capital Financing
The Entrepreneur's Guide to Negotiating a Venture Capital FinancingThe Entrepreneur's Guide to Negotiating a Venture Capital Financing
The Entrepreneur's Guide to Negotiating a Venture Capital Financing
 
Hildebrandt Social and Digital Media for Lawyers - Metrics Panel
Hildebrandt Social and Digital Media for Lawyers - Metrics PanelHildebrandt Social and Digital Media for Lawyers - Metrics Panel
Hildebrandt Social and Digital Media for Lawyers - Metrics Panel
 
Private Shopping Malls - The "Not-So-Private" Private Property
Private Shopping Malls -The "Not-So-Private" Private PropertyPrivate Shopping Malls -The "Not-So-Private" Private Property
Private Shopping Malls - The "Not-So-Private" Private Property
 

Recently uploaded

2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
beazzy04
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 

Recently uploaded (20)

2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 

Integrated project delivery for more effective development

  • 1. IPD – A Project Delivery Approach “Integrated Project Delivery (IPD) is a project delivery approach that integrates people, systems, business structures and practices into a process that collaboratively harnesses the talents and insights of all participants to optimize project results, increase value to the owner, reduce waste, and maximize efficiency through all phases of design, fabrication, and construction.” [“Integrated Project Delivery: A Guide,” published jointly by the American Institute of Architects California Council and the American Institute of Architects.] 1
  • 2. IPD approach 100% Pre-Construction Services Construction Understanding Common Architect Hired CM/GC Hired Engineers Hired Major Trades Hired SD DD CD Time 2 2 2
  • 4. The big room – UCSF Mission Bay 4
  • 5. Cost Transparency Detailed Cost of Work estimates are developed “in the light of day” 5
  • 7. IPD Contract Resources • AIA Contracts – Transitional Forms: A195, A295 and B195 – Multi-Party Agreements: C191 – The Single Purpose Entity: C195, C196 and C197 • ConsensusDOCS 300 Contracts – Supported by the AGC – “Relational” agreement example 7
  • 8. Case Studies – Sutter Medical Centers Milestones Sacramento (Traditional) Castro Valley (Lean/IPD) Total project duration: 12 5 OSHPD Permit for 24 6 Foundation/Structure: OSHPD Permit for TI: 36 6 RFI’s: 640 51 Change Orders: 159 12 OSHPD Post Approval 181 19 Docs: 8