Copyright © 2016 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Tedd Weitzman, Southern Company, presents the ‘Integrated Data
Requirements’ at the AVEVA World Summit 2016, New Orleans. In order to be
prepared for progressive data handover of project information, owner
operators need to put in place a holistic data management strategy. Tedd
describes Southern Company’s ‘Integrated Data Requirements’ project. By
employing AVEVA technology enabled Southern Company a smooth
information handover from projects into operations.
Find out more how AVEVA can transform your business
www.aveva.com
Integrated Data Requirements
Tedd Weitzman
Project Manager - Performance Improvement Team
Southern Company, Engineering & Construction Services
“Knowledge Is Power”
scientia potentia est
~Francis Bacon
scientia potentia est
~Francis Bacon
011000110110100101100101011011100111010001101001011
000010010000001110000011011110111010001100101011011
10011101000110100101100001001000000110010101110011
01110100
01100011
4
• Qualified
• Normalized
• Collected
01110100011100110110010100100000
01100001011010010111010001101110
01100101011101000110111101110000
00100000011000010110100101110100
01101110011001010110100101100011
Copyright 2013. All rights reserved
Balance for Success
Technology is the easy part …….
….. Aligning the other elements, clearly
accelerates success for ALL
Gaining Value from Participation
Process People
Technology
Success
Management of Documents
Document
of Record
Design
Construction
Operations &
Maintenance
Cost
Estimating
Startup &
Commissioning
In Process
Content
7
Management of Data
Design Tool
Design Tool
8
Construction
Operations &
Maintenance
Cost
Estimating
Startup &
Commissioning
MechanicalInstrumentation
& Controls
Electrical
Design
Data-centric Model
Design Tool
Design Tool
9
Construction
Operations &
Maintenance
Cost
Estimating
Startup &
Commissioning
Mechanical
Instrumentation
& Controls
Electrical
Data
System
Documents
Data Sheet
Elementary
Enclosure Drawing
Heat Trace Drawing
Impulse Drawing
Installation Detail
Layout
Location Drawing
Loop Sheet
Orthographic
P&ID
Vendor P&ID
Piping Drawing Reference
Purchase Order
Single Line
Specification
Vendor Document
Wiring Diagram
Lifecycle State
Failed Validation
Conceptual
Released for Detail Design
Released for Construction
As-Built Unverified
As-Built Verified
Scheduled for Demolition
Supplier / Manufacturer
Model Number
Class
Functional Tag
Physical Tag
Plant
Projects
Start Up Codes
Failed Validation
Location
Systems
Sub-Systems
Change Orders
Work Breakdown Structure
Area
ONTOLOGYTAXONOMY
Class Library
Overview
Assets
ProjectStructureAttributes
Design/Operational
Workflow
Area Pipe
Pipe Spool
Equipment
Cable
Raceway
Line
Facility Physical Structure #
Equipment
Line Segment
P&ID
Collection
Supplier/Manufacturer
01100011
Reference Data LibraryProcess Line
Cable
Motor
Startup &
Commissioning
Pump
MCC
Package
Builder
Electrical
Data
System
CYGNA
PDMS
Organization Chart
14
Chief Operating
Officer
Chief
Transmission
Officer
President,
Southern Power
EVP, Engineering
& Construction
Services
VP, Commercial
Operations &
Planning
SVP, Research and
Environmental
Affairs
EVP, Chief
Production
Officer
GM, Project
Planning and
Services
Project Director
Kemper County
IGCC
Construction
VP,
Engineering
GM, Environmental
Projects and
Construction - East
VP,
Technical
Services
Manager,
Governance
and Project
Assurance
Director, Safety and
Health Southern
Company Generation
and Transmission
GM,
Design
General
Manager
Manager,
I&C
Manager,
Electrical
Manager,
Civil
Manager,
Mechanical
Manager,
Project
Engineering
Manager,
Equipment &
Materials
Supervisor, Clean
Air Major Projects
Supervisor, New
Generation
Projects
Supervisor,
Retrofit Projects
and Support
Supervisor,
Design
Automation Team
Supervisor, Major
Projects and
Retrofits - South
Supervisor, Major
Projects and
Retrofits - North
GM, Project
Planning and
Services
Project Director
Kemper County
IGCC
Construction
VP,
Engineering
GM, Environmental
Projects and
Construction - East
VP,
Technical
Services
Manager,
Governance
and Project
Assurance
Director, Safety and
Health Southern
Company Generation
and Transmission
GM,
Design
General
Manager
Organizational Chart
15
Chief Operating
Officer
EVP and Chief
Transmission
Officer
VP Commercial
Services and
Planning
EVP, Engineering
& Construction
Services
Business
Development
Director
SVP, Research and
Environmental
Affairs
GenEVP, GPC SPO,
and Chief
Production Officer
President and
CEO Southern
Power
VP
Commercial
Operations
GM, Project Planning
and Services
VP, Technical
Services
Manager, Governance
and Business
Assurance
VP Projects and
Construction
Mgr, Performance
Improvement
Mgr, Project
Quality
GM, Project
Support
Mgr, Project
Management Office
Mgr, Civil Field
Services
Mgr, Start Up and
Commissioning
Performance Improvement Team
“The PIT Crew”
Ernie Barton
Engineering
Design Tools Life Cycle
Leverage Data for
Conceptual and Estimating
Smart Modeling
Justin Weaver
Construction
Advanced Work Packaging
Quantity Tracking
Progress Reporting
Earned Value
Symya Williams
Start-up
Automated Start-up
Packaging
PSM
Configuration Management
Kevin Manogue
Project / Info
Management
Project Process
Automation
Collaboration
Document Management
Tedd Weitzman
Integrated Data
Requirements
Consistent Asset
Identification
Link Information to Assets
Data Consistency and
Integrity
Be prepared for progressive data handover of project information and learn
how AVEVA can help you to put in place a holistic data management strategy.
Visit www.aveva.com or click here to get in touch with our team.
avevaworld.com
@aveva
/aveva

Integrated Data Requirements by Tedd Weitzman, Southern Company

  • 1.
    Copyright © 2016AVEVA Solutions Limited and its subsidiaries. All rights reserved. Tedd Weitzman, Southern Company, presents the ‘Integrated Data Requirements’ at the AVEVA World Summit 2016, New Orleans. In order to be prepared for progressive data handover of project information, owner operators need to put in place a holistic data management strategy. Tedd describes Southern Company’s ‘Integrated Data Requirements’ project. By employing AVEVA technology enabled Southern Company a smooth information handover from projects into operations. Find out more how AVEVA can transform your business www.aveva.com
  • 2.
    Integrated Data Requirements TeddWeitzman Project Manager - Performance Improvement Team Southern Company, Engineering & Construction Services
  • 4.
    “Knowledge Is Power” scientiapotentia est ~Francis Bacon scientia potentia est ~Francis Bacon 011000110110100101100101011011100111010001101001011 000010010000001110000011011110111010001100101011011 10011101000110100101100001001000000110010101110011 01110100 01100011 4
  • 5.
    • Qualified • Normalized •Collected 01110100011100110110010100100000 01100001011010010111010001101110 01100101011101000110111101110000 00100000011000010110100101110100 01101110011001010110100101100011
  • 6.
    Copyright 2013. Allrights reserved Balance for Success Technology is the easy part ……. ….. Aligning the other elements, clearly accelerates success for ALL Gaining Value from Participation Process People Technology Success
  • 7.
    Management of Documents Document ofRecord Design Construction Operations & Maintenance Cost Estimating Startup & Commissioning In Process Content 7
  • 8.
    Management of Data DesignTool Design Tool 8 Construction Operations & Maintenance Cost Estimating Startup & Commissioning MechanicalInstrumentation & Controls Electrical Design
  • 9.
    Data-centric Model Design Tool DesignTool 9 Construction Operations & Maintenance Cost Estimating Startup & Commissioning Mechanical Instrumentation & Controls Electrical Data System
  • 11.
    Documents Data Sheet Elementary Enclosure Drawing HeatTrace Drawing Impulse Drawing Installation Detail Layout Location Drawing Loop Sheet Orthographic P&ID Vendor P&ID Piping Drawing Reference Purchase Order Single Line Specification Vendor Document Wiring Diagram Lifecycle State Failed Validation Conceptual Released for Detail Design Released for Construction As-Built Unverified As-Built Verified Scheduled for Demolition Supplier / Manufacturer Model Number Class Functional Tag Physical Tag Plant Projects Start Up Codes Failed Validation Location Systems Sub-Systems Change Orders Work Breakdown Structure Area ONTOLOGYTAXONOMY Class Library Overview Assets ProjectStructureAttributes Design/Operational Workflow Area Pipe Pipe Spool Equipment Cable Raceway Line Facility Physical Structure # Equipment Line Segment P&ID Collection Supplier/Manufacturer
  • 13.
    01100011 Reference Data LibraryProcessLine Cable Motor Startup & Commissioning Pump MCC Package Builder Electrical Data System CYGNA PDMS
  • 14.
    Organization Chart 14 Chief Operating Officer Chief Transmission Officer President, SouthernPower EVP, Engineering & Construction Services VP, Commercial Operations & Planning SVP, Research and Environmental Affairs EVP, Chief Production Officer GM, Project Planning and Services Project Director Kemper County IGCC Construction VP, Engineering GM, Environmental Projects and Construction - East VP, Technical Services Manager, Governance and Project Assurance Director, Safety and Health Southern Company Generation and Transmission GM, Design General Manager Manager, I&C Manager, Electrical Manager, Civil Manager, Mechanical Manager, Project Engineering Manager, Equipment & Materials Supervisor, Clean Air Major Projects Supervisor, New Generation Projects Supervisor, Retrofit Projects and Support Supervisor, Design Automation Team Supervisor, Major Projects and Retrofits - South Supervisor, Major Projects and Retrofits - North GM, Project Planning and Services Project Director Kemper County IGCC Construction VP, Engineering GM, Environmental Projects and Construction - East VP, Technical Services Manager, Governance and Project Assurance Director, Safety and Health Southern Company Generation and Transmission GM, Design General Manager
  • 15.
    Organizational Chart 15 Chief Operating Officer EVPand Chief Transmission Officer VP Commercial Services and Planning EVP, Engineering & Construction Services Business Development Director SVP, Research and Environmental Affairs GenEVP, GPC SPO, and Chief Production Officer President and CEO Southern Power VP Commercial Operations GM, Project Planning and Services VP, Technical Services Manager, Governance and Business Assurance VP Projects and Construction Mgr, Performance Improvement Mgr, Project Quality GM, Project Support Mgr, Project Management Office Mgr, Civil Field Services Mgr, Start Up and Commissioning
  • 16.
    Performance Improvement Team “ThePIT Crew” Ernie Barton Engineering Design Tools Life Cycle Leverage Data for Conceptual and Estimating Smart Modeling Justin Weaver Construction Advanced Work Packaging Quantity Tracking Progress Reporting Earned Value Symya Williams Start-up Automated Start-up Packaging PSM Configuration Management Kevin Manogue Project / Info Management Project Process Automation Collaboration Document Management Tedd Weitzman Integrated Data Requirements Consistent Asset Identification Link Information to Assets Data Consistency and Integrity
  • 17.
    Be prepared forprogressive data handover of project information and learn how AVEVA can help you to put in place a holistic data management strategy. Visit www.aveva.com or click here to get in touch with our team. avevaworld.com @aveva /aveva