Presentation Overview
Keeping on top of constantly changing information from multiple sources is a time-consuming, risk-
prone task. In fact, most engineering professionals spend more than 20% of their time checking and
transcribing information.
This presentation that presents the challenge, ‘How fast can you access information?’ and
demonstrates how AVEVA Net provides rapid access to all types of data and documents, and then
validates it across all sources, enabling faster, more informed decision making for our customers.
MANAGING ENGINEERING
INFORMATION WITH
AVEVA SOLUTIONS
© 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
AVEVA World Conference
North America 2018
AGENDA
▲ Who we are
▲ AVEVA’s Digital Asset
▲ Why its important to you
© 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved.3
WHAT IS THE DIGITAL ASSET?
ONE ASSET MADE OF STEEL ONE ASSET MADE OF INFORMATION
Engineering
Information
Financial
Data
Real Time
Data
Maintenance
Data
Engineering
Information
Financial
Data
me
nce
STATUS INFORMATION / MATURITY
RELATIONSHIP / CONTEXT
3D
1D
2D= +
LASER SCAN
P&IDs SHOP DRAWINGS ISOMETRICS
DATASHEETSINSTRUMENT LIST LINE LIST
3D MODEL
ENGINEERING INFORMATION ASSET
Digital Asset
Contracting Strategy /
Technology Mandate
Data Centric Integrated
Project Execution
Environment
Project Information Hub
NOYES
30% more
efficient
information
access
80% more
efficient data
handover
10%
savings
TIC
AVEVA CONTRIBUTION TO YOUR SUCCESS
FEED
Detail Design
Advanced Work packaging
Workface Planning
Procurement
Materials Management
Commissioning and Startup
PROJECT EXECUTION SOLUTION
PROJECT INFORMATION HUB (HANDOVER)
Master data deliverables Aveva Cost per Tag Manual Cost per
Tag 2
Aveva
Implementation
Additional Manual
Work Required 1
Total
Master Tag List $1.18 $0.00 $1.18 $50
FLOC/ EO MDCR
Functional Location
$1.18 $16.75 $17.93 $67
FLOC/ EO Characteristics
Template List of Items
$1.18 $4.25 $5.43 $17
BOM MDCR
Bill of Materials Registry
$1.18 $62.50 $63.68 $50
MM MDCR
Material Management
$1.18 $5.00 $6.18 $250
Document Turnover Reporting $1.18 $0.00 $1.18 $50
Total estimated cost / tag $7.06 $88.50 $95.56 $484
Total Cost for 85,000 tags3 $0.6M $7.5M $8.1M $41M
• Regulatory audits
• HAZOP studies
• Population of principal operation systems
• Immerse training
• Master Data Management
DIGITAL ASSET
© 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
number of staff searching for information 10
cost per staff per year 150,000$
total cost staff per year 1,500,000$
time spent searching for information 40%
total cost searching for information per year 600,000$
improvement through Digital Asset 80%
total savings while searching for information per year 480,000$
percentage savings 32%
© 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved.15

AVEVA World Conference NA - Todd Kubiak, AVEVA NET

  • 1.
    © 2017 AVEVASolutions Limited and its subsidiaries. All rights reserved. Presentation Overview Keeping on top of constantly changing information from multiple sources is a time-consuming, risk- prone task. In fact, most engineering professionals spend more than 20% of their time checking and transcribing information. This presentation that presents the challenge, ‘How fast can you access information?’ and demonstrates how AVEVA Net provides rapid access to all types of data and documents, and then validates it across all sources, enabling faster, more informed decision making for our customers.
  • 2.
    MANAGING ENGINEERING INFORMATION WITH AVEVASOLUTIONS © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. AVEVA World Conference North America 2018
  • 3.
    AGENDA ▲ Who weare ▲ AVEVA’s Digital Asset ▲ Why its important to you © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved.3
  • 9.
    WHAT IS THEDIGITAL ASSET? ONE ASSET MADE OF STEEL ONE ASSET MADE OF INFORMATION Engineering Information Financial Data Real Time Data Maintenance Data
  • 10.
    Engineering Information Financial Data me nce STATUS INFORMATION /MATURITY RELATIONSHIP / CONTEXT 3D 1D 2D= + LASER SCAN P&IDs SHOP DRAWINGS ISOMETRICS DATASHEETSINSTRUMENT LIST LINE LIST 3D MODEL ENGINEERING INFORMATION ASSET
  • 11.
    Digital Asset Contracting Strategy/ Technology Mandate Data Centric Integrated Project Execution Environment Project Information Hub NOYES 30% more efficient information access 80% more efficient data handover 10% savings TIC AVEVA CONTRIBUTION TO YOUR SUCCESS
  • 12.
    FEED Detail Design Advanced Workpackaging Workface Planning Procurement Materials Management Commissioning and Startup PROJECT EXECUTION SOLUTION
  • 13.
    PROJECT INFORMATION HUB(HANDOVER) Master data deliverables Aveva Cost per Tag Manual Cost per Tag 2 Aveva Implementation Additional Manual Work Required 1 Total Master Tag List $1.18 $0.00 $1.18 $50 FLOC/ EO MDCR Functional Location $1.18 $16.75 $17.93 $67 FLOC/ EO Characteristics Template List of Items $1.18 $4.25 $5.43 $17 BOM MDCR Bill of Materials Registry $1.18 $62.50 $63.68 $50 MM MDCR Material Management $1.18 $5.00 $6.18 $250 Document Turnover Reporting $1.18 $0.00 $1.18 $50 Total estimated cost / tag $7.06 $88.50 $95.56 $484 Total Cost for 85,000 tags3 $0.6M $7.5M $8.1M $41M
  • 14.
    • Regulatory audits •HAZOP studies • Population of principal operation systems • Immerse training • Master Data Management DIGITAL ASSET © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved. number of staff searching for information 10 cost per staff per year 150,000$ total cost staff per year 1,500,000$ time spent searching for information 40% total cost searching for information per year 600,000$ improvement through Digital Asset 80% total savings while searching for information per year 480,000$ percentage savings 32%
  • 15.