PROCEDURE
NO. KONTRAK :
00200.PO/SNBP/PGAS/V
III/2022
NOMOR DOKUMEN:
SNBP-CV-CPM-PRO-QC-ITP-001
4 Halaman
PENGADAAN CONTROL VALVE PACKAGE
SENIPAH – BALIKPAPAN
INSPECTION AND TEST PLAN
D 09 Jan 23 Re-Issued For Approval PRB WIN VIC
ASW
EFC
C 01 Dec 22 Re-Issued For Approval PRB WIN VIC
ASW
EFC
B 18 Oct 22 Issued For Approval PRB WIN VIC
ASW
EFC
A 14 Sep 22 Issued For Review PRB WIN VIC ASW EFC
REV TANGGAL DESKRIPSI
DISIAPKAN DIPERIKSA DISETUJUI DISETUJUI
PT. CONTROMATIC PRIMA MANDIRI PT PGAS SOLUTION
JASA PERANCANGAN,
PENGADAAN DAN KONSTRUKSI
(EPC)
PEMBANGUNAN PIPA GAS
SENIPAH - BALIKPAPAN
Document Number:
SNBP-CV-CPM-PRO-QC-ITP-001
Rev. D INSPECTION AND TEST PLAN
09/01/2023
Hal. 1 dari 4
TABEL REVISI
HAL
REVISI
HAL
REVISI
HAL
REVISI
A B C D 0 1 2 A B C D 0 1 2 A B C D 0 1 2
1 X X X X
2 X X X X
3 X X X X
4 X X X X
JASA PERANCANGAN,
PENGADAAN DAN KONSTRUKSI
(EPC)
PEMBANGUNAN PIPA GAS
SENIPAH - BALIKPAPAN
Document Number:
SNBP-CV-CPM-PRO-QC-ITP-001
Rev. D INSPECTION AND TEST PLAN
09/01/2023
Hal. 2 dari 4
CATATAN PERUBAHAN DOKUMEN
No.
Alasan
Perubahan
Item yang
diubah
Tgl.
Perubahan
Revisi
Ke
Diubah
Oleh
Diketahui
Oleh
1
Apakah hydro akan dilakukan
setelah Actuator di
Assembly.Actuator di Assembly?
Iya,
- 18 Oct 22 B PRB WIN
2
Only FAT/ Function Test?
FAT Factory will apply to all test
as mentioned in 6.2.
(we recommended 10% of total
item orrepresent of each model
and size)
- 18 Oct 22 B PRB WIN
3
FAT/Function 100%
Hydrotest dan Leak Test pada point
6.2 dihapus karena sudah
dilakukan di hydrotest Valve
Ok
- 09 Jan 23 C PRB WIN
4
Ok
Ok
- 09 Jan 23 C PRB WIN
JASA PERANCANGAN,
PENGADAAN DAN KONSTRUKSI
(EPC)
PEMBANGUNAN PIPA GAS
SENIPAH - BALIKPAPAN
Document Number:
SNBP-CV-CPM-PRO-QC-ITP-001
Rev. D INSPECTION AND TEST PLAN
09/01/2023
Hal. 3 dari 4
TABLE OF CONTENTS
COVER ...........................................................................................................................................
1. TABEL REVISI.............................................................................................................................. 1
2. CATATAN PERUBAHAN.............................................................................................................. 2
3. DAFTAR ISI .................................................................................................................................. 3
4. LAMPIRAN ................................................................................................................................... 4
- LAMPIRAN : INSPECTION AND TEST PLAN .......................................................................... 4
JASA PERANCANGAN,
PENGADAAN DAN KONSTRUKSI
(EPC)
PEMBANGUNAN PIPA GAS
SENIPAH - BALIKPAPAN
Document Number:
SNBP-CV-CPM-PRO-QC-ITP-001
Rev. D INSPECTION AND TEST PLAN
09/01/2023
Hal. 4 dari 4
Lampiran
INSPECTION AND TEST PLAN
Quality Plan
1 / 3
INSPECTION AND TEST PLAN
Printed copies are considered uncontrolled unless otherwise identified. The latest document revision is available in CustDoc.
Manufacturing
Neles Korea Co., Ltd.
#235 Cheomdansaneop 1-ro Daesowon-myeon,
Chungju-si, Chungbuk-do,
Korea #27466
Products location
Control Vlave
Tag
-
Customer reference
Quotation number
-
Order number -
-
RESTRICTED
Info:
M - Implementation
R - Review
W - Witness
H - Hold Point
Nel - Neles Korea Co.Ltd
Met - metso
ITEM DESCRIPTION OF OPERATION SCOPE ACCEPTANCE CRITERIA DOC. TYPE INSPECTIONS BY
General Nel/Met CPM PGSOL/PERTAGAS
A. Quality System Control of
quality related
processes
Flow Control HSEQ Guideline
FC-HSEQ-973-En and
procedures. Pressure
Equipment Directive (PED)
2014/68/EU Module H. Metso
Quality System is certified to
ISO 9001.
M - R
B. Contract review Order is
compared with
quotation
Customer requirements
defined and can be complied
with
Order Ackn
M - R
C. Inspection of design and
manufacturing documents
Design
documents for
ASME B16.34
and proprietary
design valves
ASME B16.34 latest rev,
Design documents, Quality
plan M - R
Revision: 2 Approved: Aug 1, 2022 Checker: Rio Yoon
Status: APPROVED Responsible: Sunju Jung Approver: Youngjun Joo
Quality Plan
2 / 3
INSPECTION AND TEST PLAN
Printed copies are considered uncontrolled unless otherwise identified. The latest document revision is available in CustDoc.
ITEM DESCRIPTION OF OPERATION SCOPE ACCEPTANCE CRITERIA DOC. TYPE INSPECTIONS BY
1.0 Quality Control of Materials by Neles Nel/Met CPM PGSOL/PERTAGAS
1.1 Chemical analysis and mechanical
tests
Control of ladle analysis taken during
pouring, and mechanical properties
Pressure
retaining parts
Procedures M-144-En / M-
148-En and material
specification
10204 3.1
M - R
1.2 Visual examination
Visual inspection of surfaces/marking
prior to delivery
Pressure
retaining parts
MSS SP-55 standard and
relevant drawing
M - -
1.3 Liquid Penetrant Test
Examination of surface defects on
component surfaces.
Pressure
retaining parts
Neles Standard Test report M - R
2.0 Quality Control of Materials at Metso Nel/Met CPM PGSOL/PERTAGAS
2.1
Receiving of materials and
certificates
Comparing of dispatch list with
purchasing documents
Verification of
identification
marking and
visual condition
Purchase order Test report M - R
2.2 Incoming inspection
Control of dimensions, surface quality,
markings and certificates
Applicable
parts
Drawings, MSS SP-55
standard and procedures M-
264-En, M-176-En, M-144-En
/ M-148-En / M-147-En
M - -
2.3 Visual and dimensional inspection
Main dimensions, 3D measuring
machine used on a sample basis,
markings
In house
machined parts
Drawings, standards and
procedure M - -
3.0 Quality control during Valve Assembly at Metso Nel/Met CPM PGSOL/PERTAGAS
3.1 Assembly
Control of visual appearance,
cleanliness and markings
All parts
Procedures M-230-En, SOP-
2195-EN and internal
procedures
M - -
3.2 Valve final testing
- Shell PressureTest
- High Pressure Test
- Low Pressure Test
Valve
No visible leakage in shell test
acc. to M-906-Ko.
Seat leakage according to
procedure M-907-Ko and
international standards
Test record
M - W
4.0 Quality control during Actuator Assembly at NELES
Revision: 2 Approved: Aug 1, 2022 Checker: Rio Yoon
Status: APPROVED Responsible: Sunju Jung Approver: Youngjun Joo
Quality Plan
3 / 3
INSPECTION AND TEST PLAN
Printed copies are considered uncontrolled unless otherwise identified. The latest document revision is available in CustDoc.
ITEM DESCRIPTION OF OPERATION SCOPE ACCEPTANCE CRITERIA DOC. TYPE INSPECTIONS BY
4.1 Actuator final inspection
Tightness test (air)
Breakaway test
Actuator
Test Record M - -
5.0 Quality control during Surface Treatment at Metso Nel/Met CPM PGSOL/PERTAGAS
5.1 Surface treatment
Valve painted and dried for corrosion
protection and surface finish
Note! Stainless steel valves blast
cleaned and pickled in cast condition.
Valve
Actuator
Accessory
Test Record Painting Report M M R
6.0 Quality control during Final Assembly (Topworks) at Metso Nel/Met CPM PGSOL/PERTAGAS
6.1 Actuator/Valve assembly
Topworks assembly; mounting of
actuator
Complete valve
actuator unit
Internal SOP procedures and
drawings
(3)
Report
M M R
6.2 Topworks testing
Functional test and Final inspection Complete valve
actuator unit
Procedure M-360-En and M-
905-Ko
FAT Report
M M W
7.0 Quality Control after Manufacturing at Metso Nel/Met CPM PGSOL/PERTAGAS
7.1 Preservation and Packaging
Ensure integrity and preservation of
goods
Valve or
complete
Topwork
M M R
7.2 Manufacturing Data Record (MDR) All Document and
Report
Contract Dossier
M M R
NOTES
1)
Standard document package consists of a Certificate of Compliance, 3.1 material certs for pressure retaining components and Declaration of Conformity and NDT/PT Report shall be
compiled into MDR
2)
Neles Flow control valve manufacturing and sub-suppliers in supply chain
Revision: 2 Approved: Aug 1, 2022 Checker: Rio Yoon
Status: APPROVED Responsible: Sunju Jung Approver: Youngjun Joo

More Related Content

What's hot

Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
Khiem Vo Duy
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx
Sharad Naik
 
Procedure qualification
Procedure qualificationProcedure qualification
Procedure qualification
vaasuBandaru
 
Piping engineering guide
Piping engineering guidePiping engineering guide
Piping engineering guideram111eg
 
Piping sample report
Piping sample reportPiping sample report
Piping sample reportram111eg
 
API 653 Exam March 2019-1.pdf
API 653 Exam March 2019-1.pdfAPI 653 Exam March 2019-1.pdf
API 653 Exam March 2019-1.pdf
EmmanuelMatutu
 
Methods of examination of joints(RT) - API 650 Tanks
Methods of examination of joints(RT) - API 650 TanksMethods of examination of joints(RT) - API 650 Tanks
Methods of examination of joints(RT) - API 650 Tanks
RajSamy
 
Cswip plant inspector course level i week 1
Cswip plant inspector course level i week 1Cswip plant inspector course level i week 1
Cswip plant inspector course level i week 1ram111eg
 
Introduction to piping.......PLEASE give your valuable comments if you like t...
Introduction to piping.......PLEASE give your valuable comments if you like t...Introduction to piping.......PLEASE give your valuable comments if you like t...
Introduction to piping.......PLEASE give your valuable comments if you like t...Madhur Mahajan
 
Ipea api579
Ipea api579Ipea api579
Ipea api579
Anil Choudhary
 
ASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
ASME Vessels, Pig Launchers, Strainers and More from Sweco FabASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
ASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
Piping Technology & Products, Inc.
 
Piping Fundamentals .pdf
Piping Fundamentals .pdfPiping Fundamentals .pdf
Piping Fundamentals .pdf
VenkataSivaNagaSai
 
Flange management presentation
Flange management presentationFlange management presentation
Flange management presentation
Mohamed Gaafar
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Emeka Ngwobia
 
Structural Steel Welding Inspection
Structural Steel Welding InspectionStructural Steel Welding Inspection
Structural Steel Welding Inspection
Asirul Hoq
 
TrimTeck OpGL Control Valves
TrimTeck OpGL Control ValvesTrimTeck OpGL Control Valves
TrimTeck OpGL Control Valves
Belilove Company-Engineers
 
419471094-PIPING-HANDBOOK-pdf.pdf
419471094-PIPING-HANDBOOK-pdf.pdf419471094-PIPING-HANDBOOK-pdf.pdf
419471094-PIPING-HANDBOOK-pdf.pdf
moumo1
 

What's hot (20)

Presentation on SECVIII
Presentation on SECVIIIPresentation on SECVIII
Presentation on SECVIII
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx
 
Procedure qualification
Procedure qualificationProcedure qualification
Procedure qualification
 
Piping engineering guide
Piping engineering guidePiping engineering guide
Piping engineering guide
 
Piping sample report
Piping sample reportPiping sample report
Piping sample report
 
API 653 Exam March 2019-1.pdf
API 653 Exam March 2019-1.pdfAPI 653 Exam March 2019-1.pdf
API 653 Exam March 2019-1.pdf
 
Methods of examination of joints(RT) - API 650 Tanks
Methods of examination of joints(RT) - API 650 TanksMethods of examination of joints(RT) - API 650 Tanks
Methods of examination of joints(RT) - API 650 Tanks
 
Cswip plant inspector course level i week 1
Cswip plant inspector course level i week 1Cswip plant inspector course level i week 1
Cswip plant inspector course level i week 1
 
Introduction to piping.......PLEASE give your valuable comments if you like t...
Introduction to piping.......PLEASE give your valuable comments if you like t...Introduction to piping.......PLEASE give your valuable comments if you like t...
Introduction to piping.......PLEASE give your valuable comments if you like t...
 
Saudi Aramco Inspection Checklist (SAIC)
Saudi Aramco Inspection Checklist (SAIC)Saudi Aramco Inspection Checklist (SAIC)
Saudi Aramco Inspection Checklist (SAIC)
 
Ipea api579
Ipea api579Ipea api579
Ipea api579
 
ASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
ASME Vessels, Pig Launchers, Strainers and More from Sweco FabASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
ASME Vessels, Pig Launchers, Strainers and More from Sweco Fab
 
Piping Fundamentals .pdf
Piping Fundamentals .pdfPiping Fundamentals .pdf
Piping Fundamentals .pdf
 
Flange management presentation
Flange management presentationFlange management presentation
Flange management presentation
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.
 
Asme wps-demo
Asme wps-demoAsme wps-demo
Asme wps-demo
 
Structural Steel Welding Inspection
Structural Steel Welding InspectionStructural Steel Welding Inspection
Structural Steel Welding Inspection
 
TrimTeck OpGL Control Valves
TrimTeck OpGL Control ValvesTrimTeck OpGL Control Valves
TrimTeck OpGL Control Valves
 
419471094-PIPING-HANDBOOK-pdf.pdf
419471094-PIPING-HANDBOOK-pdf.pdf419471094-PIPING-HANDBOOK-pdf.pdf
419471094-PIPING-HANDBOOK-pdf.pdf
 

Similar to Inspection and Test Plan_D.pdf

testing formats
testing formatstesting formats
testing formats
Abhishek Shukla
 
Nes 362
Nes 362Nes 362
Nes 362
Prashant Naik
 
Protocol for compressed air validation
Protocol for compressed air  validationProtocol for compressed air  validation
Protocol for compressed air validation
Avinash Verma
 
Satip nde-ut-01
Satip nde-ut-01Satip nde-ut-01
Satip nde-ut-01
Jagan Durga
 
Veerasekar api inspectorresume
Veerasekar api inspectorresumeVeerasekar api inspectorresume
Veerasekar api inspectorresume
kalyanasundaram veerasekaran
 
Veerasekar api inspectorresume
Veerasekar api inspectorresumeVeerasekar api inspectorresume
Veerasekar api inspectorresume
kalyanasundaram veerasekaran
 
2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF
WorldofAllLyrics
 
51410-55S00.pdf
51410-55S00.pdf51410-55S00.pdf
51410-55S00.pdf
Mian Majid
 
15811-55S00.pdf
15811-55S00.pdf15811-55S00.pdf
15811-55S00.pdf
Mian Majid
 
96326047 process-description-og-lpg-train-4
96326047 process-description-og-lpg-train-496326047 process-description-og-lpg-train-4
96326047 process-description-og-lpg-train-4Ajay Tiwari
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS
Mary Calkins
 

Similar to Inspection and Test Plan_D.pdf (20)

18rf 31170-ts-002 (flange)
18rf 31170-ts-002 (flange)18rf 31170-ts-002 (flange)
18rf 31170-ts-002 (flange)
 
testing formats
testing formatstesting formats
testing formats
 
Nes 362
Nes 362Nes 362
Nes 362
 
Protocol for compressed air validation
Protocol for compressed air  validationProtocol for compressed air  validation
Protocol for compressed air validation
 
Satip nde-ut-01
Satip nde-ut-01Satip nde-ut-01
Satip nde-ut-01
 
Amar Resume
Amar ResumeAmar Resume
Amar Resume
 
Veerasekar api inspectorresume
Veerasekar api inspectorresumeVeerasekar api inspectorresume
Veerasekar api inspectorresume
 
Veerasekar api inspectorresume
Veerasekar api inspectorresumeVeerasekar api inspectorresume
Veerasekar api inspectorresume
 
18rf 31170-ts-001 (seal ring)
18rf 31170-ts-001 (seal ring)18rf 31170-ts-001 (seal ring)
18rf 31170-ts-001 (seal ring)
 
2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF
 
18rf 31170-ts-003 (screws)
18rf 31170-ts-003 (screws)18rf 31170-ts-003 (screws)
18rf 31170-ts-003 (screws)
 
51410-55S00.pdf
51410-55S00.pdf51410-55S00.pdf
51410-55S00.pdf
 
15811-55S00.pdf
15811-55S00.pdf15811-55S00.pdf
15811-55S00.pdf
 
NONG YAO PROJECT SUBSEA VALVE Rev 0
NONG YAO PROJECT SUBSEA VALVE Rev 0NONG YAO PROJECT SUBSEA VALVE Rev 0
NONG YAO PROJECT SUBSEA VALVE Rev 0
 
LINGAM
LINGAMLINGAM
LINGAM
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
96326047 process-description-og-lpg-train-4
96326047 process-description-og-lpg-train-496326047 process-description-og-lpg-train-4
96326047 process-description-og-lpg-train-4
 
Mithun Banjan CV
Mithun Banjan CVMithun Banjan CV
Mithun Banjan CV
 
CV MOHAMAD SUNANDAR
CV MOHAMAD SUNANDARCV MOHAMAD SUNANDAR
CV MOHAMAD SUNANDAR
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS
 

More from Multidisciplinary consulting and engineering firm (10)

Main distribution board (mdb) testing and commissioning field instrumentati...
Main distribution board (mdb) testing and commissioning   field instrumentati...Main distribution board (mdb) testing and commissioning   field instrumentati...
Main distribution board (mdb) testing and commissioning field instrumentati...
 
Procedure cable testing
Procedure cable testingProcedure cable testing
Procedure cable testing
 
Panel check-list
Panel check-listPanel check-list
Panel check-list
 
Scada foft & hardware
Scada foft & hardwareScada foft & hardware
Scada foft & hardware
 
Tac xenta 300 specification sheet
Tac xenta 300 specification sheetTac xenta 300 specification sheet
Tac xenta 300 specification sheet
 
4.1.1 royston handycap
4.1.1 royston handycap4.1.1 royston handycap
4.1.1 royston handycap
 
Cathodic isolator
Cathodic isolatorCathodic isolator
Cathodic isolator
 
Pub059 007-00 0904
Pub059 007-00 0904Pub059 007-00 0904
Pub059 007-00 0904
 
Slickline co pei
Slickline co peiSlickline co pei
Slickline co pei
 
Basic Instrument PID
Basic Instrument PID Basic Instrument PID
Basic Instrument PID
 

Recently uploaded

Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 

Recently uploaded (20)

Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 

Inspection and Test Plan_D.pdf

  • 1. PROCEDURE NO. KONTRAK : 00200.PO/SNBP/PGAS/V III/2022 NOMOR DOKUMEN: SNBP-CV-CPM-PRO-QC-ITP-001 4 Halaman PENGADAAN CONTROL VALVE PACKAGE SENIPAH – BALIKPAPAN INSPECTION AND TEST PLAN D 09 Jan 23 Re-Issued For Approval PRB WIN VIC ASW EFC C 01 Dec 22 Re-Issued For Approval PRB WIN VIC ASW EFC B 18 Oct 22 Issued For Approval PRB WIN VIC ASW EFC A 14 Sep 22 Issued For Review PRB WIN VIC ASW EFC REV TANGGAL DESKRIPSI DISIAPKAN DIPERIKSA DISETUJUI DISETUJUI PT. CONTROMATIC PRIMA MANDIRI PT PGAS SOLUTION
  • 2. JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI (EPC) PEMBANGUNAN PIPA GAS SENIPAH - BALIKPAPAN Document Number: SNBP-CV-CPM-PRO-QC-ITP-001 Rev. D INSPECTION AND TEST PLAN 09/01/2023 Hal. 1 dari 4 TABEL REVISI HAL REVISI HAL REVISI HAL REVISI A B C D 0 1 2 A B C D 0 1 2 A B C D 0 1 2 1 X X X X 2 X X X X 3 X X X X 4 X X X X
  • 3. JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI (EPC) PEMBANGUNAN PIPA GAS SENIPAH - BALIKPAPAN Document Number: SNBP-CV-CPM-PRO-QC-ITP-001 Rev. D INSPECTION AND TEST PLAN 09/01/2023 Hal. 2 dari 4 CATATAN PERUBAHAN DOKUMEN No. Alasan Perubahan Item yang diubah Tgl. Perubahan Revisi Ke Diubah Oleh Diketahui Oleh 1 Apakah hydro akan dilakukan setelah Actuator di Assembly.Actuator di Assembly? Iya, - 18 Oct 22 B PRB WIN 2 Only FAT/ Function Test? FAT Factory will apply to all test as mentioned in 6.2. (we recommended 10% of total item orrepresent of each model and size) - 18 Oct 22 B PRB WIN 3 FAT/Function 100% Hydrotest dan Leak Test pada point 6.2 dihapus karena sudah dilakukan di hydrotest Valve Ok - 09 Jan 23 C PRB WIN 4 Ok Ok - 09 Jan 23 C PRB WIN
  • 4. JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI (EPC) PEMBANGUNAN PIPA GAS SENIPAH - BALIKPAPAN Document Number: SNBP-CV-CPM-PRO-QC-ITP-001 Rev. D INSPECTION AND TEST PLAN 09/01/2023 Hal. 3 dari 4 TABLE OF CONTENTS COVER ........................................................................................................................................... 1. TABEL REVISI.............................................................................................................................. 1 2. CATATAN PERUBAHAN.............................................................................................................. 2 3. DAFTAR ISI .................................................................................................................................. 3 4. LAMPIRAN ................................................................................................................................... 4 - LAMPIRAN : INSPECTION AND TEST PLAN .......................................................................... 4
  • 5. JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI (EPC) PEMBANGUNAN PIPA GAS SENIPAH - BALIKPAPAN Document Number: SNBP-CV-CPM-PRO-QC-ITP-001 Rev. D INSPECTION AND TEST PLAN 09/01/2023 Hal. 4 dari 4 Lampiran INSPECTION AND TEST PLAN
  • 6. Quality Plan 1 / 3 INSPECTION AND TEST PLAN Printed copies are considered uncontrolled unless otherwise identified. The latest document revision is available in CustDoc. Manufacturing Neles Korea Co., Ltd. #235 Cheomdansaneop 1-ro Daesowon-myeon, Chungju-si, Chungbuk-do, Korea #27466 Products location Control Vlave Tag - Customer reference Quotation number - Order number - - RESTRICTED Info: M - Implementation R - Review W - Witness H - Hold Point Nel - Neles Korea Co.Ltd Met - metso ITEM DESCRIPTION OF OPERATION SCOPE ACCEPTANCE CRITERIA DOC. TYPE INSPECTIONS BY General Nel/Met CPM PGSOL/PERTAGAS A. Quality System Control of quality related processes Flow Control HSEQ Guideline FC-HSEQ-973-En and procedures. Pressure Equipment Directive (PED) 2014/68/EU Module H. Metso Quality System is certified to ISO 9001. M - R B. Contract review Order is compared with quotation Customer requirements defined and can be complied with Order Ackn M - R C. Inspection of design and manufacturing documents Design documents for ASME B16.34 and proprietary design valves ASME B16.34 latest rev, Design documents, Quality plan M - R Revision: 2 Approved: Aug 1, 2022 Checker: Rio Yoon Status: APPROVED Responsible: Sunju Jung Approver: Youngjun Joo
  • 7. Quality Plan 2 / 3 INSPECTION AND TEST PLAN Printed copies are considered uncontrolled unless otherwise identified. The latest document revision is available in CustDoc. ITEM DESCRIPTION OF OPERATION SCOPE ACCEPTANCE CRITERIA DOC. TYPE INSPECTIONS BY 1.0 Quality Control of Materials by Neles Nel/Met CPM PGSOL/PERTAGAS 1.1 Chemical analysis and mechanical tests Control of ladle analysis taken during pouring, and mechanical properties Pressure retaining parts Procedures M-144-En / M- 148-En and material specification 10204 3.1 M - R 1.2 Visual examination Visual inspection of surfaces/marking prior to delivery Pressure retaining parts MSS SP-55 standard and relevant drawing M - - 1.3 Liquid Penetrant Test Examination of surface defects on component surfaces. Pressure retaining parts Neles Standard Test report M - R 2.0 Quality Control of Materials at Metso Nel/Met CPM PGSOL/PERTAGAS 2.1 Receiving of materials and certificates Comparing of dispatch list with purchasing documents Verification of identification marking and visual condition Purchase order Test report M - R 2.2 Incoming inspection Control of dimensions, surface quality, markings and certificates Applicable parts Drawings, MSS SP-55 standard and procedures M- 264-En, M-176-En, M-144-En / M-148-En / M-147-En M - - 2.3 Visual and dimensional inspection Main dimensions, 3D measuring machine used on a sample basis, markings In house machined parts Drawings, standards and procedure M - - 3.0 Quality control during Valve Assembly at Metso Nel/Met CPM PGSOL/PERTAGAS 3.1 Assembly Control of visual appearance, cleanliness and markings All parts Procedures M-230-En, SOP- 2195-EN and internal procedures M - - 3.2 Valve final testing - Shell PressureTest - High Pressure Test - Low Pressure Test Valve No visible leakage in shell test acc. to M-906-Ko. Seat leakage according to procedure M-907-Ko and international standards Test record M - W 4.0 Quality control during Actuator Assembly at NELES Revision: 2 Approved: Aug 1, 2022 Checker: Rio Yoon Status: APPROVED Responsible: Sunju Jung Approver: Youngjun Joo
  • 8. Quality Plan 3 / 3 INSPECTION AND TEST PLAN Printed copies are considered uncontrolled unless otherwise identified. The latest document revision is available in CustDoc. ITEM DESCRIPTION OF OPERATION SCOPE ACCEPTANCE CRITERIA DOC. TYPE INSPECTIONS BY 4.1 Actuator final inspection Tightness test (air) Breakaway test Actuator Test Record M - - 5.0 Quality control during Surface Treatment at Metso Nel/Met CPM PGSOL/PERTAGAS 5.1 Surface treatment Valve painted and dried for corrosion protection and surface finish Note! Stainless steel valves blast cleaned and pickled in cast condition. Valve Actuator Accessory Test Record Painting Report M M R 6.0 Quality control during Final Assembly (Topworks) at Metso Nel/Met CPM PGSOL/PERTAGAS 6.1 Actuator/Valve assembly Topworks assembly; mounting of actuator Complete valve actuator unit Internal SOP procedures and drawings (3) Report M M R 6.2 Topworks testing Functional test and Final inspection Complete valve actuator unit Procedure M-360-En and M- 905-Ko FAT Report M M W 7.0 Quality Control after Manufacturing at Metso Nel/Met CPM PGSOL/PERTAGAS 7.1 Preservation and Packaging Ensure integrity and preservation of goods Valve or complete Topwork M M R 7.2 Manufacturing Data Record (MDR) All Document and Report Contract Dossier M M R NOTES 1) Standard document package consists of a Certificate of Compliance, 3.1 material certs for pressure retaining components and Declaration of Conformity and NDT/PT Report shall be compiled into MDR 2) Neles Flow control valve manufacturing and sub-suppliers in supply chain Revision: 2 Approved: Aug 1, 2022 Checker: Rio Yoon Status: APPROVED Responsible: Sunju Jung Approver: Youngjun Joo