SPEC Innovations has been supporting the academic
community for more than 20 years.
Innoslate for Academia
YourHost:Dr.StevenDam
Thewebinarwillbeginshortly.
AsksUsQuestionsAsk Us Your Questions
• Ask us your questions using
the panel on the right
• This presentation is being
recorded and will be made
available to you.
• Contact us after the webinar
through
o support@Innoslate.com
o Call 571.485.7800
o LinkedIn Innoslate User Group
o Twitter
2
MeetYourHost
• President and Founder of SPEC
Innovations
• Participated in the development of
C4ISR and the DoDAF
• Expert Systems Engineering
Professionals Certificate
• steven.dam@specinnovations.com
• @stevenhdam
3
Agenda
1. About Us
2. Benefits for Students
3. General Benefits
4. One Lifecycle
5. How to Access Innoslate Academic
6. Your Organization
7. Quick Start Demo
8. Helpful Resources
9. Next Step
Add a footer 4
• SPEC Innovations provides software, training, and
consulting to the defense and aerospace industries and
the intelligence community.
• Our flagship software product, Innoslate is the first
cloud-native, model-based systems engineering
software solution made solely in the United States of
America.
• Our engineers built Innoslate to help systems engineers
develop full lifecycle solutions to complex system of
systems.
• Innoslate software supports Requirements
Management, Modeling and Simulation, Verification
and Validation, and more in one seamless package.
AboutUs
We are the experts in systems engineering.
5
BenefitsforStudents
Add a footer 6
Innoslate takes a modern and user intuitive
approach to model-based systems engineering.
This makes Innoslate a great introduction to
MBSE for students - in classroom and research
settings.
Innoslate is the ideal systems engineering software tool to
use in the classroom.
Full lifecycle solution
Free for academic purposes
Students can get started immediately; no download
required
Live collaboration makes it easy for students to work in
teams
Reviewer features give professors a way to comment and
review student’s work individually
GeneralBenefitsoftheInnoslateSolution
• Simplicity
• Common options at the forefront
• Primary tool language is easy to learn (LML)
• Works with no installation, in a web browser
• Collaboration
• Real-Time Collaboration (Group Chat/Real
Time)
• Easy Communication to other engineers (not
just SEs)
• Accuracy
• Full Discrete Event Simulator which simulates
cost, schedule, and performance is
integrated into the Action Diagrams
• Full Monte Carlo Simulator to simulate
variance
• NLP/ML
• Scalability
• Tested to over 10 Million entities and 1,000
simultaneous users
• Full Lifecycle Management Support
• Full requirements analysis and management
capability with Requirements View
• Full modeling capability (SysML/LML/IDEF0)
• Test Center (Test Suites and Test Cases)
• Documents View (CONOPS, Project Plan, and Test
Plan)
• Interoperability
• Automatically generate and/or use other
representations (SysML, DoDAF)
• Import from other RM tools (IBM DOORS CSV,
Excel CSV)
OneLifecycle
Documents View
Requirements
View
Modeling
CAD Viewer
Simulation
Test Center
Risk Analysis
Timeline
HowtoAccess
InnoslateAcademic
The Innoslate Academic organization is free for all students and
professors
• Sign up at cloud.innoslate.com/signup with your .edu
email address and you will automatically be granted
access to Innoslate Academic.
• Don’t have a .edu email? Contact us with proof that you
are a current student or professor and we’ll be happy to
help you.
Add a footer 9
YourOrganization
Manage your Innoslate Academic Organizations
• When you first sign up with your .edu, you will have to
switch over to the Academic Organization.
• You can access Innoslate Academic by going to Manage
Projects and switching organizations in the right-hand
corner.
• You can also contact us to request an organization just
for your classroom.
Add a footer 10
QuickStartDemo
Let’s go over getting started with Innoslate
11
HelpfulResources
For systems engineers and new Innoslate users
DoDAF:
• DoD Architecture Framework 2.0: A Guide to Applying Systems Engineering to Develop Integrated, Executable ($49, Amazon)
• https://www.amazon.com/DoD-Architecture-Framework-2-0-Architectures/dp/1502757621
• DoDAF Government website
• https://dodcio.defense.gov/library/dod-architecture-framework/
Innoslate:
• Guided User Tour: Available on all Organization Dashboards
• Innoslate Help Center: https://help.innoslate.com/
• Innoslate Users Guide: https://help.innoslate.com/users-guide/
• YouTube: https://www.youtube.com/user/specinnovations/videos
• Innoslate Blog: https://blog.innoslate.com/
• LinkedIn Innoslate User Group: On LinkedIn, search for Innoslate
LML:
• Essential LML: Lifecycle Modeling Language (LML): a Thinking Tool for Capturing, Connecting, and Communicating Complex Systems ($15, Amazon)
• https://www.amazon.com/Essential-LML-Lifecycle-Connecting-Communicating/dp/1790702348
• LML Website
• http://www.lifecyclemodeling.org/spec/LML_Specification_1_1.pdf
Add a footer 12
NextStep
Add a footer 13
Students Professors
• Create an account with your .edu (and use the
Academic organization)
• Watch the webinars
• Reach out to use with questions. We’re here to help!
• Get started with Innoslate in your classroom by
requesting
• personalized demos
• your own organization
• Coming soon – Lab Manual
For technical help, contact support@Innoslate.com.
Questionsand
Answers
Use the panel on the right to ask your questions.
Add a footer 14
Thank you!
Visit cloud.innoslate.com for a trial.
571.485.7800
blog.Innoslate.com
innoslate.com
SPEC Innovations
Innoslate User Group
@Innoslate
15

Innoslate for Academia

  • 1.
    SPEC Innovations hasbeen supporting the academic community for more than 20 years. Innoslate for Academia YourHost:Dr.StevenDam Thewebinarwillbeginshortly.
  • 2.
    AsksUsQuestionsAsk Us YourQuestions • Ask us your questions using the panel on the right • This presentation is being recorded and will be made available to you. • Contact us after the webinar through o support@Innoslate.com o Call 571.485.7800 o LinkedIn Innoslate User Group o Twitter 2
  • 3.
    MeetYourHost • President andFounder of SPEC Innovations • Participated in the development of C4ISR and the DoDAF • Expert Systems Engineering Professionals Certificate • steven.dam@specinnovations.com • @stevenhdam 3
  • 4.
    Agenda 1. About Us 2.Benefits for Students 3. General Benefits 4. One Lifecycle 5. How to Access Innoslate Academic 6. Your Organization 7. Quick Start Demo 8. Helpful Resources 9. Next Step Add a footer 4
  • 5.
    • SPEC Innovationsprovides software, training, and consulting to the defense and aerospace industries and the intelligence community. • Our flagship software product, Innoslate is the first cloud-native, model-based systems engineering software solution made solely in the United States of America. • Our engineers built Innoslate to help systems engineers develop full lifecycle solutions to complex system of systems. • Innoslate software supports Requirements Management, Modeling and Simulation, Verification and Validation, and more in one seamless package. AboutUs We are the experts in systems engineering. 5
  • 6.
    BenefitsforStudents Add a footer6 Innoslate takes a modern and user intuitive approach to model-based systems engineering. This makes Innoslate a great introduction to MBSE for students - in classroom and research settings. Innoslate is the ideal systems engineering software tool to use in the classroom. Full lifecycle solution Free for academic purposes Students can get started immediately; no download required Live collaboration makes it easy for students to work in teams Reviewer features give professors a way to comment and review student’s work individually
  • 7.
    GeneralBenefitsoftheInnoslateSolution • Simplicity • Commonoptions at the forefront • Primary tool language is easy to learn (LML) • Works with no installation, in a web browser • Collaboration • Real-Time Collaboration (Group Chat/Real Time) • Easy Communication to other engineers (not just SEs) • Accuracy • Full Discrete Event Simulator which simulates cost, schedule, and performance is integrated into the Action Diagrams • Full Monte Carlo Simulator to simulate variance • NLP/ML • Scalability • Tested to over 10 Million entities and 1,000 simultaneous users • Full Lifecycle Management Support • Full requirements analysis and management capability with Requirements View • Full modeling capability (SysML/LML/IDEF0) • Test Center (Test Suites and Test Cases) • Documents View (CONOPS, Project Plan, and Test Plan) • Interoperability • Automatically generate and/or use other representations (SysML, DoDAF) • Import from other RM tools (IBM DOORS CSV, Excel CSV)
  • 8.
  • 9.
    HowtoAccess InnoslateAcademic The Innoslate Academicorganization is free for all students and professors • Sign up at cloud.innoslate.com/signup with your .edu email address and you will automatically be granted access to Innoslate Academic. • Don’t have a .edu email? Contact us with proof that you are a current student or professor and we’ll be happy to help you. Add a footer 9
  • 10.
    YourOrganization Manage your InnoslateAcademic Organizations • When you first sign up with your .edu, you will have to switch over to the Academic Organization. • You can access Innoslate Academic by going to Manage Projects and switching organizations in the right-hand corner. • You can also contact us to request an organization just for your classroom. Add a footer 10
  • 11.
    QuickStartDemo Let’s go overgetting started with Innoslate 11
  • 12.
    HelpfulResources For systems engineersand new Innoslate users DoDAF: • DoD Architecture Framework 2.0: A Guide to Applying Systems Engineering to Develop Integrated, Executable ($49, Amazon) • https://www.amazon.com/DoD-Architecture-Framework-2-0-Architectures/dp/1502757621 • DoDAF Government website • https://dodcio.defense.gov/library/dod-architecture-framework/ Innoslate: • Guided User Tour: Available on all Organization Dashboards • Innoslate Help Center: https://help.innoslate.com/ • Innoslate Users Guide: https://help.innoslate.com/users-guide/ • YouTube: https://www.youtube.com/user/specinnovations/videos • Innoslate Blog: https://blog.innoslate.com/ • LinkedIn Innoslate User Group: On LinkedIn, search for Innoslate LML: • Essential LML: Lifecycle Modeling Language (LML): a Thinking Tool for Capturing, Connecting, and Communicating Complex Systems ($15, Amazon) • https://www.amazon.com/Essential-LML-Lifecycle-Connecting-Communicating/dp/1790702348 • LML Website • http://www.lifecyclemodeling.org/spec/LML_Specification_1_1.pdf Add a footer 12
  • 13.
    NextStep Add a footer13 Students Professors • Create an account with your .edu (and use the Academic organization) • Watch the webinars • Reach out to use with questions. We’re here to help! • Get started with Innoslate in your classroom by requesting • personalized demos • your own organization • Coming soon – Lab Manual For technical help, contact support@Innoslate.com.
  • 14.
    Questionsand Answers Use the panelon the right to ask your questions. Add a footer 14
  • 15.
    Thank you! Visit cloud.innoslate.comfor a trial. 571.485.7800 blog.Innoslate.com innoslate.com SPEC Innovations Innoslate User Group @Innoslate 15

Editor's Notes

  • #9 Innoslate encompasses the entire lifecycle
  • #12 exisiting entities roles, labels, templates database search, resources schema extender sysml and lml differences