Innoslate Overview
• SPEC Innovations provides software, training, and
consulting to the defense and aerospace industries
and the intelligence community.
• Our flagship software product, Innoslate is the first
cloud-native, model-based systems engineering
software solution made solely in the United States
of America.
• Our engineers built Innoslate to help systems
engineers develop full lifecycle solutions to
complex systems of systems.
• Innoslate software supports Requirements
Management, Modeling and Simulation,
Verification and Validation, and more in one
seamless package.
About Us
We are the experts in systems
engineering.
2
Today’s Systems Engineering Tools
Difficult to Use
•Learning full SysML/UML often
takes months
•Dozens of options are present on
many views
•Drawings usually must be redrawn
(ex. the Sequence, Activity, and
BDD)
•Required desktop software
installation to modify the models
The Models Do Not Execute
Lack of built-in variance simulation
(Monte Carlo Simulation)
Activity Diagrams do not have to be
executable
Limited Lifecycle
Management
Focus is typically only on drawing
models
Most organizations use additional
tools for requirements management,
test management, and Monte Carlo
simulation
Lack of Collaboration
Model conflicts during commits (no
real-time collaboration)
Models typically only communicate
to the SE domain
Server collaboration software often
does not scale and users suffer long
download/commit times (>20 min)
The Innoslate Solution
• Simplicity
• Common options at the forefront
• Primary tool language is easy to learn
(LML)
• Works with no installation, in a web
browser
• Collaboration
• Real-Time Collaboration (Group Chat/Real
Time)
• Easy Communication to other engineers
(not just SEs)
• Accuracy
• Full Discrete Event Simulator which
simulates cost, schedule, and performance
is integrated into the Action Diagrams
• Full Monte Carlo Simulator to simulate
variance
• NLP/ML
• Scalability
• Tested to over 10 Million entities and 1,000
simultaneous users
• Full Lifecycle Management Support
• Full requirements analysis and management
capability with Requirements View
• Full modeling capability (SysML/LML/IDEF0)
• Test Center (Test Suites and Test Cases)
• Documents View (CONOPS, Project Plan,
and Test Plan)
• Interoperability
• Automatically generate and/or use other
representations (SysML, DoDAF)
• Import from other RM tools (IBM DOORS
CSV and ReqIF, Excel CSV)
One Lifecycle
Documents View
Requirements
View
Modeling
CAD Viewer
Simulation
Test Center
Risk Analysis
Timeline
WBS
CrossProjectsRelationships
• Add relationships
between different
projects in the same
organization (allows fine-
grained data separation)
• Redacted bars are
displayed if the entity is
not viewable
6
Permissions + Cross
Project Relations
Enable Redaction
 Permissions are fine-grained
to the object level
 User-defined permissions are
available
 Users who do not have
permission to see specific
information see a redacted
version
Workflow
• Add Workflow to
any class with an
enumerated
attribute (including
user defined)
• Customizable
permissions for
each transition
• Lock entity ability
• Customizable
notifications for
each transition
8
Collaborate With Your Whole Team
in Any Environment in Real Time
• Workflow/Permissions
• Chat
• Comments
• Version Control
• Add Roles and Teams
9
Easy to Use
• Drag and drop
• Sidebar for Attributes
• Responsive
• All developed to the latest web software
standards
What’s New in 4.3?
• Added Risk Burndown
Chart to Charts View
• Added New Interface
Control Diagram
• Cross Project Indicators
• Redesigned Search
Capability
• Activity Feed Report
• And many bug fixes
Request a Live Demo
Visit innoslate.com/request-a-demo.
12

Innoslate Overview

  • 1.
  • 2.
    • SPEC Innovationsprovides software, training, and consulting to the defense and aerospace industries and the intelligence community. • Our flagship software product, Innoslate is the first cloud-native, model-based systems engineering software solution made solely in the United States of America. • Our engineers built Innoslate to help systems engineers develop full lifecycle solutions to complex systems of systems. • Innoslate software supports Requirements Management, Modeling and Simulation, Verification and Validation, and more in one seamless package. About Us We are the experts in systems engineering. 2
  • 3.
    Today’s Systems EngineeringTools Difficult to Use •Learning full SysML/UML often takes months •Dozens of options are present on many views •Drawings usually must be redrawn (ex. the Sequence, Activity, and BDD) •Required desktop software installation to modify the models The Models Do Not Execute Lack of built-in variance simulation (Monte Carlo Simulation) Activity Diagrams do not have to be executable Limited Lifecycle Management Focus is typically only on drawing models Most organizations use additional tools for requirements management, test management, and Monte Carlo simulation Lack of Collaboration Model conflicts during commits (no real-time collaboration) Models typically only communicate to the SE domain Server collaboration software often does not scale and users suffer long download/commit times (>20 min)
  • 4.
    The Innoslate Solution •Simplicity • Common options at the forefront • Primary tool language is easy to learn (LML) • Works with no installation, in a web browser • Collaboration • Real-Time Collaboration (Group Chat/Real Time) • Easy Communication to other engineers (not just SEs) • Accuracy • Full Discrete Event Simulator which simulates cost, schedule, and performance is integrated into the Action Diagrams • Full Monte Carlo Simulator to simulate variance • NLP/ML • Scalability • Tested to over 10 Million entities and 1,000 simultaneous users • Full Lifecycle Management Support • Full requirements analysis and management capability with Requirements View • Full modeling capability (SysML/LML/IDEF0) • Test Center (Test Suites and Test Cases) • Documents View (CONOPS, Project Plan, and Test Plan) • Interoperability • Automatically generate and/or use other representations (SysML, DoDAF) • Import from other RM tools (IBM DOORS CSV and ReqIF, Excel CSV)
  • 5.
    One Lifecycle Documents View Requirements View Modeling CADViewer Simulation Test Center Risk Analysis Timeline WBS
  • 6.
    CrossProjectsRelationships • Add relationships betweendifferent projects in the same organization (allows fine- grained data separation) • Redacted bars are displayed if the entity is not viewable 6
  • 7.
    Permissions + Cross ProjectRelations Enable Redaction  Permissions are fine-grained to the object level  User-defined permissions are available  Users who do not have permission to see specific information see a redacted version
  • 8.
    Workflow • Add Workflowto any class with an enumerated attribute (including user defined) • Customizable permissions for each transition • Lock entity ability • Customizable notifications for each transition 8
  • 9.
    Collaborate With YourWhole Team in Any Environment in Real Time • Workflow/Permissions • Chat • Comments • Version Control • Add Roles and Teams 9
  • 10.
    Easy to Use •Drag and drop • Sidebar for Attributes • Responsive • All developed to the latest web software standards
  • 11.
    What’s New in4.3? • Added Risk Burndown Chart to Charts View • Added New Interface Control Diagram • Cross Project Indicators • Redesigned Search Capability • Activity Feed Report • And many bug fixes
  • 12.
    Request a LiveDemo Visit innoslate.com/request-a-demo. 12

Editor's Notes

  • #6 Innoslate encompasses the entire lifecycle