 NATURE OF LOSSES - Breakdown stoppage loss
(Equipment & Die).
 LOSS DEFINITION - Stoppage due to breakdown of
equipment / Die.
 EXAMPLE - Machine / die stoppage due to mechanical /
electrical system failure.
 CALCULATION FORMULA - Break down time X Charge
rate.
 NATURE OF LOSSES - Set Up & Adjustment.
 LOSS DEFINITION - Time loss happening during setup for
switch over of product to first ok piece comes out.
 EXAMPLE - Time consumed till first ok sample piece after
change of product Model.
 CALCULATION FORMULA - Stoppage time X Charge rate.
 NATURE OF LOSSES - Tool Change Loss.
 LOSS DEFINITION - Time loss due to change of tool on
account of damage or non availability of material for existing
Tool.
 EXAMPLE - Time consumed during Jig, Fixture, Insert, Drill,
Cutter change.
 CALCULATION FORMULA - Stoppage time X Charge rate.
 NATURE OF LOSSES - Start up Loss.
 LOSS DEFINITION - Loss happening at the start of
work.
 EXAMPLE - Warming up time to attain initial
parameter of process plant.
 CALCULATION FORMULA - Loss time X Charge rate.
 NATURE OF LOSSES - Process trouble Loss.
 LOSS DEFINITION - Equipment, Fixture, Die or not In B /
D but stoppage time more than 10 minutes.
 EXAMPLE - Chattering during turning & grinding, Jamming
of tool in power press & rectified without unloading the tool.
 CALCULATION FORMULA - Loss time X Charge rate.
 NATURE OF LOSSES - Management Loss.
 LOSS DEFINITION - Time for which equipment could not
be operated for management or organisational reasons.
 EXAMPLE - Waiting for Raw material & instruction fro
management.
 CALCULATION FORMULA - Loss time X Charge rate.
 NATURE OF LOSSES - Minor Stoppage.
 LOSS DEFINITION - There is no breakdown but equipment
stops (< 10 minutes).
 EXAMPLE - Power change over, Operator not available due
to natures call.
 CALCULATION FORMULA - Loss time X Charge rate.
 NATURE OF LOSSES - Speed Loss.
 LOSS DEFINITION - Loss due to performance, below rated
speed.
 EXAMPLE - Output loss than designed capacity without any
stoppage.
 CALCULATION FORMULA - (Available time- Std. CT X No.
of pcs. Produced X Charge rate) / 3600.
 NATURE OF LOSSES - Defect & Rework Loss.
 LOSS DEFINITION -
(a) Stage wise rejection due to defect.
(b) Rework Loss due to defect.
 EXAMPLE -
(a) Raw material & Value addition up to that process.
(b) Salvage cost.
 CALCULATION FORMULA -
(a) Raw material + Value addition .
(b) Consumable + labour cost.
 NATURE OF LOSSES - Inventory carrying Loss.
 LOSS DEFINITION - Cost incurred in Carrying inventory of
finished goods, WIP & raw material.
 EXAMPLE - Keeping of RM / WIP / FG.
 CALCULATION FORMULA - 23 % of total Inventory Carrying
cost / 12.
 NATURE OF LOSSES - Yield Loss.
 LOSS DEFINITION - Loss due to less output in comparison
to designed output.
 EXAMPLE - Chips / Scrape / End cuts.
 CALCULATION FORMULA - {(input - output) X Cost per
Ton} - Scrap cost.
 NATURE OF LOSSES - Energy Loss.
 LOSS DEFINITION - Loss generate due to excess
consumption of energy.
 EXAMPLE - Higher energy consumption for making one MT
of product.
 CALCULATION FORMULA - (Actual Energy Consumption
- Target Energy Consumption) X Unit price X Produced Qty.
 NATURE OF LOSSES - Logistic Loss.
 LOSS DEFINITION - Losses due to higher transportation,
warehousing, manpower & packaging cost & production loss
due to fork lift availability.
 EXAMPLE - Delivery through premium Mode, under
utilization of vehicle capacity.
 CALCULATION FORMULA - Actual - Target
(Transportation + labour + packaging) & Machine charge
rate.
 NATURE OF LOSSES - Inspection Loss.
 LOSS DEFINITION - Loss generated due to cost incurred in
carrying out off line inspection.
 EXAMPLE - 100 % Inspection Activity carried out by an
Inspector.
 CALCULATION FORMULA - (Inspection time X labor
cost)+Material cost if applicable + conveyance.
 NATURE OF LOSSES - Consumable Loss.
 LOSS DEFINITION - Loss generated due to excess
consumption.
 EXAMPLE - Steel Shots, Paints, Q.Oile.
 CALCULATION FORMULA - (Actual-planned) X Rate.
 NATURE OF LOSSES - Office Loss.
 LOSS DEFINITION - Losses in offices due to higher
consumables, travelling cost, communication cost &
manpower cost.
 EXAMPLE - Stationary, Taxi, Meeting time,
communication loss & Manpower loss.
 CALCULATION FORMULA - (Actual - Planned) X Rate.
 NATURE OF LOSSES - Purchase Loss.
 LOSS DEFINITION - Losses due to higher cost paid for same
material or Single Source & Excess Purchasing.
 EXAMPLE - Cost of RM / Consumables / Spares.
 CALCULATION FORMULA -
A.) Rate difference X Quantity.
B.) Target Budgeted Saving - Actual Saving.
 NATURE OF LOSSES - Manpower Loss.
 LOSS DEFINITION - Loss generated due to excess
manpower.
 EXAMPLE - Extra manpower deployed for completing
work.
 CALCULATION FORMULA - (Targeted Productivity -
Actual Productivity) X Production X Cost of one
manpower.
 NATURE OF LOSSES - Outsourcing Loss.
 LOSS DEFINITION -Despite In-House capability
subcontracting some part of process.
 EXAMPLE - Out source SPVC activity.
 CALCULATION FORMULA - Rate difference X Quantity.
 NATURE OF LOSSES - Planed Shutout.
 LOSS DEFINITION - Loss due to planned shutdown of
equipments.
 EXAMPLE - Shutdown as per production plan.
 CALCULATION FORMULA - Stoppage time X Charge
rate.

More Related Content

What's hot

Abnormality tagging
Abnormality taggingAbnormality tagging
Abnormality tagging
roel gamo
 
3b Paper Machine Steam Systems Part2
3b Paper Machine Steam Systems Part23b Paper Machine Steam Systems Part2
3b Paper Machine Steam Systems Part2
Nhan Vo Trong
 

What's hot (20)

HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)
HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)
HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)
 
Quality Based Management (QBM)
Quality Based Management (QBM)Quality Based Management (QBM)
Quality Based Management (QBM)
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
Total Productive Maintenance (TPM) for EVERTS  20Aug2018Total Productive Maintenance (TPM) for EVERTS  20Aug2018
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
 
Taguchi loss function
Taguchi loss functionTaguchi loss function
Taguchi loss function
 
WORLD CLASS MANUFACTURING (WCM) PRESENTATION
WORLD CLASS MANUFACTURING (WCM) PRESENTATIONWORLD CLASS MANUFACTURING (WCM) PRESENTATION
WORLD CLASS MANUFACTURING (WCM) PRESENTATION
 
C11 maintenance
C11 maintenanceC11 maintenance
C11 maintenance
 
Catalyst Breakage in Reformer Tubes
Catalyst Breakage in Reformer TubesCatalyst Breakage in Reformer Tubes
Catalyst Breakage in Reformer Tubes
 
FINAL REPORT (4)
FINAL REPORT (4)FINAL REPORT (4)
FINAL REPORT (4)
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
Abnormality tagging
Abnormality taggingAbnormality tagging
Abnormality tagging
 
3b Paper Machine Steam Systems Part2
3b Paper Machine Steam Systems Part23b Paper Machine Steam Systems Part2
3b Paper Machine Steam Systems Part2
 
Practical thermal design of air cooled heat exchangers
Practical thermal design of air cooled heat exchangersPractical thermal design of air cooled heat exchangers
Practical thermal design of air cooled heat exchangers
 
Introduction to cost accounting
Introduction to cost accountingIntroduction to cost accounting
Introduction to cost accounting
 
different techniques to productivity improvement
different techniques to productivity improvementdifferent techniques to productivity improvement
different techniques to productivity improvement
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
ENERGY MODELING OF THE PYROPROCESSING OF CLINKER IN A ROTARY CEMENT KILN
ENERGY MODELING OF THE PYROPROCESSING OF CLINKER IN A ROTARY CEMENT KILNENERGY MODELING OF THE PYROPROCESSING OF CLINKER IN A ROTARY CEMENT KILN
ENERGY MODELING OF THE PYROPROCESSING OF CLINKER IN A ROTARY CEMENT KILN
 
A Case Study of Productivity Improvement by using IE Tools
A Case Study of Productivity Improvement by using IE ToolsA Case Study of Productivity Improvement by using IE Tools
A Case Study of Productivity Improvement by using IE Tools
 
Maintenance Autonomous
Maintenance AutonomousMaintenance Autonomous
Maintenance Autonomous
 
Cement mill notebook
Cement mill notebookCement mill notebook
Cement mill notebook
 

Similar to industrial losses

C9 inventory management
C9 inventory managementC9 inventory management
C9 inventory management
hakimizaki
 
Manufacturing and process selection design
Manufacturing and process selection designManufacturing and process selection design
Manufacturing and process selection design
Arun Kandukuri
 

Similar to industrial losses (20)

Equipment mgmt 4.pdf
Equipment mgmt 4.pdfEquipment mgmt 4.pdf
Equipment mgmt 4.pdf
 
Deep Dive Training Energy Efficiency in Industrial Processes
Deep Dive TrainingEnergy Efficiency in Industrial ProcessesDeep Dive TrainingEnergy Efficiency in Industrial Processes
Deep Dive Training Energy Efficiency in Industrial Processes
 
Transformation process
Transformation processTransformation process
Transformation process
 
C9 inventory management
C9 inventory managementC9 inventory management
C9 inventory management
 
C9 inventory management
C9 inventory managementC9 inventory management
C9 inventory management
 
Efektivitas peralatan secara keseluruhan
Efektivitas peralatan secara keseluruhanEfektivitas peralatan secara keseluruhan
Efektivitas peralatan secara keseluruhan
 
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
 
Manufacturing account
Manufacturing accountManufacturing account
Manufacturing account
 
Cost report guidelines
Cost report guidelinesCost report guidelines
Cost report guidelines
 
16 Major production losses.pdf
16 Major production losses.pdf16 Major production losses.pdf
16 Major production losses.pdf
 
Triple/S Roller Mill Pre-Screening Case Study
Triple/S Roller Mill Pre-Screening Case StudyTriple/S Roller Mill Pre-Screening Case Study
Triple/S Roller Mill Pre-Screening Case Study
 
replacementtheory.pptx
replacementtheory.pptxreplacementtheory.pptx
replacementtheory.pptx
 
The Impact of No Unplanned Downtime
The Impact of No Unplanned DowntimeThe Impact of No Unplanned Downtime
The Impact of No Unplanned Downtime
 
Replacement theory
Replacement theoryReplacement theory
Replacement theory
 
Sop oee [1]
Sop   oee [1]Sop   oee [1]
Sop oee [1]
 
Sop oee [1]
Sop   oee [1]Sop   oee [1]
Sop oee [1]
 
Asprova Case Study for Metal, Plastics, Paper and Textiles Industry
Asprova Case Study for Metal, Plastics, Paper and Textiles IndustryAsprova Case Study for Metal, Plastics, Paper and Textiles Industry
Asprova Case Study for Metal, Plastics, Paper and Textiles Industry
 
Project control
Project controlProject control
Project control
 
Manufacturing and process selection design
Manufacturing and process selection designManufacturing and process selection design
Manufacturing and process selection design
 
From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...
From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...
From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...
 

Recently uploaded

Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
BalamuruganV28
 
1893-part-1-2016 for Earthquake load design
1893-part-1-2016 for Earthquake load design1893-part-1-2016 for Earthquake load design
1893-part-1-2016 for Earthquake load design
AshishSingh1301
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
drjose256
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Lovely Professional University
 

Recently uploaded (20)

Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
 
1893-part-1-2016 for Earthquake load design
1893-part-1-2016 for Earthquake load design1893-part-1-2016 for Earthquake load design
1893-part-1-2016 for Earthquake load design
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
 
Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AI
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
The Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptxThe Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptx
 

industrial losses

  • 1.
  • 2.  NATURE OF LOSSES - Breakdown stoppage loss (Equipment & Die).  LOSS DEFINITION - Stoppage due to breakdown of equipment / Die.  EXAMPLE - Machine / die stoppage due to mechanical / electrical system failure.  CALCULATION FORMULA - Break down time X Charge rate.
  • 3.  NATURE OF LOSSES - Set Up & Adjustment.  LOSS DEFINITION - Time loss happening during setup for switch over of product to first ok piece comes out.  EXAMPLE - Time consumed till first ok sample piece after change of product Model.  CALCULATION FORMULA - Stoppage time X Charge rate.
  • 4.  NATURE OF LOSSES - Tool Change Loss.  LOSS DEFINITION - Time loss due to change of tool on account of damage or non availability of material for existing Tool.  EXAMPLE - Time consumed during Jig, Fixture, Insert, Drill, Cutter change.  CALCULATION FORMULA - Stoppage time X Charge rate.
  • 5.  NATURE OF LOSSES - Start up Loss.  LOSS DEFINITION - Loss happening at the start of work.  EXAMPLE - Warming up time to attain initial parameter of process plant.  CALCULATION FORMULA - Loss time X Charge rate.
  • 6.  NATURE OF LOSSES - Process trouble Loss.  LOSS DEFINITION - Equipment, Fixture, Die or not In B / D but stoppage time more than 10 minutes.  EXAMPLE - Chattering during turning & grinding, Jamming of tool in power press & rectified without unloading the tool.  CALCULATION FORMULA - Loss time X Charge rate.
  • 7.  NATURE OF LOSSES - Management Loss.  LOSS DEFINITION - Time for which equipment could not be operated for management or organisational reasons.  EXAMPLE - Waiting for Raw material & instruction fro management.  CALCULATION FORMULA - Loss time X Charge rate.
  • 8.  NATURE OF LOSSES - Minor Stoppage.  LOSS DEFINITION - There is no breakdown but equipment stops (< 10 minutes).  EXAMPLE - Power change over, Operator not available due to natures call.  CALCULATION FORMULA - Loss time X Charge rate.
  • 9.  NATURE OF LOSSES - Speed Loss.  LOSS DEFINITION - Loss due to performance, below rated speed.  EXAMPLE - Output loss than designed capacity without any stoppage.  CALCULATION FORMULA - (Available time- Std. CT X No. of pcs. Produced X Charge rate) / 3600.
  • 10.  NATURE OF LOSSES - Defect & Rework Loss.  LOSS DEFINITION - (a) Stage wise rejection due to defect. (b) Rework Loss due to defect.  EXAMPLE - (a) Raw material & Value addition up to that process. (b) Salvage cost.  CALCULATION FORMULA - (a) Raw material + Value addition . (b) Consumable + labour cost.
  • 11.  NATURE OF LOSSES - Inventory carrying Loss.  LOSS DEFINITION - Cost incurred in Carrying inventory of finished goods, WIP & raw material.  EXAMPLE - Keeping of RM / WIP / FG.  CALCULATION FORMULA - 23 % of total Inventory Carrying cost / 12.
  • 12.  NATURE OF LOSSES - Yield Loss.  LOSS DEFINITION - Loss due to less output in comparison to designed output.  EXAMPLE - Chips / Scrape / End cuts.  CALCULATION FORMULA - {(input - output) X Cost per Ton} - Scrap cost.
  • 13.  NATURE OF LOSSES - Energy Loss.  LOSS DEFINITION - Loss generate due to excess consumption of energy.  EXAMPLE - Higher energy consumption for making one MT of product.  CALCULATION FORMULA - (Actual Energy Consumption - Target Energy Consumption) X Unit price X Produced Qty.
  • 14.  NATURE OF LOSSES - Logistic Loss.  LOSS DEFINITION - Losses due to higher transportation, warehousing, manpower & packaging cost & production loss due to fork lift availability.  EXAMPLE - Delivery through premium Mode, under utilization of vehicle capacity.  CALCULATION FORMULA - Actual - Target (Transportation + labour + packaging) & Machine charge rate.
  • 15.  NATURE OF LOSSES - Inspection Loss.  LOSS DEFINITION - Loss generated due to cost incurred in carrying out off line inspection.  EXAMPLE - 100 % Inspection Activity carried out by an Inspector.  CALCULATION FORMULA - (Inspection time X labor cost)+Material cost if applicable + conveyance.
  • 16.  NATURE OF LOSSES - Consumable Loss.  LOSS DEFINITION - Loss generated due to excess consumption.  EXAMPLE - Steel Shots, Paints, Q.Oile.  CALCULATION FORMULA - (Actual-planned) X Rate.
  • 17.  NATURE OF LOSSES - Office Loss.  LOSS DEFINITION - Losses in offices due to higher consumables, travelling cost, communication cost & manpower cost.  EXAMPLE - Stationary, Taxi, Meeting time, communication loss & Manpower loss.  CALCULATION FORMULA - (Actual - Planned) X Rate.
  • 18.  NATURE OF LOSSES - Purchase Loss.  LOSS DEFINITION - Losses due to higher cost paid for same material or Single Source & Excess Purchasing.  EXAMPLE - Cost of RM / Consumables / Spares.  CALCULATION FORMULA - A.) Rate difference X Quantity. B.) Target Budgeted Saving - Actual Saving.
  • 19.  NATURE OF LOSSES - Manpower Loss.  LOSS DEFINITION - Loss generated due to excess manpower.  EXAMPLE - Extra manpower deployed for completing work.  CALCULATION FORMULA - (Targeted Productivity - Actual Productivity) X Production X Cost of one manpower.
  • 20.  NATURE OF LOSSES - Outsourcing Loss.  LOSS DEFINITION -Despite In-House capability subcontracting some part of process.  EXAMPLE - Out source SPVC activity.  CALCULATION FORMULA - Rate difference X Quantity.
  • 21.  NATURE OF LOSSES - Planed Shutout.  LOSS DEFINITION - Loss due to planned shutdown of equipments.  EXAMPLE - Shutdown as per production plan.  CALCULATION FORMULA - Stoppage time X Charge rate.