OECD – Green Hydrogen Opportunities
for Emerging and Developing Economies
14 June 2022
4. HYPHEN 4
Net zero: 500-660 million tons p.a. of hydrogen demand globally
Primary
Electricity
Hydrogen
Ca. 500-660
Mt/a
Straight
Hydrogen
(ca. 40%)
Hydrogen
Derivatives
(ca. 60%)
Potential global energy system in the end state
Re-electrification
Long-haul trucking
Chemicals, cement
Electrolyser
Ammonia
Methanol
Kerosene
Raw Iron
Process heat
Electronics, motors, lights
Space heating and cooling
Cars, buses, trucks, ships
Fertiliser, explosives
Long-haul shipping
Long-haul aviation
Steelmaking
Tradable
products
5. HYPHEN 5
Namibia: one of top 3 locations for green hydrogen production
Demand region
Supply region
7. HYPHEN 7
Hyphen project area and connection to Lüderitz port
Renewable Electricity
Water
Green Hydrogen
S
E
A
Desalinated
seawater
Green
hydrogen
Electrolysis site
for hydrogen
production
Renewable dispatchable
power via overhead line
Existing 66 kV
transmission line
from NamPower
Lüderitz port area:
ammonia plant, air
separation, desalination
and multi-buoy port
terminal
Concession areas put out to
tender by the Namibian
government (4,000 km²) Average wind speed:
> 10 m/s (like offshore)
Solar: 2 600 – 2 800 full-
load hours p.a. (only
1 000 in Germany)
8. HYPHEN 8
Hyphen will produce > 50% of German NH3 demand
Green Hydrogen/Ammonia 300 kt/a H2 / 1.7 Mt/a NH3
(4-5 Mt/a CO2 avoided)
Installed capacity
5-6 GW renewables
3 GW electrolysis
Total investment USD $10bn
Direct construction jobs 15,000 for 4-5 years
Direct operational jobs 3,000 permanent jobs
Phase one & two
One large steel
plant: 350 kt/a H2
GDP of Namibia:
ca. US$10 billion
Demand Germany:
3 Mt/a NH3
9. HYPHEN 9
Rapid scalability beyond Hyphen to more than 3Mt/a H2
A
B
X
Y
A
Tsau //Khaeb H2 gas pipeline connecting Lüderitz
and Oranjemund
B
Namibia to South Africa regional pipeline
connecting Oranjemund to Boegoebaai Port
Hydrogen pipeline backbone Seawater desalination and water pipelines Renewable and electricity infrastructure
X Lüderitz desalination plant and pumpstation
Y Oranjemund desalination plant and pumpstation
Offtake point Line end
X
Y
Combined power and Hydrogen facility
Critical to minimising the environmental impact of the total development of the park will
be to minimise the construction of transmission infrastructure. As such the proposal is
for the Southern and Northern most parcels to be combined H2 and power production
sites, with the central sites focussing on H2 only
Renewable Electricity
Water
Green Hydrogen
Renewable Electricity
Water
Green Hydrogen
Renewable Electricity
Water
Green Hydrogen
Hyphen
project area
Fahrplanstrom
nach Namibia /
Südafrika
Fahrplanstrom
nach Namibia /
Südafrika
Dispatchable
electricity to
Namibia / RSA
Hydrogen towards
South Africa
Hydrogen towards Lüderitz
conversion facilities
10. HYPHEN 10
-4
-3
-2
-1
0
1
2
Sat
Wed
GW
Tue
Mon Thu Fri Sun
Electricity sector 2040 plus one green-hydrogen project
Electricity-sector Load (5 x current demand)
2.8 GW
4.5 GW Residual Load
Solar PV
Wind
H2 Production 3-3.5 GW
Namibian
domestic
electricity
demand
Each hydrogen project the
size of Hyphen has 2 TWh/a
surplus electricity (40% of
Namibian demand today)
11. HYPHEN 11
Green-H2 product requires >200,000 jobs in wind/solar alone
Namibia - Potential End State (2050)
150 GW electrolyser
250 GW Wind/Solar PV
• 10 GW p.a. of new wind/solar PV and
• 5 GW p.a. electrolyser in perpetuity
Namibia’s domestic demand
decarbonized in the 2020s
10-15 Mt/a green-H2-based export
> $35 billion H2-based export potential
> 200,000 permanent jobs
100
0
250
200
50
150
300
2021
2022
2037
1
2036
2024
2025
2042
2
2026
2030
2043
2
2027
2028
2029
2033
2034
2035
2038
2047
2040
2041
2046
2048
5
2049
2056
2045
Total installed capacity in GW
2039
1
2032
2031
2044
2052
2053
2054
2055
2057
2058
2051
2060
5
2020
2050
2023
250
2059
Capacity additions solar PV
Capacity additions wind
12. This document is protected under the copyright laws of South Africa and other countries as an unpublished work. This proposal contains information that is proprietary and confidential to HYPHEN
Hydrogen Energy (Pty) Ltd, which shall not be disclosed outside the recipient’s company or duplicated, used or disclosed in whole or in part by the recipient for any purpose other than to evaluate this
document. Any other use or disclosure in whole or in part of this information without the express written permission of HYPHEN Hydrogen Energy (Pty) Ltd, is prohibited.