HYPERLOOPThe most effective travel service
By m.manikanta
13a51a0362
Mechanical-a
Contents
• Introduction to hyper loop
• The concept
• The capsule and tube
• working
• Energy requirements
• Why we need the hyperloop
• Energy efficiency
What is hyper loop?
• It is the new form of
transportation between long
distances
• Now exists between los
angeles and san Francisco
The concept
THE TUBE
TUBE CONSTRUCTION
• The tube will be supported by pillars
• Average spacing is 30m between each pillar
• There will be roughly 25000 pillars for a
distance of 680 kilometers
• Built using reinforced concrete
• Tunneling mountains to kept the route straight
WORKING
Energy requirements
Why we need hyperloop?
Energy efficiency
THANK YOU

Hyperloop