SlideShare a Scribd company logo
Prepared by Dr. Oeurng Chantha
Introduction to modelling
1.1. Introduction of watershed models
Watershed models simulate natural processes of the flow of water, sediment, chemicals,
nutrients, and microbial organisms within watersheds, as well as quantify the impact of
human activities on these processes. Simulation of these processes plays a fundamental role in
addressing a range of water resources, environmental, and social problems. The current
generation of watershed models is quite diverse and varies significantly in sophistication and
data and computational requirements. Newly emerging technologies are being increasingly
integrated into watershed models. This chapter introduces some of these technologies as well
as the theme of the book.
A hydrological model is a simplified simulator of the complex hydrological system. The main
problem in modelling the hydrological processes based on their physical governing laws is the
variability in space and time of the parameters that control these processes (Porter and
Mcmahon, 1971). In the first generation hydrological models, this had been dealt with by
assuming homogeneous properties for the hydrological processes over the whole catchment’s
area or for subdivisions of the catchment’s area (More & al, 1993).
Over the last two decades, the need for hydrological models has shifted from generating flow
hydrographs into predicting the effects of the actual landuse practices on water resource or
estimating the distributed surface and subsurface flow. These needs require better description
of the catchment’s topography and the distributed properties of the hydrological process
acting on it.
Various techniques have been used for hydrological modelling systems. Simulation is one of
the techniques where a system is represented as a model and its behaviour is studied. Digital
simulation is needed in watershed research because it is a complex system to be analysed by
exact mathematical techniques. In digital simulation system models are developed by a
number of mathematical expressions that represents the various hydrological processes of the
system and simulation is done by the integration of these processes in order to produce the
expected output.
1.2. Applications of watershed models
Today it is difficult to think of an environmental or a water resources problem whose solution
does not involve application of some kind of a watershed model. Indeed watershed models
have become a main tool in addressing a wide spectrum of environmental and water resources
problems, including water resources planning, development, design, operation, and
management. Flooding; droughts; upland erosion; streambank erosion; coastal erosion;
sedimentation; nonpoint source pollution; water pollution from industrial, domestic,
agricultural, and energy industry sources; migration of microbes; salinity and alkalinity of
soils; deterioration of lakes; acidn precipitation; disappearance of beaches; desertification of
land; degradation of land; decay of rivers; irrigation of agricultural lands; proper management
of water resources; conjunctive use of surface and groundwater; reliable design of hydraulic
structures; and justifying the need for river training works are some of the critical
Prepared by Dr. Oeurng Chantha
environmental problems which are solved using watershed models. These models are also
employed in military operations. For example, the U.S. Department of Defense (DOD)
employs watershed simulation to support military as well as civilian operations, in
environmental management of approximately 200,000 km2 of land on military installations in
the U.S., and flood control and river improvement (Downer and Ogden, 2004). Watershed
models help understand dynamic interactions between climate and land surface hydrology.
For example, vegetation, snow cover, and the permafrost active layer are some of the features
which are quite sensitive to the lower boundary of the atmospheric system. The water and
heat transfer between the land surface and atmosphere significantly influence hydrologic
characteristics and yield, in turn, agricultural productivity is made possible by the use of
watershed models. Water allocation requires integration of watershed models with models of
physical habitat, biological populations, and economic response. Estimating the value of
instream water use allows recreational, ecological, and biological concerns to compete with
traditional consumptive uses, such as agriculture, hydropower, municipality, and industry
(Hickey and Diaz, 1999). Watershed models are utilized to quantify the impacts of watershed
management strategies linking human activities within the watershed to water quantity and
quality of the receiving stream or lake (Mankin et al., 1999; Rudra et al., 1999) for
environmental and water resources protection.
1.3. Inventory of watershed models
In 1991, the Bureau of Reclamation prepared an inventory of 64 watershed hydrology models
classified into 4 categories, and the inventory has been updated over the past several years.
Burton (1993) compiled the Proceedings of the Federal Interagency Workshop on Hydrologic
Modeling Demands for the 1990s, which contains several important watershed hydrology
models. Singh (1995b) edited a book that summarized 26 popular models from around the
globe. The Subcommittee on Hydrology of the Interagency Advisory Committee on Water
Data (1998) published proceedings of the First Federal Interagency Hydrologic Modeling
Conference which contains many popular watershed hydrology models developed by federal
agencies in the United States. Wurbs (1998) listed a number of generalized water resources
simulation models in seven categories and discussed their dissemination. Singh and Frevert
(2002a, b) edited two books that contain 38 models. There are still some popular models
which have not yet been presented under one cover, and that constitutes the rationale for
preparing this book.
1.4. Development of watershed models
The digital revolution started with the advent of computers in the 1960s. The power of
computers has since increased exponentially. The digital revolution also triggered two other
revolutions, namely, numerical simulation and statistical simulation. As a result, advances in
watershed models have occurred at an unprecedented pace since the groundbreaking
development of the Stanford Watershed Model (SWM) by Crawford and Linsley in 1966.
SWM was the first attempt to model virtually the entire hydrologic cycle. During the decades
of the 1970s and the 1980s, a number of mathematical models were developed. Indeed there
has been a proliferation of watershed hydrology models since, with growing emphasis on
physically based models. Examples of such watershed hydrology models are Storm Water
Management Model (SWMM) (Metcalf and Eddy, Inc., 1971), Precipitation-Runoff Modeling
System (PRMS) (Leavesley et al., 1983), National Weather Service (NWS) River Forecast
System (Burnash et al., 1973), Streamflow Synthesis and Reservoir Regulation (SSARR)
(Rockwood, 1982), Systeme Hydrologique Europeen (SHE) (Abbott et al., 1986a, b),
TOPMODEL (Beven and Kirkby, 1979), Institute of Hydrology Distributed Model (IHDM)
(Morris, 1980), and others. All of these models have since been significantly improved.
Prepared by Dr. Oeurng Chantha
SWM, now called Hydrological Simulation Program-Fortran (HSPF), is far more
comprehensive than its original version. SHE has been extended to include sediment transport
and is applicable at the scale of a river basin (Bathurst et al., 1995). TOPMODEL has been
extended to contain increased catchment information, more physically based processes, and
improved parameter estimation. Development of new models or improvement of the
previously developed models continues today. Today, many federal agencies in the United
States have their own models or some variants of models developed elsewhere. Singh and
Frevert (2002c) traced the evolution of watershed models before and during the computer era.
1.5. Classifications of Hydrological Model
Hydrological models can be classified in different ways. The first classification is based on
data acquisition; therefore, it can be categorized into two types of models: lumped models and
distributed models (Vijay P, 1995).
 Lumped model: generally expressed by ordinary differential equations taking no
account of spatial variability of processes, input, boundary conditions and system
(watershed) geometric characteristics. In most lumped models, some processes are
described by differential equations based on simplified hydraulic laws, and other
processes are expressed by empirical algebraic equations. Examples of lumped models
are HEC-1 (Hydrologic Engineering Center, 1981), HYMO (Williams and Hann,
1972), RORB (Laurenson and Mein, 1983), SSARR (US. Army Engineer, 1972), tank
model (Sugawara et al, 1984).
 Distributed model: taking an explicit account of spatial variability of processes, input,
boundary conditions, and/or system (watershed) characteristics. Obviously, a lack of
data prevents such a general formulation of distributed models. In a majority cases the
system (watershed) characteristic are lumped and even some of the boundary
conditions are lumped, but some of the process are directly linked to the output are
distributed. Examples of distributed models are SHE (Abbott, et al.; 1986a, 1986b),
IHM (Morris, 1980, SWMM (Metcalf and Eddy, Inc., et al., 1971) NWSRFS
(Hydrological Research Laboratory, 1972).
Figure 1-1-Classification of models based on data acquisition
According to the data treatment, the models can be also classified as following (Singh, 1988):
 Deterministic: all input, parameters, and processes in a model are free of random
variation and known with certainty.
Data Acquisition
DISTRIBUTEDLUMPED
Prepared by Dr. Oeurng Chantha
 Stochastic: probabilistic refers to the model governed by probability. The behaviour
of a probabilistic system cannot be predicted exactly but the probability of certain
behaviours is known. Such systems may be simulated using pseudo-random numbers.

 Mixed: defined as the model combined of deterministic and stochastic.
Figure 1-2-Classification based on data treatment
If all of the components of a model are deterministic, the watershed model is deterministic but
if all the components of the model are stochastic, the model is quasi-stochastic. There is also
the combination of deterministic and stochastic components and it is called stochastic-
deterministic or mixed model. A vast majority of the models are deterministic, and virtually
no model is fully stochastic. In some cases, only some parts of the model are described by the
laws of probability, and other pares are fully deterministic. It is then fair to characterize them
as quasi-deterministic or quasi-stochastic.
The concerned model classification is also classified into two categories (Daniela, 2004) as
followings:
 Conceptual model: refers to the models using generally semi-empirical equations
which have a physical basis. Their models parameters could not be estimated from
field data alone but they have to be calibrated (Refsgaard and Storm (1996)). Different
kinds of conceptual models have been used through the world such as Sacramento
Model in USA, the tank model used in Japan, the HBV model used in Scandinavian
countries or TOPMODEL (Beven and Kirkby (1979)) developed in England.
 Physically based model: defined as a model which uses physical laws and equations
to describe the hydrological processes. In the same context of the physical laws
describing hydrological processes and in order to simplify resolution of too complex
physical equations. We can work with simpler hypothesis and then we can speak of
semi-physical hydrological models.
The classifications of models have been differently categorized from various authors.
However, regarding to the above classifications, data acquisition and data treatment are the
better way of classification because those are the ways to work with the data which can be
easy to put into categories.
MIXEDSTOCHASTIC DETERMINISTIC
DISTRIBUTEDLUMPED
Data Treatment
Prepared by Dr. Oeurng Chantha
1.6. Purposes of a Modelling Protocol
 Establish the purpose of the model
 Develop a conceptual model of the systems
 Select the governing equation and a computer code
 Design the model
 Calibrate the designed model (most models)
 Determine the effects of uncertainty on model results
 Verify designed and calibrated Model
 Predict results based on calibrated model
 Determine the effect of uncertainty on model predictions
 Present modelling design and results
 Post audit and redesign model as necessary
1.7. Model calibration
Calibration means adjustment of the model parameters between the observed and simulated
responses and the result is different as small as possible. This can be done manually (trial and
error method) or automatically by searching an optimal value of a given criterion (often called
objective function), which described the fit between observed and simulated data. The value
of a model's predictions is only as good as the model's ability to be effectively calibrated.
1.8. Model parameters
Many hydrologic models are based on conceptual representations of the physical processes
which govern the flow of water through and over the soil. Therefore, there are several
parameters such as physical parameters representing physically measurable properties of the
watershed and process parameters representing watershed properties which are not directly
measurable.
1.9. Model validation
Validation is the process of assessing the performance of a calibrated model over a set of
event period that are distinct from the event period used to calibrate the model. Validation of
the overall set of models tests the effects of compounding errors.
In order to test the ability of the model to predict future behaviours, validation requires
comparing the model predictions with information other than that used in estimating the
model. This step is typically an iterative process linked to model calibration. It involves
checking the model results against observed data and adjusting parameters until model results
fall within an acceptable range of error. If the only way that a model will replicate observed
Prepared by Dr. Oeurng Chantha
data is through the use of unusual parameters and procedures or localized "quick-fixes", then
it is unlikely that the model can reliably forecast future conditions.
1.10.Model Application
Although the model may replicate base year conditions, the application of the model to future
year conditions and policy options requires checking the reasonableness of projections, so
there is a link between application and validation as well. The sensitivity of the models in
response to system or policy changes is often the main issue in model application.
1.11.Model uncertainty
Uncertainty in modelling can happen from errors in model structure and in parameter
estimation. There is not only one single parameter which leads to an optimum but several sets
of parameters lead to equivalent performances. Due to these reasons, the uncertainty
associated with the estimated model parameters became a very important issue in order to
assess the accuracy of a given parameter set. For operational purposes, the uncertainty became
very important to assess the accuracy of model-simulated outputs. The calibration of the
hydrological modelling became often associated with the uncertainty.
According to Refsgard and Storm (1996), four main sources of uncertainty have been
considered as following:
 Random or systematic errors in data input (i.e. precipitation, temperature)
 Random or systematic errors in the recorded data (water level records, rain curves,
discharge data, groundwater levels, soil moisture levels)
 Errors due to non-optimal parameters values
 Errors due to non-optimal structure
To solve the problem of uncertainty associated with model parameters and model outputs,
different statistical have been used. The most well known methods are Monte Carlo method
and the Bayesian method such as GLUE (Generalized likelihood uncertainty Estimation) and
MCMC (Monte-Carlo Markow Chains).
1.12. Uses of models
Models serve three main purposes (Barton, 1997) as following:
Firstly, they give us a framework to assemble our process understanding and to explore the
implied system behaviours that come from that understanding. We can examine the model
results, and consider whether they concur with our overall system analysis or not. If not, we
have a structured framework to analyse whether it is our model or our overall understanding,
or both, that is in error.
Prepared by Dr. Oeurng Chantha
The second main use of a model is as a mechanism for testing data, to check for
inconsistencies and errors, and to fill in missing information. It also gives us a method to
explore the implications of our measurements. In fact, this may be the most useful function of
models, because they help structure scientific enquiry that can elucidate further details behind
observations. These first two uses of models fall into the categories of scientific and
engineering discussed by Passioura (1996). If we intend using models as scientific tools, we
need to ensure that we actually use them to test hypotheses, and not just play computer games
that reinforce our understanding and the conjectures built into the models. The engineer will
take a model to solve some day to day problem within well defined boundary conditions for
which the responses are well understood, and the model essentially provides a decision
support system for them and their client. It gives a semblance of authority and a legally
defendable recommendation.
The third use of models, and probably the most widely publicised and ‘‘commercial’’ use, is
to explore scenario options. These may be options for management of a system or exploring
possible outcomes under a range of different input conditions, perhaps depending on future
climate, political or economic scenarios. However, unless these scenarios are well constrained
within known data boundaries, it is my contention that these activities should be confined
largely to stimulate discussion, should always be tempered by some healthy scepticism, and
retain due regard for our understanding of the whole system being considered.
Major References:
- Oeurng Chantha (2006). Comparative studies of models and application of Model Maker for
conceptual hydrological model development. Gembloux Agricultural University, Master thesis.
- Vijay P. Singh (2006, edited). Watershed Models. Taylor & Francis Group 6000 Broken Sound
Parkway NW, Suite 300.

More Related Content

What's hot

Stream flow measurement technique
Stream flow measurement techniqueStream flow measurement technique
Stream flow measurement technique
Chandra Vanshi Thakur
 
Reservoir sedimentation causes sedimentation
Reservoir sedimentation causes sedimentationReservoir sedimentation causes sedimentation
Reservoir sedimentation causes sedimentation
Pramoda Raj
 
Boundary conditions in groundwater modeling
Boundary conditions in groundwater modelingBoundary conditions in groundwater modeling
Boundary conditions in groundwater modeling
Bijit Banik
 
GROUNDWATER MODELING SYSTEM
GROUNDWATER MODELING SYSTEMGROUNDWATER MODELING SYSTEM
GROUNDWATER MODELING SYSTEM
Shyam Mohan Chaudhary
 
Hec ras
Hec rasHec ras
Hec ras
Karan Tyagi
 
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMSRainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Ankit Balyan MBA, B.Tech.
 
4 runoff and floods
4 runoff and floods4 runoff and floods
4 runoff and floods
pradeepkumawat4142
 
Aquifer Parameter Estimation
Aquifer Parameter EstimationAquifer Parameter Estimation
Aquifer Parameter EstimationC. P. Kumar
 
Application of RS and GIS in Groundwater Prospects Zonation
Application of RS and GIS in Groundwater Prospects ZonationApplication of RS and GIS in Groundwater Prospects Zonation
Application of RS and GIS in Groundwater Prospects Zonation
Vishwanath Awati
 
Rainfall-Runoff Modelling
Rainfall-Runoff ModellingRainfall-Runoff Modelling
Rainfall-Runoff Modelling
Cobain Schofield
 
REMOTE SENSING DATA FOR HYDROLOGICAL MODELING
REMOTE SENSING DATA FOR HYDROLOGICAL MODELINGREMOTE SENSING DATA FOR HYDROLOGICAL MODELING
REMOTE SENSING DATA FOR HYDROLOGICAL MODELING
Shyam Mohan Chaudhary
 
Flood modelling and prediction 1
Flood modelling and prediction 1Flood modelling and prediction 1
Flood modelling and prediction 1
tp jayamohan
 
Synthetic unit hydrograph
Synthetic unit hydrographSynthetic unit hydrograph
Synthetic unit hydrograph
uzma shaikh
 
APPLICATIONS OF REMOTE SENSING AND GIS IN WATERSHED MANAGEMENT
APPLICATIONS OF REMOTE SENSING AND GIS IN WATERSHED MANAGEMENTAPPLICATIONS OF REMOTE SENSING AND GIS IN WATERSHED MANAGEMENT
APPLICATIONS OF REMOTE SENSING AND GIS IN WATERSHED MANAGEMENTSriram Chakravarthy
 
Stream flow
Stream flow Stream flow
Stream flow
Meesum Zaidi
 
Stream flow measurement
Stream flow  measurementStream flow  measurement
Stream flow measurement
Kiran Yadav
 
soil erosion modelling by RUSLE
soil erosion modelling by RUSLEsoil erosion modelling by RUSLE
soil erosion modelling by RUSLE
kaushal gadariya
 
RUNOFF AND SEDIMENT YIELD
RUNOFF AND SEDIMENT YIELDRUNOFF AND SEDIMENT YIELD
RUNOFF AND SEDIMENT YIELD
Shyam Mohan Chaudhary
 
Watershed Delineation in ArcGIS
Watershed Delineation in ArcGISWatershed Delineation in ArcGIS
Watershed Delineation in ArcGIS
Arthur Green
 

What's hot (20)

Stream flow measurement technique
Stream flow measurement techniqueStream flow measurement technique
Stream flow measurement technique
 
Reservoir sedimentation causes sedimentation
Reservoir sedimentation causes sedimentationReservoir sedimentation causes sedimentation
Reservoir sedimentation causes sedimentation
 
Boundary conditions in groundwater modeling
Boundary conditions in groundwater modelingBoundary conditions in groundwater modeling
Boundary conditions in groundwater modeling
 
GROUNDWATER MODELING SYSTEM
GROUNDWATER MODELING SYSTEMGROUNDWATER MODELING SYSTEM
GROUNDWATER MODELING SYSTEM
 
Hec ras
Hec rasHec ras
Hec ras
 
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMSRainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
Rainfall Runoff Modelling on the Lower Tapi Basin using HEC-HMS
 
4 runoff and floods
4 runoff and floods4 runoff and floods
4 runoff and floods
 
Aquifer Parameter Estimation
Aquifer Parameter EstimationAquifer Parameter Estimation
Aquifer Parameter Estimation
 
Application of RS and GIS in Groundwater Prospects Zonation
Application of RS and GIS in Groundwater Prospects ZonationApplication of RS and GIS in Groundwater Prospects Zonation
Application of RS and GIS in Groundwater Prospects Zonation
 
Rainfall-Runoff Modelling
Rainfall-Runoff ModellingRainfall-Runoff Modelling
Rainfall-Runoff Modelling
 
REMOTE SENSING DATA FOR HYDROLOGICAL MODELING
REMOTE SENSING DATA FOR HYDROLOGICAL MODELINGREMOTE SENSING DATA FOR HYDROLOGICAL MODELING
REMOTE SENSING DATA FOR HYDROLOGICAL MODELING
 
Flood modelling and prediction 1
Flood modelling and prediction 1Flood modelling and prediction 1
Flood modelling and prediction 1
 
Synthetic unit hydrograph
Synthetic unit hydrographSynthetic unit hydrograph
Synthetic unit hydrograph
 
APPLICATIONS OF REMOTE SENSING AND GIS IN WATERSHED MANAGEMENT
APPLICATIONS OF REMOTE SENSING AND GIS IN WATERSHED MANAGEMENTAPPLICATIONS OF REMOTE SENSING AND GIS IN WATERSHED MANAGEMENT
APPLICATIONS OF REMOTE SENSING AND GIS IN WATERSHED MANAGEMENT
 
Ground Water Hydrology
Ground Water HydrologyGround Water Hydrology
Ground Water Hydrology
 
Stream flow
Stream flow Stream flow
Stream flow
 
Stream flow measurement
Stream flow  measurementStream flow  measurement
Stream flow measurement
 
soil erosion modelling by RUSLE
soil erosion modelling by RUSLEsoil erosion modelling by RUSLE
soil erosion modelling by RUSLE
 
RUNOFF AND SEDIMENT YIELD
RUNOFF AND SEDIMENT YIELDRUNOFF AND SEDIMENT YIELD
RUNOFF AND SEDIMENT YIELD
 
Watershed Delineation in ArcGIS
Watershed Delineation in ArcGISWatershed Delineation in ArcGIS
Watershed Delineation in ArcGIS
 

Viewers also liked

ទស្សនាវដ្ដីអប់រំ លេខ១៦
ទស្សនាវដ្ដីអប់រំ លេខ១៦ទស្សនាវដ្ដីអប់រំ លេខ១៦
ទស្សនាវដ្ដីអប់រំ លេខ១៦
Thim Mengly(ម៉េងលី,孟李)
 
Traveaux Pratique Topographie à l'ITC-I3-GRU32
Traveaux Pratique Topographie à l'ITC-I3-GRU32Traveaux Pratique Topographie à l'ITC-I3-GRU32
Traveaux Pratique Topographie à l'ITC-I3-GRU32
Thim Mengly(ម៉េងលី,孟李)
 
Report technology-in-costruction-site-the-élysée-from-mam-to-itc
Report technology-in-costruction-site-the-élysée-from-mam-to-itcReport technology-in-costruction-site-the-élysée-from-mam-to-itc
Report technology-in-costruction-site-the-élysée-from-mam-to-itc
Thim Mengly(ម៉េងលី,孟李)
 
Report Daily Solid Waste Disposal
Report Daily Solid Waste Disposal Report Daily Solid Waste Disposal
Report Daily Solid Waste Disposal
Thim Mengly(ម៉េងលី,孟李)
 
ទស្សនាវដ្ដីអប់រំ​​ លេខ១៣
ទស្សនាវដ្ដីអប់រំ​​ លេខ១៣ទស្សនាវដ្ដីអប់រំ​​ លេខ១៣
ទស្សនាវដ្ដីអប់រំ​​ លេខ១៣
Thim Mengly(ម៉េងលី,孟李)
 
Future of television slideshare
Future of television slideshareFuture of television slideshare
Future of television slideshare
mehtachandru
 
3533
35333533
Austin Cloud Native Meetup #1 - Intro / Demo
Austin Cloud Native Meetup #1 - Intro / DemoAustin Cloud Native Meetup #1 - Intro / Demo
Austin Cloud Native Meetup #1 - Intro / Demo
mborges-pivotal
 
Tattoo Portfolio
Tattoo PortfolioTattoo Portfolio
Tattoo Portfolio
Yovah
 
Webinar Introdução ao Social Selling 26.10.2016
Webinar Introdução ao Social Selling 26.10.2016Webinar Introdução ao Social Selling 26.10.2016
Webinar Introdução ao Social Selling 26.10.2016
Mariana Craveiro
 
He art
He artHe art
ព្រះរាជពិធីបុណ្យអុំទូក បណ្តែតប្រទីប​​ សំពះព្រះខែ នឹង អកអំបុក(Water festival o...
ព្រះរាជពិធីបុណ្យអុំទូក បណ្តែតប្រទីប​​ សំពះព្រះខែ នឹង អកអំបុក(Water festival o...ព្រះរាជពិធីបុណ្យអុំទូក បណ្តែតប្រទីប​​ សំពះព្រះខែ នឹង អកអំបុក(Water festival o...
ព្រះរាជពិធីបុណ្យអុំទូក បណ្តែតប្រទីប​​ សំពះព្រះខែ នឹង អកអំបុក(Water festival o...
Thim Mengly(ម៉េងលី,孟李)
 
Final exam 2014 question(THIM Mengly ITC)
Final exam 2014 question(THIM Mengly ITC)Final exam 2014 question(THIM Mengly ITC)
Final exam 2014 question(THIM Mengly ITC)
Thim Mengly(ម៉េងលី,孟李)
 
Report topographic & surveying
Report topographic & surveyingReport topographic & surveying
Report topographic & surveying
Thim Mengly(ម៉េងលី,孟李)
 

Viewers also liked (20)

ទស្សនាវដ្ដីអប់រំ លេខ១៦
ទស្សនាវដ្ដីអប់រំ លេខ១៦ទស្សនាវដ្ដីអប់រំ លេខ១៦
ទស្សនាវដ្ដីអប់រំ លេខ១៦
 
Dimensional analysisblumankumei
Dimensional analysisblumankumeiDimensional analysisblumankumei
Dimensional analysisblumankumei
 
Chapt2 energy
Chapt2 energyChapt2 energy
Chapt2 energy
 
Traveaux Pratique Topographie à l'ITC-I3-GRU32
Traveaux Pratique Topographie à l'ITC-I3-GRU32Traveaux Pratique Topographie à l'ITC-I3-GRU32
Traveaux Pratique Topographie à l'ITC-I3-GRU32
 
Report technology-in-costruction-site-the-élysée-from-mam-to-itc
Report technology-in-costruction-site-the-élysée-from-mam-to-itcReport technology-in-costruction-site-the-élysée-from-mam-to-itc
Report technology-in-costruction-site-the-élysée-from-mam-to-itc
 
Report Daily Solid Waste Disposal
Report Daily Solid Waste Disposal Report Daily Solid Waste Disposal
Report Daily Solid Waste Disposal
 
Hydraulic jump
Hydraulic jumpHydraulic jump
Hydraulic jump
 
ទស្សនាវដ្ដីអប់រំ​​ លេខ១៣
ទស្សនាវដ្ដីអប់រំ​​ លេខ១៣ទស្សនាវដ្ដីអប់រំ​​ លេខ១៣
ទស្សនាវដ្ដីអប់រំ​​ លេខ១៣
 
Future of television slideshare
Future of television slideshareFuture of television slideshare
Future of television slideshare
 
1.carte ouvrages of
1.carte ouvrages of 1.carte ouvrages of
1.carte ouvrages of
 
3533
35333533
3533
 
Austin Cloud Native Meetup #1 - Intro / Demo
Austin Cloud Native Meetup #1 - Intro / DemoAustin Cloud Native Meetup #1 - Intro / Demo
Austin Cloud Native Meetup #1 - Intro / Demo
 
Tattoo Portfolio
Tattoo PortfolioTattoo Portfolio
Tattoo Portfolio
 
Webinar Introdução ao Social Selling 26.10.2016
Webinar Introdução ao Social Selling 26.10.2016Webinar Introdução ao Social Selling 26.10.2016
Webinar Introdução ao Social Selling 26.10.2016
 
He art
He artHe art
He art
 
ព្រះរាជពិធីបុណ្យអុំទូក បណ្តែតប្រទីប​​ សំពះព្រះខែ នឹង អកអំបុក(Water festival o...
ព្រះរាជពិធីបុណ្យអុំទូក បណ្តែតប្រទីប​​ សំពះព្រះខែ នឹង អកអំបុក(Water festival o...ព្រះរាជពិធីបុណ្យអុំទូក បណ្តែតប្រទីប​​ សំពះព្រះខែ នឹង អកអំបុក(Water festival o...
ព្រះរាជពិធីបុណ្យអុំទូក បណ្តែតប្រទីប​​ សំពះព្រះខែ នឹង អកអំបុក(Water festival o...
 
Siam house
Siam houseSiam house
Siam house
 
Final exam 2014 question(THIM Mengly ITC)
Final exam 2014 question(THIM Mengly ITC)Final exam 2014 question(THIM Mengly ITC)
Final exam 2014 question(THIM Mengly ITC)
 
Mit2 25 f13_the_buckingham
Mit2 25 f13_the_buckinghamMit2 25 f13_the_buckingham
Mit2 25 f13_the_buckingham
 
Report topographic & surveying
Report topographic & surveyingReport topographic & surveying
Report topographic & surveying
 

Similar to Hydrological modelling i5

DSD-INT 2017 Global modelling of hydrology and water resources: current state...
DSD-INT 2017 Global modelling of hydrology and water resources: current state...DSD-INT 2017 Global modelling of hydrology and water resources: current state...
DSD-INT 2017 Global modelling of hydrology and water resources: current state...
Deltares
 
Hydrological models. (1).pptx
Hydrological models. (1).pptxHydrological models. (1).pptx
Hydrological models. (1).pptx
JuanMorales786048
 
Assessing the importance of geo hydrological data acquisition in the developm...
Assessing the importance of geo hydrological data acquisition in the developm...Assessing the importance of geo hydrological data acquisition in the developm...
Assessing the importance of geo hydrological data acquisition in the developm...
Alexander Decker
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
IJERD Editor
 
Approach to-soil-water-modelling-for-redsim
Approach to-soil-water-modelling-for-redsimApproach to-soil-water-modelling-for-redsim
Approach to-soil-water-modelling-for-redsim
cfdcfd33
 
Scope Of Work For The Four Mile Run Watershed Management...
Scope Of Work For The Four Mile Run Watershed Management...Scope Of Work For The Four Mile Run Watershed Management...
Scope Of Work For The Four Mile Run Watershed Management...
Haley Johnson
 
Planning for water sensitive communities: the need for a bottom up systems ap...
Planning for water sensitive communities: the need for a bottom up systems ap...Planning for water sensitive communities: the need for a bottom up systems ap...
Planning for water sensitive communities: the need for a bottom up systems ap...
Michael Barry
 
The impacts of water conservation strategies on water
The impacts of water conservation strategies on waterThe impacts of water conservation strategies on water
The impacts of water conservation strategies on water
KuldeepVashist1
 
Comparative Review Integrated Models
Comparative Review Integrated ModelsComparative Review Integrated Models
Comparative Review Integrated Models
dvanvliet
 
Iv3615381548
Iv3615381548Iv3615381548
Iv3615381548
IJERA Editor
 
Analysis of Water Quality Characteristics in Distribution Networks
Analysis of Water Quality Characteristics in Distribution NetworksAnalysis of Water Quality Characteristics in Distribution Networks
Analysis of Water Quality Characteristics in Distribution Networks
AI Publications
 
Swat & modflow
Swat & modflowSwat & modflow
Swat & modflow
Pradipa Chinnasamy
 
Hidrodinamica Cardoso&motta marques 2009aeco
Hidrodinamica Cardoso&motta marques 2009aecoHidrodinamica Cardoso&motta marques 2009aeco
Hidrodinamica Cardoso&motta marques 2009aeco
Caline Gally
 
Water and Productivity Impacts for the NBDC
Water and Productivity Impacts for the NBDCWater and Productivity Impacts for the NBDC
Water and Productivity Impacts for the NBDC
International Water Management Institute (IWMI)
 
Developing a stochastic simulation model for the generation of residential wa...
Developing a stochastic simulation model for the generation of residential wa...Developing a stochastic simulation model for the generation of residential wa...
Developing a stochastic simulation model for the generation of residential wa...
Environmental Intelligence Lab
 
Developing a stochastic simulation model for the generation of residential wa...
Developing a stochastic simulation model for the generation of residential wa...Developing a stochastic simulation model for the generation of residential wa...
Developing a stochastic simulation model for the generation of residential wa...
SmartH2O
 
Application of GIS and MODFLOW to Ground Water Hydrology- A Review
Application of GIS and MODFLOW to Ground Water Hydrology- A ReviewApplication of GIS and MODFLOW to Ground Water Hydrology- A Review
Application of GIS and MODFLOW to Ground Water Hydrology- A Review
IJERA Editor
 
Application of GIS and MODFLOW to Ground Water Hydrology- A Review
Application of GIS and MODFLOW to Ground Water Hydrology- A ReviewApplication of GIS and MODFLOW to Ground Water Hydrology- A Review
Application of GIS and MODFLOW to Ground Water Hydrology- A Review
IJERA Editor
 
Aswan High Dam Reservoir Management System
Aswan High Dam Reservoir Management SystemAswan High Dam Reservoir Management System
Aswan High Dam Reservoir Management System
Luisa Polanco
 

Similar to Hydrological modelling i5 (20)

DSD-INT 2017 Global modelling of hydrology and water resources: current state...
DSD-INT 2017 Global modelling of hydrology and water resources: current state...DSD-INT 2017 Global modelling of hydrology and water resources: current state...
DSD-INT 2017 Global modelling of hydrology and water resources: current state...
 
Hydrological models. (1).pptx
Hydrological models. (1).pptxHydrological models. (1).pptx
Hydrological models. (1).pptx
 
Assessing the importance of geo hydrological data acquisition in the developm...
Assessing the importance of geo hydrological data acquisition in the developm...Assessing the importance of geo hydrological data acquisition in the developm...
Assessing the importance of geo hydrological data acquisition in the developm...
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
Brusli n
Brusli nBrusli n
Brusli n
 
Approach to-soil-water-modelling-for-redsim
Approach to-soil-water-modelling-for-redsimApproach to-soil-water-modelling-for-redsim
Approach to-soil-water-modelling-for-redsim
 
Scope Of Work For The Four Mile Run Watershed Management...
Scope Of Work For The Four Mile Run Watershed Management...Scope Of Work For The Four Mile Run Watershed Management...
Scope Of Work For The Four Mile Run Watershed Management...
 
Planning for water sensitive communities: the need for a bottom up systems ap...
Planning for water sensitive communities: the need for a bottom up systems ap...Planning for water sensitive communities: the need for a bottom up systems ap...
Planning for water sensitive communities: the need for a bottom up systems ap...
 
The impacts of water conservation strategies on water
The impacts of water conservation strategies on waterThe impacts of water conservation strategies on water
The impacts of water conservation strategies on water
 
Comparative Review Integrated Models
Comparative Review Integrated ModelsComparative Review Integrated Models
Comparative Review Integrated Models
 
Iv3615381548
Iv3615381548Iv3615381548
Iv3615381548
 
Analysis of Water Quality Characteristics in Distribution Networks
Analysis of Water Quality Characteristics in Distribution NetworksAnalysis of Water Quality Characteristics in Distribution Networks
Analysis of Water Quality Characteristics in Distribution Networks
 
Swat & modflow
Swat & modflowSwat & modflow
Swat & modflow
 
Hidrodinamica Cardoso&motta marques 2009aeco
Hidrodinamica Cardoso&motta marques 2009aecoHidrodinamica Cardoso&motta marques 2009aeco
Hidrodinamica Cardoso&motta marques 2009aeco
 
Water and Productivity Impacts for the NBDC
Water and Productivity Impacts for the NBDCWater and Productivity Impacts for the NBDC
Water and Productivity Impacts for the NBDC
 
Developing a stochastic simulation model for the generation of residential wa...
Developing a stochastic simulation model for the generation of residential wa...Developing a stochastic simulation model for the generation of residential wa...
Developing a stochastic simulation model for the generation of residential wa...
 
Developing a stochastic simulation model for the generation of residential wa...
Developing a stochastic simulation model for the generation of residential wa...Developing a stochastic simulation model for the generation of residential wa...
Developing a stochastic simulation model for the generation of residential wa...
 
Application of GIS and MODFLOW to Ground Water Hydrology- A Review
Application of GIS and MODFLOW to Ground Water Hydrology- A ReviewApplication of GIS and MODFLOW to Ground Water Hydrology- A Review
Application of GIS and MODFLOW to Ground Water Hydrology- A Review
 
Application of GIS and MODFLOW to Ground Water Hydrology- A Review
Application of GIS and MODFLOW to Ground Water Hydrology- A ReviewApplication of GIS and MODFLOW to Ground Water Hydrology- A Review
Application of GIS and MODFLOW to Ground Water Hydrology- A Review
 
Aswan High Dam Reservoir Management System
Aswan High Dam Reservoir Management SystemAswan High Dam Reservoir Management System
Aswan High Dam Reservoir Management System
 

More from Thim Mengly(ម៉េងលី,孟李)

Introduction to-matlab
Introduction to-matlabIntroduction to-matlab
Matlab by Prof.Keang Sè Pouv
Matlab by Prof.Keang Sè PouvMatlab by Prof.Keang Sè Pouv
Matlab by Prof.Keang Sè Pouv
Thim Mengly(ម៉េងលី,孟李)
 
Assignment fluid year 3
Assignment fluid  year 3Assignment fluid  year 3
មេកានិកនៃសន្ទនីយ៍
មេកានិកនៃសន្ទនីយ៍មេកានិកនៃសន្ទនីយ៍
មេកានិកនៃសន្ទនីយ៍
Thim Mengly(ម៉េងលី,孟李)
 
ក្រប់គ្រងសំណង់
ក្រប់គ្រងសំណង់ក្រប់គ្រងសំណង់
ក្រប់គ្រងសំណង់
Thim Mengly(ម៉េងលី,孟李)
 
Math cad lesson etc by Sok Raksmey
Math cad lesson etc by Sok RaksmeyMath cad lesson etc by Sok Raksmey
Math cad lesson etc by Sok Raksmey
Thim Mengly(ម៉េងលី,孟李)
 
ប្រវត្តិសម្តេចHun sen
ប្រវត្តិសម្តេចHun senប្រវត្តិសម្តេចHun sen
ប្រវត្តិសម្តេចHun sen
Thim Mengly(ម៉េងលី,孟李)
 
ប្រវត្តិសម្តេចHun sen
ប្រវត្តិសម្តេចHun senប្រវត្តិសម្តេចHun sen
ប្រវត្តិសម្តេចHun sen
Thim Mengly(ម៉េងលី,孟李)
 
ស្រីហិតោបទេស​១
ស្រីហិតោបទេស​១ស្រីហិតោបទេស​១
ស្រីហិតោបទេស​១
Thim Mengly(ម៉េងលី,孟李)
 
Important Comment used in AutoCAD 2D Khmer Guide
Important Comment used in AutoCAD 2D Khmer Guide Important Comment used in AutoCAD 2D Khmer Guide
Important Comment used in AutoCAD 2D Khmer Guide
Thim Mengly(ម៉េងលី,孟李)
 
Résistance des Matérieaux
Résistance des Matérieaux Résistance des Matérieaux
Résistance des Matérieaux
Thim Mengly(ម៉េងលី,孟李)
 
Project Of Irrigation at Stoeung Chhinit, Kg.Thom, KHmer
Project Of Irrigation at Stoeung Chhinit, Kg.Thom, KHmer Project Of Irrigation at Stoeung Chhinit, Kg.Thom, KHmer
Project Of Irrigation at Stoeung Chhinit, Kg.Thom, KHmer
Thim Mengly(ម៉េងលី,孟李)
 

More from Thim Mengly(ម៉េងលី,孟李) (20)

Matlab commands
Matlab commandsMatlab commands
Matlab commands
 
Introduction to-matlab
Introduction to-matlabIntroduction to-matlab
Introduction to-matlab
 
Matlab by Prof.Keang Sè Pouv
Matlab by Prof.Keang Sè PouvMatlab by Prof.Keang Sè Pouv
Matlab by Prof.Keang Sè Pouv
 
Assignment fluid year 3
Assignment fluid  year 3Assignment fluid  year 3
Assignment fluid year 3
 
មេកានិកនៃសន្ទនីយ៍
មេកានិកនៃសន្ទនីយ៍មេកានិកនៃសន្ទនីយ៍
មេកានិកនៃសន្ទនីយ៍
 
fluid khmer-Chapter6
fluid khmer-Chapter6fluid khmer-Chapter6
fluid khmer-Chapter6
 
fluid khmer-Chapter5
fluid khmer-Chapter5fluid khmer-Chapter5
fluid khmer-Chapter5
 
fluid khmer-Chapter 4
fluid khmer-Chapter 4fluid khmer-Chapter 4
fluid khmer-Chapter 4
 
fluid khmer-Chapter 3
fluid khmer-Chapter 3fluid khmer-Chapter 3
fluid khmer-Chapter 3
 
fluid khmer-Chapter 2
fluid khmer-Chapter 2fluid khmer-Chapter 2
fluid khmer-Chapter 2
 
ក្រប់គ្រងសំណង់
ក្រប់គ្រងសំណង់ក្រប់គ្រងសំណង់
ក្រប់គ្រងសំណង់
 
Math cad lesson etc by Sok Raksmey
Math cad lesson etc by Sok RaksmeyMath cad lesson etc by Sok Raksmey
Math cad lesson etc by Sok Raksmey
 
ប្រវត្តិសម្តេចHun sen
ប្រវត្តិសម្តេចHun senប្រវត្តិសម្តេចHun sen
ប្រវត្តិសម្តេចHun sen
 
ប្រវត្តិសម្តេចHun sen
ប្រវត្តិសម្តេចHun senប្រវត្តិសម្តេចHun sen
ប្រវត្តិសម្តេចHun sen
 
ស្រីហិតោបទេស​១
ស្រីហិតោបទេស​១ស្រីហិតោបទេស​១
ស្រីហិតោបទេស​១
 
Report of Visit Internship
Report of Visit Internship Report of Visit Internship
Report of Visit Internship
 
Important Comment used in AutoCAD 2D Khmer Guide
Important Comment used in AutoCAD 2D Khmer Guide Important Comment used in AutoCAD 2D Khmer Guide
Important Comment used in AutoCAD 2D Khmer Guide
 
Résistance des Matérieaux
Résistance des Matérieaux Résistance des Matérieaux
Résistance des Matérieaux
 
Projet irrigation-samras
Projet irrigation-samrasProjet irrigation-samras
Projet irrigation-samras
 
Project Of Irrigation at Stoeung Chhinit, Kg.Thom, KHmer
Project Of Irrigation at Stoeung Chhinit, Kg.Thom, KHmer Project Of Irrigation at Stoeung Chhinit, Kg.Thom, KHmer
Project Of Irrigation at Stoeung Chhinit, Kg.Thom, KHmer
 

Recently uploaded

一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 

Hydrological modelling i5

  • 1. Prepared by Dr. Oeurng Chantha Introduction to modelling 1.1. Introduction of watershed models Watershed models simulate natural processes of the flow of water, sediment, chemicals, nutrients, and microbial organisms within watersheds, as well as quantify the impact of human activities on these processes. Simulation of these processes plays a fundamental role in addressing a range of water resources, environmental, and social problems. The current generation of watershed models is quite diverse and varies significantly in sophistication and data and computational requirements. Newly emerging technologies are being increasingly integrated into watershed models. This chapter introduces some of these technologies as well as the theme of the book. A hydrological model is a simplified simulator of the complex hydrological system. The main problem in modelling the hydrological processes based on their physical governing laws is the variability in space and time of the parameters that control these processes (Porter and Mcmahon, 1971). In the first generation hydrological models, this had been dealt with by assuming homogeneous properties for the hydrological processes over the whole catchment’s area or for subdivisions of the catchment’s area (More & al, 1993). Over the last two decades, the need for hydrological models has shifted from generating flow hydrographs into predicting the effects of the actual landuse practices on water resource or estimating the distributed surface and subsurface flow. These needs require better description of the catchment’s topography and the distributed properties of the hydrological process acting on it. Various techniques have been used for hydrological modelling systems. Simulation is one of the techniques where a system is represented as a model and its behaviour is studied. Digital simulation is needed in watershed research because it is a complex system to be analysed by exact mathematical techniques. In digital simulation system models are developed by a number of mathematical expressions that represents the various hydrological processes of the system and simulation is done by the integration of these processes in order to produce the expected output. 1.2. Applications of watershed models Today it is difficult to think of an environmental or a water resources problem whose solution does not involve application of some kind of a watershed model. Indeed watershed models have become a main tool in addressing a wide spectrum of environmental and water resources problems, including water resources planning, development, design, operation, and management. Flooding; droughts; upland erosion; streambank erosion; coastal erosion; sedimentation; nonpoint source pollution; water pollution from industrial, domestic, agricultural, and energy industry sources; migration of microbes; salinity and alkalinity of soils; deterioration of lakes; acidn precipitation; disappearance of beaches; desertification of land; degradation of land; decay of rivers; irrigation of agricultural lands; proper management of water resources; conjunctive use of surface and groundwater; reliable design of hydraulic structures; and justifying the need for river training works are some of the critical
  • 2. Prepared by Dr. Oeurng Chantha environmental problems which are solved using watershed models. These models are also employed in military operations. For example, the U.S. Department of Defense (DOD) employs watershed simulation to support military as well as civilian operations, in environmental management of approximately 200,000 km2 of land on military installations in the U.S., and flood control and river improvement (Downer and Ogden, 2004). Watershed models help understand dynamic interactions between climate and land surface hydrology. For example, vegetation, snow cover, and the permafrost active layer are some of the features which are quite sensitive to the lower boundary of the atmospheric system. The water and heat transfer between the land surface and atmosphere significantly influence hydrologic characteristics and yield, in turn, agricultural productivity is made possible by the use of watershed models. Water allocation requires integration of watershed models with models of physical habitat, biological populations, and economic response. Estimating the value of instream water use allows recreational, ecological, and biological concerns to compete with traditional consumptive uses, such as agriculture, hydropower, municipality, and industry (Hickey and Diaz, 1999). Watershed models are utilized to quantify the impacts of watershed management strategies linking human activities within the watershed to water quantity and quality of the receiving stream or lake (Mankin et al., 1999; Rudra et al., 1999) for environmental and water resources protection. 1.3. Inventory of watershed models In 1991, the Bureau of Reclamation prepared an inventory of 64 watershed hydrology models classified into 4 categories, and the inventory has been updated over the past several years. Burton (1993) compiled the Proceedings of the Federal Interagency Workshop on Hydrologic Modeling Demands for the 1990s, which contains several important watershed hydrology models. Singh (1995b) edited a book that summarized 26 popular models from around the globe. The Subcommittee on Hydrology of the Interagency Advisory Committee on Water Data (1998) published proceedings of the First Federal Interagency Hydrologic Modeling Conference which contains many popular watershed hydrology models developed by federal agencies in the United States. Wurbs (1998) listed a number of generalized water resources simulation models in seven categories and discussed their dissemination. Singh and Frevert (2002a, b) edited two books that contain 38 models. There are still some popular models which have not yet been presented under one cover, and that constitutes the rationale for preparing this book. 1.4. Development of watershed models The digital revolution started with the advent of computers in the 1960s. The power of computers has since increased exponentially. The digital revolution also triggered two other revolutions, namely, numerical simulation and statistical simulation. As a result, advances in watershed models have occurred at an unprecedented pace since the groundbreaking development of the Stanford Watershed Model (SWM) by Crawford and Linsley in 1966. SWM was the first attempt to model virtually the entire hydrologic cycle. During the decades of the 1970s and the 1980s, a number of mathematical models were developed. Indeed there has been a proliferation of watershed hydrology models since, with growing emphasis on physically based models. Examples of such watershed hydrology models are Storm Water Management Model (SWMM) (Metcalf and Eddy, Inc., 1971), Precipitation-Runoff Modeling System (PRMS) (Leavesley et al., 1983), National Weather Service (NWS) River Forecast System (Burnash et al., 1973), Streamflow Synthesis and Reservoir Regulation (SSARR) (Rockwood, 1982), Systeme Hydrologique Europeen (SHE) (Abbott et al., 1986a, b), TOPMODEL (Beven and Kirkby, 1979), Institute of Hydrology Distributed Model (IHDM) (Morris, 1980), and others. All of these models have since been significantly improved.
  • 3. Prepared by Dr. Oeurng Chantha SWM, now called Hydrological Simulation Program-Fortran (HSPF), is far more comprehensive than its original version. SHE has been extended to include sediment transport and is applicable at the scale of a river basin (Bathurst et al., 1995). TOPMODEL has been extended to contain increased catchment information, more physically based processes, and improved parameter estimation. Development of new models or improvement of the previously developed models continues today. Today, many federal agencies in the United States have their own models or some variants of models developed elsewhere. Singh and Frevert (2002c) traced the evolution of watershed models before and during the computer era. 1.5. Classifications of Hydrological Model Hydrological models can be classified in different ways. The first classification is based on data acquisition; therefore, it can be categorized into two types of models: lumped models and distributed models (Vijay P, 1995).  Lumped model: generally expressed by ordinary differential equations taking no account of spatial variability of processes, input, boundary conditions and system (watershed) geometric characteristics. In most lumped models, some processes are described by differential equations based on simplified hydraulic laws, and other processes are expressed by empirical algebraic equations. Examples of lumped models are HEC-1 (Hydrologic Engineering Center, 1981), HYMO (Williams and Hann, 1972), RORB (Laurenson and Mein, 1983), SSARR (US. Army Engineer, 1972), tank model (Sugawara et al, 1984).  Distributed model: taking an explicit account of spatial variability of processes, input, boundary conditions, and/or system (watershed) characteristics. Obviously, a lack of data prevents such a general formulation of distributed models. In a majority cases the system (watershed) characteristic are lumped and even some of the boundary conditions are lumped, but some of the process are directly linked to the output are distributed. Examples of distributed models are SHE (Abbott, et al.; 1986a, 1986b), IHM (Morris, 1980, SWMM (Metcalf and Eddy, Inc., et al., 1971) NWSRFS (Hydrological Research Laboratory, 1972). Figure 1-1-Classification of models based on data acquisition According to the data treatment, the models can be also classified as following (Singh, 1988):  Deterministic: all input, parameters, and processes in a model are free of random variation and known with certainty. Data Acquisition DISTRIBUTEDLUMPED
  • 4. Prepared by Dr. Oeurng Chantha  Stochastic: probabilistic refers to the model governed by probability. The behaviour of a probabilistic system cannot be predicted exactly but the probability of certain behaviours is known. Such systems may be simulated using pseudo-random numbers.   Mixed: defined as the model combined of deterministic and stochastic. Figure 1-2-Classification based on data treatment If all of the components of a model are deterministic, the watershed model is deterministic but if all the components of the model are stochastic, the model is quasi-stochastic. There is also the combination of deterministic and stochastic components and it is called stochastic- deterministic or mixed model. A vast majority of the models are deterministic, and virtually no model is fully stochastic. In some cases, only some parts of the model are described by the laws of probability, and other pares are fully deterministic. It is then fair to characterize them as quasi-deterministic or quasi-stochastic. The concerned model classification is also classified into two categories (Daniela, 2004) as followings:  Conceptual model: refers to the models using generally semi-empirical equations which have a physical basis. Their models parameters could not be estimated from field data alone but they have to be calibrated (Refsgaard and Storm (1996)). Different kinds of conceptual models have been used through the world such as Sacramento Model in USA, the tank model used in Japan, the HBV model used in Scandinavian countries or TOPMODEL (Beven and Kirkby (1979)) developed in England.  Physically based model: defined as a model which uses physical laws and equations to describe the hydrological processes. In the same context of the physical laws describing hydrological processes and in order to simplify resolution of too complex physical equations. We can work with simpler hypothesis and then we can speak of semi-physical hydrological models. The classifications of models have been differently categorized from various authors. However, regarding to the above classifications, data acquisition and data treatment are the better way of classification because those are the ways to work with the data which can be easy to put into categories. MIXEDSTOCHASTIC DETERMINISTIC DISTRIBUTEDLUMPED Data Treatment
  • 5. Prepared by Dr. Oeurng Chantha 1.6. Purposes of a Modelling Protocol  Establish the purpose of the model  Develop a conceptual model of the systems  Select the governing equation and a computer code  Design the model  Calibrate the designed model (most models)  Determine the effects of uncertainty on model results  Verify designed and calibrated Model  Predict results based on calibrated model  Determine the effect of uncertainty on model predictions  Present modelling design and results  Post audit and redesign model as necessary 1.7. Model calibration Calibration means adjustment of the model parameters between the observed and simulated responses and the result is different as small as possible. This can be done manually (trial and error method) or automatically by searching an optimal value of a given criterion (often called objective function), which described the fit between observed and simulated data. The value of a model's predictions is only as good as the model's ability to be effectively calibrated. 1.8. Model parameters Many hydrologic models are based on conceptual representations of the physical processes which govern the flow of water through and over the soil. Therefore, there are several parameters such as physical parameters representing physically measurable properties of the watershed and process parameters representing watershed properties which are not directly measurable. 1.9. Model validation Validation is the process of assessing the performance of a calibrated model over a set of event period that are distinct from the event period used to calibrate the model. Validation of the overall set of models tests the effects of compounding errors. In order to test the ability of the model to predict future behaviours, validation requires comparing the model predictions with information other than that used in estimating the model. This step is typically an iterative process linked to model calibration. It involves checking the model results against observed data and adjusting parameters until model results fall within an acceptable range of error. If the only way that a model will replicate observed
  • 6. Prepared by Dr. Oeurng Chantha data is through the use of unusual parameters and procedures or localized "quick-fixes", then it is unlikely that the model can reliably forecast future conditions. 1.10.Model Application Although the model may replicate base year conditions, the application of the model to future year conditions and policy options requires checking the reasonableness of projections, so there is a link between application and validation as well. The sensitivity of the models in response to system or policy changes is often the main issue in model application. 1.11.Model uncertainty Uncertainty in modelling can happen from errors in model structure and in parameter estimation. There is not only one single parameter which leads to an optimum but several sets of parameters lead to equivalent performances. Due to these reasons, the uncertainty associated with the estimated model parameters became a very important issue in order to assess the accuracy of a given parameter set. For operational purposes, the uncertainty became very important to assess the accuracy of model-simulated outputs. The calibration of the hydrological modelling became often associated with the uncertainty. According to Refsgard and Storm (1996), four main sources of uncertainty have been considered as following:  Random or systematic errors in data input (i.e. precipitation, temperature)  Random or systematic errors in the recorded data (water level records, rain curves, discharge data, groundwater levels, soil moisture levels)  Errors due to non-optimal parameters values  Errors due to non-optimal structure To solve the problem of uncertainty associated with model parameters and model outputs, different statistical have been used. The most well known methods are Monte Carlo method and the Bayesian method such as GLUE (Generalized likelihood uncertainty Estimation) and MCMC (Monte-Carlo Markow Chains). 1.12. Uses of models Models serve three main purposes (Barton, 1997) as following: Firstly, they give us a framework to assemble our process understanding and to explore the implied system behaviours that come from that understanding. We can examine the model results, and consider whether they concur with our overall system analysis or not. If not, we have a structured framework to analyse whether it is our model or our overall understanding, or both, that is in error.
  • 7. Prepared by Dr. Oeurng Chantha The second main use of a model is as a mechanism for testing data, to check for inconsistencies and errors, and to fill in missing information. It also gives us a method to explore the implications of our measurements. In fact, this may be the most useful function of models, because they help structure scientific enquiry that can elucidate further details behind observations. These first two uses of models fall into the categories of scientific and engineering discussed by Passioura (1996). If we intend using models as scientific tools, we need to ensure that we actually use them to test hypotheses, and not just play computer games that reinforce our understanding and the conjectures built into the models. The engineer will take a model to solve some day to day problem within well defined boundary conditions for which the responses are well understood, and the model essentially provides a decision support system for them and their client. It gives a semblance of authority and a legally defendable recommendation. The third use of models, and probably the most widely publicised and ‘‘commercial’’ use, is to explore scenario options. These may be options for management of a system or exploring possible outcomes under a range of different input conditions, perhaps depending on future climate, political or economic scenarios. However, unless these scenarios are well constrained within known data boundaries, it is my contention that these activities should be confined largely to stimulate discussion, should always be tempered by some healthy scepticism, and retain due regard for our understanding of the whole system being considered. Major References: - Oeurng Chantha (2006). Comparative studies of models and application of Model Maker for conceptual hydrological model development. Gembloux Agricultural University, Master thesis. - Vijay P. Singh (2006, edited). Watershed Models. Taylor & Francis Group 6000 Broken Sound Parkway NW, Suite 300.