SlideShare a Scribd company logo
- Advanced Technologies
to
Upgrade Dams under
Operation.
Rohan Kumar
[ M.E. – Infrastructure Engg. ]
Comparison :
Upgrading the dam (ongoing) v/s Building a new dam ( reconstruction )
Almost no impact on the local society. Necessity to reconstruct the local
society.
No Substitute roads reconstruction. Substitute roads reconstruction.
Environmental assessment is not
required.
Environmental assessment is
required.
Almost no impact on animals and
plant.
Necessity to mitigate impacts on
animal and plant.
MILT:
Ministry of Land, Infrastructure, Transport and
Tourism.
MLIT, is a ministry of the Japanese Govt. It is responsible for one-third of all the laws and
orders in Japan, and is the largest Japanese ministry in terms of employees, as well as the
second-largest executive agency of the Japanese government after the Ministry of
Defense.
 MLIT executes comprehensive water management -
Planning
Coordinating
Implementing
Accumulating
 Technologies to upgrade dams under
operation. :
1. Technologies to increase reservoir volume.
- Raising the dam body.
- Constructing a new dam just downstream from the operating dam without stream
diversion.
- Under water structural engineering work to construct in deep reservoir.
New Katsurazawa Dam in Hokkaido Kasabori Dam in Niigata
2.Technology to increase discharge capacity.
- Constructing additional crest gate.
- Drilling the existing dam body from downstream.
- Constructing new spillways.
- Upgrading existing spillways.
Nagayasuguchi Dam in Tokushima
Tsuruda Dam in Kagoshima
3. Technology to improve structural stability.
- Improving an existing dam’s structure stability to resist earthquakes damage.
- Controlling seepage through dam bodies or their foundations.
- Improving structural stability of downstream.
- Inspecting structural stability to resist earthquake.
Tsuruda Dam in Kagoshima
4.Technologies to improve operation.
- Maximizing its functions through coordination with several other dams.
- Implementing flexible operation well timed with the flood discharge.
- Converting to a new system while continuing operation.
- Construction or upgrading power plants.
5. Technologies to improve operation.
- Controlling sediment by bypass tunnels.
- Excavating and transporting sediment.
- Constructing a check dam to control sediment.
- Combining several sediment removal methods.
Koshibu Dam in Nagano
Yuda Dam
Miwa Dam
Conclusion:
• Upgrading dam is more reasonable and short-term.
• In comparison of building a new dam, upgradation is more
ecological.
• With the help of latest technology available, it requires less
manpower and less time for the work.
• It improves the serviceability of the existing dam after the
upgradation process.
• It increases the capacity of the energy production of dam.
References:
www.mlit.go.jp
link.springer.com
nptel.ac.in
THANK YOU

More Related Content

What's hot (20)

Tarbela Hydro Power Plant
Tarbela Hydro Power PlantTarbela Hydro Power Plant
Tarbela Hydro Power Plant
 
Circular waterway project
Circular waterway projectCircular waterway project
Circular waterway project
 
Tarbela dam
Tarbela damTarbela dam
Tarbela dam
 
Warsak Dam(16me07)
Warsak Dam(16me07)Warsak Dam(16me07)
Warsak Dam(16me07)
 
Warsak Hydro Power Plant
Warsak Hydro Power PlantWarsak Hydro Power Plant
Warsak Hydro Power Plant
 
Ghazi Barotha Hydropower project Internship Report
Ghazi Barotha Hydropower project Internship ReportGhazi Barotha Hydropower project Internship Report
Ghazi Barotha Hydropower project Internship Report
 
Neelum jehlum hydropower project
Neelum jehlum hydropower projectNeelum jehlum hydropower project
Neelum jehlum hydropower project
 
Presention ppt
Presention pptPresention ppt
Presention ppt
 
field visit to Victoria dam
field visit to Victoria damfield visit to Victoria dam
field visit to Victoria dam
 
Mangla Dam
Mangla Dam Mangla Dam
Mangla Dam
 
Polavaram Irrigation Project
Polavaram Irrigation ProjectPolavaram Irrigation Project
Polavaram Irrigation Project
 
Three georges dam (china) real##
Three georges dam  (china) real##  Three georges dam  (china) real##
Three georges dam (china) real##
 
Upper Laguna Creek Eva Butler
Upper Laguna Creek Eva ButlerUpper Laguna Creek Eva Butler
Upper Laguna Creek Eva Butler
 
Top 3 Asia Oil & Gas Pipelines
Top 3 Asia Oil & Gas PipelinesTop 3 Asia Oil & Gas Pipelines
Top 3 Asia Oil & Gas Pipelines
 
Padma Brige Project 2017 Slide
Padma Brige Project 2017 Slide Padma Brige Project 2017 Slide
Padma Brige Project 2017 Slide
 
Converting energy from ocean currents
Converting energy from ocean currentsConverting energy from ocean currents
Converting energy from ocean currents
 
Status of river linking project in india
Status of river linking project in indiaStatus of river linking project in india
Status of river linking project in india
 
Three georges dam
Three georges damThree georges dam
Three georges dam
 
A013160108
A013160108A013160108
A013160108
 
Tarbela dam
Tarbela damTarbela dam
Tarbela dam
 

Similar to Hydraulic ppt

Building Service Assignment
Building Service Assignment Building Service Assignment
Building Service Assignment XinYee Khoo
 
Sustainable Stormwater Management
Sustainable Stormwater Management Sustainable Stormwater Management
Sustainable Stormwater Management Shane Ah
 
IRJET- Analysis of CR TOWER G+6 Buildings Having Top Rectangular Water Ta...
IRJET-  	  Analysis of CR TOWER G+6 Buildings Having Top Rectangular Water Ta...IRJET-  	  Analysis of CR TOWER G+6 Buildings Having Top Rectangular Water Ta...
IRJET- Analysis of CR TOWER G+6 Buildings Having Top Rectangular Water Ta...IRJET Journal
 
Retrofitting of irrigation structures- Prakasam Barrage, Andhra Pradesh, -A...
Retrofitting of irrigation  structures- Prakasam Barrage, Andhra Pradesh, -A...Retrofitting of irrigation  structures- Prakasam Barrage, Andhra Pradesh, -A...
Retrofitting of irrigation structures- Prakasam Barrage, Andhra Pradesh, -A...IEI GSC
 
The Northern Collector Water Tunnel Project Report
The Northern Collector Water Tunnel Project ReportThe Northern Collector Water Tunnel Project Report
The Northern Collector Water Tunnel Project ReportThe Star Newspaper
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
A brief overview of drilling and blasting process for tunnel excavation used ...
A brief overview of drilling and blasting process for tunnel excavation used ...A brief overview of drilling and blasting process for tunnel excavation used ...
A brief overview of drilling and blasting process for tunnel excavation used ...kimilsungLimbu
 
Mitigation symposium - Andre Corbould
Mitigation symposium - Andre CorbouldMitigation symposium - Andre Corbould
Mitigation symposium - Andre CorbouldYourAlberta
 
Fort indraprastha-egm v1.0
Fort  indraprastha-egm v1.0Fort  indraprastha-egm v1.0
Fort indraprastha-egm v1.0Dwarak Ethiraj
 
IRJET- Storm Water Management and Road Tunnel
IRJET- Storm Water Management and Road TunnelIRJET- Storm Water Management and Road Tunnel
IRJET- Storm Water Management and Road TunnelIRJET Journal
 
Melamchi Water Supply Project
Melamchi Water Supply ProjectMelamchi Water Supply Project
Melamchi Water Supply ProjectChandanGupta201
 
Planning of Major Infrastructure Repairs – the Tamar Bridge webinar
Planning of Major Infrastructure Repairs – the Tamar Bridge webinarPlanning of Major Infrastructure Repairs – the Tamar Bridge webinar
Planning of Major Infrastructure Repairs – the Tamar Bridge webinarAssociation for Project Management
 
Project report on Lakwa Thermal Power Station
Project report on Lakwa Thermal Power StationProject report on Lakwa Thermal Power Station
Project report on Lakwa Thermal Power StationDeepDarsanKalita1
 

Similar to Hydraulic ppt (20)

yeywaoverview
yeywaoverviewyeywaoverview
yeywaoverview
 
BS ASSIGNMENT
BS ASSIGNMENTBS ASSIGNMENT
BS ASSIGNMENT
 
Building Service Assignment
Building Service Assignment Building Service Assignment
Building Service Assignment
 
Sustainable Stormwater Management
Sustainable Stormwater Management Sustainable Stormwater Management
Sustainable Stormwater Management
 
IRJET- Analysis of CR TOWER G+6 Buildings Having Top Rectangular Water Ta...
IRJET-  	  Analysis of CR TOWER G+6 Buildings Having Top Rectangular Water Ta...IRJET-  	  Analysis of CR TOWER G+6 Buildings Having Top Rectangular Water Ta...
IRJET- Analysis of CR TOWER G+6 Buildings Having Top Rectangular Water Ta...
 
Retrofitting of irrigation structures- Prakasam Barrage, Andhra Pradesh, -A...
Retrofitting of irrigation  structures- Prakasam Barrage, Andhra Pradesh, -A...Retrofitting of irrigation  structures- Prakasam Barrage, Andhra Pradesh, -A...
Retrofitting of irrigation structures- Prakasam Barrage, Andhra Pradesh, -A...
 
The Northern Collector Water Tunnel Project Report
The Northern Collector Water Tunnel Project ReportThe Northern Collector Water Tunnel Project Report
The Northern Collector Water Tunnel Project Report
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
Iee ppt
Iee pptIee ppt
Iee ppt
 
A brief overview of drilling and blasting process for tunnel excavation used ...
A brief overview of drilling and blasting process for tunnel excavation used ...A brief overview of drilling and blasting process for tunnel excavation used ...
A brief overview of drilling and blasting process for tunnel excavation used ...
 
Mitigation symposium - Andre Corbould
Mitigation symposium - Andre CorbouldMitigation symposium - Andre Corbould
Mitigation symposium - Andre Corbould
 
Fort indraprastha-egm v1.0
Fort  indraprastha-egm v1.0Fort  indraprastha-egm v1.0
Fort indraprastha-egm v1.0
 
IRJET- Storm Water Management and Road Tunnel
IRJET- Storm Water Management and Road TunnelIRJET- Storm Water Management and Road Tunnel
IRJET- Storm Water Management and Road Tunnel
 
Melamchi Water Supply Project
Melamchi Water Supply ProjectMelamchi Water Supply Project
Melamchi Water Supply Project
 
Planning of Major Infrastructure Repairs – the Tamar Bridge webinar
Planning of Major Infrastructure Repairs – the Tamar Bridge webinarPlanning of Major Infrastructure Repairs – the Tamar Bridge webinar
Planning of Major Infrastructure Repairs – the Tamar Bridge webinar
 
Francis' CV
Francis' CVFrancis' CV
Francis' CV
 
Nam Theun 2
Nam Theun 2Nam Theun 2
Nam Theun 2
 
TRIKE-presentation.pptx
TRIKE-presentation.pptxTRIKE-presentation.pptx
TRIKE-presentation.pptx
 
Project report on Lakwa Thermal Power Station
Project report on Lakwa Thermal Power StationProject report on Lakwa Thermal Power Station
Project report on Lakwa Thermal Power Station
 

Recently uploaded

Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringC Sai Kiran
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdfPratik Pawar
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdfKamal Acharya
 
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxThe Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxCenterEnamel
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdfKamal Acharya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientistgettygaming1
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfKamal Acharya
 
fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerapareshmondalnita
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxMd. Shahidul Islam Prodhan
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfPipe Restoration Solutions
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfKamal Acharya
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdfKamal Acharya
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdfKamal Acharya
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdfKamal Acharya
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsAtif Razi
 

Recently uploaded (20)

Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxThe Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answer
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 

Hydraulic ppt

  • 1. - Advanced Technologies to Upgrade Dams under Operation. Rohan Kumar [ M.E. – Infrastructure Engg. ]
  • 2. Comparison : Upgrading the dam (ongoing) v/s Building a new dam ( reconstruction ) Almost no impact on the local society. Necessity to reconstruct the local society. No Substitute roads reconstruction. Substitute roads reconstruction. Environmental assessment is not required. Environmental assessment is required. Almost no impact on animals and plant. Necessity to mitigate impacts on animal and plant.
  • 3. MILT: Ministry of Land, Infrastructure, Transport and Tourism. MLIT, is a ministry of the Japanese Govt. It is responsible for one-third of all the laws and orders in Japan, and is the largest Japanese ministry in terms of employees, as well as the second-largest executive agency of the Japanese government after the Ministry of Defense.  MLIT executes comprehensive water management - Planning Coordinating Implementing Accumulating
  • 4.  Technologies to upgrade dams under operation. : 1. Technologies to increase reservoir volume. - Raising the dam body. - Constructing a new dam just downstream from the operating dam without stream diversion. - Under water structural engineering work to construct in deep reservoir. New Katsurazawa Dam in Hokkaido Kasabori Dam in Niigata
  • 5. 2.Technology to increase discharge capacity. - Constructing additional crest gate. - Drilling the existing dam body from downstream. - Constructing new spillways. - Upgrading existing spillways. Nagayasuguchi Dam in Tokushima
  • 6. Tsuruda Dam in Kagoshima
  • 7. 3. Technology to improve structural stability. - Improving an existing dam’s structure stability to resist earthquakes damage. - Controlling seepage through dam bodies or their foundations. - Improving structural stability of downstream. - Inspecting structural stability to resist earthquake. Tsuruda Dam in Kagoshima
  • 8. 4.Technologies to improve operation. - Maximizing its functions through coordination with several other dams. - Implementing flexible operation well timed with the flood discharge. - Converting to a new system while continuing operation. - Construction or upgrading power plants. 5. Technologies to improve operation. - Controlling sediment by bypass tunnels. - Excavating and transporting sediment. - Constructing a check dam to control sediment. - Combining several sediment removal methods.
  • 9. Koshibu Dam in Nagano
  • 12. Conclusion: • Upgrading dam is more reasonable and short-term. • In comparison of building a new dam, upgradation is more ecological. • With the help of latest technology available, it requires less manpower and less time for the work. • It improves the serviceability of the existing dam after the upgradation process. • It increases the capacity of the energy production of dam.

Editor's Notes

  1. Crest gate : Crest Gates are bottom hinged gates used where precise water level control is needed. They are typically hydraulically operated to allow for opening during power outages in flood events.