WHAT IS POLAVARAM PROJECT?
• FRL :45.72M
• GROSS STORAGE : 194TMC
• RMC : 80.09TMC
• LMC : 84.81TMC
• TO VISHAKAPATTANAM : 23.44TMC
• DIVERSION TO KRISHNA: 84.7TMC
• AYACUT : 7.5LAKH ACRES
FIRST PROPOSAL
RAMPADASAGAR DAM
• FRL : 59.4M
• STORAGE : 690 TMC
• SPILL WAY LENGTH : 1260M
• PMF : 21LAKH CUSEC
• COST : 129CR
• POWER : 150MW
• GATES : 16
WHY POLAVARAM IS LIFE LINE OF ANDHRA
PRADESH
WHY IT IS CONSTRUCTED ONLY THERE?
MAIN COMPONENTS
• EARTH CUM ROCK FILL DAM
• SPILL WAY
• COFFER DAMS[DOWNSTREAM AND UPSTREAM]
• TWIN TUNNELS
• CANAL REGULATORS
• APPROCH CHANNEL, SPILL CHANNEL AND PILOT CHANNEL
• POWER HOUSE
• RIGHT MAIN CANAL AND LEFT MAIN CANAL
• PATTISEMA LIFT IRRIGATION
• SADDLE DAMS
• ICONIC BRIDGE
SPILLWAY
• FRL :45.72M
• CREST LEVEL :25.72M
• LENGTH :1128.4M
• TRUNION LEVEL :35.5M
• ROAD TOP LEVEL :54M
• RADIAL GATE SIZE :16*20M
EARTH CUM ROCK FILL DAM
• LENGTH OF THE DAM : 1750M
• TOP OF BANK LEVEL :
+53.320M
• TOP WIDTH OF THE DAM : 15M
• BOTTOM WIDTH OF THE DAM : 330M
• GROSS STORAGE CAPACITY : 194TMC
• LIVE STORAGE :
75.20TMC
• HEIGHT OF THE DAM : 45M
DIAPHRAGM WALL
• LENGTH :1450M
• WIDTH :15M
• DEPTH : 40M TO 100M
• PURPOSE : TO PREVENT SEEPAGE
AT DIAPHRAGM WALL
COFFER DAM
• U/S LENGTH :2356M
• D/S LENGTH :1613M
• TECHNOLOGY :JET GROUTING
TWIN TUNNELS
HEAVY MACHINERY
NEW TECHNOLOGIES
• BENTONITE SLURRY
• PLASTIC CONCRETE
• JET GROUTING
• DESANDINATION PLANT
HEAVY VEHICLE MOVEMENT
PATTISEMA LIFT IRRIGATION
• NO OF PUMPS :24
• TOTAL DISCHARGE :24*10CUMEC
• HEAD :33M
• PUMP CAPACITY :5300HP
• MOTOR CAPACITY :6400HP
• POWER REQUIRED :113MW
CANAL HEAD REGULATORS
GATES
TELL ME AND I FORGET
TEACH ME AND I REMEMBER
INVOLVE ME AND I LEARN
THANK YOU

Polavaram Irrigation Project

  • 1.
    POLAVARAM PROJECT LIFE LINEOF ANDHRA PRADESH J. SAI PRASANNA KUMAR B. SIRIKANTH RAVI TEJA II B.TECH. CIVIL ENGINEERING UCEN JNTUK NARASARAOPET
  • 2.
  • 3.
    WHAT IS POLAVARAMPROJECT? • FRL :45.72M • GROSS STORAGE : 194TMC • RMC : 80.09TMC • LMC : 84.81TMC • TO VISHAKAPATTANAM : 23.44TMC • DIVERSION TO KRISHNA: 84.7TMC • AYACUT : 7.5LAKH ACRES
  • 4.
    FIRST PROPOSAL RAMPADASAGAR DAM •FRL : 59.4M • STORAGE : 690 TMC • SPILL WAY LENGTH : 1260M • PMF : 21LAKH CUSEC • COST : 129CR • POWER : 150MW • GATES : 16
  • 6.
    WHY POLAVARAM ISLIFE LINE OF ANDHRA PRADESH
  • 7.
    WHY IT ISCONSTRUCTED ONLY THERE?
  • 8.
    MAIN COMPONENTS • EARTHCUM ROCK FILL DAM • SPILL WAY • COFFER DAMS[DOWNSTREAM AND UPSTREAM] • TWIN TUNNELS • CANAL REGULATORS • APPROCH CHANNEL, SPILL CHANNEL AND PILOT CHANNEL • POWER HOUSE • RIGHT MAIN CANAL AND LEFT MAIN CANAL • PATTISEMA LIFT IRRIGATION • SADDLE DAMS • ICONIC BRIDGE
  • 10.
    SPILLWAY • FRL :45.72M •CREST LEVEL :25.72M • LENGTH :1128.4M • TRUNION LEVEL :35.5M • ROAD TOP LEVEL :54M • RADIAL GATE SIZE :16*20M
  • 11.
    EARTH CUM ROCKFILL DAM • LENGTH OF THE DAM : 1750M • TOP OF BANK LEVEL : +53.320M • TOP WIDTH OF THE DAM : 15M • BOTTOM WIDTH OF THE DAM : 330M • GROSS STORAGE CAPACITY : 194TMC • LIVE STORAGE : 75.20TMC • HEIGHT OF THE DAM : 45M
  • 12.
    DIAPHRAGM WALL • LENGTH:1450M • WIDTH :15M • DEPTH : 40M TO 100M • PURPOSE : TO PREVENT SEEPAGE
  • 13.
  • 14.
    COFFER DAM • U/SLENGTH :2356M • D/S LENGTH :1613M • TECHNOLOGY :JET GROUTING
  • 15.
  • 16.
  • 17.
    NEW TECHNOLOGIES • BENTONITESLURRY • PLASTIC CONCRETE • JET GROUTING • DESANDINATION PLANT
  • 18.
  • 19.
    PATTISEMA LIFT IRRIGATION •NO OF PUMPS :24 • TOTAL DISCHARGE :24*10CUMEC • HEAD :33M • PUMP CAPACITY :5300HP • MOTOR CAPACITY :6400HP • POWER REQUIRED :113MW
  • 20.
  • 21.
  • 22.
    TELL ME ANDI FORGET TEACH ME AND I REMEMBER INVOLVE ME AND I LEARN THANK YOU