INTRODUCTION
• Statistics and studies made by International Commission on Large
Dams (ICOLD) show that more than 20% of dam accidents occurred
due to poor provision of energy dissipation arrangements.
• Normally energy dissipators are designed for ‘design discharge’ of
spillway. But their performance is affected during varying discharge
condition.
• In majority of failure cases, the jump is not clear – i.e. jump is either
swept up or drowned.
• Our present study objective is to design a suitable design of
hydraulic jump type energy dissipator for tail water deficiency and
steady flow. This can largely reduce dependency on TWRC without
disconnecting it from JHC.
• Efforts are made to produce required JHC at all discharges to form
clear jumps.
Damaged stilling basin of sardar
sarovar dam
• Sardar Sarovar Project (SSP) is one of the major
projects in India. In the year 1999 it is reported
that during a flood in monsoon season, 10,000
m3 of concrete was washed out due to flood
flows.
• The design discharge of spillway is 87,000m3/s.
The flood was even lesser than 50% of the design
discharge.
• The approximate cost of concrete that washed
out was Rs. 3 crore
View of dislodged panel at Bhama askhed dam
Definition sketch of hydraulic jump
Design of rectangular stepped weir
(Section A-A earlier shown)
FORMULA USED FOR DETERMINATION OF DIMENSION
OF STEPPED WEIR
Classification of tail water conditions
for the design of energy dissipator
FACTORS AFFECTING HYDRAULIC
JUMP
Factors affecting hydraulic jump are
• Total head on upstream of sluice gate (H),
• Pre jump depth (y1) ,
• Post jump depth (y2),
• Crest height of weir (y'),
• Head over weir crest (h) and tail water depth (yt).
• Another non dimensional important parameter
that governs hydraulic jump phenomenon is
supercritical Froude number Fr1.
Dimensions and Data of model used in
fluent
Height of sluice gate H=0.4m,
Height of flume H’=0.45m
Width of flume B=0.3m,
Length of flume L=4m
Max discharge Qmax=0.01 m3/s,
Min discharge Qmin=0.002 m3/s,
Crest height of weir y'=0.015m
Table 1: Output of Mathematical Procedure for Data
(Horizontal apron and Cd = 0.623)
Sr. No. Q y1 y2 H Fr1 B
m3/s M M M M
1 0.0020 0.0024 0.0605 0.0455 18.3350 0.1119
2 0.0028 0.0033 0.0714 0.0564 15.4960 0.1336
3 0.0036 0.0043 0.0807 0.0657 13.6661 0.1463
4 0.0044 0.0052 0.0889 0.0739 12.3614 0.1569
5 0.005 0.0062 0.0965 0.0814 11.3709 0.1660
6 0.0060 0.0071 0.1034 0.0884 10.5857 0.1741
7 0.0068 0.0081 0.1098 0.0948 9.9435 0.1816
8 0.0076 0.0090 0.1159 0.1009 9.4056 0.1884
9 0.0084 0.0100 0.1216 0.1066 8.9466 0.1949
10 0.0092 0.010947 0.1270 0.1120 8.5487 0.2010
11 0.0100 0.011899 0.1322 0.1172 8.1997 0.2067
Stepped weir in fluent
Stepped weir in fluent
Stepped weir in flume
Inlet section in flume
Outlet section in flume
Hydraulic jump at discharge 0.0020 m3 /sec
Hydraulic jump at discharge 0.005 m3 /sec
Hydraulic jump at discharge 0.0068 m3 /sec
Hydraulic jump at discharge 0.0084 m3 /sec
Hydraulic jump at discharge 0.0092 m3 /sec
Hydraulic jump at discharge 0.010 m3 /sec
Table 2: Comparisons of post jump depth of experimental and
fluent value at Cd = 0.60
Test Discharge Post jump Post jump Tail water
No. Q m3/s Depth Depth depth
y2 m y2 m yt m
(Fluent) (experimental) (Fluent) (Fluent)
1 0.0100 0.132 0.1210 0.063
2 0.0092 0.1270 0.1161 0.059
3 0.0084 0.1216 0.1089 0.056
4 0.0068 0.1098 0.1040 0.049
5 0.0050 0.0968 0.0913 0.041
6 0.0040 0.0865 0.0869 0.035
7 0.0020 0.0605 0.0621 0.028
Comparisons of post jump depth of experimental and fluent
value at Cd = 0.60
0
0.02
0.04
0.06
0.08
0.1
0.12
0.14
0 0.002 0.004 0.006 0.008 0.01 0.012
y2
Discharge (m3/s)
JHC Exp.
JHC fluent
Table 3: Comparisons of post jump depth of experimental and
fluent value at Cd = 0.65
Test Discharge Post jump Post jump Tail water
No. Q m3/s Depth depth Depth
y2 m y2 m yt m
(Fluent) (Experimental) (Fluent) (Fluent)
1 0.0100 0.1322 0.1140 0.0540
2 0.0092 0.1270 0.1110 0.0510
3 0.0084 0.1216 0.1035 0.0475
4 0.0068 0.1098 0.1010 0.0464
5 0.0050 0.0965 0.0850 0.0363
6 0.0040 0.0850 0.0810 0.0330
7 0.0020 0.0605 0.0587 0.0270
Comparison of Experimental and Fluent – JHC (y 2) at for
horizontal apron (Cd = 0.65)
0
0.02
0.04
0.06
0.08
0.1
0.12
0.14
0 0.002 0.004 0.006 0.008 0.01 0.012
Post jump Depth y2 m (Experimental)
Post jump depth y2 m (Fluent)
Table 4 : Comparisons of post jump depth of experimental and
fluent value at Cd = 0.63
Test Discharge Post jump Post jump Tail water
No. Q m3/s Depth depth Depth
y2 m y2 m yt m
(Fluent) (Experimental) (Fluent) (Fluent)
1 0.0100 0.1322 0.1228 0.044
2 0.0092 0.1270 0.1240 0.043
3 0.0084 0.1216 0.1211 0.039
4 0.0068 0.1008 0.0984 0.036
5 0.005 0.0965 0.0960 0.032
6 0.0020 0.0605 0.060 0.027
Comparisons of post jump depth of experimental and fluent
value at Cd = 0.63
0
0.02
0.04
0.06
0.08
0.1
0.12
0.14
0 0.002 0.004 0.006 0.008 0.01 0.012
Post jump Depth y2 m (experimental)
Post jump depth y2 m (Fluent)
Analysis of Pawana dam model
Table 5: Dimension of Pawana Dam
spillway model by Froude’s law (Scale 1 : 40)
Design Parameter Designation Prototype Model
Stilling Basin width B 12m 0.3m
Stilling Basin length L 60m 1.5m
Height of spillway H 25.3m 0.6325m
Height of crested weir h 4.36 0.109
Top width of crested
weir
b 2.95 0.074
Coefficient of discharge Cd 0.623 0.623
Crest height of weir Y’ 0.024
Hydraulic jump at discharge 0.0043 m3 /sec
Hydraulic jump at discharge 0.013 m3 /sec
Hydraulic jump at discharge 0.020 m3 /sec
Table 6 : Comparison of post jump depths for Pawana dam –
experimental and Fluent (designed weir)
Test Discharge Post jump Post jump Tail water
No. Q m3/s Depth Depth Depth
(Fluent) y2 m y2 m yt m
(Expt) (Fluent) (Expt)
1 0.0200 0.195 0.2070 0.054
2 0.0181 0.186 0.1922 0.052
3 0.0160 0.175 0.1846 0.049
4 0.0130 0.158 0.1640 0.045
5 0.0095 0.135 0.1455 0.04
6 0.0077 0.120 0.1260 0.037
7 0.0065 0.110 0.1204 0.035
8 0.0043 0.090 0.1002 0.03
Comparison of Experimental and Fluent – JHC (y 2) for Proposed
designed weir
0
0.05
0.1
0.15
0.2
0.25
0 0.005 0.01 0.015 0.02 0.025
JHC EXPERIMENTAL
JHC FLUENT
Conclusions
• The performance is checked for six discharges (20%, 50%, 68%, 84%, 92%
and 100% of the design discharge). It is found that for all these discharges
clear hydraulic jumps are formed and are located near toe of spillway.
• There was good correlation found between experimental values and fluent
values ranging between 0.9 to 0.98 .
• Among all the values of coefficient of discharge for design of weir Cd =
0.623 is found to be perfect.
Limitations
• The method developed in the study is
applicable for steady flow only.
• There are chances of cavitations in weir due to
too many rectangular sharp edges.
Unique Advantages of Proposed
Stilling Basin
1. As tail water level lies below the water level on apron,
the chances of horizontal eddies bringing the
sediments / riprap material back into the basin get
nullified.
2. The proposed stepped weir assures appropriate
location of jump for all operating conditions and thus
the corresponding Fr1 and energy dissipation is
maximum. This further reduces the chances of jump
sweep out in such situation.
3. The proposed basin requires no appurtenances like
chute blocks or baffle blocks. Thus there is saving in
their cost of construction.
References
• Achour, B., Debabeche, M. (2003). “Control of hydraulic
jump by sill in triangular channel”. J. Hydr. Res., 41(3), 319-
325.
• Anderson, J.D. (1995). “Computational fluid dynamics”.
McGraw-Hill book company, Inc., New York, 1995
• Chow, V.T. (1959). “Open channel hydraulics”. McGraw-Hill
book company, Inc., New York, 1959
• Hinge G. A., Balkrishna S., Khare K.C. (2010), Pawana Dam
Energy Dissipation – A Case Study, Australian Journal of
Basic and Applied Sciences, Vol.4(8), pp. 3261-3267.
• Hinge G. A., Balkrishna S., Khare K.C. (2010), Improved
Design of Stilling Basin for Deficient Tail Water, Journal of
Basic and Applied Scientific Research, Vol.1(1), pp. 31-40.
THANK YOU

More Related Content

What's hot

What's hot (20)

Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptx
 
Design of a channel Reach
Design of a channel ReachDesign of a channel Reach
Design of a channel Reach
 
Reservoir capacity
Reservoir capacityReservoir capacity
Reservoir capacity
 
Open Channel Flow
Open Channel FlowOpen Channel Flow
Open Channel Flow
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 
Spillways and Flood Control Works
Spillways and Flood Control WorksSpillways and Flood Control Works
Spillways and Flood Control Works
 
Hydraulic jump
Hydraulic jumpHydraulic jump
Hydraulic jump
 
Spillways & energy dissipator
Spillways & energy dissipatorSpillways & energy dissipator
Spillways & energy dissipator
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Spillway
Spillway Spillway
Spillway
 
Hydraulic Jump
Hydraulic JumpHydraulic Jump
Hydraulic Jump
 
design of weirs
design of weirsdesign of weirs
design of weirs
 
Canal outlets and modules
Canal outlets and modulesCanal outlets and modules
Canal outlets and modules
 
Chapter 9:Uniform flow in mobile boundary channel
Chapter 9:Uniform flow in mobile boundary channelChapter 9:Uniform flow in mobile boundary channel
Chapter 9:Uniform flow in mobile boundary channel
 
Types of flow in open channel
Types of flow in open channelTypes of flow in open channel
Types of flow in open channel
 
Canal Regulation Works
Canal Regulation WorksCanal Regulation Works
Canal Regulation Works
 
Critical flow through an Open channel
Critical flow through an Open channelCritical flow through an Open channel
Critical flow through an Open channel
 
ogee design
ogee designogee design
ogee design
 
Reservior planning
Reservior    planningReservior    planning
Reservior planning
 

Similar to Hydraulic jump location control

1 FLO-2D Updates and Enhancements 2019.pptx
1 FLO-2D Updates and Enhancements 2019.pptx1 FLO-2D Updates and Enhancements 2019.pptx
1 FLO-2D Updates and Enhancements 2019.pptx
Jorge Atau
 
Odemba ECE2304 Hydraulics1Lab
Odemba ECE2304 Hydraulics1LabOdemba ECE2304 Hydraulics1Lab
Odemba ECE2304 Hydraulics1Lab
Walumasi Odemba
 
Ce 3205-lecture-08-spillways
Ce 3205-lecture-08-spillwaysCe 3205-lecture-08-spillways
Ce 3205-lecture-08-spillways
saibabu48
 
Answers assignment 5 open channel hydraulics-fluid mechanics
Answers assignment 5 open channel hydraulics-fluid mechanicsAnswers assignment 5 open channel hydraulics-fluid mechanics
Answers assignment 5 open channel hydraulics-fluid mechanics
asghar123456
 

Similar to Hydraulic jump location control (20)

Restricting Hydraulic Jump Location Inside Stilling Basin for Maximum Energy ...
Restricting Hydraulic Jump Location Inside Stilling Basin for Maximum Energy ...Restricting Hydraulic Jump Location Inside Stilling Basin for Maximum Energy ...
Restricting Hydraulic Jump Location Inside Stilling Basin for Maximum Energy ...
 
1 FLO-2D Updates and Enhancements 2019.pptx
1 FLO-2D Updates and Enhancements 2019.pptx1 FLO-2D Updates and Enhancements 2019.pptx
1 FLO-2D Updates and Enhancements 2019.pptx
 
Control Seepage Thought Earth Dams
Control Seepage Thought Earth DamsControl Seepage Thought Earth Dams
Control Seepage Thought Earth Dams
 
Energy Dissipation Regimes and Stability of the Overflow Dam (Spillway) for t...
Energy Dissipation Regimes and Stability of the Overflow Dam (Spillway) for t...Energy Dissipation Regimes and Stability of the Overflow Dam (Spillway) for t...
Energy Dissipation Regimes and Stability of the Overflow Dam (Spillway) for t...
 
Teoria bocatoma
Teoria bocatomaTeoria bocatoma
Teoria bocatoma
 
Deck drainage design
Deck drainage designDeck drainage design
Deck drainage design
 
FLUID MECHANICS LAB MANUAL BSc Civil Technology 3rd Semster
FLUID  MECHANICS LAB  MANUAL BSc Civil Technology 3rd Semster FLUID  MECHANICS LAB  MANUAL BSc Civil Technology 3rd Semster
FLUID MECHANICS LAB MANUAL BSc Civil Technology 3rd Semster
 
Discharge Over a Vee-Notch Weir | Jameel Academy
Discharge Over a Vee-Notch Weir | Jameel AcademyDischarge Over a Vee-Notch Weir | Jameel Academy
Discharge Over a Vee-Notch Weir | Jameel Academy
 
wk1_Introduction.pdf
wk1_Introduction.pdfwk1_Introduction.pdf
wk1_Introduction.pdf
 
Culvertdesign
CulvertdesignCulvertdesign
Culvertdesign
 
Odemba ECE2304 Hydraulics1Lab
Odemba ECE2304 Hydraulics1LabOdemba ECE2304 Hydraulics1Lab
Odemba ECE2304 Hydraulics1Lab
 
FLOW OVER A SHARP CRESTED WEIR
FLOW OVER A SHARP CRESTED WEIRFLOW OVER A SHARP CRESTED WEIR
FLOW OVER A SHARP CRESTED WEIR
 
Ce 3205-lecture-08-spillways
Ce 3205-lecture-08-spillwaysCe 3205-lecture-08-spillways
Ce 3205-lecture-08-spillways
 
Basic Theory & Formulae Training Module
Basic Theory & Formulae Training ModuleBasic Theory & Formulae Training Module
Basic Theory & Formulae Training Module
 
Surface runoff
Surface runoffSurface runoff
Surface runoff
 
Answers assignment 5 open channel hydraulics-fluid mechanics
Answers assignment 5 open channel hydraulics-fluid mechanicsAnswers assignment 5 open channel hydraulics-fluid mechanics
Answers assignment 5 open channel hydraulics-fluid mechanics
 
13. Canal Outlets & other Head Regulators.pdf
13. Canal Outlets & other Head Regulators.pdf13. Canal Outlets & other Head Regulators.pdf
13. Canal Outlets & other Head Regulators.pdf
 
Hydrology.pdf
Hydrology.pdfHydrology.pdf
Hydrology.pdf
 
Pump out tests in alluvial sands – a case study
Pump out tests in alluvial sands – a case studyPump out tests in alluvial sands – a case study
Pump out tests in alluvial sands – a case study
 
Thermo fluids lab key
Thermo fluids lab keyThermo fluids lab key
Thermo fluids lab key
 

Recently uploaded

RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
Atif Razi
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
AbrahamGadissa
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
Kamal Acharya
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdf
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdf
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 

Hydraulic jump location control

  • 1. CONTROLLING THE LOCATION OF HYDRAULIC JUMP IN RECTANGULAR CHANNEL SUBMITTED BY SUBMITTED TO SIDDHARTH UPADHYAY Mr. S ANBU KUMAR 2K15/HFE/15 ASSOCIATE PROFESSOR Department of Civil Engineering
  • 2. INTRODUCTION • Statistics and studies made by International Commission on Large Dams (ICOLD) show that more than 20% of dam accidents occurred due to poor provision of energy dissipation arrangements. • Normally energy dissipators are designed for ‘design discharge’ of spillway. But their performance is affected during varying discharge condition. • In majority of failure cases, the jump is not clear – i.e. jump is either swept up or drowned. • Our present study objective is to design a suitable design of hydraulic jump type energy dissipator for tail water deficiency and steady flow. This can largely reduce dependency on TWRC without disconnecting it from JHC. • Efforts are made to produce required JHC at all discharges to form clear jumps.
  • 3. Damaged stilling basin of sardar sarovar dam
  • 4. • Sardar Sarovar Project (SSP) is one of the major projects in India. In the year 1999 it is reported that during a flood in monsoon season, 10,000 m3 of concrete was washed out due to flood flows. • The design discharge of spillway is 87,000m3/s. The flood was even lesser than 50% of the design discharge. • The approximate cost of concrete that washed out was Rs. 3 crore
  • 5. View of dislodged panel at Bhama askhed dam
  • 6. Definition sketch of hydraulic jump
  • 7. Design of rectangular stepped weir (Section A-A earlier shown)
  • 8. FORMULA USED FOR DETERMINATION OF DIMENSION OF STEPPED WEIR
  • 9. Classification of tail water conditions for the design of energy dissipator
  • 10. FACTORS AFFECTING HYDRAULIC JUMP Factors affecting hydraulic jump are • Total head on upstream of sluice gate (H), • Pre jump depth (y1) , • Post jump depth (y2), • Crest height of weir (y'), • Head over weir crest (h) and tail water depth (yt). • Another non dimensional important parameter that governs hydraulic jump phenomenon is supercritical Froude number Fr1.
  • 11. Dimensions and Data of model used in fluent Height of sluice gate H=0.4m, Height of flume H’=0.45m Width of flume B=0.3m, Length of flume L=4m Max discharge Qmax=0.01 m3/s, Min discharge Qmin=0.002 m3/s, Crest height of weir y'=0.015m
  • 12.
  • 13. Table 1: Output of Mathematical Procedure for Data (Horizontal apron and Cd = 0.623) Sr. No. Q y1 y2 H Fr1 B m3/s M M M M 1 0.0020 0.0024 0.0605 0.0455 18.3350 0.1119 2 0.0028 0.0033 0.0714 0.0564 15.4960 0.1336 3 0.0036 0.0043 0.0807 0.0657 13.6661 0.1463 4 0.0044 0.0052 0.0889 0.0739 12.3614 0.1569 5 0.005 0.0062 0.0965 0.0814 11.3709 0.1660 6 0.0060 0.0071 0.1034 0.0884 10.5857 0.1741 7 0.0068 0.0081 0.1098 0.0948 9.9435 0.1816 8 0.0076 0.0090 0.1159 0.1009 9.4056 0.1884 9 0.0084 0.0100 0.1216 0.1066 8.9466 0.1949 10 0.0092 0.010947 0.1270 0.1120 8.5487 0.2010 11 0.0100 0.011899 0.1322 0.1172 8.1997 0.2067
  • 14. Stepped weir in fluent
  • 15. Stepped weir in fluent
  • 19. Hydraulic jump at discharge 0.0020 m3 /sec
  • 20. Hydraulic jump at discharge 0.005 m3 /sec
  • 21. Hydraulic jump at discharge 0.0068 m3 /sec
  • 22. Hydraulic jump at discharge 0.0084 m3 /sec
  • 23. Hydraulic jump at discharge 0.0092 m3 /sec
  • 24. Hydraulic jump at discharge 0.010 m3 /sec
  • 25. Table 2: Comparisons of post jump depth of experimental and fluent value at Cd = 0.60 Test Discharge Post jump Post jump Tail water No. Q m3/s Depth Depth depth y2 m y2 m yt m (Fluent) (experimental) (Fluent) (Fluent) 1 0.0100 0.132 0.1210 0.063 2 0.0092 0.1270 0.1161 0.059 3 0.0084 0.1216 0.1089 0.056 4 0.0068 0.1098 0.1040 0.049 5 0.0050 0.0968 0.0913 0.041 6 0.0040 0.0865 0.0869 0.035 7 0.0020 0.0605 0.0621 0.028
  • 26. Comparisons of post jump depth of experimental and fluent value at Cd = 0.60 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0 0.002 0.004 0.006 0.008 0.01 0.012 y2 Discharge (m3/s) JHC Exp. JHC fluent
  • 27. Table 3: Comparisons of post jump depth of experimental and fluent value at Cd = 0.65 Test Discharge Post jump Post jump Tail water No. Q m3/s Depth depth Depth y2 m y2 m yt m (Fluent) (Experimental) (Fluent) (Fluent) 1 0.0100 0.1322 0.1140 0.0540 2 0.0092 0.1270 0.1110 0.0510 3 0.0084 0.1216 0.1035 0.0475 4 0.0068 0.1098 0.1010 0.0464 5 0.0050 0.0965 0.0850 0.0363 6 0.0040 0.0850 0.0810 0.0330 7 0.0020 0.0605 0.0587 0.0270
  • 28. Comparison of Experimental and Fluent – JHC (y 2) at for horizontal apron (Cd = 0.65) 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0 0.002 0.004 0.006 0.008 0.01 0.012 Post jump Depth y2 m (Experimental) Post jump depth y2 m (Fluent)
  • 29. Table 4 : Comparisons of post jump depth of experimental and fluent value at Cd = 0.63 Test Discharge Post jump Post jump Tail water No. Q m3/s Depth depth Depth y2 m y2 m yt m (Fluent) (Experimental) (Fluent) (Fluent) 1 0.0100 0.1322 0.1228 0.044 2 0.0092 0.1270 0.1240 0.043 3 0.0084 0.1216 0.1211 0.039 4 0.0068 0.1008 0.0984 0.036 5 0.005 0.0965 0.0960 0.032 6 0.0020 0.0605 0.060 0.027
  • 30. Comparisons of post jump depth of experimental and fluent value at Cd = 0.63 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0 0.002 0.004 0.006 0.008 0.01 0.012 Post jump Depth y2 m (experimental) Post jump depth y2 m (Fluent)
  • 31. Analysis of Pawana dam model
  • 32. Table 5: Dimension of Pawana Dam spillway model by Froude’s law (Scale 1 : 40) Design Parameter Designation Prototype Model Stilling Basin width B 12m 0.3m Stilling Basin length L 60m 1.5m Height of spillway H 25.3m 0.6325m Height of crested weir h 4.36 0.109 Top width of crested weir b 2.95 0.074 Coefficient of discharge Cd 0.623 0.623 Crest height of weir Y’ 0.024
  • 33. Hydraulic jump at discharge 0.0043 m3 /sec
  • 34. Hydraulic jump at discharge 0.013 m3 /sec
  • 35. Hydraulic jump at discharge 0.020 m3 /sec
  • 36. Table 6 : Comparison of post jump depths for Pawana dam – experimental and Fluent (designed weir) Test Discharge Post jump Post jump Tail water No. Q m3/s Depth Depth Depth (Fluent) y2 m y2 m yt m (Expt) (Fluent) (Expt) 1 0.0200 0.195 0.2070 0.054 2 0.0181 0.186 0.1922 0.052 3 0.0160 0.175 0.1846 0.049 4 0.0130 0.158 0.1640 0.045 5 0.0095 0.135 0.1455 0.04 6 0.0077 0.120 0.1260 0.037 7 0.0065 0.110 0.1204 0.035 8 0.0043 0.090 0.1002 0.03
  • 37. Comparison of Experimental and Fluent – JHC (y 2) for Proposed designed weir 0 0.05 0.1 0.15 0.2 0.25 0 0.005 0.01 0.015 0.02 0.025 JHC EXPERIMENTAL JHC FLUENT
  • 38. Conclusions • The performance is checked for six discharges (20%, 50%, 68%, 84%, 92% and 100% of the design discharge). It is found that for all these discharges clear hydraulic jumps are formed and are located near toe of spillway. • There was good correlation found between experimental values and fluent values ranging between 0.9 to 0.98 . • Among all the values of coefficient of discharge for design of weir Cd = 0.623 is found to be perfect.
  • 39. Limitations • The method developed in the study is applicable for steady flow only. • There are chances of cavitations in weir due to too many rectangular sharp edges.
  • 40. Unique Advantages of Proposed Stilling Basin 1. As tail water level lies below the water level on apron, the chances of horizontal eddies bringing the sediments / riprap material back into the basin get nullified. 2. The proposed stepped weir assures appropriate location of jump for all operating conditions and thus the corresponding Fr1 and energy dissipation is maximum. This further reduces the chances of jump sweep out in such situation. 3. The proposed basin requires no appurtenances like chute blocks or baffle blocks. Thus there is saving in their cost of construction.
  • 41. References • Achour, B., Debabeche, M. (2003). “Control of hydraulic jump by sill in triangular channel”. J. Hydr. Res., 41(3), 319- 325. • Anderson, J.D. (1995). “Computational fluid dynamics”. McGraw-Hill book company, Inc., New York, 1995 • Chow, V.T. (1959). “Open channel hydraulics”. McGraw-Hill book company, Inc., New York, 1959 • Hinge G. A., Balkrishna S., Khare K.C. (2010), Pawana Dam Energy Dissipation – A Case Study, Australian Journal of Basic and Applied Sciences, Vol.4(8), pp. 3261-3267. • Hinge G. A., Balkrishna S., Khare K.C. (2010), Improved Design of Stilling Basin for Deficient Tail Water, Journal of Basic and Applied Scientific Research, Vol.1(1), pp. 31-40.