Human Resource Management
NIXON JOHNY
1
What is Human Resource Management?
2
Human Resources Management
• “HRM is the function performed in
organizations that facilitates the most effective
use of people to achieve organizational and
individual goals.”
▫ Ivancevich and Glueck
• The HRM process consists of planning,
attracting, developing, and retaining the human
resources (employees) of an organization.
3
• According to Adi Godrej,
“all corporate strengths are
dependent on people.”
4
Scope of HR Management
• HRM in Personnel Management: This is
typically direct manpower management that
involves manpower planning, hiring
(recruitment and selection), training and
development, induction and orientation,
transfer, promotion, compensation, layoff and
retrenchment, employee productivity.
5
• HRM in Employee Welfare: This particular
aspect of HRM deals with working conditions
and amenities at workplace.
• HRM in Industrial Relations: Since it is a
highly sensitive area, it needs careful
interactions with labor or employee unions,
addressing their grievances and settling the
disputes effectively in order to maintain peace
and harmony in the organization.
6
HR Planning
strategic HR planning;
job design
FUNCTIONS
Attracting
employees
recruiting; selecting
Developing
employees
training & development;
performance appraisal
Retaining employees
compensation;
maintenance; labor
relations; separation
7
HR Planning
• Planning for the future personnel needs of an
organization,
• taking into account both internal activities and
factors in the external environment
8
HR Planning
• Job Design
▫ usually done prior to recruitment
▫ the process of describing the work that needs
to be done by an employee and
▫ specifying the requirements needed in
fulfilling the job
9
Attracting Employees
• Recruitment
▫ development of a pool of job candidates in
accordance with a human resource plan
▫ its purpose is to provide mgmt. with enough
candidates from which they can select
qualified employees
10
Attracting Employees
• Selection
▫ the mutual process whereby the organization
decides to make a job offer and the candidate
decides whether or not to accept it.
11
12
Developing Employees
• Orientation
▫ a program designed to help employees fit
smoothly into an organization
13
Developing Employees
• Training
▫ a process designed to maintain or improve
current employee performance
• Development
▫ a process designed to develop skills and
attitudes necessary for future work
14
Developing Employees
• Performance Appraisal
▫ process of providing feedback to subordinates
regarding their performance on the job.
▫ Informal versus Formal
15
Developing Employees
• A formalized appraisal process is used for:
▫ rating work performance
▫ identifying those deserving raises or
promotions
▫ identifying those in need of further
training
16
Retaining Employees
Compensation
• the adequate and equitable remuneration of
personnel for their contribution in the
achievement of organization objectives.
17
Retaining Employees
Labor relations
• entails recognizing the validity of unions,
negotiating for the collective bargaining
agreement, and being able to handle strikes and
other forms of mass action.
18
Retaining Employees
Maintenance
• the process of providing the following
services to employees:
▫ career counselling
▫ safety & health programs
• Also involves the minimization of
absenteeism and tardiness
19
Retaining Employees
Separation
• employee separation can be just as important
as employee retention
▫ Organizations pursuing differentiation rely on
highly skilled employees who have specialized
knowledge and ability.
▫ An employee who is not capable of providing
skilled inputs does not contribute, making
termination of nonperforming employees critical
for organizations that seek to produce premium
goods and services
REFERENCE
•https://en.wikipedia.org/wiki/Human_resource_manage
ment
•http://www.whatishumanresource.com/Human-
Resource-Management-functions
•http://www.managementstudyguide.com/human
resource-management.htm
20

More Related Content

What's hot (20)

introduction to leading and management
introduction to leading and managementintroduction to leading and management
introduction to leading and management
 
Staffing
StaffingStaffing
Staffing
 
Staffing and Directing
Staffing and DirectingStaffing and Directing
Staffing and Directing
 
Staffing
StaffingStaffing
Staffing
 
Staffing in Organization
Staffing in OrganizationStaffing in Organization
Staffing in Organization
 
Staffing - management
Staffing -  managementStaffing -  management
Staffing - management
 
Staffing; Definition, Scope, Need, Significance, Process.
Staffing; Definition, Scope, Need, Significance, Process.Staffing; Definition, Scope, Need, Significance, Process.
Staffing; Definition, Scope, Need, Significance, Process.
 
Hrd strategies
Hrd strategiesHrd strategies
Hrd strategies
 
Staffing Problems
Staffing ProblemsStaffing Problems
Staffing Problems
 
Staffing in management
Staffing in managementStaffing in management
Staffing in management
 
Staffing
StaffingStaffing
Staffing
 
Importance of staffing
Importance of staffingImportance of staffing
Importance of staffing
 
Federal Bank
Federal BankFederal Bank
Federal Bank
 
Human Resource Management
Human Resource ManagementHuman Resource Management
Human Resource Management
 
HR Product SBC 001
HR Product SBC 001HR Product SBC 001
HR Product SBC 001
 
Power point slide
Power point slidePower point slide
Power point slide
 
Staffing process
Staffing processStaffing process
Staffing process
 
Functions of Human Resource Management
Functions of Human Resource Management Functions of Human Resource Management
Functions of Human Resource Management
 
Staffing manager performance appraisal
Staffing manager performance appraisalStaffing manager performance appraisal
Staffing manager performance appraisal
 
Staffing
StaffingStaffing
Staffing
 

Similar to Human resource management

Edited final reportseema kumari 9888546117
Edited final reportseema kumari 9888546117Edited final reportseema kumari 9888546117
Edited final reportseema kumari 9888546117Icaii Infotech
 
Human resource management complete note
Human resource management  complete noteHuman resource management  complete note
Human resource management complete notekabul university
 
Human Resource Management
Human Resource ManagementHuman Resource Management
Human Resource ManagementPrince Verma
 
Human Resource Management presentation.Human Resource roles,Human resource Fu...
Human Resource Management presentation.Human Resource roles,Human resource Fu...Human Resource Management presentation.Human Resource roles,Human resource Fu...
Human Resource Management presentation.Human Resource roles,Human resource Fu...Jubin Johny
 
Chapter One.pptx
Chapter One.pptxChapter One.pptx
Chapter One.pptxabdulfetah2
 
203 human resource management notes dimr (1)
203 human resource management notes dimr (1)203 human resource management notes dimr (1)
203 human resource management notes dimr (1)KhanShehzade
 
Human resource management & Committee and teams
Human resource management & Committee and teamsHuman resource management & Committee and teams
Human resource management & Committee and teamshawraz Faris
 
Basic of Human Resource Management
Basic of Human Resource ManagementBasic of Human Resource Management
Basic of Human Resource ManagementAshit Jain
 
Essentials_of_HRM__Course_Presentation_Qc3J3DX5NX.pptx
Essentials_of_HRM__Course_Presentation_Qc3J3DX5NX.pptxEssentials_of_HRM__Course_Presentation_Qc3J3DX5NX.pptx
Essentials_of_HRM__Course_Presentation_Qc3J3DX5NX.pptxPremaS29
 
HR chapter one.pptx
HR chapter one.pptxHR chapter one.pptx
HR chapter one.pptxAnwarjemal7
 
Human Resource Management
Human Resource ManagementHuman Resource Management
Human Resource ManagementAriful Saimon
 
HRM PPT Suveer.pptx
HRM PPT Suveer.pptxHRM PPT Suveer.pptx
HRM PPT Suveer.pptxSuveerJain2
 
Senor subordinate relations and personnel administration
Senor subordinate relations and personnel administrationSenor subordinate relations and personnel administration
Senor subordinate relations and personnel administrationzulfi799
 

Similar to Human resource management (20)

Njongo dhrm1 m13 ppt1
Njongo dhrm1 m13 ppt1Njongo dhrm1 m13 ppt1
Njongo dhrm1 m13 ppt1
 
Edited final reportseema kumari 9888546117
Edited final reportseema kumari 9888546117Edited final reportseema kumari 9888546117
Edited final reportseema kumari 9888546117
 
Human resource management complete note
Human resource management  complete noteHuman resource management  complete note
Human resource management complete note
 
Human Resource Management
Human Resource ManagementHuman Resource Management
Human Resource Management
 
Human Resource
Human ResourceHuman Resource
Human Resource
 
Human Resource Management presentation.Human Resource roles,Human resource Fu...
Human Resource Management presentation.Human Resource roles,Human resource Fu...Human Resource Management presentation.Human Resource roles,Human resource Fu...
Human Resource Management presentation.Human Resource roles,Human resource Fu...
 
Chapter One.pptx
Chapter One.pptxChapter One.pptx
Chapter One.pptx
 
HRM - Unit 1.pptx
HRM - Unit 1.pptxHRM - Unit 1.pptx
HRM - Unit 1.pptx
 
203 human resource management notes dimr (1)
203 human resource management notes dimr (1)203 human resource management notes dimr (1)
203 human resource management notes dimr (1)
 
Staffing in management
Staffing in managementStaffing in management
Staffing in management
 
Human resource management & Committee and teams
Human resource management & Committee and teamsHuman resource management & Committee and teams
Human resource management & Committee and teams
 
Basic of Human Resource Management
Basic of Human Resource ManagementBasic of Human Resource Management
Basic of Human Resource Management
 
Essentials_of_HRM__Course_Presentation_Qc3J3DX5NX.pptx
Essentials_of_HRM__Course_Presentation_Qc3J3DX5NX.pptxEssentials_of_HRM__Course_Presentation_Qc3J3DX5NX.pptx
Essentials_of_HRM__Course_Presentation_Qc3J3DX5NX.pptx
 
Human Resources Roles and Responsibility.pptx
Human Resources Roles and Responsibility.pptxHuman Resources Roles and Responsibility.pptx
Human Resources Roles and Responsibility.pptx
 
HR chapter one.pptx
HR chapter one.pptxHR chapter one.pptx
HR chapter one.pptx
 
HRM.pptx
HRM.pptxHRM.pptx
HRM.pptx
 
Human Resource Management
Human Resource ManagementHuman Resource Management
Human Resource Management
 
HRM PPT Suveer.pptx
HRM PPT Suveer.pptxHRM PPT Suveer.pptx
HRM PPT Suveer.pptx
 
Senor subordinate relations and personnel administration
Senor subordinate relations and personnel administrationSenor subordinate relations and personnel administration
Senor subordinate relations and personnel administration
 
Hrm btz
Hrm btzHrm btz
Hrm btz
 

Recently uploaded

Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.MateoGardella
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 

Recently uploaded (20)

Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 

Human resource management

  • 2. What is Human Resource Management? 2
  • 3. Human Resources Management • “HRM is the function performed in organizations that facilitates the most effective use of people to achieve organizational and individual goals.” ▫ Ivancevich and Glueck • The HRM process consists of planning, attracting, developing, and retaining the human resources (employees) of an organization. 3
  • 4. • According to Adi Godrej, “all corporate strengths are dependent on people.” 4
  • 5. Scope of HR Management • HRM in Personnel Management: This is typically direct manpower management that involves manpower planning, hiring (recruitment and selection), training and development, induction and orientation, transfer, promotion, compensation, layoff and retrenchment, employee productivity. 5
  • 6. • HRM in Employee Welfare: This particular aspect of HRM deals with working conditions and amenities at workplace. • HRM in Industrial Relations: Since it is a highly sensitive area, it needs careful interactions with labor or employee unions, addressing their grievances and settling the disputes effectively in order to maintain peace and harmony in the organization. 6
  • 7. HR Planning strategic HR planning; job design FUNCTIONS Attracting employees recruiting; selecting Developing employees training & development; performance appraisal Retaining employees compensation; maintenance; labor relations; separation 7
  • 8. HR Planning • Planning for the future personnel needs of an organization, • taking into account both internal activities and factors in the external environment 8
  • 9. HR Planning • Job Design ▫ usually done prior to recruitment ▫ the process of describing the work that needs to be done by an employee and ▫ specifying the requirements needed in fulfilling the job 9
  • 10. Attracting Employees • Recruitment ▫ development of a pool of job candidates in accordance with a human resource plan ▫ its purpose is to provide mgmt. with enough candidates from which they can select qualified employees 10
  • 11. Attracting Employees • Selection ▫ the mutual process whereby the organization decides to make a job offer and the candidate decides whether or not to accept it. 11
  • 12. 12 Developing Employees • Orientation ▫ a program designed to help employees fit smoothly into an organization
  • 13. 13 Developing Employees • Training ▫ a process designed to maintain or improve current employee performance • Development ▫ a process designed to develop skills and attitudes necessary for future work
  • 14. 14 Developing Employees • Performance Appraisal ▫ process of providing feedback to subordinates regarding their performance on the job. ▫ Informal versus Formal
  • 15. 15 Developing Employees • A formalized appraisal process is used for: ▫ rating work performance ▫ identifying those deserving raises or promotions ▫ identifying those in need of further training
  • 16. 16 Retaining Employees Compensation • the adequate and equitable remuneration of personnel for their contribution in the achievement of organization objectives.
  • 17. 17 Retaining Employees Labor relations • entails recognizing the validity of unions, negotiating for the collective bargaining agreement, and being able to handle strikes and other forms of mass action.
  • 18. 18 Retaining Employees Maintenance • the process of providing the following services to employees: ▫ career counselling ▫ safety & health programs • Also involves the minimization of absenteeism and tardiness
  • 19. 19 Retaining Employees Separation • employee separation can be just as important as employee retention ▫ Organizations pursuing differentiation rely on highly skilled employees who have specialized knowledge and ability. ▫ An employee who is not capable of providing skilled inputs does not contribute, making termination of nonperforming employees critical for organizations that seek to produce premium goods and services