V I S I O N T E K N I K S E N G I N E E R I N G & A U T O M A T I O N
PREVENTATIVE BUS DUCT MAINTENANCE SAVES THOUSANDS IN UNPLANNED DOWNTIME COSTS
Bus duct systems are incredibly important in effectively distributing power to switchgear and various loads.
Improper maintenance of bus duct systems can lead to problems resulting in catastrophic failures and
costly downtime events.
Standard Requirements for BusDuct
Selection
Some of the common reasons for bus
failure:
• Has the correct voltage rating
• Condensation and outside water
intrusion
• Has sufficient current rating • Conductor connection integrity
• Has right quantity of conductors (phase,
neutral, and ground)
• Dirt/foreign debris
• Damaged gasket/bellows
• Has adequate short circuit bracing • Grounding/interference issues
• Is totally enclosed • Improper termination design/installation
• Has the right duty of protection • Cracked weld joints
Recommended Maintenance Procedures
The following maintenance procedures and periodical
inspection are recommended to ensure a safe
operation of busduct system for long terms.
1.Period of Inspection
1.1 An inspection on busduct every once a year or two
is recommended. If a busduct is installed in an
unfavourable environment such as, High temperature ;
High humidity, Dusty or Corrosive atmosphere or such similar environment, a periodical inspection shall be
a must.
1.2 In the event of the following unusual conditions, inspection must be carried out immediately in each
case:
 After severe earthquake
 After being involved in a fire
 After being exposed to water
 After an electrical fault
2. Maintenance and Routine Inspection
2.1 Inspection on External Appearance
Check whether:-
 If any rust spots visible
 There is any deformation, damage, dirt, etc throughout the length of Busduct.
 There is any dislocation, bending and other abnormality of the connecting covers, hangers and plug-in
appliances
2.2 Environmental Inspection
The environment, where the ducts are installed, sometimes changes after its installation. Check if the
environment has become hazardous due to water, moisture, high temperature, corrosive gas, high
vibration, dust, etc.
2.3 Inspection for Abnormal Heat
An Infra Red Thermography instrument is recommended to detect any abnormal heat and
measure the operating temperature of busduct system.
As an option, a thermal indicator can be placed onto the busduct housing. If the temperature rise of the
busduct housing exceeds the limit, the colour of the indicator will change. e.g. from white to red colour.
2.4 Inspection on Connection Sections
Check whether:-
 Busduct joint section is securely fastened with joint bolts and both sides of the busduct joint
section are held with a pair of leaf springs.
 Leaf springs are almost flat and the pin holes are inserted with snap pins.
 Busduct is supported by vertical spring hangers, vertical hangers, edgewise / flat wise
horizontal hangers according to manufacturer’s requirement and recommendation.
 All the connecting parts, such as leaf springs, hangers, busduct joints, joint covers, etc are tight.
2.5 Inspection on Load Condition
After the busduct installation, increase of load is expected. An inspection has to be carried out to ensure
that the total connected load does not exceed the rated current of the busduct before the load is
increased.
2.6 Measurement of Insulation Resistance
Measure the insulation resistance between each conductor and between conductor and housing. When
the measurement is carried out, the electrical loads and connected equipment shall be disconnected.
2.7 Inspection on Rust or Peeling of Paint on Busduct Housing
If there are sign of peeling paint or rust on the busduct housing,
cleaning work and touch-up painting are recommended.
The metal housing /enclosure of busduct must not be dismantled by
any parties without the official authorization from the manufacturer for
any purposes. Any violation or abuse will result the respective party to
be responsible for all the consequences and compensation.
Furthermore, the manufacturer reserves the right to void the warranty
if any proof of violation or any sign of abuse is found.
V I S I O N T E K N I K S E N G I N E E R I N G & A U T O M A T I O N

More Related Content

What's hot

Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...
Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...
Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...
AKBAR TRADING
 
Eagle Orange/Clear Suction and Discharge Hose – Water Suction and Discharge Hose
Eagle Orange/Clear Suction and Discharge Hose – Water Suction and Discharge HoseEagle Orange/Clear Suction and Discharge Hose – Water Suction and Discharge Hose
Eagle Orange/Clear Suction and Discharge Hose – Water Suction and Discharge Hose
JGB Enterprises, Inc.
 
Cathodic Protection
Cathodic ProtectionCathodic Protection
Cathodic Protection
Thorne & Derrick International
 
EESS 2018 Day 2 - Owen Barry
EESS 2018 Day 2 - Owen BarryEESS 2018 Day 2 - Owen Barry
EESS 2018 Day 2 - Owen Barry
NSW Environment and Planning
 
EESS 2018 Day 1 - Peter Every-burns
EESS 2018 Day 1 - Peter Every-burnsEESS 2018 Day 1 - Peter Every-burns
EESS 2018 Day 1 - Peter Every-burns
NSW Environment and Planning
 
Nexans Euromold Bushings, Air Insulated 24kV 1250A 672TBC Interface D
Nexans Euromold Bushings, Air Insulated 24kV 1250A 672TBC Interface DNexans Euromold Bushings, Air Insulated 24kV 1250A 672TBC Interface D
Nexans Euromold Bushings, Air Insulated 24kV 1250A 672TBC Interface D
Thorne & Derrick International
 
EESS 2018 Day 2 - Bipin Parmar
EESS 2018 Day 2 - Bipin ParmarEESS 2018 Day 2 - Bipin Parmar
EESS 2018 Day 2 - Bipin Parmar
NSW Environment and Planning
 
Flujómetro Tipo Capacitivo.
Flujómetro Tipo Capacitivo.Flujómetro Tipo Capacitivo.
Flujómetro Tipo Capacitivo.
SINAUC
 
5203
52035203
Fts onload disconnector switch
Fts onload disconnector switchFts onload disconnector switch
Fts onload disconnector switch
JoeChueng
 
Nexans Euromold 151SP Screened Separable Straight Connector
Nexans Euromold 151SP Screened Separable Straight ConnectorNexans Euromold 151SP Screened Separable Straight Connector
Nexans Euromold 151SP Screened Separable Straight Connector
Thorne & Derrick International
 
Mouser Electronics, Marketing Document
Mouser Electronics, Marketing DocumentMouser Electronics, Marketing Document
Mouser Electronics, Marketing DocumentSteven Kopenhaver
 
Site Inspections - Looking for Dangerous Installations or Incorrect Billing
Site Inspections - Looking for Dangerous Installations or Incorrect BillingSite Inspections - Looking for Dangerous Installations or Incorrect Billing
Site Inspections - Looking for Dangerous Installations or Incorrect Billing
TESCO - The Eastern Specialty Company
 
cricuit breaker report
cricuit breaker reportcricuit breaker report
cricuit breaker report
Ankit Vij
 
Underwater welding
Underwater weldingUnderwater welding
Underwater welding
RAVI KUMAR
 
SYSTEMS SUNLIGHT S.A. | RES OPzV (Premium Quality Batteries for Renewable Ene...
SYSTEMS SUNLIGHT S.A. | RES OPzV (Premium Quality Batteries for Renewable Ene...SYSTEMS SUNLIGHT S.A. | RES OPzV (Premium Quality Batteries for Renewable Ene...
SYSTEMS SUNLIGHT S.A. | RES OPzV (Premium Quality Batteries for Renewable Ene...
SYSTEMS SUNLIGHT S.A.
 
Nexans Euromold 180A High Voltage Air Insulated Bushing
Nexans Euromold 180A High Voltage Air Insulated BushingNexans Euromold 180A High Voltage Air Insulated Bushing
Nexans Euromold 180A High Voltage Air Insulated Bushing
Thorne & Derrick International
 
Behaviour of ZnO surge arrester in pollution
Behaviour of ZnO surge arrester in pollutionBehaviour of ZnO surge arrester in pollution
Behaviour of ZnO surge arrester in pollution
Mukesh Kumar Tanwar
 
Wind Turbine Slip Ring
Wind Turbine Slip RingWind Turbine Slip Ring
Wind Turbine Slip Ring
Sarah Wu
 

What's hot (20)

Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...
Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...
Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...
 
Eagle Orange/Clear Suction and Discharge Hose – Water Suction and Discharge Hose
Eagle Orange/Clear Suction and Discharge Hose – Water Suction and Discharge HoseEagle Orange/Clear Suction and Discharge Hose – Water Suction and Discharge Hose
Eagle Orange/Clear Suction and Discharge Hose – Water Suction and Discharge Hose
 
Cathodic Protection
Cathodic ProtectionCathodic Protection
Cathodic Protection
 
EESS 2018 Day 2 - Owen Barry
EESS 2018 Day 2 - Owen BarryEESS 2018 Day 2 - Owen Barry
EESS 2018 Day 2 - Owen Barry
 
EESS 2018 Day 1 - Peter Every-burns
EESS 2018 Day 1 - Peter Every-burnsEESS 2018 Day 1 - Peter Every-burns
EESS 2018 Day 1 - Peter Every-burns
 
Nexans Euromold Bushings, Air Insulated 24kV 1250A 672TBC Interface D
Nexans Euromold Bushings, Air Insulated 24kV 1250A 672TBC Interface DNexans Euromold Bushings, Air Insulated 24kV 1250A 672TBC Interface D
Nexans Euromold Bushings, Air Insulated 24kV 1250A 672TBC Interface D
 
EESS 2018 Day 2 - Bipin Parmar
EESS 2018 Day 2 - Bipin ParmarEESS 2018 Day 2 - Bipin Parmar
EESS 2018 Day 2 - Bipin Parmar
 
Flujómetro Tipo Capacitivo.
Flujómetro Tipo Capacitivo.Flujómetro Tipo Capacitivo.
Flujómetro Tipo Capacitivo.
 
5203
52035203
5203
 
Fts onload disconnector switch
Fts onload disconnector switchFts onload disconnector switch
Fts onload disconnector switch
 
Gis91
Gis91Gis91
Gis91
 
Nexans Euromold 151SP Screened Separable Straight Connector
Nexans Euromold 151SP Screened Separable Straight ConnectorNexans Euromold 151SP Screened Separable Straight Connector
Nexans Euromold 151SP Screened Separable Straight Connector
 
Mouser Electronics, Marketing Document
Mouser Electronics, Marketing DocumentMouser Electronics, Marketing Document
Mouser Electronics, Marketing Document
 
Site Inspections - Looking for Dangerous Installations or Incorrect Billing
Site Inspections - Looking for Dangerous Installations or Incorrect BillingSite Inspections - Looking for Dangerous Installations or Incorrect Billing
Site Inspections - Looking for Dangerous Installations or Incorrect Billing
 
cricuit breaker report
cricuit breaker reportcricuit breaker report
cricuit breaker report
 
Underwater welding
Underwater weldingUnderwater welding
Underwater welding
 
SYSTEMS SUNLIGHT S.A. | RES OPzV (Premium Quality Batteries for Renewable Ene...
SYSTEMS SUNLIGHT S.A. | RES OPzV (Premium Quality Batteries for Renewable Ene...SYSTEMS SUNLIGHT S.A. | RES OPzV (Premium Quality Batteries for Renewable Ene...
SYSTEMS SUNLIGHT S.A. | RES OPzV (Premium Quality Batteries for Renewable Ene...
 
Nexans Euromold 180A High Voltage Air Insulated Bushing
Nexans Euromold 180A High Voltage Air Insulated BushingNexans Euromold 180A High Voltage Air Insulated Bushing
Nexans Euromold 180A High Voltage Air Insulated Bushing
 
Behaviour of ZnO surge arrester in pollution
Behaviour of ZnO surge arrester in pollutionBehaviour of ZnO surge arrester in pollution
Behaviour of ZnO surge arrester in pollution
 
Wind Turbine Slip Ring
Wind Turbine Slip RingWind Turbine Slip Ring
Wind Turbine Slip Ring
 

Similar to HT & LT Bus Ducts Manufacturer in Telangana and Andhra Pradesh

Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015Edwin Low
 
OSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact finalOSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact finalJohn Grover
 
Corrosion control
Corrosion controlCorrosion control
Corrosion control
Duy Vu
 
Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION
SAJJAD KHUDHUR ABBAS
 
Inspection of Electrical Installations in Homes
Inspection of Electrical Installations in HomesInspection of Electrical Installations in Homes
Inspection of Electrical Installations in Homes
Leonardo ENERGY
 
Episode 34 : Project Execution Part (5)
Episode 34 :  Project Execution Part (5)Episode 34 :  Project Execution Part (5)
Episode 34 : Project Execution Part (5)
SAJJAD KHUDHUR ABBAS
 
01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976
Southern Railway
 
'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt
Thien Phan Bản
 
SD.pptx
SD.pptxSD.pptx
SD.pptx
hemant9402
 
Residential wiring PPT.pptx
Residential wiring PPT.pptxResidential wiring PPT.pptx
Residential wiring PPT.pptx
vlkumashankardeekshi th
 
194 adss cable-installationguide
194 adss cable-installationguide194 adss cable-installationguide
194 adss cable-installationguide
bui thequan
 
Safety inspection of gates
Safety inspection of gates Safety inspection of gates
Safety inspection of gates
IEI GSC
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
johny renoald
 
Earthing and disconnecting panel report.pdf
Earthing and disconnecting panel report.pdfEarthing and disconnecting panel report.pdf
Earthing and disconnecting panel report.pdf
MohitKumar989420
 
KNPC Volume 3B.pdf
KNPC Volume 3B.pdfKNPC Volume 3B.pdf
KNPC Volume 3B.pdf
MohamedElAyoutti
 
Water tight integrity surveys, inspections & repair brochure v8
Water tight integrity surveys, inspections & repair brochure v8Water tight integrity surveys, inspections & repair brochure v8
Water tight integrity surveys, inspections & repair brochure v8
SteveFarries
 
Whitepaper Series Part 1 - Underwater Connectivity
Whitepaper Series Part 1 - Underwater ConnectivityWhitepaper Series Part 1 - Underwater Connectivity
Whitepaper Series Part 1 - Underwater Connectivity
NorthwireCable
 
Sample
SampleSample
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Thorne & Derrick International
 
Cable preparation in CCTV
Cable preparation in CCTVCable preparation in CCTV
Cable preparation in CCTV
hepzijustin
 

Similar to HT & LT Bus Ducts Manufacturer in Telangana and Andhra Pradesh (20)

Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015
 
OSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact finalOSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact final
 
Corrosion control
Corrosion controlCorrosion control
Corrosion control
 
Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION
 
Inspection of Electrical Installations in Homes
Inspection of Electrical Installations in HomesInspection of Electrical Installations in Homes
Inspection of Electrical Installations in Homes
 
Episode 34 : Project Execution Part (5)
Episode 34 :  Project Execution Part (5)Episode 34 :  Project Execution Part (5)
Episode 34 : Project Execution Part (5)
 
01 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 963213697601 guidelines for electrical work ace 9632136976
01 guidelines for electrical work ace 9632136976
 
'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt'docslide.us_hv-testing.ppt
'docslide.us_hv-testing.ppt
 
SD.pptx
SD.pptxSD.pptx
SD.pptx
 
Residential wiring PPT.pptx
Residential wiring PPT.pptxResidential wiring PPT.pptx
Residential wiring PPT.pptx
 
194 adss cable-installationguide
194 adss cable-installationguide194 adss cable-installationguide
194 adss cable-installationguide
 
Safety inspection of gates
Safety inspection of gates Safety inspection of gates
Safety inspection of gates
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
Earthing and disconnecting panel report.pdf
Earthing and disconnecting panel report.pdfEarthing and disconnecting panel report.pdf
Earthing and disconnecting panel report.pdf
 
KNPC Volume 3B.pdf
KNPC Volume 3B.pdfKNPC Volume 3B.pdf
KNPC Volume 3B.pdf
 
Water tight integrity surveys, inspections & repair brochure v8
Water tight integrity surveys, inspections & repair brochure v8Water tight integrity surveys, inspections & repair brochure v8
Water tight integrity surveys, inspections & repair brochure v8
 
Whitepaper Series Part 1 - Underwater Connectivity
Whitepaper Series Part 1 - Underwater ConnectivityWhitepaper Series Part 1 - Underwater Connectivity
Whitepaper Series Part 1 - Underwater Connectivity
 
Sample
SampleSample
Sample
 
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
Sheath Fault Location On Power Cables - Sheath Testing, Sheath Fault Location...
 
Cable preparation in CCTV
Cable preparation in CCTVCable preparation in CCTV
Cable preparation in CCTV
 

Recently uploaded

Textile Chemical Brochure - Tradeasia (1).pdf
Textile Chemical Brochure - Tradeasia (1).pdfTextile Chemical Brochure - Tradeasia (1).pdf
Textile Chemical Brochure - Tradeasia (1).pdf
jeffmilton96
 
Michael Economou - Don't build a marketplace.pdf
Michael Economou - Don't build a marketplace.pdfMichael Economou - Don't build a marketplace.pdf
Michael Economou - Don't build a marketplace.pdf
Michael Oikonomou
 
Create a spend money transaction during bank reconciliation.pdf
Create a spend money transaction during bank reconciliation.pdfCreate a spend money transaction during bank reconciliation.pdf
Create a spend money transaction during bank reconciliation.pdf
andreakaterasco
 
Best Crypto Marketing Ideas to Lead Your Project to Success
Best Crypto Marketing Ideas to Lead Your Project to SuccessBest Crypto Marketing Ideas to Lead Your Project to Success
Best Crypto Marketing Ideas to Lead Your Project to Success
Intelisync
 
Get To Know About Salma Karina Hayat.pdf
Get To Know About Salma Karina Hayat.pdfGet To Know About Salma Karina Hayat.pdf
Get To Know About Salma Karina Hayat.pdf
Salma Karina Hayat
 
Showcase Portfolio- Marian Andrea Tana.pdf
Showcase Portfolio- Marian Andrea Tana.pdfShowcase Portfolio- Marian Andrea Tana.pdf
Showcase Portfolio- Marian Andrea Tana.pdf
MarianAndreaSTana
 
How to Build a Diversified Investment Portfolio.pdf
How to Build a Diversified Investment Portfolio.pdfHow to Build a Diversified Investment Portfolio.pdf
How to Build a Diversified Investment Portfolio.pdf
Trims Creators
 
How To Leak-Proof Your Magazine Business
How To Leak-Proof Your Magazine BusinessHow To Leak-Proof Your Magazine Business
How To Leak-Proof Your Magazine Business
Charlie McDermott
 
Office Furniture | Furniture Store in Sarasota, Florida | Sarasota Collection
Office Furniture | Furniture Store in Sarasota, Florida | Sarasota CollectionOffice Furniture | Furniture Store in Sarasota, Florida | Sarasota Collection
Office Furniture | Furniture Store in Sarasota, Florida | Sarasota Collection
The Sarasota Collection Home Store
 
Web Technology LAB MANUAL for Undergraduate Programs
Web Technology  LAB MANUAL for Undergraduate ProgramsWeb Technology  LAB MANUAL for Undergraduate Programs
Web Technology LAB MANUAL for Undergraduate Programs
Chandrakant Divate
 
Dining Tables and Chairs | Furniture Store in Sarasota, Florida
Dining Tables and Chairs | Furniture Store in Sarasota, FloridaDining Tables and Chairs | Furniture Store in Sarasota, Florida
Dining Tables and Chairs | Furniture Store in Sarasota, Florida
The Sarasota Collection Home Store
 

Recently uploaded (11)

Textile Chemical Brochure - Tradeasia (1).pdf
Textile Chemical Brochure - Tradeasia (1).pdfTextile Chemical Brochure - Tradeasia (1).pdf
Textile Chemical Brochure - Tradeasia (1).pdf
 
Michael Economou - Don't build a marketplace.pdf
Michael Economou - Don't build a marketplace.pdfMichael Economou - Don't build a marketplace.pdf
Michael Economou - Don't build a marketplace.pdf
 
Create a spend money transaction during bank reconciliation.pdf
Create a spend money transaction during bank reconciliation.pdfCreate a spend money transaction during bank reconciliation.pdf
Create a spend money transaction during bank reconciliation.pdf
 
Best Crypto Marketing Ideas to Lead Your Project to Success
Best Crypto Marketing Ideas to Lead Your Project to SuccessBest Crypto Marketing Ideas to Lead Your Project to Success
Best Crypto Marketing Ideas to Lead Your Project to Success
 
Get To Know About Salma Karina Hayat.pdf
Get To Know About Salma Karina Hayat.pdfGet To Know About Salma Karina Hayat.pdf
Get To Know About Salma Karina Hayat.pdf
 
Showcase Portfolio- Marian Andrea Tana.pdf
Showcase Portfolio- Marian Andrea Tana.pdfShowcase Portfolio- Marian Andrea Tana.pdf
Showcase Portfolio- Marian Andrea Tana.pdf
 
How to Build a Diversified Investment Portfolio.pdf
How to Build a Diversified Investment Portfolio.pdfHow to Build a Diversified Investment Portfolio.pdf
How to Build a Diversified Investment Portfolio.pdf
 
How To Leak-Proof Your Magazine Business
How To Leak-Proof Your Magazine BusinessHow To Leak-Proof Your Magazine Business
How To Leak-Proof Your Magazine Business
 
Office Furniture | Furniture Store in Sarasota, Florida | Sarasota Collection
Office Furniture | Furniture Store in Sarasota, Florida | Sarasota CollectionOffice Furniture | Furniture Store in Sarasota, Florida | Sarasota Collection
Office Furniture | Furniture Store in Sarasota, Florida | Sarasota Collection
 
Web Technology LAB MANUAL for Undergraduate Programs
Web Technology  LAB MANUAL for Undergraduate ProgramsWeb Technology  LAB MANUAL for Undergraduate Programs
Web Technology LAB MANUAL for Undergraduate Programs
 
Dining Tables and Chairs | Furniture Store in Sarasota, Florida
Dining Tables and Chairs | Furniture Store in Sarasota, FloridaDining Tables and Chairs | Furniture Store in Sarasota, Florida
Dining Tables and Chairs | Furniture Store in Sarasota, Florida
 

HT & LT Bus Ducts Manufacturer in Telangana and Andhra Pradesh

  • 1. V I S I O N T E K N I K S E N G I N E E R I N G & A U T O M A T I O N PREVENTATIVE BUS DUCT MAINTENANCE SAVES THOUSANDS IN UNPLANNED DOWNTIME COSTS Bus duct systems are incredibly important in effectively distributing power to switchgear and various loads. Improper maintenance of bus duct systems can lead to problems resulting in catastrophic failures and costly downtime events. Standard Requirements for BusDuct Selection Some of the common reasons for bus failure: • Has the correct voltage rating • Condensation and outside water intrusion • Has sufficient current rating • Conductor connection integrity • Has right quantity of conductors (phase, neutral, and ground) • Dirt/foreign debris • Damaged gasket/bellows • Has adequate short circuit bracing • Grounding/interference issues • Is totally enclosed • Improper termination design/installation • Has the right duty of protection • Cracked weld joints Recommended Maintenance Procedures The following maintenance procedures and periodical inspection are recommended to ensure a safe operation of busduct system for long terms. 1.Period of Inspection 1.1 An inspection on busduct every once a year or two is recommended. If a busduct is installed in an unfavourable environment such as, High temperature ;
  • 2. High humidity, Dusty or Corrosive atmosphere or such similar environment, a periodical inspection shall be a must. 1.2 In the event of the following unusual conditions, inspection must be carried out immediately in each case:  After severe earthquake  After being involved in a fire  After being exposed to water  After an electrical fault 2. Maintenance and Routine Inspection 2.1 Inspection on External Appearance Check whether:-  If any rust spots visible  There is any deformation, damage, dirt, etc throughout the length of Busduct.  There is any dislocation, bending and other abnormality of the connecting covers, hangers and plug-in appliances 2.2 Environmental Inspection The environment, where the ducts are installed, sometimes changes after its installation. Check if the environment has become hazardous due to water, moisture, high temperature, corrosive gas, high vibration, dust, etc. 2.3 Inspection for Abnormal Heat An Infra Red Thermography instrument is recommended to detect any abnormal heat and measure the operating temperature of busduct system. As an option, a thermal indicator can be placed onto the busduct housing. If the temperature rise of the busduct housing exceeds the limit, the colour of the indicator will change. e.g. from white to red colour. 2.4 Inspection on Connection Sections Check whether:-  Busduct joint section is securely fastened with joint bolts and both sides of the busduct joint section are held with a pair of leaf springs.  Leaf springs are almost flat and the pin holes are inserted with snap pins.  Busduct is supported by vertical spring hangers, vertical hangers, edgewise / flat wise horizontal hangers according to manufacturer’s requirement and recommendation.  All the connecting parts, such as leaf springs, hangers, busduct joints, joint covers, etc are tight.
  • 3. 2.5 Inspection on Load Condition After the busduct installation, increase of load is expected. An inspection has to be carried out to ensure that the total connected load does not exceed the rated current of the busduct before the load is increased. 2.6 Measurement of Insulation Resistance Measure the insulation resistance between each conductor and between conductor and housing. When the measurement is carried out, the electrical loads and connected equipment shall be disconnected. 2.7 Inspection on Rust or Peeling of Paint on Busduct Housing If there are sign of peeling paint or rust on the busduct housing, cleaning work and touch-up painting are recommended. The metal housing /enclosure of busduct must not be dismantled by any parties without the official authorization from the manufacturer for any purposes. Any violation or abuse will result the respective party to be responsible for all the consequences and compensation. Furthermore, the manufacturer reserves the right to void the warranty if any proof of violation or any sign of abuse is found. V I S I O N T E K N I K S E N G I N E E R I N G & A U T O M A T I O N