Establish maintenance practices and provide general guidelines for switchgear maintenance. Maintenance programs can range from continuous online monitoring to run-to-failure approaches, with most combining predictive and preventive maintenance. Key aspects include inspection of components for abnormalities, maintenance of breakers and feeders, protection relay testing, and condition monitoring through load monitoring and thermography. Reliability concerns include issues with insulation, operating mechanisms, protective devices, and controls that are integral to breakers. Common failure modes include failure to close or open and spurious operation.
Maintenance of Substation Equipment | Operation And Maintenance Of SubstationSystem Protection
We work with the latest tools and equipment’s ensuring the delivery of highest quality of Services. We have served over 200 major industrial clients, in Oil & Gas, Cement, Government, Fertilizers and various other core and non-core Sectors. We are headquartered in Vadodara (Gujarat), India, but our exposure is not limited to National Industries. We are leaving a global footprint with clients in various nations like Tanzania, Paraguay, UAE, Kuwait, Nepal, Bangladesh, etc.
Installation Operation & Maintenance of 33kV & 11kV SwitchgearSheikh Nazmul Islam
In-Country Training On Operation, Maintenance, Protection & Control of 33/11 kV Substation Project Name: Design, Supply, Installation, Testing & Commissioning of 33/11 kV sub-stations with source end feeder bays. Contract No: BREB/UREDS/W-01A-001/02/2016-2017 BREB/UREDS/W-01A-002/03/2016-2017 BREB/UREDS/W-01A-004/04/2016-2017
Maintenance of Substation Equipment | Operation And Maintenance Of SubstationSystem Protection
We work with the latest tools and equipment’s ensuring the delivery of highest quality of Services. We have served over 200 major industrial clients, in Oil & Gas, Cement, Government, Fertilizers and various other core and non-core Sectors. We are headquartered in Vadodara (Gujarat), India, but our exposure is not limited to National Industries. We are leaving a global footprint with clients in various nations like Tanzania, Paraguay, UAE, Kuwait, Nepal, Bangladesh, etc.
Installation Operation & Maintenance of 33kV & 11kV SwitchgearSheikh Nazmul Islam
In-Country Training On Operation, Maintenance, Protection & Control of 33/11 kV Substation Project Name: Design, Supply, Installation, Testing & Commissioning of 33/11 kV sub-stations with source end feeder bays. Contract No: BREB/UREDS/W-01A-001/02/2016-2017 BREB/UREDS/W-01A-002/03/2016-2017 BREB/UREDS/W-01A-004/04/2016-2017
This presentation will discuss how the use and need for voltage transformers has changed over the last twenty years. With the introduction of auto-ranging electric meters, meter technicians need to be prepared, use the appropriate tools and PPE for high capacity circuits (without VT's), as this method has become increasingly popular.
Maximizing Generator Lifespan Key Strategies For Effective MaintenanceLeddy Power Systems Inc
Ensuring the longevity of your generator requires regular inspections, fluid system maintenance, load testing, and clean fuel management. Focus on key components like fuel lines, belts, and electrical connections. Use proper tools and seek professional help for fluid replacements. Regularly clean or replace fuel filters and monitor coolant levels to keep your generator running efficiently and reliably.
Fluke 101 Basic Digital Multimeter User ManualTim Miller
This is the user manual of Fluke 101 Basic Digital Multimeter.
>> READ MORE: https://www.obdadvisor.com/best-automotive-multimeter/
Here is a detailed review of the multimeter based on my own experience, including:
- Compatibility
- Features and Functions
- Pros and Cons
Check it out to get the REVIEW and some NOTES about using the tool.
This presentation will discuss how the use and need for voltage transformers has changed over the last twenty years. With the introduction of auto-ranging electric meters, meter technicians need to be prepared, use the appropriate tools and PPE for high capacity circuits (without VT's), as this method has become increasingly popular.
Maximizing Generator Lifespan Key Strategies For Effective MaintenanceLeddy Power Systems Inc
Ensuring the longevity of your generator requires regular inspections, fluid system maintenance, load testing, and clean fuel management. Focus on key components like fuel lines, belts, and electrical connections. Use proper tools and seek professional help for fluid replacements. Regularly clean or replace fuel filters and monitor coolant levels to keep your generator running efficiently and reliably.
Fluke 101 Basic Digital Multimeter User ManualTim Miller
This is the user manual of Fluke 101 Basic Digital Multimeter.
>> READ MORE: https://www.obdadvisor.com/best-automotive-multimeter/
Here is a detailed review of the multimeter based on my own experience, including:
- Compatibility
- Features and Functions
- Pros and Cons
Check it out to get the REVIEW and some NOTES about using the tool.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
2. “ Establish maintenance practices and provide general guidelines for switch
gear maintenance”
PM - practices
Establish maintenance practice
from continuous online monitoring to “run-to-failure”
Predictive and preventive maintenance programs—including most of
the NFPA and InterNational Electrical Testing Association (NETA)
recommendations—fall in the middle of this range.
Most real-world maintenance programs are a combination of these
approaches. Eg replace indicating lamp when fail, but do predictive
for breaker.
Decide maintenance frequency
Finalize preventive & diagnostic maintenance practices & schedule
3. Maintenance check points
Panel / Feeder
– Inspection of components, terminations, hardware for any
abnormality
– Ensure Panel vermin proofing
– Site specific checklist
Support Insulators
– Inspection for tracking, condensation
– Inspection for damages caused by overheating
Breaker
– PM & overhauling as per standard practice and
manufacturer guidelines
4. Maintenance check points
Protection relay and protection schemes
Cleaning / Functional test of individual relay
Follow specific instructions from OEM
Protection scheme check after PM
Bus maintenance
Cleaning / tightness / Insulation test
Condition monitoring
Load monitoring
Thermography
5. ELECTRICAL PARAMETERS TO CHECK
a) Insulation resistance to be measured
b) If facility is available then measure opening and closing time of
breaker .This shall be once in a year even through outside agency .
c) Measurement of contact resistance .
d) Checking of control circuit
e) Taking trial in test position for closing
and tripping .
f) Checking of indicating devices .
g) Checking of closing and tripping coils .
h) Checking of contacts
i) Checking of operating mechanism
j) Checking of auxiliary switches
k)) Checking of tightness of bolts and nuts
During Periodic Maintenance
6. Simple maintenance tips that work
Few key considerations:
Visually inspect the external condition of the switchboard on a
regular basis for foreign matter, dust and hot spots, and when
planned the inside of the cable termination chambers and other
sections within the switchboard
Annually check using infrared detection for internal electrical hot
spots
Examine the main/arcing contacts for excessive burning/damage
and recondition or renew as requirede
Check and adjust the spring contact force and contact alignment
as required
Remove, examine and clean the arc chutes and renew if damaged
Inspect, adjust and lubricate mechanisms
7. Simple maintenance tips that work
On withdrawable equipment examine the primary isolating
contacts for damage, burning, corrosion and clean and refurb
where necessary.
Check the lubrication of the circuit-breaker isolating mechanism
Check that the position indicators and interlocks work properly
Examine and check the voltage transformer if applicable
Plan for frequent trip-testing of the circuit-breakers via the
protection relay system
Never work on live equipment. Or when absolutely necessary,
use properly insulated tools to prevent risk of flashover
Check operation of interlocks and safety shutters
Carry out ductor, megger and secondary injection tests and
8. Maintenance and CM schedule
SN Activity Frequency
1 Monitor and record load current and voltage Daily
2 Thermography survey 6 months
Maintenance
Condition monitoring / Diagnostic
1 PM of breaker and feeder 6 months
2 Overhauling of breaker 3 to 4 years / OEM
recommendation
3 PM of bus bars Opportunity
4 Relay testing As per criticality of service
1 year to 4 years
5 Functional testing of protection scheme After carrying out PM / relay
testing
9. reliability concerns
Reliability concerns to not only insulation but also to the
correct functioning of the operating mechanism, protective
devices, and control that are integral to the breaker.
switchgear breakers are active elements that can fail by acting
spuriously or by not functioning upon command
10. Failure modes for medium-voltage
circuit breakers
• Failure to close
• Failure to open
• Spurious opening
• Spurious closure
• Failure to operate as required
• Failure to recharge closing spring
• Slow operation
• Short circuit to ground
• Out of calibration
• Intermittent operation
11. failure symptom categories
The following failure symptom categories were identified as being
important:
• Movement of the breaker mechanism is impeded by insuffi cient or
inadequate lubrication
• Movement of the breaker mechanism is impeded by broken, bent,
or loose parts, friction, binding, resulting from excessive stress,
wear, or faulty installation
• Operation of the breaker is impeded by incorrect adjustment of set
points/limit switches
• Various electrical problems caused, e.g., by defective coils,
defective command circuits, wiring faults, loose wires, poor
contacts, and blown fuses
• Others (e.g., dirt, pollution, and corrosion)
12.
13. MAINTENANCE OF POWER TRANSFORMER
General maintenance of transformer requires …..
HALF YEARLY CHECKS:
Check & clean bushings.
Check OLTC mechanism for smooth operation. Check
motor & its control.
Check dielectric strength of oil.
Check cooling system i.e. cooling fan working and its
operating controls.
Service fans and replace if not working.
Check earthing of transformer.
14. MAINTENANCE OF POWER TRANSFORMER
General maintenance of transformer requires …..
YEARLY CHECKS:
Check & clean bushings.
Check OLTC mechanism for smooth operation.
Check OLTC motor & its control.
Check dielectric strength of oil.
Check water content in oil.
Check earthing of transformer.
Check control & protection system and Tighten all
connections.
Take routine test on transformer.
15. General maintenance of Distribution transformer
HALF YEARLY CHECKS:
Check proper size of DO fuse.
Check colour of silica gel.
Tight all incoming / out going connections.
Check earthing of transformer.
Check oil leakage & attend if any.
Clean main tank, radiator & bushings.
YEARLY CHECKS:
Measure IR value.
Measure dielectric strength of oil.
16. • AFTER SERVICE OF 5 – 7 YEARS:
Preferably, the manufacturer’s engineer may
be called at site.
Replace all ageing gaskets.
The existing oil in the transformer should be
filtered continuously to attain dielectric
strength of 60 kV for 1 min. or more with
improvement in the IR value.
The procedure could also be as per the
manufacturer’s manual.
17. • AFTER SERVICE OF 5 – 7 YEARS:
Filtration would remove sludge, dirt, moisture,
etc. from the oil.
If condition of existing oil is found extremely
deteriorated upon testing prior to
maintenance, fresh oil should be filled in the
transformer under vacuum.
The values of IR and PI should be taken
again to ensure the healthiness of
transformer.
18. ■ Transformer Body
Main Tank
Conservator tank
Load Tap Changer
Bushings
Core
Winding
■ Cooling Media / system
Oil
Radiator
Radiator Fans
Oil Pumps
Accessories
Breather
Buchholtz relay
Oil and Winding Temp. indicator
Explosion vent
Pressure release valve
MOG
OSR
Marshaling box
Editor's Notes
Develop a maintenance program. The many approaches to switchgear maintenance range from continuous online monitoring to “do nothing” (also called “run-to-failure”). Predictive and preventive maintenance programs—including most of the National Fire Protection Association (NFPA) and InterNational Electrical Testing Association (NETA) recommendations—fall in the middle of this range. Most real-world maintenance programs are a combination of
these approaches. For instance, replacing indication lights only when they’ve failed is an example of run-to-failure maintenance. On the other hand, maintaining disconnect switches on a periodic basis— cleaning, lubricating, and exercising them—is an example of preventive maintenance.
Annual visual and thermographic inspections on bus connections and breakers are examples of predictive maintenance.
reliability concerns to not only insulation but also to the correct functioning of the operating mechanism, protective devices, and control that are integral to the breaker. Unlike transformers that are a quiescent element, switchgear breakers are active elements that can fail by acting spuriously or by not functioning (either to open or close) upon command. These incorrect functions can create problems in the connected circuits that are quite different from those that result directly from any fire, explosion, or spread of possibly toxic insulating fluids. If a breaker fails to clear upon signal or becomes overloaded for any reason, then the circuit will be subjected to further damage until an upstream breaker (usually larger and set at a higher current rating) can sense and clear the overload.