Contents:
Page No
1. Abstract ------------------------------------------------------------------------------------------------ 3
2. Project Overview ------------------------------------------------------------------------------------- 3
3. Software Requirements ------------------------------------------------------------------------------ 3-4
4. User Characteristics ---------------------------------------------------------------------------------- 4
5. Constrains ---------------------------------------------------------------------------------------------- 4
6. Feasibility Study --------------------------------------------------------------------------------------- 5-8
 Steps in feasibility analysis
 Technical feasibility
 Front-end and back-end selection
 Front-end selection
 Back-end Selection
 Economical feasibility
 Operational Feasibility
 Schedule feasibility
7. Data flow Diagrams (DFD) ------------------------------------------------------------------------------ 8-9
 Level 1 DFD:
 Level 2 DFD Registration form
 LEVEL 3 DFD LOGIN PROCESSES
8. Database Table ----------------------------------------------------------------------------------------- 10-11
 Doctor Table
 Department Table
 Room Table
 Doctor Category Table
 Patient Table
9. Database Diagram ------------------------------------------------------------------------------------- 11
10. Output Screens --------------------------------------------------------------------------------------- 12-17
11. Conclusion -------------------------------------------------------------------------------------------- 17
3
Abstract
Objective :
Hospitals currently use a manual system for visiting Doctor Slip as a token. The current system
requires numerous paper forms, with data stores spread throughout the hospital management infrastructure.
Often information (on forms) is incomplete, or does not follow management standards. Forms are often lost
in transit between departments requiring a comprehensive auditing process to ensure that no vital
information is lost. Multiple copies of the same information exist in the hospital and may lead to
inconsistencies in data in various data stores.
A significant part of the operation of any hospital involves the acquisition, management and timely
retrieval of great volumes of information. This information typically involves; Doctor, Room, Department
and Patient personal Information. All of this information must be managed in an efficient and cost wise
fashion so that an institution's resources may be effectively utilized Hospital E-Token management will
automate the management of the hospital making it more efficient and error free for outdoor patient. It aims
at standardizing data, consolidating data ensuring data integrity and reducing inconsistencies.
PROJECT OVERVIEW :
 Project is related to Hospital E-Token Management.
 Main facilities available in this project are:-
 Maintaining records of outdoor patients.
 Providing billing details for outdoor patients.
 User or Administrator can search a Doctor/Doctor Category/Room/Department
and patient’s record by his/her name
SOFTWARE REQUIREMENTS :
Platform: Windows
Technologies Used (Back End):
 MVC 5,
 Entity Framework 6.0,
 Web API 2.2,
4
 OData v4,
 Cors.
Technologies Used (Front End)
 HTML5,
 CSS3,
 Bootstrap,
 jQuery,
 AngularJS.
Database: SQL Server 2012
Deployment Environment: IIS 7 or higher, Windows Azure Web Hosting
Description:
 Authentication/Log In,
 Doctor Entry and Search Doctor By Name/Department Name,
 Department Entry,
 Doctor Category Entry.
 Room Entry,
 Patient Entry and view Details,
 Print Patient details as a Doctor Visiting Token.
User Characteristics:
Every user should be:
• Comfortable of working with computer.
• He must have knowledge in medical field.
• He must also have basic knowledge of English too.
Constraints:
• GUI is only in English.
• Login and password is used for identification of user and there is no facility for guest.
5
Feasibility Study:
Depending on the results of the initial investigation the survey is now expanded to a more detailed
feasibility study. “FEASIBILITY STUDY” is a test of system proposal according to its workability, impact
of the organization, ability to meet needs and effective use of the resources. It focuses on these major
questions:
1. What are the user’s demonstrable needs and how does a candidate system
Meet them?
2. What resources are available for given candidate system?
3. What are the likely impacts of the candidate system on the organization?
4. Whether it is worth to solve the problem?
During feasibility analysis for this project, following primary areas of interest are to be
Considered. Investigation and generating ideas about a new system does this.
Steps in feasibility analysis:
Eight steps involved in the feasibility analysis are:
Form a project team and appoint a project leader.
Prepare system flowcharts.
Enumerate potential proposed system.
Define and identify characteristics of proposed system.
Determine and evaluate performance and cost effective of each proposed system.
Weight system performance and cost data.
Select the best-proposed system.
Prepare and report final project directive to management.
6
Technical feasibility:
A study of resource availability that may affect the ability to achieve an acceptable system. This
evaluation determines whether the technology needed for the proposed system is available or not.
Can the work for the project be done with current equipment existing software technology &
available personal?
Can the system be upgraded if developed?
If new technology is needed then what can be developed?
This is concerned with specifying equipment and software that will successfully satisfy the user
requirement. The technical needs of the system may include:
Front-end and back-end selection
An important issue for the development of a project is the selection of suitable front-end and back-end.
When we decided to develop the project we went through an extensive study to determine the most
suitable platform that suits the needs of the organization as well as helps in development of the project.
The aspects of our study included the following factors.
Front-end selection:
It must have a graphical user interface that assists employees that are not from IT
background.
Scalability and extensibility.
Flexibility.
Robustness.
According to the organization requirement and the culture.
Must provide excellent reporting features with good printing support.
Platform independent.
Easy to debug and maintain.
Event driven programming facility.
Front end must support some popular back end like MS SQL Server.
According to the above stated features we selected VB6.0 as the front-end for developing our project.
7
Back-end Selection:
 Multiple user support.
 Efficient data handling.
 Provide inherent features for security.
 Efficient data retrieval and maintenance.
 Popularity.
 Operating System compatible.
 Easy to install.
 Various drivers must be available.
 Easy to implant with the Front-end.
According to above stated features we selected MS SQL Server as the backend.
The technical feasibility is frequently the most difficult area encountered at this stage. It is essential that
the process of analysis and definition be conducted in parallel with an assessment to technical feasibility.
It centers on the existing computer system (hardware, software etc.) and to what extent it can support the
proposed system.
Economical feasibility:
Economic justification is generally the “Bottom Line” consideration for most systems. Economic
justification includes a broad range of concerns that includes cost benefit analysis. In this we weight the
cost and the benefits associated with the candidate system and if it suits the basic purpose of the
organization i.e. profit making, the project is making to the analysis and design phase.
The financial and the economic questions during the preliminary investigation are verified to estimate the
following:
 The cost to conduct a full system investigation.
 The cost of hardware and software for the class of application being considered.
 The benefits in the form of reduced cost.
 The proposed system will give the minute information, as a result the performance is
improved which in turn may be expected to provide increased profits.
 This feasibility checks whether the system can be developed with the available funds.
The Hospital E-Token Management does not require enormous amount of money
to be developed. This can be done economically if planned judicially, so it is
economically feasible. The cost of project depends upon the number of man hours
required.
8
Operational Feasibility:
It is mainly related to human organizations and political aspects. The points to be considered are:
• What changes will be brought with the system?
• What organization structures are disturbed?
• What new skills will be required? Do the existing staff members have these skills? If not, can they be
trained in due course of time? The system is operationally feasible as it very easy for the End users to
operate it. It only needs basic information about Windows platform.
Schedule feasibility:
Time evaluation is the most important consideration in the development of project. The time schedule
required for the developed of this project is very important since more development time effect machine
time, cost and cause delay in the development of other systems.
A reliable Hospital E-Token Management can be developed in the considerable amount of time.
Data Flow Diagrams (DFD):
A DFD i.e. Data Flow Diagram is a graphical tool, which has the purpose of clarifying system requirements
and identifying major transformation that will be programs in the system design. It depicts the information
flow and transformation that occurs, as data moves from input to output. The DFD provides a mechanism
for functional modeling as well as information flow modeling.
An external entity which can be a source or a destiny is represented by a solid square. It lies outside the
context of the system. A process indicates the work that is performed on data. A circle represents a process.
Data flow takes place between various components of the system & hence represented by an arrow mark.
A data store is a repository for data. It is represented by an open-ended rectangle.
9
Level 1 DFD:
Figure-1: Data flow Diagrams
Level 2 DFD Registration form:
Figure-2: Login Process
LEVEL 3 DFD LOGIN PROCESSES:
Figure-3: Login Process
Hospital E-Token
Management
Administrator
Create and
Update
Information
Information
New User
User Email
New
Password
Confirmation
Password
Get User
Details
Reg.Confirmation
and go to Login
Form
Open
Login form
Enter User
Email and
Password
Check
User
Redirect
to Home
page
Verification
10
Database Table:
1. Doctor Table:
2. Department Table:
3. Room Table:
11
5. Doctor Category Table:
4. Patient Table:
Database Diagram:
12
OUTPUT SCREENS:
1. Admin Registration Form:
2. Login Form:
3. Home Page:
13
4. Doctor Entry Form:
5. Department Entry Form:
14
6. Room Entry From:
7. Doctor Category Entry Form:
15
8. Patient Entry Form:
16
9. Doctor Visiting slip/E-Token of Patient:
10. About and Contact :
17
Conclusion:
The project Hospital E-Token Management is for computerizing the working in a hospital. The software
takes care of all the requirements of an average hospital and iscapable to provide easy and effective
storage of information related to patients that come up to the hospital and Hospital Authority provide a
slip as a token for visiting desired doctor such as professore,Lecturer.The system also provides the facility
of backup as per the requirement.
The End

More Related Content

What's hot

Hospital management system (php project) web engineering
Hospital management system (php project) web engineeringHospital management system (php project) web engineering
Hospital management system (php project) web engineering
Iftikhar Ahmad
 
Pharmaceutical store management system
Pharmaceutical store management systemPharmaceutical store management system
Pharmaceutical store management system
Shantanu Deshpande
 
Project Proposal(Hospital Management System)
Project Proposal(Hospital Management System)Project Proposal(Hospital Management System)
Project Proposal(Hospital Management System)
SN Chakraborty
 
Hospital Management System Project Report
Hospital Management System Project Report Hospital Management System Project Report
Hospital Management System Project Report
Sarfaraj Alam
 
Final Year Project BCA Presentation on Pic-O-Stica
Final Year Project BCA Presentation on Pic-O-SticaFinal Year Project BCA Presentation on Pic-O-Stica
Final Year Project BCA Presentation on Pic-O-Stica
Sharath Raj
 
Online railway reservation system
Online railway reservation systemOnline railway reservation system
Online railway reservation system
PIYUSH Dubey
 
Pharmacy management system Requirement Analysis and Elicitation Document
Pharmacy management system Requirement Analysis and Elicitation Document Pharmacy management system Requirement Analysis and Elicitation Document
Pharmacy management system Requirement Analysis and Elicitation Document
Habitamu Asimare
 
Hospital management system
Hospital management systemHospital management system
Hospital management system
Asmat Hayat
 
Onlinemovieticketbooking 120215060739-phpapp02
Onlinemovieticketbooking 120215060739-phpapp02Onlinemovieticketbooking 120215060739-phpapp02
Onlinemovieticketbooking 120215060739-phpapp02
ISHA AHUJA
 
Project Proposal for Medical Assistant
Project Proposal for Medical AssistantProject Proposal for Medical Assistant
Project Proposal for Medical Assistant
Pasan Jayathilaka
 
SRS for Railways Reservation System
SRS for Railways Reservation System SRS for Railways Reservation System
SRS for Railways Reservation System
Vignesh Arun
 
Pharmacy management system project report
Pharmacy management system project reportPharmacy management system project report
Pharmacy management system project report
Dipta Roy
 
SRS for Hospital Management System
SRS for Hospital Management SystemSRS for Hospital Management System
SRS for Hospital Management System
kataria Arvind
 
Hospital management system
Hospital management systemHospital management system
Hospital Infomation System
Hospital Infomation SystemHospital Infomation System
Hospital Infomation SystemNguyen Truong
 
Pharmacy Management System
Pharmacy Management SystemPharmacy Management System
Pharmacy Management System
AI Publications
 
Hospital Management System
Hospital Management SystemHospital Management System
Hospital Management System
RANJIT SINGH
 
CANTEEN MANAGEMENT SYSTEM IN C++
CANTEEN MANAGEMENT SYSTEM IN C++CANTEEN MANAGEMENT SYSTEM IN C++
CANTEEN MANAGEMENT SYSTEM IN C++
vikram mahendra
 
Hospital management system
Hospital management systemHospital management system
Hospital management systemsubu
 
Apartment management system web application project
Apartment management system web application projectApartment management system web application project
Apartment management system web application project
FAKHRUN NISHA
 

What's hot (20)

Hospital management system (php project) web engineering
Hospital management system (php project) web engineeringHospital management system (php project) web engineering
Hospital management system (php project) web engineering
 
Pharmaceutical store management system
Pharmaceutical store management systemPharmaceutical store management system
Pharmaceutical store management system
 
Project Proposal(Hospital Management System)
Project Proposal(Hospital Management System)Project Proposal(Hospital Management System)
Project Proposal(Hospital Management System)
 
Hospital Management System Project Report
Hospital Management System Project Report Hospital Management System Project Report
Hospital Management System Project Report
 
Final Year Project BCA Presentation on Pic-O-Stica
Final Year Project BCA Presentation on Pic-O-SticaFinal Year Project BCA Presentation on Pic-O-Stica
Final Year Project BCA Presentation on Pic-O-Stica
 
Online railway reservation system
Online railway reservation systemOnline railway reservation system
Online railway reservation system
 
Pharmacy management system Requirement Analysis and Elicitation Document
Pharmacy management system Requirement Analysis and Elicitation Document Pharmacy management system Requirement Analysis and Elicitation Document
Pharmacy management system Requirement Analysis and Elicitation Document
 
Hospital management system
Hospital management systemHospital management system
Hospital management system
 
Onlinemovieticketbooking 120215060739-phpapp02
Onlinemovieticketbooking 120215060739-phpapp02Onlinemovieticketbooking 120215060739-phpapp02
Onlinemovieticketbooking 120215060739-phpapp02
 
Project Proposal for Medical Assistant
Project Proposal for Medical AssistantProject Proposal for Medical Assistant
Project Proposal for Medical Assistant
 
SRS for Railways Reservation System
SRS for Railways Reservation System SRS for Railways Reservation System
SRS for Railways Reservation System
 
Pharmacy management system project report
Pharmacy management system project reportPharmacy management system project report
Pharmacy management system project report
 
SRS for Hospital Management System
SRS for Hospital Management SystemSRS for Hospital Management System
SRS for Hospital Management System
 
Hospital management system
Hospital management systemHospital management system
Hospital management system
 
Hospital Infomation System
Hospital Infomation SystemHospital Infomation System
Hospital Infomation System
 
Pharmacy Management System
Pharmacy Management SystemPharmacy Management System
Pharmacy Management System
 
Hospital Management System
Hospital Management SystemHospital Management System
Hospital Management System
 
CANTEEN MANAGEMENT SYSTEM IN C++
CANTEEN MANAGEMENT SYSTEM IN C++CANTEEN MANAGEMENT SYSTEM IN C++
CANTEEN MANAGEMENT SYSTEM IN C++
 
Hospital management system
Hospital management systemHospital management system
Hospital management system
 
Apartment management system web application project
Apartment management system web application projectApartment management system web application project
Apartment management system web application project
 

Viewers also liked

Banking services offered by indian banks online
Banking services offered by indian banks onlineBanking services offered by indian banks online
Banking services offered by indian banks online
eSAT Journals
 
Queue Management and Digital Signage from one source: ONLINET
Queue Management and Digital Signage from one source: ONLINETQueue Management and Digital Signage from one source: ONLINET
Queue Management and Digital Signage from one source: ONLINET
ONLINET Group
 
Queue Management System
Queue Management SystemQueue Management System
Queue Management System
Amr Omar
 
Queue Management System
Queue Management SystemQueue Management System
Queue Management System
Saniya Wilson
 
Queue Management System
Queue Management SystemQueue Management System
Queue Management System
Rahul Barot
 
queueing problems in banking
queueing problems in bankingqueueing problems in banking
queueing problems in banking
Mani Deep
 
APPLICATION OF QUEUE MODEL TO ENHANCE BANK SERVICE IN WAITING LINES
APPLICATION OF QUEUE MODEL TO ENHANCE BANK SERVICE IN WAITING LINESAPPLICATION OF QUEUE MODEL TO ENHANCE BANK SERVICE IN WAITING LINES
APPLICATION OF QUEUE MODEL TO ENHANCE BANK SERVICE IN WAITING LINES
Pavel Islam
 
What is a Token Service Provider?
What is a Token Service Provider?What is a Token Service Provider?
What is a Token Service Provider?
Rambus Inc
 
Queue Management Best Practices
Queue Management Best PracticesQueue Management Best Practices
Queue Management Best Practices
Lavi Industries
 
Queuing theory
Queuing theoryQueuing theory
Queuing theory
Amit Sinha
 
Queuing Theory - Operation Research
Queuing Theory - Operation ResearchQueuing Theory - Operation Research
Queuing Theory - Operation Research
Manmohan Anand
 
QUEUING THEORY
QUEUING THEORYQUEUING THEORY
QUEUING THEORYavtarsingh
 
Final presentation on domino's pizza (2)
Final presentation on domino's pizza (2)Final presentation on domino's pizza (2)
Final presentation on domino's pizza (2)
Marwari college ranchi
 
E Banking
E BankingE Banking
E Banking
cssangoram
 

Viewers also liked (15)

Banking services offered by indian banks online
Banking services offered by indian banks onlineBanking services offered by indian banks online
Banking services offered by indian banks online
 
Queue Management and Digital Signage from one source: ONLINET
Queue Management and Digital Signage from one source: ONLINETQueue Management and Digital Signage from one source: ONLINET
Queue Management and Digital Signage from one source: ONLINET
 
Queue Management System
Queue Management SystemQueue Management System
Queue Management System
 
Queue Management System
Queue Management SystemQueue Management System
Queue Management System
 
Queue Management System
Queue Management SystemQueue Management System
Queue Management System
 
queueing problems in banking
queueing problems in bankingqueueing problems in banking
queueing problems in banking
 
APPLICATION OF QUEUE MODEL TO ENHANCE BANK SERVICE IN WAITING LINES
APPLICATION OF QUEUE MODEL TO ENHANCE BANK SERVICE IN WAITING LINESAPPLICATION OF QUEUE MODEL TO ENHANCE BANK SERVICE IN WAITING LINES
APPLICATION OF QUEUE MODEL TO ENHANCE BANK SERVICE IN WAITING LINES
 
What is a Token Service Provider?
What is a Token Service Provider?What is a Token Service Provider?
What is a Token Service Provider?
 
Queue Management Best Practices
Queue Management Best PracticesQueue Management Best Practices
Queue Management Best Practices
 
Queuing theory
Queuing theoryQueuing theory
Queuing theory
 
Queuing Theory - Operation Research
Queuing Theory - Operation ResearchQueuing Theory - Operation Research
Queuing Theory - Operation Research
 
QUEUING THEORY
QUEUING THEORYQUEUING THEORY
QUEUING THEORY
 
Final presentation on domino's pizza (2)
Final presentation on domino's pizza (2)Final presentation on domino's pizza (2)
Final presentation on domino's pizza (2)
 
E banking
E bankingE banking
E banking
 
E Banking
E BankingE Banking
E Banking
 

Similar to Hospital E-Token Management(outdoor)

Project on multiplex ticket bookingn system globsyn2014
Project on multiplex ticket bookingn system globsyn2014Project on multiplex ticket bookingn system globsyn2014
Project on multiplex ticket bookingn system globsyn2014Md Imran
 
online banking system
online banking systemonline banking system
online banking system
kartikeya upadhyay
 
Synopsis on billing system
Synopsis on billing systemSynopsis on billing system
Synopsis on billing system
Alok Sharma
 
Online-Voting-System.doc
Online-Voting-System.docOnline-Voting-System.doc
Online-Voting-System.doc
ShangaviS2
 
lake city institute of technology
lake city institute of technology lake city institute of technology
lake city institute of technology
RaviKalola786
 
04.project billing system
04.project billing system04.project billing system
04.project billing systemgirivaishali
 
System analysis and_design.docx
System analysis and_design.docxSystem analysis and_design.docx
System analysis and_design.docx
AlaJebnoun
 
46393833 e banking
46393833 e banking46393833 e banking
46393833 e bankingdipali2009
 
Report on medical center
Report on medical centerReport on medical center
Report on medical center
MD Hasan Mozumder
 
IRJET- Speech and Hearing
IRJET- Speech and HearingIRJET- Speech and Hearing
IRJET- Speech and Hearing
IRJET Journal
 
Bank Management System.docx
Bank Management System.docxBank Management System.docx
Bank Management System.docx
Nikhil Patil
 
system development life cycle
system development life cyclesystem development life cycle
system development life cycle
SuhleemAhmd
 
ONLINE VOTING SYSTEM.docx
ONLINE VOTING SYSTEM.docxONLINE VOTING SYSTEM.docx
ONLINE VOTING SYSTEM.docx
DHEERAJSAINI71
 
Hospital Management System Project
Hospital Management System ProjectHospital Management System Project
Hospital Management System Project
Sanjit Yadav
 
Project Documentation Student Management System format.pptx
Project Documentation Student Management System format.pptxProject Documentation Student Management System format.pptx
Project Documentation Student Management System format.pptx
AjayPatre1
 
373512722-Employee-Leave-Management-System.docx
373512722-Employee-Leave-Management-System.docx373512722-Employee-Leave-Management-System.docx
373512722-Employee-Leave-Management-System.docx
santhoshyadav23
 
Issue Management System
Issue Management SystemIssue Management System
Issue Management System
Pratik Vipul
 
The tasks You are assumed to be one of the software consultants .docx
The tasks You are assumed to be one of the software consultants .docxThe tasks You are assumed to be one of the software consultants .docx
The tasks You are assumed to be one of the software consultants .docx
sarah98765
 

Similar to Hospital E-Token Management(outdoor) (20)

Project on multiplex ticket bookingn system globsyn2014
Project on multiplex ticket bookingn system globsyn2014Project on multiplex ticket bookingn system globsyn2014
Project on multiplex ticket bookingn system globsyn2014
 
online banking system
online banking systemonline banking system
online banking system
 
Synopsis on billing system
Synopsis on billing systemSynopsis on billing system
Synopsis on billing system
 
Print report
Print reportPrint report
Print report
 
Online-Voting-System.doc
Online-Voting-System.docOnline-Voting-System.doc
Online-Voting-System.doc
 
lake city institute of technology
lake city institute of technology lake city institute of technology
lake city institute of technology
 
04.project billing system
04.project billing system04.project billing system
04.project billing system
 
System analysis and_design.docx
System analysis and_design.docxSystem analysis and_design.docx
System analysis and_design.docx
 
46393833 e banking
46393833 e banking46393833 e banking
46393833 e banking
 
Report on medical center
Report on medical centerReport on medical center
Report on medical center
 
IRJET- Speech and Hearing
IRJET- Speech and HearingIRJET- Speech and Hearing
IRJET- Speech and Hearing
 
Bank Management System.docx
Bank Management System.docxBank Management System.docx
Bank Management System.docx
 
system development life cycle
system development life cyclesystem development life cycle
system development life cycle
 
Sdlc1
Sdlc1Sdlc1
Sdlc1
 
ONLINE VOTING SYSTEM.docx
ONLINE VOTING SYSTEM.docxONLINE VOTING SYSTEM.docx
ONLINE VOTING SYSTEM.docx
 
Hospital Management System Project
Hospital Management System ProjectHospital Management System Project
Hospital Management System Project
 
Project Documentation Student Management System format.pptx
Project Documentation Student Management System format.pptxProject Documentation Student Management System format.pptx
Project Documentation Student Management System format.pptx
 
373512722-Employee-Leave-Management-System.docx
373512722-Employee-Leave-Management-System.docx373512722-Employee-Leave-Management-System.docx
373512722-Employee-Leave-Management-System.docx
 
Issue Management System
Issue Management SystemIssue Management System
Issue Management System
 
The tasks You are assumed to be one of the software consultants .docx
The tasks You are assumed to be one of the software consultants .docxThe tasks You are assumed to be one of the software consultants .docx
The tasks You are assumed to be one of the software consultants .docx
 

Recently uploaded

Graphic Design Crash Course for beginners
Graphic Design Crash Course for beginnersGraphic Design Crash Course for beginners
Graphic Design Crash Course for beginners
e20449
 
Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...
Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...
Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...
Globus
 
Globus Compute Introduction - GlobusWorld 2024
Globus Compute Introduction - GlobusWorld 2024Globus Compute Introduction - GlobusWorld 2024
Globus Compute Introduction - GlobusWorld 2024
Globus
 
Cyaniclab : Software Development Agency Portfolio.pdf
Cyaniclab : Software Development Agency Portfolio.pdfCyaniclab : Software Development Agency Portfolio.pdf
Cyaniclab : Software Development Agency Portfolio.pdf
Cyanic lab
 
Providing Globus Services to Users of JASMIN for Environmental Data Analysis
Providing Globus Services to Users of JASMIN for Environmental Data AnalysisProviding Globus Services to Users of JASMIN for Environmental Data Analysis
Providing Globus Services to Users of JASMIN for Environmental Data Analysis
Globus
 
Accelerate Enterprise Software Engineering with Platformless
Accelerate Enterprise Software Engineering with PlatformlessAccelerate Enterprise Software Engineering with Platformless
Accelerate Enterprise Software Engineering with Platformless
WSO2
 
First Steps with Globus Compute Multi-User Endpoints
First Steps with Globus Compute Multi-User EndpointsFirst Steps with Globus Compute Multi-User Endpoints
First Steps with Globus Compute Multi-User Endpoints
Globus
 
Vitthal Shirke Microservices Resume Montevideo
Vitthal Shirke Microservices Resume MontevideoVitthal Shirke Microservices Resume Montevideo
Vitthal Shirke Microservices Resume Montevideo
Vitthal Shirke
 
Top Features to Include in Your Winzo Clone App for Business Growth (4).pptx
Top Features to Include in Your Winzo Clone App for Business Growth (4).pptxTop Features to Include in Your Winzo Clone App for Business Growth (4).pptx
Top Features to Include in Your Winzo Clone App for Business Growth (4).pptx
rickgrimesss22
 
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
informapgpstrackings
 
Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...
Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...
Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...
Globus
 
GlobusWorld 2024 Opening Keynote session
GlobusWorld 2024 Opening Keynote sessionGlobusWorld 2024 Opening Keynote session
GlobusWorld 2024 Opening Keynote session
Globus
 
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdfDominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
AMB-Review
 
TROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERROR
TROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERRORTROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERROR
TROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERROR
Tier1 app
 
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
Juraj Vysvader
 
Globus Connect Server Deep Dive - GlobusWorld 2024
Globus Connect Server Deep Dive - GlobusWorld 2024Globus Connect Server Deep Dive - GlobusWorld 2024
Globus Connect Server Deep Dive - GlobusWorld 2024
Globus
 
Orion Context Broker introduction 20240604
Orion Context Broker introduction 20240604Orion Context Broker introduction 20240604
Orion Context Broker introduction 20240604
Fermin Galan
 
Understanding Globus Data Transfers with NetSage
Understanding Globus Data Transfers with NetSageUnderstanding Globus Data Transfers with NetSage
Understanding Globus Data Transfers with NetSage
Globus
 
BoxLang: Review our Visionary Licenses of 2024
BoxLang: Review our Visionary Licenses of 2024BoxLang: Review our Visionary Licenses of 2024
BoxLang: Review our Visionary Licenses of 2024
Ortus Solutions, Corp
 
How to Position Your Globus Data Portal for Success Ten Good Practices
How to Position Your Globus Data Portal for Success Ten Good PracticesHow to Position Your Globus Data Portal for Success Ten Good Practices
How to Position Your Globus Data Portal for Success Ten Good Practices
Globus
 

Recently uploaded (20)

Graphic Design Crash Course for beginners
Graphic Design Crash Course for beginnersGraphic Design Crash Course for beginners
Graphic Design Crash Course for beginners
 
Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...
Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...
Exploring Innovations in Data Repository Solutions - Insights from the U.S. G...
 
Globus Compute Introduction - GlobusWorld 2024
Globus Compute Introduction - GlobusWorld 2024Globus Compute Introduction - GlobusWorld 2024
Globus Compute Introduction - GlobusWorld 2024
 
Cyaniclab : Software Development Agency Portfolio.pdf
Cyaniclab : Software Development Agency Portfolio.pdfCyaniclab : Software Development Agency Portfolio.pdf
Cyaniclab : Software Development Agency Portfolio.pdf
 
Providing Globus Services to Users of JASMIN for Environmental Data Analysis
Providing Globus Services to Users of JASMIN for Environmental Data AnalysisProviding Globus Services to Users of JASMIN for Environmental Data Analysis
Providing Globus Services to Users of JASMIN for Environmental Data Analysis
 
Accelerate Enterprise Software Engineering with Platformless
Accelerate Enterprise Software Engineering with PlatformlessAccelerate Enterprise Software Engineering with Platformless
Accelerate Enterprise Software Engineering with Platformless
 
First Steps with Globus Compute Multi-User Endpoints
First Steps with Globus Compute Multi-User EndpointsFirst Steps with Globus Compute Multi-User Endpoints
First Steps with Globus Compute Multi-User Endpoints
 
Vitthal Shirke Microservices Resume Montevideo
Vitthal Shirke Microservices Resume MontevideoVitthal Shirke Microservices Resume Montevideo
Vitthal Shirke Microservices Resume Montevideo
 
Top Features to Include in Your Winzo Clone App for Business Growth (4).pptx
Top Features to Include in Your Winzo Clone App for Business Growth (4).pptxTop Features to Include in Your Winzo Clone App for Business Growth (4).pptx
Top Features to Include in Your Winzo Clone App for Business Growth (4).pptx
 
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
Field Employee Tracking System| MiTrack App| Best Employee Tracking Solution|...
 
Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...
Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...
Climate Science Flows: Enabling Petabyte-Scale Climate Analysis with the Eart...
 
GlobusWorld 2024 Opening Keynote session
GlobusWorld 2024 Opening Keynote sessionGlobusWorld 2024 Opening Keynote session
GlobusWorld 2024 Opening Keynote session
 
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdfDominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
Dominate Social Media with TubeTrivia AI’s Addictive Quiz Videos.pdf
 
TROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERROR
TROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERRORTROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERROR
TROUBLESHOOTING 9 TYPES OF OUTOFMEMORYERROR
 
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
In 2015, I used to write extensions for Joomla, WordPress, phpBB3, etc and I ...
 
Globus Connect Server Deep Dive - GlobusWorld 2024
Globus Connect Server Deep Dive - GlobusWorld 2024Globus Connect Server Deep Dive - GlobusWorld 2024
Globus Connect Server Deep Dive - GlobusWorld 2024
 
Orion Context Broker introduction 20240604
Orion Context Broker introduction 20240604Orion Context Broker introduction 20240604
Orion Context Broker introduction 20240604
 
Understanding Globus Data Transfers with NetSage
Understanding Globus Data Transfers with NetSageUnderstanding Globus Data Transfers with NetSage
Understanding Globus Data Transfers with NetSage
 
BoxLang: Review our Visionary Licenses of 2024
BoxLang: Review our Visionary Licenses of 2024BoxLang: Review our Visionary Licenses of 2024
BoxLang: Review our Visionary Licenses of 2024
 
How to Position Your Globus Data Portal for Success Ten Good Practices
How to Position Your Globus Data Portal for Success Ten Good PracticesHow to Position Your Globus Data Portal for Success Ten Good Practices
How to Position Your Globus Data Portal for Success Ten Good Practices
 

Hospital E-Token Management(outdoor)

  • 1. 1 Hospital E-Token Management (For Outdoor Patient) Submitted To: Syed Zahidul Hassan Consultant (C# .Net Framework) IDB-BISEW IT Scholarship Project. Show & Tell Consulting Ltd. Submitted By: 1. Anisur Rahman ID No: 1181340. 2. Abdur Rahim. ID No: 1186405 3. Ruhul Amin. ID No: 1185160 Round-25, TSP: CCSL, Batch: ID-ESAD-CS/CCSL-01M/R25/0. Submitted Date: 02.05.2016
  • 2. 2 Contents: Page No 1. Abstract ------------------------------------------------------------------------------------------------ 3 2. Project Overview ------------------------------------------------------------------------------------- 3 3. Software Requirements ------------------------------------------------------------------------------ 3-4 4. User Characteristics ---------------------------------------------------------------------------------- 4 5. Constrains ---------------------------------------------------------------------------------------------- 4 6. Feasibility Study --------------------------------------------------------------------------------------- 5-8  Steps in feasibility analysis  Technical feasibility  Front-end and back-end selection  Front-end selection  Back-end Selection  Economical feasibility  Operational Feasibility  Schedule feasibility 7. Data flow Diagrams (DFD) ------------------------------------------------------------------------------ 8-9  Level 1 DFD:  Level 2 DFD Registration form  LEVEL 3 DFD LOGIN PROCESSES 8. Database Table ----------------------------------------------------------------------------------------- 10-11  Doctor Table  Department Table  Room Table  Doctor Category Table  Patient Table 9. Database Diagram ------------------------------------------------------------------------------------- 11 10. Output Screens --------------------------------------------------------------------------------------- 12-17 11. Conclusion -------------------------------------------------------------------------------------------- 17
  • 3. 3 Abstract Objective : Hospitals currently use a manual system for visiting Doctor Slip as a token. The current system requires numerous paper forms, with data stores spread throughout the hospital management infrastructure. Often information (on forms) is incomplete, or does not follow management standards. Forms are often lost in transit between departments requiring a comprehensive auditing process to ensure that no vital information is lost. Multiple copies of the same information exist in the hospital and may lead to inconsistencies in data in various data stores. A significant part of the operation of any hospital involves the acquisition, management and timely retrieval of great volumes of information. This information typically involves; Doctor, Room, Department and Patient personal Information. All of this information must be managed in an efficient and cost wise fashion so that an institution's resources may be effectively utilized Hospital E-Token management will automate the management of the hospital making it more efficient and error free for outdoor patient. It aims at standardizing data, consolidating data ensuring data integrity and reducing inconsistencies. PROJECT OVERVIEW :  Project is related to Hospital E-Token Management.  Main facilities available in this project are:-  Maintaining records of outdoor patients.  Providing billing details for outdoor patients.  User or Administrator can search a Doctor/Doctor Category/Room/Department and patient’s record by his/her name SOFTWARE REQUIREMENTS : Platform: Windows Technologies Used (Back End):  MVC 5,  Entity Framework 6.0,  Web API 2.2,
  • 4. 4  OData v4,  Cors. Technologies Used (Front End)  HTML5,  CSS3,  Bootstrap,  jQuery,  AngularJS. Database: SQL Server 2012 Deployment Environment: IIS 7 or higher, Windows Azure Web Hosting Description:  Authentication/Log In,  Doctor Entry and Search Doctor By Name/Department Name,  Department Entry,  Doctor Category Entry.  Room Entry,  Patient Entry and view Details,  Print Patient details as a Doctor Visiting Token. User Characteristics: Every user should be: • Comfortable of working with computer. • He must have knowledge in medical field. • He must also have basic knowledge of English too. Constraints: • GUI is only in English. • Login and password is used for identification of user and there is no facility for guest.
  • 5. 5 Feasibility Study: Depending on the results of the initial investigation the survey is now expanded to a more detailed feasibility study. “FEASIBILITY STUDY” is a test of system proposal according to its workability, impact of the organization, ability to meet needs and effective use of the resources. It focuses on these major questions: 1. What are the user’s demonstrable needs and how does a candidate system Meet them? 2. What resources are available for given candidate system? 3. What are the likely impacts of the candidate system on the organization? 4. Whether it is worth to solve the problem? During feasibility analysis for this project, following primary areas of interest are to be Considered. Investigation and generating ideas about a new system does this. Steps in feasibility analysis: Eight steps involved in the feasibility analysis are: Form a project team and appoint a project leader. Prepare system flowcharts. Enumerate potential proposed system. Define and identify characteristics of proposed system. Determine and evaluate performance and cost effective of each proposed system. Weight system performance and cost data. Select the best-proposed system. Prepare and report final project directive to management.
  • 6. 6 Technical feasibility: A study of resource availability that may affect the ability to achieve an acceptable system. This evaluation determines whether the technology needed for the proposed system is available or not. Can the work for the project be done with current equipment existing software technology & available personal? Can the system be upgraded if developed? If new technology is needed then what can be developed? This is concerned with specifying equipment and software that will successfully satisfy the user requirement. The technical needs of the system may include: Front-end and back-end selection An important issue for the development of a project is the selection of suitable front-end and back-end. When we decided to develop the project we went through an extensive study to determine the most suitable platform that suits the needs of the organization as well as helps in development of the project. The aspects of our study included the following factors. Front-end selection: It must have a graphical user interface that assists employees that are not from IT background. Scalability and extensibility. Flexibility. Robustness. According to the organization requirement and the culture. Must provide excellent reporting features with good printing support. Platform independent. Easy to debug and maintain. Event driven programming facility. Front end must support some popular back end like MS SQL Server. According to the above stated features we selected VB6.0 as the front-end for developing our project.
  • 7. 7 Back-end Selection:  Multiple user support.  Efficient data handling.  Provide inherent features for security.  Efficient data retrieval and maintenance.  Popularity.  Operating System compatible.  Easy to install.  Various drivers must be available.  Easy to implant with the Front-end. According to above stated features we selected MS SQL Server as the backend. The technical feasibility is frequently the most difficult area encountered at this stage. It is essential that the process of analysis and definition be conducted in parallel with an assessment to technical feasibility. It centers on the existing computer system (hardware, software etc.) and to what extent it can support the proposed system. Economical feasibility: Economic justification is generally the “Bottom Line” consideration for most systems. Economic justification includes a broad range of concerns that includes cost benefit analysis. In this we weight the cost and the benefits associated with the candidate system and if it suits the basic purpose of the organization i.e. profit making, the project is making to the analysis and design phase. The financial and the economic questions during the preliminary investigation are verified to estimate the following:  The cost to conduct a full system investigation.  The cost of hardware and software for the class of application being considered.  The benefits in the form of reduced cost.  The proposed system will give the minute information, as a result the performance is improved which in turn may be expected to provide increased profits.  This feasibility checks whether the system can be developed with the available funds. The Hospital E-Token Management does not require enormous amount of money to be developed. This can be done economically if planned judicially, so it is economically feasible. The cost of project depends upon the number of man hours required.
  • 8. 8 Operational Feasibility: It is mainly related to human organizations and political aspects. The points to be considered are: • What changes will be brought with the system? • What organization structures are disturbed? • What new skills will be required? Do the existing staff members have these skills? If not, can they be trained in due course of time? The system is operationally feasible as it very easy for the End users to operate it. It only needs basic information about Windows platform. Schedule feasibility: Time evaluation is the most important consideration in the development of project. The time schedule required for the developed of this project is very important since more development time effect machine time, cost and cause delay in the development of other systems. A reliable Hospital E-Token Management can be developed in the considerable amount of time. Data Flow Diagrams (DFD): A DFD i.e. Data Flow Diagram is a graphical tool, which has the purpose of clarifying system requirements and identifying major transformation that will be programs in the system design. It depicts the information flow and transformation that occurs, as data moves from input to output. The DFD provides a mechanism for functional modeling as well as information flow modeling. An external entity which can be a source or a destiny is represented by a solid square. It lies outside the context of the system. A process indicates the work that is performed on data. A circle represents a process. Data flow takes place between various components of the system & hence represented by an arrow mark. A data store is a repository for data. It is represented by an open-ended rectangle.
  • 9. 9 Level 1 DFD: Figure-1: Data flow Diagrams Level 2 DFD Registration form: Figure-2: Login Process LEVEL 3 DFD LOGIN PROCESSES: Figure-3: Login Process Hospital E-Token Management Administrator Create and Update Information Information New User User Email New Password Confirmation Password Get User Details Reg.Confirmation and go to Login Form Open Login form Enter User Email and Password Check User Redirect to Home page Verification
  • 10. 10 Database Table: 1. Doctor Table: 2. Department Table: 3. Room Table:
  • 11. 11 5. Doctor Category Table: 4. Patient Table: Database Diagram:
  • 12. 12 OUTPUT SCREENS: 1. Admin Registration Form: 2. Login Form: 3. Home Page:
  • 13. 13 4. Doctor Entry Form: 5. Department Entry Form:
  • 14. 14 6. Room Entry From: 7. Doctor Category Entry Form:
  • 16. 16 9. Doctor Visiting slip/E-Token of Patient: 10. About and Contact :
  • 17. 17 Conclusion: The project Hospital E-Token Management is for computerizing the working in a hospital. The software takes care of all the requirements of an average hospital and iscapable to provide easy and effective storage of information related to patients that come up to the hospital and Hospital Authority provide a slip as a token for visiting desired doctor such as professore,Lecturer.The system also provides the facility of backup as per the requirement. The End