SlideShare a Scribd company logo
Bruce D. Hieber
                                                                      385 Seranade Street | Reynoldsburg, Ohio 43068
                                                                        Bruce43068@peoplepc.com | (614) 863-4631
                                                                                 www.linkedin.com/in/BruceHieber


Purchasing | Quality Management | Industrial/Manufacturing Engineering
        Earned Certified Quality Engineer (CQE) and Certified Production Inventory Manager (CPIM) designations


       Production Engineering          Manufacturing Process Development            MRP Systems
       Capital/Expense Budgets         Capital Equipment Specification              Quality Engineering
       Data Management                 Policy/Procedure Development                 Root Cause Analysis
       Vendor Negotiations             Quality Process Development                  Inventory Management
       Quality Control                 Program Implementation                       Productivity Improvement
       Staff Supervision               Staff Training & Development                 Process Troubleshooting



                                  Career Highlights/Categories
Purchasing/Supply Chain
   Enhanced operations through effective management of Electronic Requirements Planning (ERP) transactions from
    major customers; significantly improved downloading of information from Plexus ERP system and modification for
    planning through development and macro-enhancement of Excel spreadsheets. Production Planning
    Administrator … Tomasco Mulciber, Inc.
   Facilitated extensive operating savings via contribution to comprehensive localization process (sourcing new
    suppliers for Japanese supplied parts); guidance of department with reduced staff; assuming responsibilities during
    right-sizing and plant closing operations. Purchasing Manager … Tomasco Mulciber, Inc.
   Championed execution of (newly installed) MAPICS MRP system utilized in production and purchasing planning;
    included creation of items masters for parts and assemblies, conversion of hand-written parts lists into MAPICS
    bills of materials, and developed MAPICS process routers from informal work instructions. Production
    Coordinator … Scientific Columbus
Quality Engineering
   Guided initiative developing and implementing ISO-compliant quality system; included creation of quality system
    manual; functioned with complete authority over quality program for 6 years (included training of production and
    quality associates). Manufacturing Operations Manager … Dynalab
Manufacturing/Industrial Engineering
   Directed 3-4 engineers and 2 engineering technicians through development of MRP database, work instructions,
    process layout, and time studies. Significantly improved accuracy of the MAPICS database files through
    comprehensive audits of bills of materials and process routers. Also improved accuracy of production capacity and
    cost planning by introducing the Maynard MOST time study system. Industrial Engineering Manager… Scientific
    Columbus.
   Heavily involved in major circuit card manufacturing equipment specification and work cell layout improvements
    to increase productivity and introduce new cleaning technology mandated by the Montreal Protocol.
    Manufacturing Engineer…Grimes Aerospace, Manufacturing Operations Manager… Dynalab.
Manufacturing Management
   Supervised 10 – 30 production associates in circuit card and final assembly operations on 2 shifts; contributed to
    introduction of assembly line procedures (in place of individual stations) resulting in increased work flow and
    efficiency; assisted with start up of operations in new facility, including introduction of automated processes.
    Production Supervisor … Scientific Columbus
   Coordinated contributions of process engineers, production supervisors, and administrative associates as well as
    indirectly oversaw production and test associates; accountable for quality, engineering, and production
    functions. Manufacturing Operations Manager … Dynalab
Bruce D. Hieber                                                                                    Résumé Page 2

Tomasco Mulciber, Inc. … Columbus, Ohio                                                        October 2005 to Present
$50+ million/year tier 1 Honda supplier; manufactures and ships hood lock assemblies, hood hinges, radiator shrouds, and
steering hanger beams to factories in Ohio, Indiana, Alabama, Canada, and Mexico; operations supported by approximately
300 employees.
  Purchasing Manager (October 2008 – Present)
  Administer and contribute to all facets of MRO, material and component purchases totaling $7.7 million annually;
  comprised of 4,000 – 6,500 metric tons of steel, 400,000 – 500,000 steel tubes, hardware components, MRO items
  and equipment repair parts, and capital equipment including dies, assembly fixtures and inspection fixtures.
  Accountable for overall long-term planning and execution of component and material coverage; new model
  purchasing; new supplier sourcing; purchase of trial material for new projects; sourcing and purchasing prototype
  components; quality audits on new suppliers; grounds maintenance and janitorial services; facilities maintenance
  contractors; forklift fleet preventative maintenance; supplier quality and issue resolution.
  Collaborate with internal departments to establish/verify requirements, specifications, and instructions for
  requisitioned items and purchases; communicate regularly with accounts payable to approve payments and analyze
  purchase order variances.
     Replaced underperforming existing manager and successfully maintained level and quality of operations during
      company rightsizing; retained responsibilities as coordinator of new model purchasing activities.
      o   Oversaw and ensured performance of 2 buyers and 2 purchasing technicians (accountable for MRO buying,
          component and materials buying, tool crib attendants, and materials and component storeroom attendants).
     Replaced janitorial service unable to meet performance specifications; amidst tight budget constraints and staff
      layoffs, secured vendor providing plumbing, electrical, and general maintenance repairs thus reducing demands
      on in-house staff.
     Introduced Kanban (pull system) for departmental tooling supply daily requirements thereby reducing
      unnecessary trips by production associates and simultaneously improved scheduling of tool crib coverage as well
      as enhanced usage planning.
  New Model Purchasing Coordinator (January 2008 - October 2008)
     Sourced components and materials for new models while supporting sales quoting generating new business;
      collaborated with new model engineers, sales department and suppliers throughout introduction cycle.
      o   Resourced component parts for Honda Element handbrake assembly; as original supplier failed to perform,
          located new supplier under extremely tight time constraint (with new supplier playing important role as
          source for localization of components).
     Requested quotes for components, fixtures, stamping dies, and equipment; sourced new suppliers and
      participated in quality audits; negotiated purchase agreements; ordered prototype parts and trial coils of steel for
      stamped parts; administered purchase orders and delivery schedules; updated material specifications into Plexus
      ERP system; maintained records for presentation during new model introduction reviews internally and to
      Honda representatives.
  Production Planning Administrator (October 2005 – January 2008)
  Maintained inventory levels and coordinated ordering for parts supplied from company plant in Winchester, Indiana;
  monitored and responded to issues with inventory and consumption of 15-30 different parts; collaborated with plant
  production planning, purchasing, and delivery departments.
     Accountable for ERP (Electronic Requirements Planning): Monitored and corrected issues with incoming
      requirements transmitted electronically from 4 different Honda plants; established new account records
      required for new parts, plants, and shipping address changes.
      o   Worked in concert with production schedulers (addressing use of ERP information) as well as customers to
          resolve ordering issues.
     Facilitated download and data modification as well as decreased time and errors involved in manually entering data
      through enhancement and addition of macros to spreadsheets utilized by schedulers; spreadsheets utilized for
      stamping scheduling, Kanban calculation for assembly and weld operations, and parts ordering from sister plant.
  Temporary assignments including Production Planning and Electronic Data Interface for Tomasco Mulciber,
  Inc. , October 2004 - April 2006
Bruce D. Hieber                                                                                    Résumé Page 3

Dynalab, Inc. … Reynoldsburg, Ohio                                                               March 1997 to May 2004
Privately-owned electronics contract manufacturer specializing in PC board assemblies, cables and harnesses, and small
electro-mechanical and electronic units; generated $17- 20 million sales annually; operations supported by 130 employees.
  Manufacturing Operations Manager (1998 – 2004)
  Orchestrated and oversaw entire scope of production, process engineering (including quoting for new business), and
  quality system while also functioning as primary customer contact addressing quality standards, capacity planning.
  delivery, engineering modifications, and new projects.
  Supervised staff of 11 including production supervisors, process engineers, test engineers, quality inspectors, and
  administrative associates; indirectly responsible for 100 production associates and test technicians; worked with
  human resources department on hiring and staff relations; trained associates on quality principles and electronics
  assembly practices.
     Guided company to first $2 million month; facilitated growth in operations to 2+ shifts.
     Led project to specify and purchase $250,000 surface mount assembly and reflow soldering systems and modify
      production floor layout for additional equipment, expanding capacity and reducing set-up times.
     Instrumental to sourcing and introducing Automated Optical Inspection (AOI) equipment, greatly improving inspection
      accuracy.
     Provided structure and equity to associate reviews by collaborating with Human Resources department to define job
      classifications and develop wage ranges in line with local economy.
     Implemented ISO-9002 quality system including creation of quality manual and supporting procedures.
     Improved quality system through development of defect reporting and troubleshooting problem databases in
      MS Access; system used to report defects received from suppliers as well as damage/defects located during
      assembly process.

Honeywell-Grimes Aerospace, Inc. … Urbana, Ohio                                       September 1990 to March 1997
Leading manufacturer of aircraft lighting assemblies and avionics systems; supplies aircraft manufacturers globally
(including Canada, Netherlands, Brazil, France, and U.S); employed 500 associates in 3 facilities in Urbana, Ohio and 1
facility in Greenwood, South Carolina.
  Senior Quality Engineer/Senior Manufacturing Engineer/Industrial Engineer
  Provided comprehensive engineering support to PC board assembly and avionics products; scope of responsibilities
  included issue resolution, technical assistance (to department supervisor), and associate training and development;
  represented company in customer quality audits and resolved process and defect issues.
     Notable projects and improvements included implementation of assembly line procedures enhancing throughput
      and two separate, complete manufacturing cell layout changes to further improve process flow and better utilize
      production space.
     Specified new circuit card wave solder and cleaning equipment and chemicals to change from Freon-based
      cleaning to an aqueous cleaning technology as mandated by the Montreal protocol.


                                             Early Career History
                                  Scientific Columbus … Columbus, Ohio
          Manager of Industrial Engineering/Production Control Coordinator/Production Supervisor



                          Education & Professional Development
                                  MBA - Capital University … Bexley, Ohio
                         BSBA - Bowling Green State University … Bowling Green, Ohio

More Related Content

What's hot

Investigative Mechanical Engineer - BBarrett, PE
Investigative Mechanical Engineer - BBarrett, PEInvestigative Mechanical Engineer - BBarrett, PE
Investigative Mechanical Engineer - BBarrett, PE
Brad Barrett
 
Graham Harker Resume RB 15
Graham Harker Resume RB 15Graham Harker Resume RB 15
Graham Harker Resume RB 15Graham Harker
 
Sandeep Sharma Resume 0212
Sandeep Sharma  Resume 0212Sandeep Sharma  Resume 0212
Sandeep Sharma Resume 0212Sandeep Sharma
 
Mark J. Redmond - Placement Presentation
Mark J. Redmond - Placement PresentationMark J. Redmond - Placement Presentation
Mark J. Redmond - Placement PresentationMark Redmond
 
Cv waseem anwar
Cv waseem anwarCv waseem anwar
Cv waseem anwar
waseem anwar
 
Premier Office Solutions Refurbished Leed Credits
Premier Office Solutions  Refurbished Leed CreditsPremier Office Solutions  Refurbished Leed Credits
Premier Office Solutions Refurbished Leed Creditschuckepstein
 
Mahendiran Resume 07.08.15
Mahendiran Resume 07.08.15Mahendiran Resume 07.08.15
Mahendiran Resume 07.08.15Mahendiran N
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1Dave Thompson
 
Leigh anne ritter resume 2016
Leigh anne ritter resume 2016Leigh anne ritter resume 2016
Leigh anne ritter resume 2016
Leigh Ritter
 
Artificial Intelligence (AI) the Good the Bad and the Ugly of Manufacturing O...
Artificial Intelligence (AI) the Good the Bad and the Ugly of Manufacturing O...Artificial Intelligence (AI) the Good the Bad and the Ugly of Manufacturing O...
Artificial Intelligence (AI) the Good the Bad and the Ugly of Manufacturing O...
Luis Cabrera
 
MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMohammed Kaleemuddin
 

What's hot (19)

Michael Rigby CV 2
Michael Rigby CV 2Michael Rigby CV 2
Michael Rigby CV 2
 
Investigative Mechanical Engineer - BBarrett, PE
Investigative Mechanical Engineer - BBarrett, PEInvestigative Mechanical Engineer - BBarrett, PE
Investigative Mechanical Engineer - BBarrett, PE
 
Graham Harker Resume RB 15
Graham Harker Resume RB 15Graham Harker Resume RB 15
Graham Harker Resume RB 15
 
Sandeep Sharma Resume 0212
Sandeep Sharma  Resume 0212Sandeep Sharma  Resume 0212
Sandeep Sharma Resume 0212
 
Resume-SD (1)
Resume-SD (1)Resume-SD (1)
Resume-SD (1)
 
Venkat_Resume
Venkat_ResumeVenkat_Resume
Venkat_Resume
 
Resume%27-2
Resume%27-2Resume%27-2
Resume%27-2
 
Mark J. Redmond - Placement Presentation
Mark J. Redmond - Placement PresentationMark J. Redmond - Placement Presentation
Mark J. Redmond - Placement Presentation
 
Cv waseem anwar
Cv waseem anwarCv waseem anwar
Cv waseem anwar
 
Premier Office Solutions Refurbished Leed Credits
Premier Office Solutions  Refurbished Leed CreditsPremier Office Solutions  Refurbished Leed Credits
Premier Office Solutions Refurbished Leed Credits
 
Mahendiran Resume 07.08.15
Mahendiran Resume 07.08.15Mahendiran Resume 07.08.15
Mahendiran Resume 07.08.15
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
 
robert ballesteros resumee
robert ballesteros resumeerobert ballesteros resumee
robert ballesteros resumee
 
Leigh anne ritter resume 2016
Leigh anne ritter resume 2016Leigh anne ritter resume 2016
Leigh anne ritter resume 2016
 
Artificial Intelligence (AI) the Good the Bad and the Ugly of Manufacturing O...
Artificial Intelligence (AI) the Good the Bad and the Ugly of Manufacturing O...Artificial Intelligence (AI) the Good the Bad and the Ugly of Manufacturing O...
Artificial Intelligence (AI) the Good the Bad and the Ugly of Manufacturing O...
 
Arunachalam
ArunachalamArunachalam
Arunachalam
 
CV - 2.9.16
CV - 2.9.16CV - 2.9.16
CV - 2.9.16
 
Manish Singh.doc
Manish Singh.docManish Singh.doc
Manish Singh.doc
 
MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year Experience
 

Viewers also liked

Cover letter and Resume2
Cover letter and Resume2Cover letter and Resume2
Cover letter and Resume2Elena Bean
 
JKoch res v2 - generic
JKoch res v2 - genericJKoch res v2 - generic
JKoch res v2 - genericJeffrey Koch
 
Industrial Engineer Pathak
Industrial Engineer PathakIndustrial Engineer Pathak
Industrial Engineer Pathak
onkarpathak_123
 
gskresume_2015
gskresume_2015gskresume_2015
gskresume_2015Gary Katz
 
Top 8 manufacturing engineering manager resume samples
Top 8 manufacturing engineering manager resume samplesTop 8 manufacturing engineering manager resume samples
Top 8 manufacturing engineering manager resume samples
gracetempest71
 
Adalberto cervantes completefebruary2016ver1.10
Adalberto cervantes completefebruary2016ver1.10Adalberto cervantes completefebruary2016ver1.10
Adalberto cervantes completefebruary2016ver1.10
Adalberto Cervantes Rodriguez
 
Resume and Cover letter (English)
Resume and Cover letter (English)Resume and Cover letter (English)
Resume and Cover letter (English)Jose Roberto Rocha
 
John F Petak Resume July 2011
John F Petak   Resume July  2011John F Petak   Resume July  2011
John F Petak Resume July 2011
ExerciseLeanLLC
 

Viewers also liked (10)

Cover letter and Resume2
Cover letter and Resume2Cover letter and Resume2
Cover letter and Resume2
 
JKoch res v2 - generic
JKoch res v2 - genericJKoch res v2 - generic
JKoch res v2 - generic
 
Resume AMS 011217
Resume AMS 011217 Resume AMS 011217
Resume AMS 011217
 
Industrial Engineer Pathak
Industrial Engineer PathakIndustrial Engineer Pathak
Industrial Engineer Pathak
 
Resume VESolomon LM R
Resume VESolomon LM RResume VESolomon LM R
Resume VESolomon LM R
 
gskresume_2015
gskresume_2015gskresume_2015
gskresume_2015
 
Top 8 manufacturing engineering manager resume samples
Top 8 manufacturing engineering manager resume samplesTop 8 manufacturing engineering manager resume samples
Top 8 manufacturing engineering manager resume samples
 
Adalberto cervantes completefebruary2016ver1.10
Adalberto cervantes completefebruary2016ver1.10Adalberto cervantes completefebruary2016ver1.10
Adalberto cervantes completefebruary2016ver1.10
 
Resume and Cover letter (English)
Resume and Cover letter (English)Resume and Cover letter (English)
Resume and Cover letter (English)
 
John F Petak Resume July 2011
John F Petak   Resume July  2011John F Petak   Resume July  2011
John F Petak Resume July 2011
 

Similar to Hieber, Bruce Resume

Rick Inserra_Resume
Rick Inserra_ResumeRick Inserra_Resume
Rick Inserra_ResumeRick Inserra
 
AustinJo_08192011_10222016
AustinJo_08192011_10222016AustinJo_08192011_10222016
AustinJo_08192011_10222016Jo Ann Austin
 
TONYA RESUME 112816
TONYA RESUME 112816TONYA RESUME 112816
TONYA RESUME 112816Tonya Glass
 
Shriraam Madanagopal Internship Report
Shriraam Madanagopal Internship ReportShriraam Madanagopal Internship Report
Shriraam Madanagopal Internship Report
shri1984
 
Resume-travisllucas ME ATD
Resume-travisllucas ME ATDResume-travisllucas ME ATD
Resume-travisllucas ME ATDTravis Lucas
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
Saminathan Ramadoss
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
Saminathan Ramadoss
 
Antonya vijaya raj CV -4 Years Experiences in Senior Sustain Engineer,
Antonya vijaya raj  CV -4 Years Experiences in Senior Sustain Engineer,Antonya vijaya raj  CV -4 Years Experiences in Senior Sustain Engineer,
Antonya vijaya raj CV -4 Years Experiences in Senior Sustain Engineer,Antonya vijaya raj s
 
JOHN CLARK Resume
JOHN CLARK ResumeJOHN CLARK Resume
JOHN CLARK ResumeJohn Clark
 
Resume_Anthony Brennan
Resume_Anthony BrennanResume_Anthony Brennan
Resume_Anthony Brennantbrennan
 
Brian McGill_Resume
Brian McGill_ResumeBrian McGill_Resume
Brian McGill_ResumeBrian McGill
 
160401 sbryer resume
160401   sbryer resume160401   sbryer resume
160401 sbryer resume
Scott Bryer, MBA, PMP, SSGB
 

Similar to Hieber, Bruce Resume (20)

Rick Inserra_Resume
Rick Inserra_ResumeRick Inserra_Resume
Rick Inserra_Resume
 
AustinJo_08192011_10222016
AustinJo_08192011_10222016AustinJo_08192011_10222016
AustinJo_08192011_10222016
 
TONYA RESUME 112816
TONYA RESUME 112816TONYA RESUME 112816
TONYA RESUME 112816
 
Tito Camps Resume
Tito Camps ResumeTito Camps Resume
Tito Camps Resume
 
Resume_LI
Resume_LIResume_LI
Resume_LI
 
Shriraam Madanagopal Internship Report
Shriraam Madanagopal Internship ReportShriraam Madanagopal Internship Report
Shriraam Madanagopal Internship Report
 
Conprofile.DOC
Conprofile.DOCConprofile.DOC
Conprofile.DOC
 
Polasik_Resume_061316
Polasik_Resume_061316Polasik_Resume_061316
Polasik_Resume_061316
 
Resume-travisllucas ME ATD
Resume-travisllucas ME ATDResume-travisllucas ME ATD
Resume-travisllucas ME ATD
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Antonya vijaya raj CV -4 Years Experiences in Senior Sustain Engineer,
Antonya vijaya raj  CV -4 Years Experiences in Senior Sustain Engineer,Antonya vijaya raj  CV -4 Years Experiences in Senior Sustain Engineer,
Antonya vijaya raj CV -4 Years Experiences in Senior Sustain Engineer,
 
JOHN CLARK Resume
JOHN CLARK ResumeJOHN CLARK Resume
JOHN CLARK Resume
 
John F. Lorens Resume
John F. Lorens Resume John F. Lorens Resume
John F. Lorens Resume
 
CV D.Blaskivich
CV D.BlaskivichCV D.Blaskivich
CV D.Blaskivich
 
Resume
ResumeResume
Resume
 
Resume_Anthony Brennan
Resume_Anthony BrennanResume_Anthony Brennan
Resume_Anthony Brennan
 
Brian McGill_Resume
Brian McGill_ResumeBrian McGill_Resume
Brian McGill_Resume
 
Bhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.Eng
 
160401 sbryer resume
160401   sbryer resume160401   sbryer resume
160401 sbryer resume
 

Recently uploaded

CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
bosssp10
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 

Recently uploaded (20)

CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 

Hieber, Bruce Resume

  • 1. Bruce D. Hieber 385 Seranade Street | Reynoldsburg, Ohio 43068 Bruce43068@peoplepc.com | (614) 863-4631 www.linkedin.com/in/BruceHieber Purchasing | Quality Management | Industrial/Manufacturing Engineering Earned Certified Quality Engineer (CQE) and Certified Production Inventory Manager (CPIM) designations  Production Engineering  Manufacturing Process Development  MRP Systems  Capital/Expense Budgets  Capital Equipment Specification  Quality Engineering  Data Management  Policy/Procedure Development  Root Cause Analysis  Vendor Negotiations  Quality Process Development  Inventory Management  Quality Control  Program Implementation  Productivity Improvement  Staff Supervision  Staff Training & Development  Process Troubleshooting Career Highlights/Categories Purchasing/Supply Chain  Enhanced operations through effective management of Electronic Requirements Planning (ERP) transactions from major customers; significantly improved downloading of information from Plexus ERP system and modification for planning through development and macro-enhancement of Excel spreadsheets. Production Planning Administrator … Tomasco Mulciber, Inc.  Facilitated extensive operating savings via contribution to comprehensive localization process (sourcing new suppliers for Japanese supplied parts); guidance of department with reduced staff; assuming responsibilities during right-sizing and plant closing operations. Purchasing Manager … Tomasco Mulciber, Inc.  Championed execution of (newly installed) MAPICS MRP system utilized in production and purchasing planning; included creation of items masters for parts and assemblies, conversion of hand-written parts lists into MAPICS bills of materials, and developed MAPICS process routers from informal work instructions. Production Coordinator … Scientific Columbus Quality Engineering  Guided initiative developing and implementing ISO-compliant quality system; included creation of quality system manual; functioned with complete authority over quality program for 6 years (included training of production and quality associates). Manufacturing Operations Manager … Dynalab Manufacturing/Industrial Engineering  Directed 3-4 engineers and 2 engineering technicians through development of MRP database, work instructions, process layout, and time studies. Significantly improved accuracy of the MAPICS database files through comprehensive audits of bills of materials and process routers. Also improved accuracy of production capacity and cost planning by introducing the Maynard MOST time study system. Industrial Engineering Manager… Scientific Columbus.  Heavily involved in major circuit card manufacturing equipment specification and work cell layout improvements to increase productivity and introduce new cleaning technology mandated by the Montreal Protocol. Manufacturing Engineer…Grimes Aerospace, Manufacturing Operations Manager… Dynalab. Manufacturing Management  Supervised 10 – 30 production associates in circuit card and final assembly operations on 2 shifts; contributed to introduction of assembly line procedures (in place of individual stations) resulting in increased work flow and efficiency; assisted with start up of operations in new facility, including introduction of automated processes. Production Supervisor … Scientific Columbus  Coordinated contributions of process engineers, production supervisors, and administrative associates as well as indirectly oversaw production and test associates; accountable for quality, engineering, and production functions. Manufacturing Operations Manager … Dynalab
  • 2. Bruce D. Hieber Résumé Page 2 Tomasco Mulciber, Inc. … Columbus, Ohio October 2005 to Present $50+ million/year tier 1 Honda supplier; manufactures and ships hood lock assemblies, hood hinges, radiator shrouds, and steering hanger beams to factories in Ohio, Indiana, Alabama, Canada, and Mexico; operations supported by approximately 300 employees. Purchasing Manager (October 2008 – Present) Administer and contribute to all facets of MRO, material and component purchases totaling $7.7 million annually; comprised of 4,000 – 6,500 metric tons of steel, 400,000 – 500,000 steel tubes, hardware components, MRO items and equipment repair parts, and capital equipment including dies, assembly fixtures and inspection fixtures. Accountable for overall long-term planning and execution of component and material coverage; new model purchasing; new supplier sourcing; purchase of trial material for new projects; sourcing and purchasing prototype components; quality audits on new suppliers; grounds maintenance and janitorial services; facilities maintenance contractors; forklift fleet preventative maintenance; supplier quality and issue resolution. Collaborate with internal departments to establish/verify requirements, specifications, and instructions for requisitioned items and purchases; communicate regularly with accounts payable to approve payments and analyze purchase order variances.  Replaced underperforming existing manager and successfully maintained level and quality of operations during company rightsizing; retained responsibilities as coordinator of new model purchasing activities. o Oversaw and ensured performance of 2 buyers and 2 purchasing technicians (accountable for MRO buying, component and materials buying, tool crib attendants, and materials and component storeroom attendants).  Replaced janitorial service unable to meet performance specifications; amidst tight budget constraints and staff layoffs, secured vendor providing plumbing, electrical, and general maintenance repairs thus reducing demands on in-house staff.  Introduced Kanban (pull system) for departmental tooling supply daily requirements thereby reducing unnecessary trips by production associates and simultaneously improved scheduling of tool crib coverage as well as enhanced usage planning. New Model Purchasing Coordinator (January 2008 - October 2008)  Sourced components and materials for new models while supporting sales quoting generating new business; collaborated with new model engineers, sales department and suppliers throughout introduction cycle. o Resourced component parts for Honda Element handbrake assembly; as original supplier failed to perform, located new supplier under extremely tight time constraint (with new supplier playing important role as source for localization of components).  Requested quotes for components, fixtures, stamping dies, and equipment; sourced new suppliers and participated in quality audits; negotiated purchase agreements; ordered prototype parts and trial coils of steel for stamped parts; administered purchase orders and delivery schedules; updated material specifications into Plexus ERP system; maintained records for presentation during new model introduction reviews internally and to Honda representatives. Production Planning Administrator (October 2005 – January 2008) Maintained inventory levels and coordinated ordering for parts supplied from company plant in Winchester, Indiana; monitored and responded to issues with inventory and consumption of 15-30 different parts; collaborated with plant production planning, purchasing, and delivery departments.  Accountable for ERP (Electronic Requirements Planning): Monitored and corrected issues with incoming requirements transmitted electronically from 4 different Honda plants; established new account records required for new parts, plants, and shipping address changes. o Worked in concert with production schedulers (addressing use of ERP information) as well as customers to resolve ordering issues.  Facilitated download and data modification as well as decreased time and errors involved in manually entering data through enhancement and addition of macros to spreadsheets utilized by schedulers; spreadsheets utilized for stamping scheduling, Kanban calculation for assembly and weld operations, and parts ordering from sister plant. Temporary assignments including Production Planning and Electronic Data Interface for Tomasco Mulciber, Inc. , October 2004 - April 2006
  • 3. Bruce D. Hieber Résumé Page 3 Dynalab, Inc. … Reynoldsburg, Ohio March 1997 to May 2004 Privately-owned electronics contract manufacturer specializing in PC board assemblies, cables and harnesses, and small electro-mechanical and electronic units; generated $17- 20 million sales annually; operations supported by 130 employees. Manufacturing Operations Manager (1998 – 2004) Orchestrated and oversaw entire scope of production, process engineering (including quoting for new business), and quality system while also functioning as primary customer contact addressing quality standards, capacity planning. delivery, engineering modifications, and new projects. Supervised staff of 11 including production supervisors, process engineers, test engineers, quality inspectors, and administrative associates; indirectly responsible for 100 production associates and test technicians; worked with human resources department on hiring and staff relations; trained associates on quality principles and electronics assembly practices.  Guided company to first $2 million month; facilitated growth in operations to 2+ shifts.  Led project to specify and purchase $250,000 surface mount assembly and reflow soldering systems and modify production floor layout for additional equipment, expanding capacity and reducing set-up times.  Instrumental to sourcing and introducing Automated Optical Inspection (AOI) equipment, greatly improving inspection accuracy.  Provided structure and equity to associate reviews by collaborating with Human Resources department to define job classifications and develop wage ranges in line with local economy.  Implemented ISO-9002 quality system including creation of quality manual and supporting procedures.  Improved quality system through development of defect reporting and troubleshooting problem databases in MS Access; system used to report defects received from suppliers as well as damage/defects located during assembly process. Honeywell-Grimes Aerospace, Inc. … Urbana, Ohio September 1990 to March 1997 Leading manufacturer of aircraft lighting assemblies and avionics systems; supplies aircraft manufacturers globally (including Canada, Netherlands, Brazil, France, and U.S); employed 500 associates in 3 facilities in Urbana, Ohio and 1 facility in Greenwood, South Carolina. Senior Quality Engineer/Senior Manufacturing Engineer/Industrial Engineer Provided comprehensive engineering support to PC board assembly and avionics products; scope of responsibilities included issue resolution, technical assistance (to department supervisor), and associate training and development; represented company in customer quality audits and resolved process and defect issues.  Notable projects and improvements included implementation of assembly line procedures enhancing throughput and two separate, complete manufacturing cell layout changes to further improve process flow and better utilize production space.  Specified new circuit card wave solder and cleaning equipment and chemicals to change from Freon-based cleaning to an aqueous cleaning technology as mandated by the Montreal protocol. Early Career History Scientific Columbus … Columbus, Ohio Manager of Industrial Engineering/Production Control Coordinator/Production Supervisor Education & Professional Development MBA - Capital University … Bexley, Ohio BSBA - Bowling Green State University … Bowling Green, Ohio