OVERVIEW
Premier Office Solutions has always supported affordable, sustainable design, from its inception to the
recent expansion into a modern 40,000 sq. ft. showroom, remanufacturing and warehouse facility.
Since 1998, POS has installed over 50,000 remanufactured workstations. According to a published
report by the OFDA (Office Furniture Dealer Alliance), remanufacturing just 40 cubicles diverts one
tractor-trailer load of furniture from a landfill. This amounts to a staggering 1250 trailer loads.
Stretched end-to-end, the trailers would line up on the Schuylkill Expressway from Center City
Philadelphia to King of Prussia!

Premier Office Solutions is one of the few, if not the only, providers of remanufactured workstations
that has had their system Chamber-Tested to assess potential off-gassing of volatile organic
compounds (VOC). VOCs include a variety of hazardous chemicals, such as Formaldehyde, that have
short- and long-term adverse health effects. POS’s fully refurbished workstation exceeds the BIFMA
M7.1-2007 performance standard for low-emitting workstations and as such, end users are eligible for
LEED’s Commercial Interiors EQ 4.5 credit – Low-Emitting Materials. By successful conformance
with the BIFMA standard, Premier Office Solutions’ fully refurbished workstation meets the criteria of
MAS Certified Green®.

The following outlines the LEED-CI credits that Premier Office Solutions’ refurbished workstations
can contribute to earning points without paying a premium. We look forward to working with your
team to ensure the success of your LEED project.


PREMIER Office Solutions, Inc.
374 South Warminster Road – Hatboro, PA 19040
                                                   1
PHONE 215-734-2300 – FAX 215-734-2310
www.premierofficesolutions.com
Premier Office Solutions - Refurbished LEED Credits




Commercial Interiors
MR Credit 3.2: Materials Reuse – Furniture and Furnishings – 1 point
         Intent – To reuse building materials and products to reduce demand for virgin materials and
         reduce waste, thereby reducing impacts associated with the extraction and processing of virgin
         resources.

         Requirements – Use salvaged, refurbished or used furniture for 30% of the total furniture and
         furnishings budget.

         Solution – POS stocks and refurbishes at our own facility over 5000 workstations per year.
         Our refurbished workstations look so good that only your CFO will know the difference.

MR Credit 4: Recycled Content – 1-2 points
         Intent – To increase demand for building products that incorporate recycled materials thereby
         reducing impacts resulting from extraction and processing of virgin materials.




PREMIER Office Solutions, Inc.
374 South Warminster Road – Hatboro, PA 19040
                                                    2
PHONE 215-734-2300 – FAX 215-734-2310
www.premierofficesolutions.com
Premier Office Solutions - Refurbished LEED Credits




         Requirements - Use materials, including furniture and furnishings, with recycled content such
         that the sum of post-consumer recycled content plus ½ of the pre-consumer content constitutes
         at least 10% or 20% based on cost of the total value of the materials in the project.

         Solution – Premier Office offers numerous selections of fabrics and work surface materials
         that can contribute to earning MR Credit 4: Recycled Content.

MR Credit 5: Regional materials - 1-2 Points
         Intent - To increase demand for building materials and products that are extracted and
         manufactured within the region, thereby supporting the regional economy and reducing the
         environmental impacts resulting from transportation.

         Requirements - Option 1 (1 point) -Use a minimum of 20% of the combined value of construction
         and Division 12 (Furniture) materials and products that are manufactured regionally within a
         radius of 500 miles. OR - Option 2 (2 points) Meet the requirements for Option 1 AND Use a
         minimum of 10% of the combined value of construction and Division 12 (furniture) materials and
         products extracted, harvested or recovered, as well as manufactured, within 500 miles of the
         project.

         Solution – POS is located on the I-95 Northeast corridor and is within 500 miles of many
         metropolitan areas including Philadelphia, New York, Washington DC, Pittsburg, Richmond
         and Boston.



PREMIER Office Solutions, Inc.
374 South Warminster Road – Hatboro, PA 19040
                                                    3
PHONE 215-734-2300 – FAX 215-734-2310
www.premierofficesolutions.com
Premier Office Solutions - Refurbished LEED Credits




MR Credit 6: Rapidly Renewable Materials - 1 Point
         Intent – To reduce the use and depletion of finite raw materials and long-cycle renewable
         materials by replacing them with rapidly renewable materials.

         Requirements - Use rapidly renewable construction and Division 12 (Furniture and Furnishings)
         materials and products for 5% of the total value of all materials and products used in the
         project, based on cost. Rapidly renewable building materials and products are made from
         plants that are typically harvested within a 10-year or shorter cycle.

         Solution - POS offers numerous selections of fabrics and work surface materials that can
         contribute to earning MR Credit 6: Rapidly Renewable Materials.

IEQ Credit 3.2: Construction Indoor Air Quality Management Plan – Before
Occupancy - 1 point
         Intent – To reduce indoor air quality (IAQ) problems resulting from construction or renovation
         and promote the comfort and well being of construction workers and occupants.

         Requirement - Develop and IAQ management plan and implement it after all finishes have been
         installed and the building has been completely cleaned before occupancy. Movable furnishings
         such as workstations and partitions must be in place.




PREMIER Office Solutions, Inc.
374 South Warminster Road – Hatboro, PA 19040
                                                    4
PHONE 215-734-2300 – FAX 215-734-2310
www.premierofficesolutions.com
Premier Office Solutions - Refurbished LEED Credits




         Solution – Fully refurbished workstations from POS are MAS certified green®. Our Open
         Plan Panel-Based Workstation has been chamber-tested to ensure that contaminant
         concentration levels do not exceed the maximum levels required for IEQ Credit 3.2.

IEQ Credit 4.5: Low-Emitting Materials – Systems Furniture and Seating -1 Point
         Intent – To reduce the quantity of indoor air contaminants that are odorous, irritating and/or
         harmful to the comfort and well-being of installers and occupants.

         Requirements - All systems furniture and seating that was manufactured, refurbished or
         refinished within 1-year prior to occupancy must meet 1 of the options below.

         Option 3 - Calculated indoor air concentrations that are less than or equal to those determined
         by a procedure based on ANSI/BIFMA M7.1-2007 and ANSI/BIFMA X7.1-2007 testing protocol
         conducted in an independent third-party air quality testing laboratory.

         Solution - POS’s fully refurbished workstation has been chamber tested by an independent
         air quality facility and exceeds the BIFMA M7.1-2007 performance standard for low-
         emitting workstations. As such, end users are eligible for LEED’s Commercial Interiors EQ
         4.5 credit – Low-Emitting Materials. By successful conformance with the BIFMA standard,
         Premier Office Solutions’ fully refurbished workstation meets the criteria of MAS Certified
         Green®.




PREMIER Office Solutions, Inc.
374 South Warminster Road – Hatboro, PA 19040
                                                     5
PHONE 215-734-2300 – FAX 215-734-2310
www.premierofficesolutions.com
Premier Office Solutions - Refurbished LEED Credits




ID Credit 1: Innovation in Design - 1-5 points
         Intent – To provide design teams and projects the opportunity to achieve exceptional
         performance above the requirements set by the LEED Green Building Rating System and/or
         innovative performance in Green Building categories not specifically addressed by the LEED
         Green Building Rating System.

         Requirements - Path 2. Exemplary Performance (1-3 points) - An exemplary performance point
         may be earned for achieving double the credit requirements and/or achieving the next
         incremental percentage threshold of an existing credit in LEED.

         Solution – Using Premier Office Solutions’ refurbished workstations for 60% (the next
         incremental percentage of MR Credit 3.) of your LEED project will earn ID credit 1.


ID Credit 2: LEED Accredited Professional - 1 Point
         Intent – To support and encourage the design integration required by LEED to streamline the
         application and certification process.

         Requirements - At least 1 principal participant of the project team shall be a LEED Accredited
         Professional (AP).

         Solution - POS has a LEED Accredited Professional on staff.


PREMIER Office Solutions, Inc.
374 South Warminster Road – Hatboro, PA 19040
                                                    6
PHONE 215-734-2300 – FAX 215-734-2310
www.premierofficesolutions.com

More Related Content

Similar to Premier Office Solutions Refurbished Leed Credits

Spm Value Proposition Procurement
Spm Value Proposition ProcurementSpm Value Proposition Procurement
Spm Value Proposition Procurement
spmosgofian
 
Sena yuret resume dec 15 2015
Sena yuret   resume dec 15 2015Sena yuret   resume dec 15 2015
Sena yuret resume dec 15 2015
Yuret Sena
 
PetersonSierra_Interface_SustainabilityPoster
PetersonSierra_Interface_SustainabilityPosterPetersonSierra_Interface_SustainabilityPoster
PetersonSierra_Interface_SustainabilityPoster
Sierra Peterson
 
Tom Ades Resume2008
Tom Ades Resume2008Tom Ades Resume2008
Tom Ades Resume2008
guesta476e6
 
Green building rating system on des innovations
Green building rating system on des innovationsGreen building rating system on des innovations
Green building rating system on des innovations
saif hasan
 
Essig, Ileana EXPANDED RESUME
Essig, Ileana EXPANDED RESUMEEssig, Ileana EXPANDED RESUME
Essig, Ileana EXPANDED RESUME
Ileana Essig
 
zCharlieResume091416
zCharlieResume091416zCharlieResume091416
zCharlieResume091416
Charlie White
 
Kaiser 2013 resume[7]
Kaiser 2013  resume[7]Kaiser 2013  resume[7]
Kaiser 2013 resume[7]
John Kaiser
 
Portfolio - Badre Maktari - Generic
Portfolio - Badre Maktari - GenericPortfolio - Badre Maktari - Generic
Portfolio - Badre Maktari - Generic
Badre Maktari
 
Robert Langell's Resume Jan 2017
Robert Langell's Resume Jan 2017Robert Langell's Resume Jan 2017
Robert Langell's Resume Jan 2017
Robert Langell
 

Similar to Premier Office Solutions Refurbished Leed Credits (20)

Mark Middendorf Resume
Mark Middendorf ResumeMark Middendorf Resume
Mark Middendorf Resume
 
Spm Value Proposition
Spm Value PropositionSpm Value Proposition
Spm Value Proposition
 
Spm Value Proposition Procurement
Spm Value Proposition ProcurementSpm Value Proposition Procurement
Spm Value Proposition Procurement
 
Joe Resume 2015
Joe Resume 2015Joe Resume 2015
Joe Resume 2015
 
Resume G Bisanz Detailed Feb22012
Resume G Bisanz Detailed Feb22012Resume G Bisanz Detailed Feb22012
Resume G Bisanz Detailed Feb22012
 
Sena yuret resume dec 15 2015
Sena yuret   resume dec 15 2015Sena yuret   resume dec 15 2015
Sena yuret resume dec 15 2015
 
Fata Skyparks Leed Presentation
Fata Skyparks Leed PresentationFata Skyparks Leed Presentation
Fata Skyparks Leed Presentation
 
PetersonSierra_Interface_SustainabilityPoster
PetersonSierra_Interface_SustainabilityPosterPetersonSierra_Interface_SustainabilityPoster
PetersonSierra_Interface_SustainabilityPoster
 
Tom Ades Resume2008
Tom Ades Resume2008Tom Ades Resume2008
Tom Ades Resume2008
 
Green building rating system on des innovations
Green building rating system on des innovationsGreen building rating system on des innovations
Green building rating system on des innovations
 
Essig, Ileana EXPANDED RESUME
Essig, Ileana EXPANDED RESUMEEssig, Ileana EXPANDED RESUME
Essig, Ileana EXPANDED RESUME
 
zCharlieResume091416
zCharlieResume091416zCharlieResume091416
zCharlieResume091416
 
final
finalfinal
final
 
Kaiser 2013 resume[7]
Kaiser 2013  resume[7]Kaiser 2013  resume[7]
Kaiser 2013 resume[7]
 
SV Resume
SV ResumeSV Resume
SV Resume
 
Portfolio - Badre Maktari - Generic
Portfolio - Badre Maktari - GenericPortfolio - Badre Maktari - Generic
Portfolio - Badre Maktari - Generic
 
Henry Suguna Raj.
Henry Suguna Raj.Henry Suguna Raj.
Henry Suguna Raj.
 
Corneliu ioan gligor - cv - rev 2
Corneliu ioan gligor - cv - rev 2Corneliu ioan gligor - cv - rev 2
Corneliu ioan gligor - cv - rev 2
 
Robert Langell's Resume Jan 2017
Robert Langell's Resume Jan 2017Robert Langell's Resume Jan 2017
Robert Langell's Resume Jan 2017
 
Resume G Bisanz Presentation Format
Resume G Bisanz Presentation FormatResume G Bisanz Presentation Format
Resume G Bisanz Presentation Format
 

Premier Office Solutions Refurbished Leed Credits

  • 2. Premier Office Solutions - Refurbished LEED Credits OVERVIEW Premier Office Solutions has always supported affordable, sustainable design, from its inception to the recent expansion into a modern 40,000 sq. ft. showroom, remanufacturing and warehouse facility. Since 1998, POS has installed over 50,000 remanufactured workstations. According to a published report by the OFDA (Office Furniture Dealer Alliance), remanufacturing just 40 cubicles diverts one tractor-trailer load of furniture from a landfill. This amounts to a staggering 1250 trailer loads. Stretched end-to-end, the trailers would line up on the Schuylkill Expressway from Center City Philadelphia to King of Prussia! Premier Office Solutions is one of the few, if not the only, providers of remanufactured workstations that has had their system Chamber-Tested to assess potential off-gassing of volatile organic compounds (VOC). VOCs include a variety of hazardous chemicals, such as Formaldehyde, that have short- and long-term adverse health effects. POS’s fully refurbished workstation exceeds the BIFMA M7.1-2007 performance standard for low-emitting workstations and as such, end users are eligible for LEED’s Commercial Interiors EQ 4.5 credit – Low-Emitting Materials. By successful conformance with the BIFMA standard, Premier Office Solutions’ fully refurbished workstation meets the criteria of MAS Certified Green®. The following outlines the LEED-CI credits that Premier Office Solutions’ refurbished workstations can contribute to earning points without paying a premium. We look forward to working with your team to ensure the success of your LEED project. PREMIER Office Solutions, Inc. 374 South Warminster Road – Hatboro, PA 19040 1 PHONE 215-734-2300 – FAX 215-734-2310 www.premierofficesolutions.com
  • 3. Premier Office Solutions - Refurbished LEED Credits Commercial Interiors MR Credit 3.2: Materials Reuse – Furniture and Furnishings – 1 point Intent – To reuse building materials and products to reduce demand for virgin materials and reduce waste, thereby reducing impacts associated with the extraction and processing of virgin resources. Requirements – Use salvaged, refurbished or used furniture for 30% of the total furniture and furnishings budget. Solution – POS stocks and refurbishes at our own facility over 5000 workstations per year. Our refurbished workstations look so good that only your CFO will know the difference. MR Credit 4: Recycled Content – 1-2 points Intent – To increase demand for building products that incorporate recycled materials thereby reducing impacts resulting from extraction and processing of virgin materials. PREMIER Office Solutions, Inc. 374 South Warminster Road – Hatboro, PA 19040 2 PHONE 215-734-2300 – FAX 215-734-2310 www.premierofficesolutions.com
  • 4. Premier Office Solutions - Refurbished LEED Credits Requirements - Use materials, including furniture and furnishings, with recycled content such that the sum of post-consumer recycled content plus ½ of the pre-consumer content constitutes at least 10% or 20% based on cost of the total value of the materials in the project. Solution – Premier Office offers numerous selections of fabrics and work surface materials that can contribute to earning MR Credit 4: Recycled Content. MR Credit 5: Regional materials - 1-2 Points Intent - To increase demand for building materials and products that are extracted and manufactured within the region, thereby supporting the regional economy and reducing the environmental impacts resulting from transportation. Requirements - Option 1 (1 point) -Use a minimum of 20% of the combined value of construction and Division 12 (Furniture) materials and products that are manufactured regionally within a radius of 500 miles. OR - Option 2 (2 points) Meet the requirements for Option 1 AND Use a minimum of 10% of the combined value of construction and Division 12 (furniture) materials and products extracted, harvested or recovered, as well as manufactured, within 500 miles of the project. Solution – POS is located on the I-95 Northeast corridor and is within 500 miles of many metropolitan areas including Philadelphia, New York, Washington DC, Pittsburg, Richmond and Boston. PREMIER Office Solutions, Inc. 374 South Warminster Road – Hatboro, PA 19040 3 PHONE 215-734-2300 – FAX 215-734-2310 www.premierofficesolutions.com
  • 5. Premier Office Solutions - Refurbished LEED Credits MR Credit 6: Rapidly Renewable Materials - 1 Point Intent – To reduce the use and depletion of finite raw materials and long-cycle renewable materials by replacing them with rapidly renewable materials. Requirements - Use rapidly renewable construction and Division 12 (Furniture and Furnishings) materials and products for 5% of the total value of all materials and products used in the project, based on cost. Rapidly renewable building materials and products are made from plants that are typically harvested within a 10-year or shorter cycle. Solution - POS offers numerous selections of fabrics and work surface materials that can contribute to earning MR Credit 6: Rapidly Renewable Materials. IEQ Credit 3.2: Construction Indoor Air Quality Management Plan – Before Occupancy - 1 point Intent – To reduce indoor air quality (IAQ) problems resulting from construction or renovation and promote the comfort and well being of construction workers and occupants. Requirement - Develop and IAQ management plan and implement it after all finishes have been installed and the building has been completely cleaned before occupancy. Movable furnishings such as workstations and partitions must be in place. PREMIER Office Solutions, Inc. 374 South Warminster Road – Hatboro, PA 19040 4 PHONE 215-734-2300 – FAX 215-734-2310 www.premierofficesolutions.com
  • 6. Premier Office Solutions - Refurbished LEED Credits Solution – Fully refurbished workstations from POS are MAS certified green®. Our Open Plan Panel-Based Workstation has been chamber-tested to ensure that contaminant concentration levels do not exceed the maximum levels required for IEQ Credit 3.2. IEQ Credit 4.5: Low-Emitting Materials – Systems Furniture and Seating -1 Point Intent – To reduce the quantity of indoor air contaminants that are odorous, irritating and/or harmful to the comfort and well-being of installers and occupants. Requirements - All systems furniture and seating that was manufactured, refurbished or refinished within 1-year prior to occupancy must meet 1 of the options below. Option 3 - Calculated indoor air concentrations that are less than or equal to those determined by a procedure based on ANSI/BIFMA M7.1-2007 and ANSI/BIFMA X7.1-2007 testing protocol conducted in an independent third-party air quality testing laboratory. Solution - POS’s fully refurbished workstation has been chamber tested by an independent air quality facility and exceeds the BIFMA M7.1-2007 performance standard for low- emitting workstations. As such, end users are eligible for LEED’s Commercial Interiors EQ 4.5 credit – Low-Emitting Materials. By successful conformance with the BIFMA standard, Premier Office Solutions’ fully refurbished workstation meets the criteria of MAS Certified Green®. PREMIER Office Solutions, Inc. 374 South Warminster Road – Hatboro, PA 19040 5 PHONE 215-734-2300 – FAX 215-734-2310 www.premierofficesolutions.com
  • 7. Premier Office Solutions - Refurbished LEED Credits ID Credit 1: Innovation in Design - 1-5 points Intent – To provide design teams and projects the opportunity to achieve exceptional performance above the requirements set by the LEED Green Building Rating System and/or innovative performance in Green Building categories not specifically addressed by the LEED Green Building Rating System. Requirements - Path 2. Exemplary Performance (1-3 points) - An exemplary performance point may be earned for achieving double the credit requirements and/or achieving the next incremental percentage threshold of an existing credit in LEED. Solution – Using Premier Office Solutions’ refurbished workstations for 60% (the next incremental percentage of MR Credit 3.) of your LEED project will earn ID credit 1. ID Credit 2: LEED Accredited Professional - 1 Point Intent – To support and encourage the design integration required by LEED to streamline the application and certification process. Requirements - At least 1 principal participant of the project team shall be a LEED Accredited Professional (AP). Solution - POS has a LEED Accredited Professional on staff. PREMIER Office Solutions, Inc. 374 South Warminster Road – Hatboro, PA 19040 6 PHONE 215-734-2300 – FAX 215-734-2310 www.premierofficesolutions.com