Hemant Kumar Chawla is a dynamic professional with 3 years of experience in production planning, project execution, and managing teams in zinc electrolysis plant and casting unit operations. He is seeking a challenging role in plant operations, asset optimization, or projects. He has expertise in production planning and development, project management, man management, and process operations. His experience includes roles as a Process Engineer at Hindustan Zinc Limited and as a GET engineer at Welspun Corp Ltd.
LOOKING FOR NEW CHALLENGES,
I would like to apply for a position as MEP, facilities manager/Engineer, or other position vacancies in the engineering department in your company. I have been working in UAE 10 years with IBN Battuta Mall, Adnoc Technical Institute and with Legend Middle East LLC. All total experience 10 years. I am now looking for further opportunities.
LOOKING FOR NEW CHALLENGES,
I would like to apply for a position as MEP, facilities manager/Engineer, or other position vacancies in the engineering department in your company. I have been working in UAE 10 years with IBN Battuta Mall, Adnoc Technical Institute and with Legend Middle East LLC. All total experience 10 years. I am now looking for further opportunities.
- Associated with Essar Steel India Ltd. (Pipe Division) Surat (Gujarat) as Assistant Manager QA/QC Lab In charge from last 3.0 years. Experience gained in the field of quality assurance and control, inspections, process enhancement, Documentation and men power management.
- Expertise in handling the entire scope of quality control activities for HSAW & LSAW Pipes.
- Adept in ensuring quality of weld and base materials.
- Demonstrated communication and relationship management skills with the ability to lead and work in cross-functional teams in a cross-cultural environment.
ASNT Level II :- Ultrasonic Testing, Radiography Testing, Magnetic Particle Testing, Liquid Penetration Test.
• Preparing of Quality Assurance Plan (QAP), Manufacturing Process Specification (MPS), Raw Material Technical Specification (RMTDC), and Inspection dossier, Questionnaires etc.
• Responsible for preparing Raw Material Technical Delivery Condition for the raw material of the steel pipe manufacturing.
• To prepare Product planning Sheet (PPS).
• Tender enquiry handling & Co-ordination with marketing department.
• Completing the NCR form. Route cause analysis of NCR.
• Carry out the mechanical testing - Tensile testing, Bend testing, Hardness testing, Impact test, DWTT test & NACE testing – HIC, SSCC.
• Monitoring of NDT activity.
• Other quality works like instrument calibration & Co-ordination with workshop for mechanical testing samples.
• Material certificate, Release pipe list etc.
• Prepared & Reviewed of Work Instructions, Procedures for DT and inspection.
• Familiar with national and international codes like ASME, ASTM, API-5L, AWS, IS, DIN, EN etc.
• Co-ordination with Third Party Inspectors, Clients, Consultants and Vendors.
• Ensuring compliance of inspection activities as per QAP & technical specification and contractual requirements of the client.
• To check the inspection of on-going campaign & ensuring all the workers and staff are using safety accessories.
Thirteen years of experience in the field of fabrication & Erection as well as Quality Assurance &control of fabrication installation of light & heavy structures Equipment for Oil & Gas Refinery, wind mill towers and shipbuildings
- Associated with Essar Steel India Ltd. (Pipe Division) Surat (Gujarat) as Assistant Manager QA/QC Lab In charge from last 3.0 years. Experience gained in the field of quality assurance and control, inspections, process enhancement, Documentation and men power management.
- Expertise in handling the entire scope of quality control activities for HSAW & LSAW Pipes.
- Adept in ensuring quality of weld and base materials.
- Demonstrated communication and relationship management skills with the ability to lead and work in cross-functional teams in a cross-cultural environment.
ASNT Level II :- Ultrasonic Testing, Radiography Testing, Magnetic Particle Testing, Liquid Penetration Test.
• Preparing of Quality Assurance Plan (QAP), Manufacturing Process Specification (MPS), Raw Material Technical Specification (RMTDC), and Inspection dossier, Questionnaires etc.
• Responsible for preparing Raw Material Technical Delivery Condition for the raw material of the steel pipe manufacturing.
• To prepare Product planning Sheet (PPS).
• Tender enquiry handling & Co-ordination with marketing department.
• Completing the NCR form. Route cause analysis of NCR.
• Carry out the mechanical testing - Tensile testing, Bend testing, Hardness testing, Impact test, DWTT test & NACE testing – HIC, SSCC.
• Monitoring of NDT activity.
• Other quality works like instrument calibration & Co-ordination with workshop for mechanical testing samples.
• Material certificate, Release pipe list etc.
• Prepared & Reviewed of Work Instructions, Procedures for DT and inspection.
• Familiar with national and international codes like ASME, ASTM, API-5L, AWS, IS, DIN, EN etc.
• Co-ordination with Third Party Inspectors, Clients, Consultants and Vendors.
• Ensuring compliance of inspection activities as per QAP & technical specification and contractual requirements of the client.
• To check the inspection of on-going campaign & ensuring all the workers and staff are using safety accessories.
Thirteen years of experience in the field of fabrication & Erection as well as Quality Assurance &control of fabrication installation of light & heavy structures Equipment for Oil & Gas Refinery, wind mill towers and shipbuildings
Instrumentation engineer having 8+ years of exp. in Allen-Bradley PLCs like ControlLogix5000, PLC5/40E, SLC5/04 and DCS YOKOGAWA CENTUM CS3000 & various Field instruments
1. HEMANT KUMAR CHAWLA
Contact: +91-9799546417
E-Mail: hemantkumarchawla@gmail.com
Seeking challenging job assignments in Plant Operation, Asset Optimisation & Projects with
an Organisation of high repute
Professional Preface
A dynamic professional with 3 years of rich & extensive experience in production, Planning, SAP module, Project
execution, & Man Management in Raw material handling, furnace, , various types of process parameters in
Zinc Electrolysis plant, casting unit, Ore beneficial plant operation, utilities like, cooling towers, pumps &
QA-QC Activities.
Till 2nd
Sept. 2015, working with Hindustan Zinc Limited, Zinc Smelter Debari, Udaipur, Rajasthan as
Process Engineer (shift in- charge for cell- house & Casting).
Expertise in final/semi-final Product analysis, planning for monthly production, to achieve production target as per
Business plan to deliver the product of desired quality. Ensure for plant availability as per as planning.
Proficient in managing teams for plant/equipments availability & experience of developing procedures, service
standards for business excellence. .
An effective communicator with excellent relationship management skills & strong analytical & organisational abilities.
Areas of Expertise
Process: Managing overall equipment’s condition with a view to ensure timely accomplishment of production targets
within the time and cost parameters. Supervising overall procurement activities, implementing effective/Proactive
maintenance techniques to bring availability of equipment in operations
Production-Planning & Development: make plan for daily production and operation activities, take review from co-
worker and executive for batter production ensuring production compliance by monitoring and scheduled equipments
operation, identifying any effects and making changes for final scale up. Good knowledge about metallurgical testing.
Project Management / Commissioning: Evaluating project and conducting project cost / benefit analysis at project
decision points. Planning, monitoring, controlling & reporting different projects
Man Management: Leading & motivating workforce. Working on succession planning for the work force, rendering
technical guidance to the staff, shift management activities, appraising the member’s performance & providing feedback.
Employments Scan
March-13- sept.15 , with Hindustan Zinc Limited, Zinc Smelter Debari, Udaipur, Rajasthan as Process
Engineer (Zinc Electrolysis Plant & Casting unit)
Accountabilities
Monthly report preparation for operational side like Monthly production, score card, 5s, safety etc.
Review and update 5s, safety, training register, 5s score board.
Handling activities related to SAP such as creating order requisition (OR), Production and request for M/M, I/M and
E/M etc.
Procurement of Material for operational activities, modification job.
Maintaining records for ISO-9001, ISO-14001, and SA-8000 & OHSAS-18001.
Controlling, monitoring & scheduling the critical equipment’s maintenance planning.
Preparing agenda for monthly/ weekly production planning.
2. Coordinating with the operational-technical centre and key learning plant to solve problems and upgrade the
equipment for process betterment.
Developing the technical skills of the recruited/subordinate manpower.
CTC: 4.5 LPA INR
March’13 to Sept’15 with Hindustan Zinc Limited, Udaipur, Rajasthan as Process Engineer.
Started career as Process (GET) engineer in Ore beneficial plant (ZAWAR Mines) for 1.4 years and after then elevated as
process engineer with responsibility of Zinc Electrolysis and casting unit, SAP. In April ’2015 was designated as Area in
charge of Casting unit and pump area.
Accountabilities
AS PROCESS ENGINEER IN CELL HOUSE PLANT
Prime focus on Production and break down job execution for maximum plant availability.
Optimum use of manpower by proper planning and according their skills & capability.
On site safety check up on regular basis for critical equipment.
Was a part of project for erection of neutral cooler and one Annual replacement of neutral cooler in Zinc Electrolysis
plant.
To identify the opportunities for improvement of system, Modification in the Equipment to match availability and
production.
Attainments
Core Team member of “Water Saving committee”
Chairing the Monthly safety Meeting and Member of Unit Safety committee.
Appreciated as “Best Team Member for the cell house Plant”.
Leading member to implement safety at field level and got Training of Leading Safety Efforts and Incident
Investigation.
Past Experience:
WELSPUN CORP.LTD, ANJAR (July’12-March13)
Joined as GET (QA-QC) in Metallurgical lab. Of LSAW plant.
Accountabilities:
• Focus on various Testing (Hardness, Tensile, DWTT, NACE, Charpy Impact, chemical analysis) of welded MS pipe/plate
samples.
• Documentation of all testing samples and take approval from Third Party Inspector (TPI).
• Insure for Finishing of testing samples and its availability.
• To identify the microstructure for failure analysis.
CTC: 3.5 LPA INR
Technical skills
Technical expertise in Plant operation, Equipment failure Analysis, Erection and Commissioning.
SAP User
Conversant with 5S (Housekeeping Technique), Asset Optimisation and Utilisation of Conditioning monitoring.
Hands on experience on DCS, operation and data review.
Projects and Achievements
Project
3. Title : Fixing Air blasting canal in Fine Ore Bin (mill) to increase capacity from 2500 to 4200 tons
Responsibility: Operational review and planning.
Equipments :
o Canal pipes , drilling machine, burner , standard scaffolding platform
o Sump pump, crusher (tertiary), pressure vessel (4 bar Air pressure).
o Isobaric swards nozzles, pneumatic system with solenoid valve
After Installing AIR BALSTING CANAL Effect:
A cost effective solution that prevents hopper, bin, and discharge interruption, as well as process disruption
Complete safety for the operators, thus avoiding harsh rodding or other manual cleaning methods;
Increased the capacity of FINE ore BIN of the ORE DRESSING MILL.
Design , able to cope with the most severe operating conditions;
Easy maintenance, due to an easily accessible triggering device;
A metal-to-metal construction design, making the air blaster extremely reliable even in harsh environment.
Project Duration: 3 months.
Mini Project
Title : Reduction of Spent solution temp. Up to 2-3 °c.
Responsibility: Operational Owner.
Description : Angle of blade (spent solution cooler) increase up to 25 °.
Equipment :
o Temperature sensor, Vortex meter ( flow meter)
o Cooler blade angle measuring scale.
After change in blade Angle Effect:
o Full flow of the spent solution.
o Temp. decreased up to 3 °.
o Good effect in semi product (cell house); power rating also improved.
Project Duration: 1 week
Corporate Trainings and Seminars
Training on:-
o Vibration and Condition monitoring training was hold conditioning monitoring team of HZL.
o 5-s’ training.
o Behavioural & Technical training by HZL senior executive.
o SAP Module training for 2 days by CLZS SAP Cell.
o MS project training got for two days by M/s Accenture faculty at HZL.
o Attained training for Leading Safety Efforts and Incident Investigation
IT Proficiency
o MS Office
o SAP Module
o OUTLOOK
Major Strength
o Communication skill
o Firm leadership
o Self motivated
o Adaptable
o Positive Attitude
o Sharp observer and co-operative
Scholastics
B.Tech. (Metallurgy)
4. NATIONAL INSTITUTE OF TECHNOLOGY, RAIPUR (2012)
12th science in School with 70.15 %
Personal Dossier
Date of Birth: 4th April, 1990
Permanent Address: Goga Mandi, Ward 20, Khatikan, Nawalgarh, Dist. Jhunjhunu (Raj.) 333042
Linguistic Abilities: English / Hindi / Gujarati