Honorable Sir/Madam
Sub: Various opportunities in Mechanical Engineering and Process
In response to your opening, I would like to take the time to introduce myself and apply for the Engineer position; I know
that with my strong combination of professional experience and education, I would become a valuable asset to your
organization. I can utilize my techno-commercial key skills to obtain your company growth.
A competent Mechanical engineer with a comprehensive knowledge of designing, developing and maintaining Mechanical
systems and components as well as instruments to required specifications, focusing on economy, safety, reliability, quality
and sustainability. A consistent track record of successfully completing projects from the concept and detail of the design
through to implementation, testing and handover. Having a comprehensive understanding of mechanical and process with
health and safety regulations.
I have 3.8 years of excellent experience. Through my experience, I have developed and refined my skills in many areas
including project execution, commissioning of plant with new technology, erection and fabrication of machines and plant,
sales engineering, new BOQ preparation according to requirement, seminar, convince designing, instrument calibration and
installation, and operation of lime plant with very efficient way, material handling system etc.
I have also developed strong communication and people skills; I am highly motivated, and possess an ability to overcome
challenges. In short, I know that I would be a strong addition to your team.
I am looking for an aspiring career in an organization in the mechanical and maintenance field along with process, where I
can utilize my talent and gain more technical expertise, which in turn will be beneficial to the organization.
I’ve enclosed my resume for your review, and look forward to hearing from you in the near future.
Best regards:
Nikhil Mehta
House no.- 967, Sector 11th
Choupasni Housing Board,
Jodhpur, Rajasthan, India
Cellular: (+91) 7597949216; (+91) 9784977771
E-Mail: nikhilmehta45@gmail.com
Nikhil Mehta
Mobile: +91 9784977771, +91 7597949216
E-Mail: nikhilmehta45@gmail.com
~Seeking assignments in~
•Project Management and execution
•Maintenance
• Commissioning
• Kiln Operation
Core Competencies
● Planning and Deployment of Operational Assets ● decision making ● project Management
Erection/Commissioning/ operations ● Strategic Maintenance ● Breakdown Analysis with
troubleshooting
A Brief Overview
 Post Graduate in Marketing & Graduate in Mechanical Engineering about 3.5 years’
experience in projects, Operation and Maintenance.
 Presently associated with Chemical & Mineral Industry Pvt. Ltd., Jodhpur as Mechanical
Maintenance /Process-Engineer.
 Adroit at handling the issues that arises during the erection and commissioning period.
 Effectively handling the operations and maintenance of the Lime process plant.
 Deftly involved in Preventive Maintenance and Breakdown analysis of material handling
units of lime plant.
 Adept at resolving technical issues through root cause analysis and providing technical
support to internal customers.
 Experienced in implementing modifications and equipment calibrations to enhance
operational efficiencies of the systems.
 Possess good operational analysis, capacity planning, and decision-making strengths.
 Exceptional communicator with strong negotiation, problem resolution, and client need
assessment aptitude.
Organizational Scan
Mechanical-Engineer in Chemical & Mineral Industry Pvt. Ltd., Jodhpur since
December, 2012.
Area of Exposure
Project Erection and commissioning:
 As an effective team member having competency in project erection like rotating and
stationary equipment, Ducting, utility piping, hydraulic piping and testing of Twin shaft
kiln including Utility and hydraulic systems.
1
 Spearheaded efforts in handling complete erection and commissioning activities for
various rotating equipments like ID fans (Capacity -51,500Nm3/hr) and
Blowers(Capacity up to – 6,000 Nm3/hr) including their alignment and vibration
analysis.
 Responsible for erection, testing and commissioning of the hydraulic system comprises
vane pumps, hydraulic cylinders and various DC and sequence control valves, etc.
 Overseeing project activities involving working out various requirements with respect to
machines, equipment & manpower; monitoring operations for ensuring timely
completion.
 Installation and commissioning of the pet coke (FSS) a n d pneumatic system for fuel
conveying as well as conducting tests & inspections to ensure operational effectiveness of
plant & utilities.
 Fabrication, Erection and Commissioning of Piping of various diameters, Material - MS, SS,
CI, hydraulic and, Air etc.
 Managing resources to perform project activities in a cost effective manner.
 Conducting equipment identification, procurement & implementation, vendor
development & negotiation.
 Also preparing monthly Reports to monitor the status of engineering activities carried
out at Site and adherence to safety norms while carrying out engineering activities at site.
Equipment Troubleshooting & Maintenance:
 As a Maintenance Engineer preparing and performing corrective and preventive
maintenance on various equipments like De-dusting system, hydraulic and pneumatic
systems, Blowers and ID fans etc.
 Troubleshoot breakdowns; carry out root cause analysis of the problem to come out with
its permanent solution. Review the operational practices, identify the areas of obstruction
/ Quality failures and advice on system and process changes for qualitative improvement
in productivity.
 During shutdown and breakdown evaluating the problems and resolving it in cost and
work effective manner with minimal time span.
 Evaluating maintenance records of all equipments and systems on a regular basis to
ensure their effective performance in normal condition.
 Preparing and updating inventory & spares management.
Significant Highlight
 Successfully administered Lime Calcinations Fuel (Pet coke) Twin-D
5 type kiln (300TPD) designed by M/S Cimprogetti, Italy with complete Material
Handling system.
 Also working with the project team from starting of project.
Current CTC – 4.67 lacs (Expected CTC is more than 30% of current CTC)
2
Academia
Post Graduate (MBA) in Marketing from Sikkim Manipal University, Jodhpur in 2014.
Secured “A” Grade.
Graduate in Mechanical Engineering from Jodhpur Institute of Engineering & Technology,
Jodhpur in 2012. Secured 72.23% with Honors.
Sr. Sec. from Shri Maheshwari Senior Secondary School, Jodhpur affiliated to RBSE, Ajmer
in 2008. Secured 67.23%.
Sec. from Bal Niketan, Jodhpur affiliated to RBSE, Ajmer in 2006. Secured 84.00 %.
IT Forte
Well served with Auto CAD, MS Office, and Microsoft Excel.
Skills
 Being a team leader of Team member and communicate well with team.
 Well conversant with Planning Work (Man-hours & Work Progress Reports, Manpower
& Equipment Deployment Status, Schedules).
 Well acquainted with installation of both rotating and static equipments & their
alignment.
 Well served with hydraulic equipments like hydraulic cylinders, proportional valves,
directional control valves, etc.
 Exceptional communicator, administrator, computer experienced & documentation.
Address: House No. - 967 Sector 11th
Chopasani Housing Board, Jodhpur,
Rajasthan. Pin: 342001
Date of Birth: 27th
August, 1990
Religion: Jain
Languages Known: English, Hindi, and Regional
Sex: Male
Marital Status: Married
Physical attributes: Height -5’6”, Weight-58 kg.
Interest: Cricket, Badminton & Chess
I hereby declare that, the above information and details are true and complete, to the best of
my knowledge and belief.
Place – Jodhpur Nikhil Mehta
3

Nikhil resume (1)

  • 1.
    Honorable Sir/Madam Sub: Variousopportunities in Mechanical Engineering and Process In response to your opening, I would like to take the time to introduce myself and apply for the Engineer position; I know that with my strong combination of professional experience and education, I would become a valuable asset to your organization. I can utilize my techno-commercial key skills to obtain your company growth. A competent Mechanical engineer with a comprehensive knowledge of designing, developing and maintaining Mechanical systems and components as well as instruments to required specifications, focusing on economy, safety, reliability, quality and sustainability. A consistent track record of successfully completing projects from the concept and detail of the design through to implementation, testing and handover. Having a comprehensive understanding of mechanical and process with health and safety regulations. I have 3.8 years of excellent experience. Through my experience, I have developed and refined my skills in many areas including project execution, commissioning of plant with new technology, erection and fabrication of machines and plant, sales engineering, new BOQ preparation according to requirement, seminar, convince designing, instrument calibration and installation, and operation of lime plant with very efficient way, material handling system etc. I have also developed strong communication and people skills; I am highly motivated, and possess an ability to overcome challenges. In short, I know that I would be a strong addition to your team. I am looking for an aspiring career in an organization in the mechanical and maintenance field along with process, where I can utilize my talent and gain more technical expertise, which in turn will be beneficial to the organization. I’ve enclosed my resume for your review, and look forward to hearing from you in the near future. Best regards: Nikhil Mehta House no.- 967, Sector 11th Choupasni Housing Board, Jodhpur, Rajasthan, India Cellular: (+91) 7597949216; (+91) 9784977771 E-Mail: nikhilmehta45@gmail.com
  • 2.
    Nikhil Mehta Mobile: +919784977771, +91 7597949216 E-Mail: nikhilmehta45@gmail.com ~Seeking assignments in~ •Project Management and execution •Maintenance • Commissioning • Kiln Operation Core Competencies ● Planning and Deployment of Operational Assets ● decision making ● project Management Erection/Commissioning/ operations ● Strategic Maintenance ● Breakdown Analysis with troubleshooting A Brief Overview  Post Graduate in Marketing & Graduate in Mechanical Engineering about 3.5 years’ experience in projects, Operation and Maintenance.  Presently associated with Chemical & Mineral Industry Pvt. Ltd., Jodhpur as Mechanical Maintenance /Process-Engineer.  Adroit at handling the issues that arises during the erection and commissioning period.  Effectively handling the operations and maintenance of the Lime process plant.  Deftly involved in Preventive Maintenance and Breakdown analysis of material handling units of lime plant.  Adept at resolving technical issues through root cause analysis and providing technical support to internal customers.  Experienced in implementing modifications and equipment calibrations to enhance operational efficiencies of the systems.  Possess good operational analysis, capacity planning, and decision-making strengths.  Exceptional communicator with strong negotiation, problem resolution, and client need assessment aptitude. Organizational Scan Mechanical-Engineer in Chemical & Mineral Industry Pvt. Ltd., Jodhpur since December, 2012. Area of Exposure Project Erection and commissioning:  As an effective team member having competency in project erection like rotating and stationary equipment, Ducting, utility piping, hydraulic piping and testing of Twin shaft kiln including Utility and hydraulic systems. 1
  • 3.
     Spearheaded effortsin handling complete erection and commissioning activities for various rotating equipments like ID fans (Capacity -51,500Nm3/hr) and Blowers(Capacity up to – 6,000 Nm3/hr) including their alignment and vibration analysis.  Responsible for erection, testing and commissioning of the hydraulic system comprises vane pumps, hydraulic cylinders and various DC and sequence control valves, etc.  Overseeing project activities involving working out various requirements with respect to machines, equipment & manpower; monitoring operations for ensuring timely completion.  Installation and commissioning of the pet coke (FSS) a n d pneumatic system for fuel conveying as well as conducting tests & inspections to ensure operational effectiveness of plant & utilities.  Fabrication, Erection and Commissioning of Piping of various diameters, Material - MS, SS, CI, hydraulic and, Air etc.  Managing resources to perform project activities in a cost effective manner.  Conducting equipment identification, procurement & implementation, vendor development & negotiation.  Also preparing monthly Reports to monitor the status of engineering activities carried out at Site and adherence to safety norms while carrying out engineering activities at site. Equipment Troubleshooting & Maintenance:  As a Maintenance Engineer preparing and performing corrective and preventive maintenance on various equipments like De-dusting system, hydraulic and pneumatic systems, Blowers and ID fans etc.  Troubleshoot breakdowns; carry out root cause analysis of the problem to come out with its permanent solution. Review the operational practices, identify the areas of obstruction / Quality failures and advice on system and process changes for qualitative improvement in productivity.  During shutdown and breakdown evaluating the problems and resolving it in cost and work effective manner with minimal time span.  Evaluating maintenance records of all equipments and systems on a regular basis to ensure their effective performance in normal condition.  Preparing and updating inventory & spares management. Significant Highlight  Successfully administered Lime Calcinations Fuel (Pet coke) Twin-D 5 type kiln (300TPD) designed by M/S Cimprogetti, Italy with complete Material Handling system.  Also working with the project team from starting of project. Current CTC – 4.67 lacs (Expected CTC is more than 30% of current CTC) 2
  • 4.
    Academia Post Graduate (MBA)in Marketing from Sikkim Manipal University, Jodhpur in 2014. Secured “A” Grade. Graduate in Mechanical Engineering from Jodhpur Institute of Engineering & Technology, Jodhpur in 2012. Secured 72.23% with Honors. Sr. Sec. from Shri Maheshwari Senior Secondary School, Jodhpur affiliated to RBSE, Ajmer in 2008. Secured 67.23%. Sec. from Bal Niketan, Jodhpur affiliated to RBSE, Ajmer in 2006. Secured 84.00 %. IT Forte Well served with Auto CAD, MS Office, and Microsoft Excel. Skills  Being a team leader of Team member and communicate well with team.  Well conversant with Planning Work (Man-hours & Work Progress Reports, Manpower & Equipment Deployment Status, Schedules).  Well acquainted with installation of both rotating and static equipments & their alignment.  Well served with hydraulic equipments like hydraulic cylinders, proportional valves, directional control valves, etc.  Exceptional communicator, administrator, computer experienced & documentation. Address: House No. - 967 Sector 11th Chopasani Housing Board, Jodhpur, Rajasthan. Pin: 342001 Date of Birth: 27th August, 1990 Religion: Jain Languages Known: English, Hindi, and Regional Sex: Male Marital Status: Married Physical attributes: Height -5’6”, Weight-58 kg. Interest: Cricket, Badminton & Chess I hereby declare that, the above information and details are true and complete, to the best of my knowledge and belief. Place – Jodhpur Nikhil Mehta 3