Professional Instrument & Control Engineer, with 9 years’ experience of being Technical Supervisor &
Manager inOperationaswell asMaintenance in Power sector under the flag of WAPDA/PEPCO. During the
aforesaidperiod,IgotAssessmentandleadershipskills.Possessingexposure of variousmajorPowerStations
of “Water and Power Development Authority” (WAPDA) and PEPCO in Pakistan.
OBJECTIVE
Keeninterestedtobe the part of progressive,dynamicandchallengingenvironment.Where,I canprove my
expertise andimprove myskills.
EXPERIENCE
Junior Engineer Central PowerGenerationCompanyLimited,Guddu 11-01-08 to 22-01-14
Worked as an I&C maintenance Engineer at 415 MW CCP, Siemens.
2x136 MW Siemens V94.2 Gas Turbines & 143 MW Siemens Steam Turbine (HRSG)
Responsibilities:
I&C maintenance workatSiemensGasTurbine Model V94.2,HRSG’swithHighPressure Boilers, DCS
Base Control System, Steam Turbine, chemical plant and pump house.
Workedon pressure/proximityswitches,pressure/level/flow transmitters, vibration sensors, flame
sensors, signal conditioners, thermocouples, RTD’s, solenoid/pneumatic valves and actuators
Worked on Honeywell recorders, Endress+Hauser transmitters, Auma/Siemens Actuators
functional/circuitdrawingsregardingI&Candelectrical scope of work.Assistinthe developmentand
maintenance of operational standards and procedures
Well versed experience in maintenance of , SIEMENS TELEPRMME, ISKAMATIC and SIMATIC S5 PLC
Control Systems
Conduct calibration, testing and servicing of power plant instruments in accordance with
manufacturer’s procedures and plant-established intervals and acceptance criteria
Planand execute projectsfromdevelopmentandoperationsperspective. Ensure smooth operation,
safe start up & shut down
Diagnose malfunctionsatequipment/plantauxiliaries&effectivelycommunicate toDeputyManager
(Operation) and also to concerned maintenance sectional heads
Reviewof the physical layoutof I&Cequipment,racewayandgroundingplansrelated to the various
facilities within the plant
Worked on washing of Gas Turbine Compressor
Maintain isolation of equipment for planed & emergency maintenance and normalization of plant
Coordinate and issue instruction to the maintenance staff during normal and emergency condition
Provide leadership accountability for facility engineering issues and ensure resolution by
coordinating resources that may include various in-house technical staff and/or consultants or
contractors.
2. Provide technical supportandguidance onoperationsvalidation,development and implementation
and facilitate maintenance team in achieving business goals. Document current and future
configuration processes and policies
Collect and review system data for capacity and planning purposes
Plan, test, maintain and support smooth backup and recovery, business continuity and disaster
recovery solutions
Ensure correct implementation of the work according to the technical specifications
Draft daily and monthly operations/Progress report
Key Achievements
Awarded with Commendation Certificate & Cash Prize in recognition of repair and maintenance of
Steam turbine (HRSG) resulting in recovery of 40MW.
Minimized the tripping via timely attending faults without any delay and guiding the maintenance
staff
Rectified the Gas Turbine Control Valve and IGV faults
Helped the other maintenance sections by timely indicated the faults after consulting the control
drawings
Independently performed the minor inspections of Gas Turbine
Efficiently traced the different cycles e.g. Feed water cycle, lube oil cycle
Assist the operation section by working along with them
Shift Incharge (Operation)
150MW FBC Coal fired Power Plant Lakhra. Jan2014 to Sept 2015
Responsibilities:
Ensured maximum output (Generation of Electricity) with minimum possible inputs.
Minimized chance of Interruptions utilized all possible efforts and available resources and got the
required targets.
Trained the workers and prepared their substitutes, up to the possible levels.
Remained well-aware and responsible for :
1. Hazard Identification.
2. Risk Analysis of Services and Structures.
3. Environment Management System.
4. Permit to Work System.
5. Crisis & Incident Management Techniques.
Assistant Manager (JICA Project)
Lakhra Power Generation Company Limited Sept 2015 to date
Responsibilities:
To deal official matters and make correspondence with all stakeholders to expedite the
implementation plan for the Proposed 660MW Coal Fired Power Plant Construction Project at
Lakhra, financed by Japan International Cooperation Agency (JICA).
Worked with International Consultants to finalize the Environmental Impact Assessment Report
(EIA), Feasibility Reports and Land Acquisition & Rehabilitation Action Plan (LARAP)
Assistant Manager (International Competitive Bidding ICB) Addl. Charge
Lakhra PowerGenerationCompanyLimited April 2016 to date
Responsibilities:
To prepare TenderDocuments
3. To conduct Bidding process
To conduct preliminaryEvaluationof BiddersbasedonprevailingProcurement Rules
Correspondence withLocal andPrincipal Firms
SKILLS & LANGUAGES
Technical Expertise in managing the maintenance activities of Plant’s equipment.
Effective & firm Decision Making.
Knowledge of HSE systems, Crises Resolution Skills & Problem Solving Skills.
Knowledge of Procurement procedures.
HavingExcellentCommunication&PresentationSkills.
Draftingofficial Letters
Good knowledgeof MicrosoftOffice package &ComputersHardware
HavingGood commandon Listening,Reading&Writingof English, Urduand Sindhi Languages
TRAININGS
04 WeeksSteam/GasTurbine OperationwithFaultAnalysis SimulatorCourse (Secured1st
Position)
at WAPDA EngineeringAcademy,Faisalabadin2008.
08 WeeksTechnical InductionCourse forJuniorEngineersGeneration (Secured2nd
Position) at
WAPDA EngineeringAcademy,Faisalabadin2008
08 WeeksSectorSpecificCourse (Pre Promotion) forJuniorEngineersThermal Generation (Secured
3rd
Position) at WAPDA EngineeringAcademy,Faisalabadin2013.
09 WeeksJuniorManagementCourse atWapda AdministrativeCollegeIslamabadin2015.
PERSONAL INFORMATION
Education
M.E (ElectronicSystemEngineering) Mehran Universityof Engg:& Tech: Jamshoro. Final Research work phase
MBA Universityof Sindh,Jamshoro In progress
B.E (Electronics) Mehran Universityof Engg:& Tech: Jamshoro. 2006
Bio Data
Date of Birth: 28-10-1983
FathersName: AghaAtta Muhammad
Nationality: Pakistani
CNICNo: 43304-0575765-5
Marital Status: Married