BABOOLAL VISHWAKARMA
                             E-Mail: baboolalvishwakarma@rocketmail.com
            vishwakarmabl@ymail.com, vishwakarmabl@yahoo.com    Contact: +91 94258 85234

                                    Senior level assignments in:
Power Plants Operations  Project Management                    Installation & Commissioning
  Operations & Maintenance

CAREER ABSTRACT
 A skilled professional with 34 years of enriched experience; presently working with Maihar Cement,
    Sarla Nagar, M.P as General Manager Thermal Power Plant
 Adroit in managing, directing, planning & coordinating plant operations, including maximizing plant profits &
    minimizing expenses.
 A strategic planner with expertise in planning, executing and spearheading coal based Power Plant
    construction projects involving Contract & Site Administration & Resource Planning.
 Proficient in monitoring thermal power plant performance, investigating & correcting abnormal conditions &
    directing operations and maintenance activities of the power plant.
 Ensured that aims, goals and objectives were accomplished in accordance with outlined priorities, time
  limitations, and funding conditions.
 Strong skills in project planning, monitoring progress, ensuring control & maintaining project requirements.
 Excellent communication, analytical & interpersonal skills with the ability to work in a dynamic environment.

EMPLOYMENT DETAILS
                           Since Sep’83       Maihar Cement, Sarla Nagar, M.P

Growth Path
Sep’83–Nov’88      Engineer (Power Plant)
Dec’88–Jan’91      Industrial Engineer
Jan’91–Dec’92      Design Engineer
Jan’93 – Jan’95    Engineering Consultants
Jan’95 –Jan’97     DCS &boiler management, Operation Manager
Since Feb’97       Manager Thermal Power Plant (Power Generation Engineering)

Domain Skills
 Handling operations at 5 MW, 15.7 MW & 15.7 MW capacities.                                COMPETENCIES
 Designing plant layout for the power plant department & performing building
  improvements.                                                                           Project Management
 Developing boiler & turbine operation / maintenance improvement plan.
                                                                                     Purchase/ Procurement
 Overseeing mechanical systems, power plant, making complete safety package
  for work & hydraulic double stack lift.                                                    Installation &
 Redesigning dairy open style conveyor, training 10 engineers on Automation.               Commissioning
 Incorporating EPA & OSHA regulations into safety procedures, creating
                                                                                                 Testing
 Supervising power plant activities for the set up standards with accountability
  for strategic utilization & deployment of available resources to achieve                  Quality Control
  organizational goals.
 Handling the installation, commissioning & operations of construction                      Operations &
  mechanical workshop.                                                                       Maintenance
 Handling the installation & commissioning of DM water plant, filtration &
  chlorination plants.                                                                    Plant Upgradation
 Implementing systems & procedures to reduce rejection levels and ensure
  compliance with the industrial quality standards.                                      Site Administration
 Anchoring on-site erection & commissioning activities and ensuring completion
  of project within the time & cost parameters and effective resource utilisation
  to maximise the output.
 Monitoring the progress, controlling quality & cost control & undertaking the quantity survey.
 Supervising project activities and handling the complete project management cycle entailing requirement
  gathering and final execution of projects.

Accomplishments
 Efficiently handled operations at the following:
             -       5 MW unit (Turbine and Boiler): supplied by Westing House (USA)
             -       15.7 MW unit: commissioned in March 1997. Turbine is supplied by of Shin Nippo Machinery co.
                     Ltd. Japan and FBC (CFBC) Boiler
             -       15.7 MW unit: commissioned in January 2006.
 Effectively supervised over 500 college, maintained security accounts and budgets & interviewed, hired, field
    trained & conducted performance appraisals.
 Played a major role in making a 25 page monthly report.

INDUSTRIALTRAINING
Oct’75 –Mar’78 with Orient Paper Mills District, Shahdol

COMMENCED CAREER
Ma’78 –Sep’83 with Orient Paper Mills Ltd., location as Boiler Operator

SCHOLASTICS
 Master Program in Mechanical Engineering from National institute of engineering, Mumbai in 2008.
 MBA (BUSINESS ADMINISTRATION WITH DUAL SPECIALIZATION IS APPEARING) from NIM INSTITUTE in 2009
    year.
 B.A. from APS REWA University in 1986.
 First Class Boiler Compentcy. (Boiler Board Indore) from Boiler Board Indore University in 1982.
 Diploma in Mechanical Engineering from International Council for Management Studies Chennai, University
    in 2008.

CERTIFICATIONS
 Senior General Knowledge Test Certificate
 Senior U.N. Information Certificate

PERSONAL DOSSIER
Address          :   E-100 Block No. 1, Staff Colony Maihar Cement, Sarla Nagar Maihar, P.O. Sarla
                     Nagar - Maihar District, Satna (M.P.), PIN – 485772
Date of Birth :      5th January, 1956

head thermal power

  • 1.
    BABOOLAL VISHWAKARMA E-Mail: baboolalvishwakarma@rocketmail.com vishwakarmabl@ymail.com, vishwakarmabl@yahoo.com Contact: +91 94258 85234 Senior level assignments in: Power Plants Operations Project Management Installation & Commissioning Operations & Maintenance CAREER ABSTRACT  A skilled professional with 34 years of enriched experience; presently working with Maihar Cement, Sarla Nagar, M.P as General Manager Thermal Power Plant  Adroit in managing, directing, planning & coordinating plant operations, including maximizing plant profits & minimizing expenses.  A strategic planner with expertise in planning, executing and spearheading coal based Power Plant construction projects involving Contract & Site Administration & Resource Planning.  Proficient in monitoring thermal power plant performance, investigating & correcting abnormal conditions & directing operations and maintenance activities of the power plant.  Ensured that aims, goals and objectives were accomplished in accordance with outlined priorities, time limitations, and funding conditions.  Strong skills in project planning, monitoring progress, ensuring control & maintaining project requirements.  Excellent communication, analytical & interpersonal skills with the ability to work in a dynamic environment. EMPLOYMENT DETAILS Since Sep’83 Maihar Cement, Sarla Nagar, M.P Growth Path Sep’83–Nov’88 Engineer (Power Plant) Dec’88–Jan’91 Industrial Engineer Jan’91–Dec’92 Design Engineer Jan’93 – Jan’95 Engineering Consultants Jan’95 –Jan’97 DCS &boiler management, Operation Manager Since Feb’97 Manager Thermal Power Plant (Power Generation Engineering) Domain Skills  Handling operations at 5 MW, 15.7 MW & 15.7 MW capacities. COMPETENCIES  Designing plant layout for the power plant department & performing building improvements. Project Management  Developing boiler & turbine operation / maintenance improvement plan. Purchase/ Procurement  Overseeing mechanical systems, power plant, making complete safety package for work & hydraulic double stack lift. Installation &  Redesigning dairy open style conveyor, training 10 engineers on Automation. Commissioning  Incorporating EPA & OSHA regulations into safety procedures, creating Testing  Supervising power plant activities for the set up standards with accountability for strategic utilization & deployment of available resources to achieve Quality Control organizational goals.  Handling the installation, commissioning & operations of construction Operations & mechanical workshop. Maintenance  Handling the installation & commissioning of DM water plant, filtration & chlorination plants. Plant Upgradation  Implementing systems & procedures to reduce rejection levels and ensure compliance with the industrial quality standards. Site Administration  Anchoring on-site erection & commissioning activities and ensuring completion of project within the time & cost parameters and effective resource utilisation to maximise the output.  Monitoring the progress, controlling quality & cost control & undertaking the quantity survey.
  • 2.
     Supervising projectactivities and handling the complete project management cycle entailing requirement gathering and final execution of projects. Accomplishments  Efficiently handled operations at the following: - 5 MW unit (Turbine and Boiler): supplied by Westing House (USA) - 15.7 MW unit: commissioned in March 1997. Turbine is supplied by of Shin Nippo Machinery co. Ltd. Japan and FBC (CFBC) Boiler - 15.7 MW unit: commissioned in January 2006.  Effectively supervised over 500 college, maintained security accounts and budgets & interviewed, hired, field trained & conducted performance appraisals.  Played a major role in making a 25 page monthly report. INDUSTRIALTRAINING Oct’75 –Mar’78 with Orient Paper Mills District, Shahdol COMMENCED CAREER Ma’78 –Sep’83 with Orient Paper Mills Ltd., location as Boiler Operator SCHOLASTICS  Master Program in Mechanical Engineering from National institute of engineering, Mumbai in 2008.  MBA (BUSINESS ADMINISTRATION WITH DUAL SPECIALIZATION IS APPEARING) from NIM INSTITUTE in 2009 year.  B.A. from APS REWA University in 1986.  First Class Boiler Compentcy. (Boiler Board Indore) from Boiler Board Indore University in 1982.  Diploma in Mechanical Engineering from International Council for Management Studies Chennai, University in 2008. CERTIFICATIONS  Senior General Knowledge Test Certificate  Senior U.N. Information Certificate PERSONAL DOSSIER Address : E-100 Block No. 1, Staff Colony Maihar Cement, Sarla Nagar Maihar, P.O. Sarla Nagar - Maihar District, Satna (M.P.), PIN – 485772 Date of Birth : 5th January, 1956