SlideShare a Scribd company logo
Curriculum Vitae
Name . Saeed Yousef Azar
Nationality. Jordanian
Date & Place of Birth. September 1962---- Jordan
Marital Status. Married with 3 children
Contacts. Tel. + 962 (0) 77 751 84 02---- Jordan
+962 (0) 79 561 08 44---- jordan
E-mail aboazaar@yahoo.com
Education. B.Sc. Civil Engineering
Iraq -Baghdad, University, 1985
Skills. V.Good Knowledge of English.
V.Good with AutoCAD, excel, word, power point....etc
Professional skills. Expert in Civil Eng.- management& Supervision in
Building by Jordan Engineering Association.
Work Experience
Apr. 014till Apr.015 Seiner coordinator and deputy R.E. with Consolidated
Consultants (CC) For Saraya Aqaba Project in Aqaba.
The Joint Ventur Contractors’ Are (CCC, arabtec, and
Drake&Scull).
Fab2013 Till Dec 013 Project Manager with JV Al-Hamad C.C & Derar
Al-Saraireh And sons Co.
For Arab Jordan Investment Bank Tower - Six Circle
Total Area 35000M2 Estimated Cost 19 Million JD.
Dec 11 till Jan 2013 Project Manager with Consolidated Consultants For
Engineering and Environments.(CC) For Renovations
Of Housing Bank Branche in Fuhais.
Duties: Coordinate the activities between the site
And the main office, following up correspondences
With the Employer and the contractor, monthly progress reports
Involved in decisions regarding change in cost and time
July 10 till Nov 11 2011 R.E. with Alnasser Architects Company For Amman
Arab University. Total Area 16000m2 estimated cost
11m $ for all building and infrastructure works
Duties: Ensure the correct implementation of the
Project with quality plan and quality procedures,
Following up project correspondence. Time schedule
Plan (MS Project), dealing with contract documents
And correspondence, prepare minute of meeting and.
Weekly and monthly report....etc.
May 09 till June 2010 Project Manager with Kiwar Contracting Company
Jordan- for Madaba American University total area
32000m2 Estimated Cost 23m$.
Duties: review design .prepare time schedule with
Full detailed resources and cash flow for
Approval, following up shop drawings, method
Statements, coordination drawing with structure
Mechanical and electrical, prepare variations, monthly
Payments, record minutes, prepare and answer all
Correspondence related as per project conditions and
FIDIC.
Nov. 08 till April 09 Construction Manager with Ali & Sons
Contracting, Abu Dhabi – UAE for execution of villas
Complex, total area 58000m2 estimated cost 42m$.
Duties: maintain productivity targets in accordance
With work schedule, following up executed activities
In the site, coordination with subcontract, assist
The technical office engineer in preparation of shop
Dwg,s and method of statements, prepare material
Tools and equipment needed for construction.
Sept. 05 till Oct. 08 Projects Manager with Al-Bahrainieh Contracting &
Maintenance Company. Executed projects .five star villa
Total area 5000m2 cost 9m$, medical centre 2000m2
Cost 1.2.m$,commercial building 12 stores area 10400m2
Cost 1.7m$.
Duties: prepare all construction dwg,s and documents to
Approve, reviewing the design drawing and contract
Documents prepare and submit master time schedule for
Approval, following up all correspondence between
Parties, prepare reports to the G, manager, attend
Meeting, prepare material logo and submittal, following up
Monthly payments,... etc.
Aug. 04 till June 05 Owner Representative with Habitat Furniture &
Interior Company, Saudi Arabia
Duties: Supervising the erection of show rooms and
Hotel building in Jeddah. Total area of the Project
Was 45000 sqm.
June 02 till May 04 Projects Manager with Sabeel Al-Handasa
Consultant Engineering, Amman – Jordan.
Duties: supervised many projects including five health centres and two
schools. Design, specifications, bills of quantities for six schools in
addition to preparing special conditions, monthly reports, following up
with contractors and payments, coordination between civil, finishing
and electro-mechanical and plumbing.
May 99 till May 2002 Senior Civil Engineer with Solidec International LTD
Jordan Branch
“Le Royal Complex Amman – Jordan”. Five Star
Hotel, including a commercial complex, conferences’
halls, business centre, three cinemas, shopping centre,
fitness centre, banks and other retail facilities (120 000)
sqm, 32 stories, estimated cost $170m). The height of the
building is 123 meters and it is considered the highest
building in Jordan.
I was involved in all stages of const&finishing
Sept. 97 - Oct. 98 Senior Civil Engineer with Saudi Bin Laden Group
Grand Hyatt Hotel Project (40,000 m2
Preparation of Shop-drawings for structural works, bar
Bending schedule, daily work progress reports, performing the
transaction with consultant including submittals, job
Requests & quality control procedures, also I was involved in the
erection of the pedestrian foot bridge and the Underground tunnels
between Hyatt Hotel and Zara.
Mar. 97 till June 97 Site Manager with Consolidated Contractors
International Co,
For United Nations Camp Project at Um Qaser - Iraq
And supervised all civil and electro-mechanical
Installations.
Aug. 94 till Feb. 97 Construction Manager with Al-Ammar Contracting Co.
Duties:
1. Bidding for new projects.
2. Supervising all activities in company's projects.
3. Preparation of payments for completed works.
4. Purchasing of building materials and the selection of
subcontractors.
5. Approval of all projects, expenses including sub-contracts and
suppliers payments.
Nov. 89 till Jul. 94 Resident Engineer with Monther Ghosheh
Consultants.
Directly involved with all stages for the erection of
Arab Weavers Factory, 1989 – 1990 which is steel
Frame structure of 42 meter span. The supervision
Included the concrete foundations and the steel frame
Erection, the installation of the roofing and sides of the
Structure and the follow up of electro-mechanical works.
Jan. 87 till Nov. 89 Ghassan Azar Consulting Engineers.
Title: Assistant Structural Engineer.
Duties: participate in the design of various
Projects,
Site Engineer for multi story industrial building for the
Eagle
Distilleries in Zarqa. It is a three story concrete
building for distillery storage and offices space.
Supervision includes all the stages of construction
From foundations to the finishing works.

More Related Content

What's hot

CV_Ahmad_Eida final
CV_Ahmad_Eida finalCV_Ahmad_Eida final
CV_Ahmad_Eida finalAhmad Eida
 
ESHAN AHMED HASEEB_SITE ENGINEER_CV_UAE
ESHAN AHMED HASEEB_SITE ENGINEER_CV_UAEESHAN AHMED HASEEB_SITE ENGINEER_CV_UAE
ESHAN AHMED HASEEB_SITE ENGINEER_CV_UAEEhsan Ahmed Haseeb
 
Romany resume 2016
Romany resume 2016Romany resume 2016
Romany resume 2016Romany Fayez
 
gomaa tawfik.Elec.Draftsman
gomaa tawfik.Elec.Draftsmangomaa tawfik.Elec.Draftsman
gomaa tawfik.Elec.DraftsmanGomaa Tawfik
 
Ammar yasser - Civil engineer - may 2018 (cv)
Ammar yasser - Civil engineer - may 2018 (cv)Ammar yasser - Civil engineer - may 2018 (cv)
Ammar yasser - Civil engineer - may 2018 (cv)
emorkil
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansourahmed mansour
 
Ahmed Adel Mohamed Nasser
Ahmed Adel Mohamed NasserAhmed Adel Mohamed Nasser
Ahmed Adel Mohamed NasserAhmed Nasser
 
soumen paul update cv
soumen paul update cvsoumen paul update cv
soumen paul update cvSoumen Paul
 
Ahmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Shafik
 
civil engineer Cv
civil engineer Cvcivil engineer Cv
civil engineer CvRinu Chacko
 
HASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMPHASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMPhassan elemam
 
Nawab civil supervisor cv
Nawab civil supervisor cvNawab civil supervisor cv
Nawab civil supervisor cv
WasimIqbal28
 

What's hot (20)

cv 8-8-2016
cv 8-8-2016cv 8-8-2016
cv 8-8-2016
 
السي في
السي فيالسي في
السي في
 
CV_Ahmad_Eida final
CV_Ahmad_Eida finalCV_Ahmad_Eida final
CV_Ahmad_Eida final
 
hosam cv english 1
hosam cv english 1hosam cv english 1
hosam cv english 1
 
ESHAN AHMED HASEEB_SITE ENGINEER_CV_UAE
ESHAN AHMED HASEEB_SITE ENGINEER_CV_UAEESHAN AHMED HASEEB_SITE ENGINEER_CV_UAE
ESHAN AHMED HASEEB_SITE ENGINEER_CV_UAE
 
Romany resume 2016
Romany resume 2016Romany resume 2016
Romany resume 2016
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
Hesham ELdieushy 2016
Hesham ELdieushy 2016Hesham ELdieushy 2016
Hesham ELdieushy 2016
 
Latest C.V
Latest C.VLatest C.V
Latest C.V
 
Mostafa Ragaee
Mostafa RagaeeMostafa Ragaee
Mostafa Ragaee
 
gomaa tawfik.Elec.Draftsman
gomaa tawfik.Elec.Draftsmangomaa tawfik.Elec.Draftsman
gomaa tawfik.Elec.Draftsman
 
Ammar yasser - Civil engineer - may 2018 (cv)
Ammar yasser - Civil engineer - may 2018 (cv)Ammar yasser - Civil engineer - may 2018 (cv)
Ammar yasser - Civil engineer - may 2018 (cv)
 
mahmoud cv
mahmoud cv mahmoud cv
mahmoud cv
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansour
 
Ahmed Adel Mohamed Nasser
Ahmed Adel Mohamed NasserAhmed Adel Mohamed Nasser
Ahmed Adel Mohamed Nasser
 
soumen paul update cv
soumen paul update cvsoumen paul update cv
soumen paul update cv
 
Ahmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Mohamed Maher Shafik
Ahmed Mohamed Maher Shafik
 
civil engineer Cv
civil engineer Cvcivil engineer Cv
civil engineer Cv
 
HASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMPHASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMP
 
Nawab civil supervisor cv
Nawab civil supervisor cvNawab civil supervisor cv
Nawab civil supervisor cv
 

Viewers also liked

A strategic framework for sustainable construction in jordan
A strategic framework for sustainable construction in jordanA strategic framework for sustainable construction in jordan
A strategic framework for sustainable construction in jordan
Alexander Decker
 
Ayman Mousa - C.V. Financial Officer
Ayman Mousa - C.V.  Financial OfficerAyman Mousa - C.V.  Financial Officer
Ayman Mousa - C.V. Financial OfficerAyman Mousa
 
Alaa Ziad Abdellatif-Resume
Alaa Ziad Abdellatif-ResumeAlaa Ziad Abdellatif-Resume
Alaa Ziad Abdellatif-Resumealaa farooni
 
Omar Abu-Dahoud CV 11.2016
Omar Abu-Dahoud CV 11.2016Omar Abu-Dahoud CV 11.2016
Omar Abu-Dahoud CV 11.2016Omar Abu-Dahoud
 
Awad CV 20-10-2016
Awad CV 20-10-2016Awad CV 20-10-2016
Awad CV 20-10-2016Awad Ajalain
 
Mohammed bataiha cv 06072015
Mohammed bataiha cv 06072015Mohammed bataiha cv 06072015
Mohammed bataiha cv 06072015
mohammed bataiha
 
RAED_BUSHNAQ_CV[1]
RAED_BUSHNAQ_CV[1]RAED_BUSHNAQ_CV[1]
RAED_BUSHNAQ_CV[1]Read Bushnaq
 

Viewers also liked (13)

F.H.B C.V ENGLISH
F.H.B C.V ENGLISHF.H.B C.V ENGLISH
F.H.B C.V ENGLISH
 
A strategic framework for sustainable construction in jordan
A strategic framework for sustainable construction in jordanA strategic framework for sustainable construction in jordan
A strategic framework for sustainable construction in jordan
 
ENGLISH CV
ENGLISH CVENGLISH CV
ENGLISH CV
 
Sylvia 's CV (11
Sylvia 's CV (11Sylvia 's CV (11
Sylvia 's CV (11
 
Ayman Mousa - C.V. Financial Officer
Ayman Mousa - C.V.  Financial OfficerAyman Mousa - C.V.  Financial Officer
Ayman Mousa - C.V. Financial Officer
 
Alaa Ziad Abdellatif-Resume
Alaa Ziad Abdellatif-ResumeAlaa Ziad Abdellatif-Resume
Alaa Ziad Abdellatif-Resume
 
YS CV June 2013
YS CV June 2013YS CV June 2013
YS CV June 2013
 
2016 c.v
2016 c.v2016 c.v
2016 c.v
 
Omar Abu-Dahoud CV 11.2016
Omar Abu-Dahoud CV 11.2016Omar Abu-Dahoud CV 11.2016
Omar Abu-Dahoud CV 11.2016
 
Awad CV 20-10-2016
Awad CV 20-10-2016Awad CV 20-10-2016
Awad CV 20-10-2016
 
Limitless
LimitlessLimitless
Limitless
 
Mohammed bataiha cv 06072015
Mohammed bataiha cv 06072015Mohammed bataiha cv 06072015
Mohammed bataiha cv 06072015
 
RAED_BUSHNAQ_CV[1]
RAED_BUSHNAQ_CV[1]RAED_BUSHNAQ_CV[1]
RAED_BUSHNAQ_CV[1]
 

Similar to aboazaar CV.

Maged George Kamel C.V
Maged George Kamel C.VMaged George Kamel C.V
Maged George Kamel C.VMaged George
 
Mohammed imad ahmed
Mohammed imad ahmedMohammed imad ahmed
Mohammed imad ahmed
Imaad Ahmed
 
CV Nader 29_06_2016 without cover web
CV Nader 29_06_2016 without cover webCV Nader 29_06_2016 without cover web
CV Nader 29_06_2016 without cover webNader Ali
 
AHMED SAKR 2016
AHMED SAKR 2016AHMED SAKR 2016
AHMED SAKR 2016Ahmed Sakr
 
Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Albitar
 
Eng. Tarek Ali cv - 29 oct 2015
Eng. Tarek Ali   cv - 29 oct 2015Eng. Tarek Ali   cv - 29 oct 2015
Eng. Tarek Ali cv - 29 oct 2015
Tarek Ali
 
Ahmed_El_Sir_Ahmed,_ Senior Project_Manager - Final
Ahmed_El_Sir_Ahmed,_ Senior Project_Manager - FinalAhmed_El_Sir_Ahmed,_ Senior Project_Manager - Final
Ahmed_El_Sir_Ahmed,_ Senior Project_Manager - FinalAhmed Elsied
 
Omar Al Nadi CV عمر
Omar Al Nadi CV عمرOmar Al Nadi CV عمر
Omar Al Nadi CV عمرOmar mah
 
Amer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil EngineerAmer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil Engineeramer kallas
 
Eng. tarek ali cv - 29 oct 2015
Eng. tarek ali   cv - 29 oct 2015Eng. tarek ali   cv - 29 oct 2015
Eng. tarek ali cv - 29 oct 2015
Tarek Ali
 
Resume new version 17
Resume new version 17Resume new version 17
Resume new version 17shine babu
 
Mohammad Odeh CV Eng
Mohammad Odeh CV  EngMohammad Odeh CV  Eng
Mohammad Odeh CV EngMohammad Odeh
 
Mohamed Barakat Updated CV
Mohamed Barakat Updated CVMohamed Barakat Updated CV
Mohamed Barakat Updated CVMohamed Barakat
 

Similar to aboazaar CV. (20)

CV2
CV2CV2
CV2
 
Maged George Kamel C.V
Maged George Kamel C.VMaged George Kamel C.V
Maged George Kamel C.V
 
Mohammed imad ahmed
Mohammed imad ahmedMohammed imad ahmed
Mohammed imad ahmed
 
CV Nader 29_06_2016 without cover web
CV Nader 29_06_2016 without cover webCV Nader 29_06_2016 without cover web
CV Nader 29_06_2016 without cover web
 
Abdulrahman Shakboua15
Abdulrahman Shakboua15Abdulrahman Shakboua15
Abdulrahman Shakboua15
 
AHMED SAKR 2016
AHMED SAKR 2016AHMED SAKR 2016
AHMED SAKR 2016
 
Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1
 
Eng. Tarek Ali cv - 29 oct 2015
Eng. Tarek Ali   cv - 29 oct 2015Eng. Tarek Ali   cv - 29 oct 2015
Eng. Tarek Ali cv - 29 oct 2015
 
Abdelaziz Fawzy CV 1-11
Abdelaziz Fawzy CV 1-11Abdelaziz Fawzy CV 1-11
Abdelaziz Fawzy CV 1-11
 
Ahmed_El_Sir_Ahmed,_ Senior Project_Manager - Final
Ahmed_El_Sir_Ahmed,_ Senior Project_Manager - FinalAhmed_El_Sir_Ahmed,_ Senior Project_Manager - Final
Ahmed_El_Sir_Ahmed,_ Senior Project_Manager - Final
 
Omar Al Nadi CV عمر
Omar Al Nadi CV عمرOmar Al Nadi CV عمر
Omar Al Nadi CV عمر
 
Amer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil EngineerAmer Kallas resume ,Civil Engineer
Amer Kallas resume ,Civil Engineer
 
C.V HOSSAM
C.V HOSSAMC.V HOSSAM
C.V HOSSAM
 
Eng. tarek ali cv - 29 oct 2015
Eng. tarek ali   cv - 29 oct 2015Eng. tarek ali   cv - 29 oct 2015
Eng. tarek ali cv - 29 oct 2015
 
cm cv
cm cvcm cv
cm cv
 
Mohamed Sabry CV
Mohamed Sabry CVMohamed Sabry CV
Mohamed Sabry CV
 
cv_ahmed1 (2)-2
cv_ahmed1 (2)-2cv_ahmed1 (2)-2
cv_ahmed1 (2)-2
 
Resume new version 17
Resume new version 17Resume new version 17
Resume new version 17
 
Mohammad Odeh CV Eng
Mohammad Odeh CV  EngMohammad Odeh CV  Eng
Mohammad Odeh CV Eng
 
Mohamed Barakat Updated CV
Mohamed Barakat Updated CVMohamed Barakat Updated CV
Mohamed Barakat Updated CV
 

aboazaar CV.

  • 1. Curriculum Vitae Name . Saeed Yousef Azar Nationality. Jordanian Date & Place of Birth. September 1962---- Jordan Marital Status. Married with 3 children Contacts. Tel. + 962 (0) 77 751 84 02---- Jordan +962 (0) 79 561 08 44---- jordan E-mail aboazaar@yahoo.com Education. B.Sc. Civil Engineering Iraq -Baghdad, University, 1985 Skills. V.Good Knowledge of English. V.Good with AutoCAD, excel, word, power point....etc Professional skills. Expert in Civil Eng.- management& Supervision in Building by Jordan Engineering Association. Work Experience Apr. 014till Apr.015 Seiner coordinator and deputy R.E. with Consolidated Consultants (CC) For Saraya Aqaba Project in Aqaba. The Joint Ventur Contractors’ Are (CCC, arabtec, and Drake&Scull). Fab2013 Till Dec 013 Project Manager with JV Al-Hamad C.C & Derar Al-Saraireh And sons Co. For Arab Jordan Investment Bank Tower - Six Circle Total Area 35000M2 Estimated Cost 19 Million JD. Dec 11 till Jan 2013 Project Manager with Consolidated Consultants For Engineering and Environments.(CC) For Renovations Of Housing Bank Branche in Fuhais. Duties: Coordinate the activities between the site And the main office, following up correspondences With the Employer and the contractor, monthly progress reports Involved in decisions regarding change in cost and time July 10 till Nov 11 2011 R.E. with Alnasser Architects Company For Amman Arab University. Total Area 16000m2 estimated cost 11m $ for all building and infrastructure works Duties: Ensure the correct implementation of the Project with quality plan and quality procedures, Following up project correspondence. Time schedule Plan (MS Project), dealing with contract documents And correspondence, prepare minute of meeting and. Weekly and monthly report....etc.
  • 2. May 09 till June 2010 Project Manager with Kiwar Contracting Company Jordan- for Madaba American University total area 32000m2 Estimated Cost 23m$. Duties: review design .prepare time schedule with Full detailed resources and cash flow for Approval, following up shop drawings, method Statements, coordination drawing with structure Mechanical and electrical, prepare variations, monthly Payments, record minutes, prepare and answer all Correspondence related as per project conditions and FIDIC. Nov. 08 till April 09 Construction Manager with Ali & Sons Contracting, Abu Dhabi – UAE for execution of villas Complex, total area 58000m2 estimated cost 42m$. Duties: maintain productivity targets in accordance With work schedule, following up executed activities In the site, coordination with subcontract, assist The technical office engineer in preparation of shop Dwg,s and method of statements, prepare material Tools and equipment needed for construction. Sept. 05 till Oct. 08 Projects Manager with Al-Bahrainieh Contracting & Maintenance Company. Executed projects .five star villa Total area 5000m2 cost 9m$, medical centre 2000m2 Cost 1.2.m$,commercial building 12 stores area 10400m2 Cost 1.7m$. Duties: prepare all construction dwg,s and documents to Approve, reviewing the design drawing and contract Documents prepare and submit master time schedule for Approval, following up all correspondence between Parties, prepare reports to the G, manager, attend Meeting, prepare material logo and submittal, following up Monthly payments,... etc. Aug. 04 till June 05 Owner Representative with Habitat Furniture & Interior Company, Saudi Arabia Duties: Supervising the erection of show rooms and Hotel building in Jeddah. Total area of the Project Was 45000 sqm. June 02 till May 04 Projects Manager with Sabeel Al-Handasa Consultant Engineering, Amman – Jordan. Duties: supervised many projects including five health centres and two schools. Design, specifications, bills of quantities for six schools in addition to preparing special conditions, monthly reports, following up with contractors and payments, coordination between civil, finishing and electro-mechanical and plumbing. May 99 till May 2002 Senior Civil Engineer with Solidec International LTD Jordan Branch “Le Royal Complex Amman – Jordan”. Five Star Hotel, including a commercial complex, conferences’ halls, business centre, three cinemas, shopping centre, fitness centre, banks and other retail facilities (120 000) sqm, 32 stories, estimated cost $170m). The height of the
  • 3. building is 123 meters and it is considered the highest building in Jordan. I was involved in all stages of const&finishing Sept. 97 - Oct. 98 Senior Civil Engineer with Saudi Bin Laden Group Grand Hyatt Hotel Project (40,000 m2 Preparation of Shop-drawings for structural works, bar Bending schedule, daily work progress reports, performing the transaction with consultant including submittals, job Requests & quality control procedures, also I was involved in the erection of the pedestrian foot bridge and the Underground tunnels between Hyatt Hotel and Zara. Mar. 97 till June 97 Site Manager with Consolidated Contractors International Co, For United Nations Camp Project at Um Qaser - Iraq And supervised all civil and electro-mechanical Installations. Aug. 94 till Feb. 97 Construction Manager with Al-Ammar Contracting Co. Duties: 1. Bidding for new projects. 2. Supervising all activities in company's projects. 3. Preparation of payments for completed works. 4. Purchasing of building materials and the selection of subcontractors. 5. Approval of all projects, expenses including sub-contracts and suppliers payments. Nov. 89 till Jul. 94 Resident Engineer with Monther Ghosheh Consultants. Directly involved with all stages for the erection of Arab Weavers Factory, 1989 – 1990 which is steel Frame structure of 42 meter span. The supervision Included the concrete foundations and the steel frame Erection, the installation of the roofing and sides of the Structure and the follow up of electro-mechanical works. Jan. 87 till Nov. 89 Ghassan Azar Consulting Engineers. Title: Assistant Structural Engineer. Duties: participate in the design of various Projects, Site Engineer for multi story industrial building for the Eagle Distilleries in Zarqa. It is a three story concrete building for distillery storage and offices space. Supervision includes all the stages of construction From foundations to the finishing works.