Curriculum Vitae
Saeed Mahmoud Aly Shaheen
Mobile: 01066313502.
addrees :92( L) hadaik el-ahram - giza.
E.Mail: saeedshaheen53@ hotmail com
Date of birth : 26/2/1953
Nationality : Egyptian
Marital status : Married
___________________________________________________
Qualifications..
*(B.Sc. Civil Engineering (Construction)-Faculty of Engineering- AL-Azhar
University - may 1977 with general grade (v.good. (
*Graduation projects:the projects of steel bridges and construction with grade
of(v.good.(
*(Certificate of a (Consultant Engineer) issued from Engineering syndicate on
7/5/1995 in the field of supervising of civil projects construction.
*(Certificate of a (Consultant Engineer) issued from Engineering syndicate on
12/5/2003 in the field of design of concrete and steel structures.
*(A member in (Egyptian Society of Engineers. (
.
Relevant experience:
From April. 2011 till Dec.2012;
Company: Arabian Group For Consultancy Engineering - Al-Riyadh.
Position: Consultant Project Manager.
Responsibilities Supervise sewage network in HAIL city
From April. 2006 till March 2011;
Company: Saudi Sea Ports Authority- Al-Riyadh.
Position: Civil work Expert.
Responsibilities:
1-Study and review the civil and construction design submitted by consultants before
tendring.
2-Review and certify the finantial evaluations of both consultants and contractors.
3-Follow-up the construction of reinforced concrete for marine berths , breakwaters ,
buildings , open sheds , transit sheds , warehouses and water & sewage networks..
4-Study the tender documents and variation orders and participation in preparing
technical reports of tenders..
5-Follow-up the progress schedules and determine the delay time ( if any)and the
delay fine.
6-Study the requests submitted by the contractor ( thru the consultant ) asking for
extention of time and give the advice.
7-Handover the completed works and determine the outstanding items.
From Dec. 2004 till october.2005;
Company : Al-Naim Architects Engineers & Planning ( Consulting Engineers-(
Al-Ahsa- kingdom of Saudi Arabia
Position: project manager.
AL-AHSA city.
From October2000 to Augest.2004;
Company : Al-Asker Engineering- ( Consulting Engineers) Tabuk
kingdom of Saudi Arabia
Position: project manager
Responsibilities: Supervise tabuk technical college in tabuk city.
From march 1997 to June 2000
Company: International co. for petroleum & engineering projects – Inperjet-Cairo-
Egypt.
Position: Project Manager 1-
Responsibilities:Supervise the construction works in ( Elfath City ) in Nasr City-
Cairo-which consists of roads , water,sewage networks in addition to landscaping
.
2-Position: Project manager
Responsibilities:Supervise the construction works of ( Fertilizing factory ) in
Ismaeallia city, which consists of adminsration buliding, laboratories, roads, water
and sewage networks,fences and other facilities
3-Position: Project manager
Responsibilities:Supervise the construction works of ( Merghem road ) in Alexandria-
which consists of road pavment 3km length and 27 m. width ..in addition to rain
drainage network and landscaping.
From March 1995to July 1996
Company: Engineering & Trading Arab Company ( ETAC) in -Cairo-Egypt.
-Position: Project manager
-Responsibilities:Supervise the construction of
administration ,commercial& habitation towers in
-)Abassia) –Cairo- which consists of no.(6)
towers each of two basements, ground floor, mezzanine and no.13 repeated floors.
From Nov. 1990 to Nov. 1994
Company: Saudi-Aramco in Rabigh Industrial city KSA
)Previously Samarec & Petromin.(
Position: Projects inspection engineer
Responsibilities:Supervise the construction of the following projects:
1-No. of three schools ( kindergarten , co-educational & primary school ) ..the area of
each school is around 4000 sq.m. and the total cost of these schools is 64 millions
saudi riyals.
2-No. 2 warehouses each of 40*60m area with total cost of 25 millions saudi riyals.
3-Hotel consistes of no. 20 rooms, tennis courts , cafeteria and assaociated facilities ,
with total area of 3250 sq.m. and cost of 40 millions saudi riyals.
4-The main gate and security fence of the community with total cost of 18 millions
suidi riyals.
In addition to the abovementiond activities .. I carried out the design and supervised
the covered car parking ( 420 cars ) , bus stop shelters ( 37 shelters ) , gas turbines
foundations in power plant , and several other minor items..
From May. 1986 to Oct.. 1990
Company: Egyptian Co. for Construction & Trade in Giza-Egypt.
)The Consultant Engineers for Al-Saad group for investment.(
Position: Executive manager
Responsibilities:Supervise the construction of ( Lozan El Saad) village in FAYED
city on suiz canal shore ,, which consists of no. 10 buildings with total no. of 160
apartments ,120 stepped chalets , hotel , private villa , swimming pool , restaurant ,
elevated water tank, underground water tank and other associated facilities.
From May 1980 to March 1986
Company:Saudi Sea ports Authority -Riyadh-KSA.
Position:Civil engineer
Responsibilities: Responsible with the association of an english consultant co.
)SIR BRUCE WHITE & PARTNERS ) to supervise all civil works in
Dammam Port , which included the following:
1-Follow-up the construction of reinforced concrete slabs for marine berths ,
breakwaters , buildings , open sheds , transit sheds , warehouses and water & sewage
networks..
2-Study the tender documents and variation orders and participation in preparing
technical reports of tenders..
3-Follow-up the progress schedules and determine the delay time ( if any)and the
delay fine
4-Study the requests submitted by the contractor ( thru the consultant ) asking for
extention of time and give the advice.
5-Handover the completed works and determine the outstanding items
6-Calculate the consultant"s fees according to the actual executed works and variation
orders.
From July. 1977 to Feb.. 1980
Company:Foundation Engineering Co. in Cairo-Egypt.
Position: projects manager
Responsibilities:Designed the following projects:
1-The extension of the community of steel & iron Co. in Hellwan city – Cairo
)no. 820 apartments(
2-A glass factory in the sixth of october in CAIRO ( steel skeleton(
3-A ground water tank of the south cairo power plant with capacity of 5000 cubic
meter ( 47.5*47.5*2.2 m.(
From Dec. 1977 to March 1980
Instructor in faculty of engineering - Al-Azhar University to teach steel bridges and
construction.
CV update

CV update

  • 1.
    Curriculum Vitae Saeed MahmoudAly Shaheen Mobile: 01066313502. addrees :92( L) hadaik el-ahram - giza. E.Mail: saeedshaheen53@ hotmail com Date of birth : 26/2/1953 Nationality : Egyptian Marital status : Married ___________________________________________________ Qualifications.. *(B.Sc. Civil Engineering (Construction)-Faculty of Engineering- AL-Azhar University - may 1977 with general grade (v.good. ( *Graduation projects:the projects of steel bridges and construction with grade of(v.good.( *(Certificate of a (Consultant Engineer) issued from Engineering syndicate on 7/5/1995 in the field of supervising of civil projects construction. *(Certificate of a (Consultant Engineer) issued from Engineering syndicate on 12/5/2003 in the field of design of concrete and steel structures. *(A member in (Egyptian Society of Engineers. ( . Relevant experience: From April. 2011 till Dec.2012; Company: Arabian Group For Consultancy Engineering - Al-Riyadh. Position: Consultant Project Manager. Responsibilities Supervise sewage network in HAIL city From April. 2006 till March 2011; Company: Saudi Sea Ports Authority- Al-Riyadh. Position: Civil work Expert. Responsibilities: 1-Study and review the civil and construction design submitted by consultants before tendring. 2-Review and certify the finantial evaluations of both consultants and contractors. 3-Follow-up the construction of reinforced concrete for marine berths , breakwaters , buildings , open sheds , transit sheds , warehouses and water & sewage networks.. 4-Study the tender documents and variation orders and participation in preparing technical reports of tenders.. 5-Follow-up the progress schedules and determine the delay time ( if any)and the delay fine. 6-Study the requests submitted by the contractor ( thru the consultant ) asking for extention of time and give the advice. 7-Handover the completed works and determine the outstanding items.
  • 2.
    From Dec. 2004till october.2005; Company : Al-Naim Architects Engineers & Planning ( Consulting Engineers-( Al-Ahsa- kingdom of Saudi Arabia Position: project manager. AL-AHSA city. From October2000 to Augest.2004; Company : Al-Asker Engineering- ( Consulting Engineers) Tabuk kingdom of Saudi Arabia Position: project manager Responsibilities: Supervise tabuk technical college in tabuk city. From march 1997 to June 2000 Company: International co. for petroleum & engineering projects – Inperjet-Cairo- Egypt. Position: Project Manager 1- Responsibilities:Supervise the construction works in ( Elfath City ) in Nasr City- Cairo-which consists of roads , water,sewage networks in addition to landscaping . 2-Position: Project manager Responsibilities:Supervise the construction works of ( Fertilizing factory ) in Ismaeallia city, which consists of adminsration buliding, laboratories, roads, water and sewage networks,fences and other facilities 3-Position: Project manager Responsibilities:Supervise the construction works of ( Merghem road ) in Alexandria- which consists of road pavment 3km length and 27 m. width ..in addition to rain drainage network and landscaping. From March 1995to July 1996 Company: Engineering & Trading Arab Company ( ETAC) in -Cairo-Egypt. -Position: Project manager -Responsibilities:Supervise the construction of administration ,commercial& habitation towers in -)Abassia) –Cairo- which consists of no.(6) towers each of two basements, ground floor, mezzanine and no.13 repeated floors. From Nov. 1990 to Nov. 1994 Company: Saudi-Aramco in Rabigh Industrial city KSA )Previously Samarec & Petromin.( Position: Projects inspection engineer Responsibilities:Supervise the construction of the following projects: 1-No. of three schools ( kindergarten , co-educational & primary school ) ..the area of each school is around 4000 sq.m. and the total cost of these schools is 64 millions saudi riyals. 2-No. 2 warehouses each of 40*60m area with total cost of 25 millions saudi riyals.
  • 3.
    3-Hotel consistes ofno. 20 rooms, tennis courts , cafeteria and assaociated facilities , with total area of 3250 sq.m. and cost of 40 millions saudi riyals. 4-The main gate and security fence of the community with total cost of 18 millions suidi riyals. In addition to the abovementiond activities .. I carried out the design and supervised the covered car parking ( 420 cars ) , bus stop shelters ( 37 shelters ) , gas turbines foundations in power plant , and several other minor items.. From May. 1986 to Oct.. 1990 Company: Egyptian Co. for Construction & Trade in Giza-Egypt. )The Consultant Engineers for Al-Saad group for investment.( Position: Executive manager Responsibilities:Supervise the construction of ( Lozan El Saad) village in FAYED city on suiz canal shore ,, which consists of no. 10 buildings with total no. of 160 apartments ,120 stepped chalets , hotel , private villa , swimming pool , restaurant , elevated water tank, underground water tank and other associated facilities. From May 1980 to March 1986 Company:Saudi Sea ports Authority -Riyadh-KSA. Position:Civil engineer Responsibilities: Responsible with the association of an english consultant co. )SIR BRUCE WHITE & PARTNERS ) to supervise all civil works in Dammam Port , which included the following: 1-Follow-up the construction of reinforced concrete slabs for marine berths , breakwaters , buildings , open sheds , transit sheds , warehouses and water & sewage networks.. 2-Study the tender documents and variation orders and participation in preparing technical reports of tenders.. 3-Follow-up the progress schedules and determine the delay time ( if any)and the delay fine 4-Study the requests submitted by the contractor ( thru the consultant ) asking for extention of time and give the advice. 5-Handover the completed works and determine the outstanding items 6-Calculate the consultant"s fees according to the actual executed works and variation orders. From July. 1977 to Feb.. 1980 Company:Foundation Engineering Co. in Cairo-Egypt. Position: projects manager Responsibilities:Designed the following projects: 1-The extension of the community of steel & iron Co. in Hellwan city – Cairo )no. 820 apartments( 2-A glass factory in the sixth of october in CAIRO ( steel skeleton( 3-A ground water tank of the south cairo power plant with capacity of 5000 cubic meter ( 47.5*47.5*2.2 m.( From Dec. 1977 to March 1980 Instructor in faculty of engineering - Al-Azhar University to teach steel bridges and construction.