MAGED AHMED MAHMOUD ALI
Construction Manager
RESUME
PROJECT ASSIGNMENT
Construction Manager
EDUCATION
B. Sc. in Architectural Engineering - 1994
Helwan University, Cairo, Egypt
YEARS OF EXPERIENCE
21
REPRESENTATIVE EXPERIENCE
2008 – Present
Turner Arabia, Jeddah, Saudi Arabia
Position: Construction Manager/Sector Manager/Zone Manager/Sub- Contractor Coordinator
Project: King Abdullah Economic city
Dec. 2014 to June 2015
Responsibilities:
- Turner was assigned as the Project Manager for the Emaar residential project “Industrial valley” a
project with a total value exceeding 7 billion SAR. As a Construction manager my duties
included;
- Oversee the performance of the supervision consultants & Contractors ensuring that quality
control procedures and requirements are being implemented.
- Follow-up on the construction activities in the field to ensure that the work progress is conforming
to the approved project schedule and that the quality meets the project specifications.
- Coordinate between the general contractor, infra-structure contractor and the local authorities to
expedite the work.
- Conduct weekly progress, QA/QC, Safety, meetings and coordination meetings with the different
involved contractors and consultants.
- Undertakes daily site visits to check for adherence safety norms, Construction activity and to
insure the Quality procedures.
- Review the daily reports submitted form the contractor.
Project: King Abdullah University for Science &
Technology KAUST
Jun. 2008 to Oct. 2014
Responsibilities:
- Responsible for the overall zone execution and has the
authority to organize and implement all the activities necessary to achieve efficient and timely
completion of the zone buildings deliverables.
- Overseeing the Smooth Flow of all zone works.
- Attended Safety Training conducted by ARAMCO/KAUST and certified as a Work Permit
Receiver after clearing written test.
- Communicating with ARAMCO for safety issues encountered at site.
2
MAGED AHMED MAHMOUD ALI
Construction Manager
RESUME
- Assuring the implementation of safety plan according contract obligations and Assuring
compliance of Safety Requirements as per contract requirements.
- Participate with logistic department to Plan site set-up to move labor, plant, and materials around
site efficiently (e.g. site accommodation, cranes, hoists, security, temporary services, material
delivery and waste management strategy).
- Plan internal and external logistics routes through the project phases focusing on separation of
vehicles, machinery and people. Lay down areas and offloading points.
- Authorization of zone correspondence and working drawings.
- Coordination and follow-up the progress with subcontractors during the submittals and
construction stages.
- Follow up project close-out for site activities as EIL’s (exception item list) & PNR’s (performance
notification report).
2006 - 2008
Alamia Building Company, Kuwait
Position: Project Engineer.
Project: Kuwait Oil Company Complex.
Brief description of the project:
The Project Consists of 13 offices Buildings, Car park & External landscape, Construction Manager:
Fluor, Consultant: Gulf Consultant, Value: 36 Million KD,
Duties:
- Following up the skeleton works for all buildings
- Following up finishing items
- Attended Safety Training conducted by FLOUR/KOC and certified as a Work Permit Receiver
after clearing written test.
- Assuring the implementation of safety plan according contract obligations and safety
requirements.
- Participate with logistic department to Plan site set-up to move labor, plant, and materials around
site efficiently (e.g. site accommodation, cranes, hoists, security, temporary services, material
delivery and waste management strategy).
- Following up Sub-contractors
- Resolve the coordination Problems and quires regarding finishes, services
2004 - 2005
Real Estate Construction & Fabrication Co. (RECAFCO), Kuwait
Position: Architecture Engineer
Project: West Abu Fatera Vocational Services Area
Consultant: Kuwaiti Engineer Office KEO
Brief description of the project: The project consists of 9 Buildings (Police Station, Fire Station, Clinic,
3 Mosques & 3 Malls) 3 Million KD
Duties as an Architect:
- Preparation of architectural shop drawings
3
MAGED AHMED MAHMOUD ALI
Construction Manager
RESUME
- Co-ordination with consultant and all sub-contractors
- Duties as Site Engineer:
- Following up the skeleton works for 5 buildings
- Following up the finishing works for all buildings
2002 - 2004
Project: Industrial Training Institute - ITI
Position: Architecture Coordinator & Site Manager
Construction Manager: Turner Projects
Brief description of the project: The project consists of 12 Buildings (3 Workshops, sports hall,
theater, main admin, 5 class buildings, car park &external landscape)
Duties as Architect:
- Preparation of architectural shop drawings
- Co-ordination with site engineers
- Co-ordination with / review sub-contractors shop drawing
Duties as Site Engineer:
- Following up all finishes items work
- Co-ordination with site engineers
- Co-ordination with sub-contractors work s
2001 - 2002
Sayed Al-Komi Consulting Engineer, Egypt
Position: Senior Design Architect
Duties:
- Participating in preparation of office architectural design
- Participating in architectural design
- Checking the work on site to assure quality and accuracy of work
1999 - 2001
Al Ghanim International Co., Kuwait
Project: Extension for Collage of Technological Studies
Position: Architect Shop drawing Engineer
Construction Manager: Turner
Duties:
- Preparation architectural and formwork drawings
- Co-ordination between different disciplines drawings
- Co-ordination with site engineers
4
MAGED AHMED MAHMOUD ALI
Construction Manager
RESUME
1998 - 1999
Arab International Construction, Egypt
Project: World Health Organization for Middle East WHO
Position: Senior Shop Drawing Engineer
Duties:
- Preparation architectural and formwork drawings
- Co-ordination between different disciplines drawings
- Co-ordination with site engineers
- Checking the work on site to assure quality and accuracy of work
- Co-ordination with / review sub-contractors shop drawing
1997 - 1998
Sayed Al-Komi Consulting Engineer, Egypt
Project: Swiss Hotel Shark El Shikh Resort
Position: Design Architect
Duties:
- Preparation architectural design
- Design architectural details
- Preparing working drawing
- Co-ordination between different disciplines drawings
- Checking the work on site to assure quality and accuracy of work
1996 - 1997
Sayed Al-Komi Consulting Engineer, Egypt
Project: Villa Mohamed Shata--Elmansoria
Position: Design Architect
Duties:
- Preparation architectural design
- Design architectural details
- Preparing working drawing
- Co-ordination between different disciplines drawings
- Checking the work on site to assure quality and accuracy of work
COMPUTER SKILLS
- AutoCAD
- 3D Max Studio
- MS Office ( Excel, Word, PowerPoint)
______________

More Related Content

What's hot

Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWaell Azmy
 
CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -maen KHODR
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)ahmed elazazy
 
Al Shatrain Contracting Est Profile
Al Shatrain Contracting Est ProfileAl Shatrain Contracting Est Profile
Al Shatrain Contracting Est ProfileHassan Al-Yami
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansourahmed mansour
 
Cv abdullatif 2016
Cv abdullatif 2016Cv abdullatif 2016
Cv abdullatif 2016
Abdullatif Abdulla
 
Ahmed Adel Mohamed Nasser
Ahmed Adel Mohamed NasserAhmed Adel Mohamed Nasser
Ahmed Adel Mohamed NasserAhmed Nasser
 
Hassan youssef c vs
Hassan youssef c vsHassan youssef c vs
Hassan youssef c vs
hassanyoussef26
 
MOHMED EZZ 2014CV
MOHMED EZZ 2014CVMOHMED EZZ 2014CV
MOHMED EZZ 2014CVmohamed ezz
 
Cv marc andré gauvin en 2015
Cv marc andré gauvin en 2015Cv marc andré gauvin en 2015
Cv marc andré gauvin en 2015
Marc Andr Gauvin
 

What's hot (20)

mohammed soliman 4-2014
mohammed soliman 4-2014mohammed soliman 4-2014
mohammed soliman 4-2014
 
Resume (final cv)
Resume (final cv)Resume (final cv)
Resume (final cv)
 
Abdulrahman Shakboua15
Abdulrahman Shakboua15Abdulrahman Shakboua15
Abdulrahman Shakboua15
 
Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp Letters
 
CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)
 
Resume_Sherif El-Sherif
Resume_Sherif El-SherifResume_Sherif El-Sherif
Resume_Sherif El-Sherif
 
cv 8-8-2016
cv 8-8-2016cv 8-8-2016
cv 8-8-2016
 
Mohamed Magdy
Mohamed MagdyMohamed Magdy
Mohamed Magdy
 
Ahmed Aboul Azm
Ahmed Aboul AzmAhmed Aboul Azm
Ahmed Aboul Azm
 
CV mohamed
CV mohamedCV mohamed
CV mohamed
 
Stelian Dragomir-CV
Stelian Dragomir-CVStelian Dragomir-CV
Stelian Dragomir-CV
 
Al Shatrain Contracting Est Profile
Al Shatrain Contracting Est ProfileAl Shatrain Contracting Est Profile
Al Shatrain Contracting Est Profile
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansour
 
Cv abdullatif 2016
Cv abdullatif 2016Cv abdullatif 2016
Cv abdullatif 2016
 
Ahmed Adel Mohamed Nasser
Ahmed Adel Mohamed NasserAhmed Adel Mohamed Nasser
Ahmed Adel Mohamed Nasser
 
Hassan youssef c vs
Hassan youssef c vsHassan youssef c vs
Hassan youssef c vs
 
MOHMED EZZ 2014CV
MOHMED EZZ 2014CVMOHMED EZZ 2014CV
MOHMED EZZ 2014CV
 
modified cv khaled
modified  cv khaledmodified  cv khaled
modified cv khaled
 
Cv marc andré gauvin en 2015
Cv marc andré gauvin en 2015Cv marc andré gauvin en 2015
Cv marc andré gauvin en 2015
 

Viewers also liked

HFI User Experience Foundations Certificate
HFI User Experience Foundations CertificateHFI User Experience Foundations Certificate
HFI User Experience Foundations CertificateKarabo Ngoatle
 
America TV lanza nuevo esquema para venta de publicidad desde el 2016
America TV lanza nuevo esquema para venta de publicidad desde el 2016America TV lanza nuevo esquema para venta de publicidad desde el 2016
America TV lanza nuevo esquema para venta de publicidad desde el 2016
Miguel Angel Urbina
 
Select the Right Team to Maximize your Tax Savings - KKUE Tax Alert 2016.PDF
Select the Right Team to Maximize your Tax Savings - KKUE Tax Alert 2016.PDFSelect the Right Team to Maximize your Tax Savings - KKUE Tax Alert 2016.PDF
Select the Right Team to Maximize your Tax Savings - KKUE Tax Alert 2016.PDFJeremy R. Cnudde
 
C:\Documents And Settings\Mcolon\Desktop\Pdfa\Presentaciones Para El Blog\Dis...
C:\Documents And Settings\Mcolon\Desktop\Pdfa\Presentaciones Para El Blog\Dis...C:\Documents And Settings\Mcolon\Desktop\Pdfa\Presentaciones Para El Blog\Dis...
C:\Documents And Settings\Mcolon\Desktop\Pdfa\Presentaciones Para El Blog\Dis...docentercm
 
Herramientas web 2.0
Herramientas web 2.0Herramientas web 2.0
Herramientas web 2.0
Judith Flores
 
Week12
Week12Week12
Week12
WanSurang FK
 
Travel safety presentation
Travel safety presentationTravel safety presentation
Travel safety presentation
UK Meds
 
Kajian Manajemen Publik
Kajian Manajemen PublikKajian Manajemen Publik
Kajian Manajemen Publik
Edy Eko Santoso
 
Lstmh2013 j hughes_long
Lstmh2013 j hughes_longLstmh2013 j hughes_long
Lstmh2013 j hughes_longJoseph Hughes
 
一年级古诗(Upsr)
一年级古诗(Upsr)一年级古诗(Upsr)
一年级古诗(Upsr)
Edward Teo
 
Chinese 华语古诗 - 六年级
Chinese 华语古诗 - 六年级Chinese 华语古诗 - 六年级
Chinese 华语古诗 - 六年级
Kathleen Ong
 

Viewers also liked (14)

TIB.200ton crane cefti
TIB.200ton crane ceftiTIB.200ton crane cefti
TIB.200ton crane cefti
 
HFI User Experience Foundations Certificate
HFI User Experience Foundations CertificateHFI User Experience Foundations Certificate
HFI User Experience Foundations Certificate
 
America TV lanza nuevo esquema para venta de publicidad desde el 2016
America TV lanza nuevo esquema para venta de publicidad desde el 2016America TV lanza nuevo esquema para venta de publicidad desde el 2016
America TV lanza nuevo esquema para venta de publicidad desde el 2016
 
Select the Right Team to Maximize your Tax Savings - KKUE Tax Alert 2016.PDF
Select the Right Team to Maximize your Tax Savings - KKUE Tax Alert 2016.PDFSelect the Right Team to Maximize your Tax Savings - KKUE Tax Alert 2016.PDF
Select the Right Team to Maximize your Tax Savings - KKUE Tax Alert 2016.PDF
 
C:\Documents And Settings\Mcolon\Desktop\Pdfa\Presentaciones Para El Blog\Dis...
C:\Documents And Settings\Mcolon\Desktop\Pdfa\Presentaciones Para El Blog\Dis...C:\Documents And Settings\Mcolon\Desktop\Pdfa\Presentaciones Para El Blog\Dis...
C:\Documents And Settings\Mcolon\Desktop\Pdfa\Presentaciones Para El Blog\Dis...
 
Herramientas web 2.0
Herramientas web 2.0Herramientas web 2.0
Herramientas web 2.0
 
Week12
Week12Week12
Week12
 
Aula virtual
Aula virtualAula virtual
Aula virtual
 
Travel safety presentation
Travel safety presentationTravel safety presentation
Travel safety presentation
 
Kajian Manajemen Publik
Kajian Manajemen PublikKajian Manajemen Publik
Kajian Manajemen Publik
 
Lstmh2013 j hughes_long
Lstmh2013 j hughes_longLstmh2013 j hughes_long
Lstmh2013 j hughes_long
 
一年级古诗(Upsr)
一年级古诗(Upsr)一年级古诗(Upsr)
一年级古诗(Upsr)
 
Prashant_Nikam-Resume
Prashant_Nikam-ResumePrashant_Nikam-Resume
Prashant_Nikam-Resume
 
Chinese 华语古诗 - 六年级
Chinese 华语古诗 - 六年级Chinese 华语古诗 - 六年级
Chinese 华语古诗 - 六年级
 

Similar to Maged_Ahmed_Ali_CV_10-2016

updated wagdi cm cv
updated wagdi cm cvupdated wagdi cm cv
updated wagdi cm cvWagdi Wahba
 
Akhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docAkhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).doc
ShahbazAhmad953994
 
CV_Ahmad_Eida final
CV_Ahmad_Eida finalCV_Ahmad_Eida final
CV_Ahmad_Eida finalAhmad Eida
 
AHMED SAKR 2016
AHMED SAKR 2016AHMED SAKR 2016
AHMED SAKR 2016Ahmed Sakr
 
Eng.ahmed_Yousef CV
Eng.ahmed_Yousef   CVEng.ahmed_Yousef   CV
Eng.ahmed_Yousef CVahmed yousef
 
Mustafa Hatem Kadry -CV-00
Mustafa Hatem Kadry -CV-00Mustafa Hatem Kadry -CV-00
Mustafa Hatem Kadry -CV-00Mustafa Kadry
 
CV - Emad Fathi CM
CV - Emad Fathi CMCV - Emad Fathi CM
CV - Emad Fathi CMemad salim
 
Ayman Fathy Mohamed
Ayman Fathy MohamedAyman Fathy Mohamed
Ayman Fathy Mohamed
Ayman Fathy
 
Ahmed Mousa Resume
Ahmed Mousa ResumeAhmed Mousa Resume
Ahmed Mousa ResumeAhmed Mousa
 

Similar to Maged_Ahmed_Ali_CV_10-2016 (20)

updated wagdi cm cv
updated wagdi cm cvupdated wagdi cm cv
updated wagdi cm cv
 
Abo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & DutiesAbo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & Duties
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
Amr. 2015....
Amr. 2015....Amr. 2015....
Amr. 2015....
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
amir cv
amir cvamir cv
amir cv
 
Akhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docAkhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).doc
 
CV_Ahmad_Eida final
CV_Ahmad_Eida finalCV_Ahmad_Eida final
CV_Ahmad_Eida final
 
AHMED SAKR 2016
AHMED SAKR 2016AHMED SAKR 2016
AHMED SAKR 2016
 
Eng.ahmed_Yousef CV
Eng.ahmed_Yousef   CVEng.ahmed_Yousef   CV
Eng.ahmed_Yousef CV
 
Mustafa Hatem Kadry -CV-00
Mustafa Hatem Kadry -CV-00Mustafa Hatem Kadry -CV-00
Mustafa Hatem Kadry -CV-00
 
Peter L. Cabbab.
Peter L. Cabbab.Peter L. Cabbab.
Peter L. Cabbab.
 
CV - Emad Fathi CM
CV - Emad Fathi CMCV - Emad Fathi CM
CV - Emad Fathi CM
 
Ayman Fathy Mohamed
Ayman Fathy MohamedAyman Fathy Mohamed
Ayman Fathy Mohamed
 
cv
cvcv
cv
 
hatim marouf 4
hatim marouf 4hatim marouf 4
hatim marouf 4
 
Ahmed Mousa Resume
Ahmed Mousa ResumeAhmed Mousa Resume
Ahmed Mousa Resume
 
Khaled Naguib
Khaled NaguibKhaled Naguib
Khaled Naguib
 
CV.2016
CV.2016CV.2016
CV.2016
 

Maged_Ahmed_Ali_CV_10-2016

  • 1. 1 MAGED AHMED MAHMOUD ALI Construction Manager RESUME PROJECT ASSIGNMENT Construction Manager EDUCATION B. Sc. in Architectural Engineering - 1994 Helwan University, Cairo, Egypt YEARS OF EXPERIENCE 21 REPRESENTATIVE EXPERIENCE 2008 – Present Turner Arabia, Jeddah, Saudi Arabia Position: Construction Manager/Sector Manager/Zone Manager/Sub- Contractor Coordinator Project: King Abdullah Economic city Dec. 2014 to June 2015 Responsibilities: - Turner was assigned as the Project Manager for the Emaar residential project “Industrial valley” a project with a total value exceeding 7 billion SAR. As a Construction manager my duties included; - Oversee the performance of the supervision consultants & Contractors ensuring that quality control procedures and requirements are being implemented. - Follow-up on the construction activities in the field to ensure that the work progress is conforming to the approved project schedule and that the quality meets the project specifications. - Coordinate between the general contractor, infra-structure contractor and the local authorities to expedite the work. - Conduct weekly progress, QA/QC, Safety, meetings and coordination meetings with the different involved contractors and consultants. - Undertakes daily site visits to check for adherence safety norms, Construction activity and to insure the Quality procedures. - Review the daily reports submitted form the contractor. Project: King Abdullah University for Science & Technology KAUST Jun. 2008 to Oct. 2014 Responsibilities: - Responsible for the overall zone execution and has the authority to organize and implement all the activities necessary to achieve efficient and timely completion of the zone buildings deliverables. - Overseeing the Smooth Flow of all zone works. - Attended Safety Training conducted by ARAMCO/KAUST and certified as a Work Permit Receiver after clearing written test. - Communicating with ARAMCO for safety issues encountered at site.
  • 2. 2 MAGED AHMED MAHMOUD ALI Construction Manager RESUME - Assuring the implementation of safety plan according contract obligations and Assuring compliance of Safety Requirements as per contract requirements. - Participate with logistic department to Plan site set-up to move labor, plant, and materials around site efficiently (e.g. site accommodation, cranes, hoists, security, temporary services, material delivery and waste management strategy). - Plan internal and external logistics routes through the project phases focusing on separation of vehicles, machinery and people. Lay down areas and offloading points. - Authorization of zone correspondence and working drawings. - Coordination and follow-up the progress with subcontractors during the submittals and construction stages. - Follow up project close-out for site activities as EIL’s (exception item list) & PNR’s (performance notification report). 2006 - 2008 Alamia Building Company, Kuwait Position: Project Engineer. Project: Kuwait Oil Company Complex. Brief description of the project: The Project Consists of 13 offices Buildings, Car park & External landscape, Construction Manager: Fluor, Consultant: Gulf Consultant, Value: 36 Million KD, Duties: - Following up the skeleton works for all buildings - Following up finishing items - Attended Safety Training conducted by FLOUR/KOC and certified as a Work Permit Receiver after clearing written test. - Assuring the implementation of safety plan according contract obligations and safety requirements. - Participate with logistic department to Plan site set-up to move labor, plant, and materials around site efficiently (e.g. site accommodation, cranes, hoists, security, temporary services, material delivery and waste management strategy). - Following up Sub-contractors - Resolve the coordination Problems and quires regarding finishes, services 2004 - 2005 Real Estate Construction & Fabrication Co. (RECAFCO), Kuwait Position: Architecture Engineer Project: West Abu Fatera Vocational Services Area Consultant: Kuwaiti Engineer Office KEO Brief description of the project: The project consists of 9 Buildings (Police Station, Fire Station, Clinic, 3 Mosques & 3 Malls) 3 Million KD Duties as an Architect: - Preparation of architectural shop drawings
  • 3. 3 MAGED AHMED MAHMOUD ALI Construction Manager RESUME - Co-ordination with consultant and all sub-contractors - Duties as Site Engineer: - Following up the skeleton works for 5 buildings - Following up the finishing works for all buildings 2002 - 2004 Project: Industrial Training Institute - ITI Position: Architecture Coordinator & Site Manager Construction Manager: Turner Projects Brief description of the project: The project consists of 12 Buildings (3 Workshops, sports hall, theater, main admin, 5 class buildings, car park &external landscape) Duties as Architect: - Preparation of architectural shop drawings - Co-ordination with site engineers - Co-ordination with / review sub-contractors shop drawing Duties as Site Engineer: - Following up all finishes items work - Co-ordination with site engineers - Co-ordination with sub-contractors work s 2001 - 2002 Sayed Al-Komi Consulting Engineer, Egypt Position: Senior Design Architect Duties: - Participating in preparation of office architectural design - Participating in architectural design - Checking the work on site to assure quality and accuracy of work 1999 - 2001 Al Ghanim International Co., Kuwait Project: Extension for Collage of Technological Studies Position: Architect Shop drawing Engineer Construction Manager: Turner Duties: - Preparation architectural and formwork drawings - Co-ordination between different disciplines drawings - Co-ordination with site engineers
  • 4. 4 MAGED AHMED MAHMOUD ALI Construction Manager RESUME 1998 - 1999 Arab International Construction, Egypt Project: World Health Organization for Middle East WHO Position: Senior Shop Drawing Engineer Duties: - Preparation architectural and formwork drawings - Co-ordination between different disciplines drawings - Co-ordination with site engineers - Checking the work on site to assure quality and accuracy of work - Co-ordination with / review sub-contractors shop drawing 1997 - 1998 Sayed Al-Komi Consulting Engineer, Egypt Project: Swiss Hotel Shark El Shikh Resort Position: Design Architect Duties: - Preparation architectural design - Design architectural details - Preparing working drawing - Co-ordination between different disciplines drawings - Checking the work on site to assure quality and accuracy of work 1996 - 1997 Sayed Al-Komi Consulting Engineer, Egypt Project: Villa Mohamed Shata--Elmansoria Position: Design Architect Duties: - Preparation architectural design - Design architectural details - Preparing working drawing - Co-ordination between different disciplines drawings - Checking the work on site to assure quality and accuracy of work COMPUTER SKILLS - AutoCAD - 3D Max Studio - MS Office ( Excel, Word, PowerPoint) ______________