GROWTH &GROWTH &
DEVELOPMENTDEVELOPMENT
DEFINITIONS ANDDEFINITIONS AND
TERMINOLOGIESTERMINOLOGIES
www.indiandentalacademy.comwww.indiandentalacademy.com
Definition of GrowthDefinition of Growth
• “Growth refers to increase in size” - Todd
• “Growth may be defined as the normal
change in the amount of living substance”-
Moyers
• “Growth usually refers to an increase in
size and number” – Proffitwww.indiandentalacademy.comwww.indiandentalacademy.com
• “Change in any morphological parameter
which is measurable”- Moss.
• “Size development , progressive
development (i.e, evolution, emergence,
increase or expansion)”- Webster’s
dictionary.
• “Self multiplication of living substance”-
J.S.Huxley.
www.indiandentalacademy.comwww.indiandentalacademy.com
DIFFDIFFERENT KINDS OF GROWTHERENT KINDS OF GROWTH
• Size change
• Positional change
• Proportional
change
• Functional change
• Maturational
change
• Compositional
change
• Timing and
sequential change
• a Prenatal growth
• b Postnatal
growth
• c Maturity
• d Old age
www.indiandentalacademy.comwww.indiandentalacademy.com
Definition of DevelopmentDefinition of Development
“Development is a progress towards maturity” –
Todd
“Development refers to all naturally occurring
progressive, unidirectional, sequential changes
in the life of an individual from it’s existence as
a single cell to it’s elaboration as a
multifunctional unit terminating in death” –
Moyers
“Development connotes a maturational processwww.indiandentalacademy.comwww.indiandentalacademy.com
Major themes of developmentMajor themes of development
• Changing complexity
• Shifts from competent to fixation
• Shifts from dependent to independent
• Ubiquity of genetic control modulated by
environment
www.indiandentalacademy.comwww.indiandentalacademy.com
Changing complexity
• Takes place at all level of organisation
from the sub-cellular to the whole
organism
• Normally complexity increases with
development .
• Most complex period of developing
dentition is transition of dentitions.
www.indiandentalacademy.comwww.indiandentalacademy.com
Shifts from competent to fixation
• Undifferentiated cells once differentiated
become fixed.
Shifts from dependent to
independent
• Development brings greater independence at
most levels of organisation.
www.indiandentalacademy.comwww.indiandentalacademy.com
Ubiquity of genetic control
modulated by environment
• Genetic control of development is
constantly being modified by
environmental interactions
www.indiandentalacademy.comwww.indiandentalacademy.com
Correlation betweenCorrelation between
Growth & DevelopmentGrowth & Development
• Growth is basically anatomic
phenomenon and quantitative in nature
Development is basically physiologic
phenomenon and qualitative in nature
• Growth may not always be associated
with increase in size, it may at times
result in decrease in size, e.g. thymus
gland after puberty
Development on the other hand is awww.indiandentalacademy.comwww.indiandentalacademy.com
Importance of growth andImportance of growth and
development to orthodontistdevelopment to orthodontist
• Serves as a backbone to understand the
etiology of malocclusion
• Helps to assess the health and nutrition of
children
• Allows comparison of growth of an
individual child with the growth of other
children
• Helps to identify abnormal occlusal
development at an earlier stage
www.indiandentalacademy.comwww.indiandentalacademy.com
• Makes available use of growth spurts
• Surgery is done when facial growth is
completed
• Growth affects stability of occlusion
hence retention regime should be
planned accordingly.
www.indiandentalacademy.comwww.indiandentalacademy.com
DefinitionsDefinitions
• Morphogenesis – “A biologic process
having an underlying control at the cellular
and tissue levels”
• Differentiation – “It is a change from
generalized cells or tissues to a more
specialized kinds during development”
www.indiandentalacademy.comwww.indiandentalacademy.com
• Translocation – “It is a change in
position”
• Maturation – “The term maturation is
sometimes used to express qualitative
changes which occur with ripening or
ageing”
www.indiandentalacademy.comwww.indiandentalacademy.com
Normal features ofNormal features of
Growth & DevelopmentGrowth & Development
• Differential Growth
• Pattern
• Normality
• Variability
• Timing, rate & direction
www.indiandentalacademy.comwww.indiandentalacademy.com
DIFFERENTIAL GROWTHDIFFERENTIAL GROWTH
Different organs grow at different
rates to a different amount and at
different times.
• Scammon’s curve of growth
• Cephalocaudal gradient of growth
www.indiandentalacademy.comwww.indiandentalacademy.com
SCAMMON’S CURVE OFSCAMMON’S CURVE OF
GROWTHGROWTH
• LYMPHOID
• NEURAL
• GENERAL
• GENITAL
www.indiandentalacademy.comwww.indiandentalacademy.com
www.indiandentalacademy.comwww.indiandentalacademy.com
CEPHALOCAUDALCEPHALOCAUDAL
GRADIENTGRADIENT
www.indiandentalacademy.comwww.indiandentalacademy.com
PATTERNPATTERN
• Pattern in growth represents
proportionality .It refers not just to a set of
proportional relationships at a point in time
but to change in these proportional
relationships over time.
• Cephalocaudal gradient
• An important aspect of pattern is
predictablity
www.indiandentalacademy.comwww.indiandentalacademy.com
PredictabilityPredictability
• Predictability of growth pattern is a
specific kind of proportionality that exists
at a particular time and progresses
towards another, at the next time frame
with slight variations.
• In orthodontics,
- Morphogenetic
- Developmental
www.indiandentalacademy.comwww.indiandentalacademy.com
VariabilityVariability
• No two individuals with the exception of
monozygotic twins are like.
• Variability quantitatively is categorized
in terms of deviations from the usual
pattern, for which it is imp to understand
the concept of normality.
www.indiandentalacademy.comwww.indiandentalacademy.com
NormalityNormality
• Normality refers to that which is usually
expected, is ordinarily seen or typical –
Moyers
• Normality may not necessarily be ideal.
• Misuse of the concept of normality can lead
to many problems in clinical orthodontics &
treatment planning.•
www.indiandentalacademy.comwww.indiandentalacademy.com
• Statistical
• Evolutionary
• Functional
• Esthetics
• Clinical
CONCEPTS OF NORMALITYCONCEPTS OF NORMALITY
www.indiandentalacademy.comwww.indiandentalacademy.com
Growth chartsGrowth charts
www.indiandentalacademy.comwww.indiandentalacademy.com
Applications of growth charts.Applications of growth charts.
• Location of an individual relative to the
group can be established.
• Can be used to follow a child over time
and note for any unexpected change in
growth pattern.
www.indiandentalacademy.comwww.indiandentalacademy.com
Timing of GrowthTiming of Growth
• One of the factors for variablity in growth.
• Timing variations arise because biologic clock of
different individuals is different.
• It is influenced by:
genetic influence
sex related differences
physique related
environmental influences
www.indiandentalacademy.comwww.indiandentalacademy.com
Distance curveDistance curve
VsVs
Velocity curveVelocity curve
Distance
curve
Velocity
curve
Age
Height
Distance Curve (cumulative curve): In this curve growth
can be plotted in height or weight recorded at various
ages.
Velocity Curve(incremental curve): In this by amount
of change in any given interval that is growth incrementwww.indiandentalacademy.comwww.indiandentalacademy.com
Growth spurtsGrowth spurts
• Defined as periods of growth acceleration
• Sex-linked
– Normal spurts are
• Infantile spurt – at 3 years age
• Juvenile spurt – 7-8 years (females); 8-10
years (males)
• Pubertal spurt – 10-11 years(females); 18-15
years (males)
www.indiandentalacademy.comwww.indiandentalacademy.com
www.indiandentalacademy.comwww.indiandentalacademy.com
www.indiandentalacademy.comwww.indiandentalacademy.com
GROWTH STUDIES AND METHODS OF
STUDYING GROWTH.
www.indiandentalacademy.comwww.indiandentalacademy.com
• Types of growth data
• Methods of gathering growth data
• Longitudinal growth studies
• Methods of studying bone growth
www.indiandentalacademy.comwww.indiandentalacademy.com
Types of growth data.
Opinion
Observations.
Ratings and rankings.
Quantitative measurements.
direct data.
indirect data.
derived data.
www.indiandentalacademy.comwww.indiandentalacademy.com
Types of growth data.
• Opinion
It is a clever guess based on experience.
they are the crudest form of scientific
knowledge.
• Observations:
They are useful for studying all or none
phenomenon.they are used in a limited way
when more quantitative data is available.
www.indiandentalacademy.comwww.indiandentalacademy.com
• Ratings and rankings:
certain data is difficult to quantify and thus
may be compared to conventional rating
scale .ratings make use of comparisons with
such scales.rankings array data in ordered
sequence according to value.
www.indiandentalacademy.comwww.indiandentalacademy.com
Quantitative measurements:
Includes expressing an idea or fact as a
meaningful quantity or numbers.
• Direct data: derived from measurements taken
on living persons or cadaver with a measuring
device.
• Indirect data: derived from measurements
taken from images or reproductions of the
actual person.
• Derived data: obtained by comparing at least
two other measurements.
www.indiandentalacademy.comwww.indiandentalacademy.com
Methods of gathering growth
data.
• Longitudinal studies .
• Cross sectional studies.
• Overlapping or semi longitudinal studies.
www.indiandentalacademy.comwww.indiandentalacademy.com
Longitudinal studies.
• These are measurements made of the same person
or group at regular intervals through time.
• Advantages: temporary temporal problems are
smoothed with time,
Variability in development within a group is put in
proper perspective,serial comparison makes study
of specific developmental pattern of individual
possible.
Disadvantages: time consuming, expensive, sample
loss or attrition,averaging.
www.indiandentalacademy.comwww.indiandentalacademy.com
Cross sectional studiesCross sectional studies
ADVANTAGES
• Quicker
• Less costly
• Statistical treatment made easier
• Allows repeating
DISADVANTAGES
• Variation in development amongst individuals
within the sample cannot be studied
www.indiandentalacademy.comwww.indiandentalacademy.com
Semi longitudinal studies.
• Longitudinal and cross sectional studies can
be combined to to seek the advantages of
both.in this way one might compress 15
years of study into 3 years of gathering
growth data.
www.indiandentalacademy.comwww.indiandentalacademy.com
LONGITUDINAL GROWTH
STUDIES.
www.indiandentalacademy.comwww.indiandentalacademy.com
Longitudinal growth studiesLongitudinal growth studies
• Bolton brush growth study
• Burlington growth study
• Michigan growth study
• Denver child growth study
• Iowa child welfare study
• Forsyth twin study
• Meharry growth study
www.indiandentalacademy.comwww.indiandentalacademy.com
• Montreal growth study
• Krogman philadelphia growth study
• Fels growth study
• Implant studies
• the mathews implant collection
• the hixon oregon implant study
• Cleft palate study
www.indiandentalacademy.comwww.indiandentalacademy.com
Bolton Brush growth study.
• Initiated by Prof T Wingate Todd in 1926
• Aim- studying skeletal development .
• Initiated concurrently by Dr Holly Broadbent Sr in
1929.
• Aim- studying normal development of facial
skeleton.
• Sample size:5000 normal healthy children.
• Records:series of x-rays,casts,dental and medical
examination and psychological tests.
www.indiandentalacademy.comwww.indiandentalacademy.com
• The two collections merged officially in 1970.
• In 1975 the Bolton standards of dentofacial development
growth were published by Dr Holly Broadbent jr.
• These standards are a series of averages that represent
optimum facial and developmental growth and form a
baseline for understanding and assessing craniofacial
growth.
www.indiandentalacademy.comwww.indiandentalacademy.com
Burlington growth study
• AIM
• Malcclusion
• Evaluate preventive and interceptive orthodontic
treatment.
• Obtain a set of growth records as a database for
future studies.
• Sample size:1632 subjects followed
longitudinally.
www.indiandentalacademy.comwww.indiandentalacademy.com
• Records :series of x-rays,
casts,photographs,height and weight
records and medical examination.
• The original concept for the study was
presented by Robert Moyers& the
records were gathered under Frank
Popovich.
www.indiandentalacademy.comwww.indiandentalacademy.com
Burlington growth study
• More than 247 investigations & 322 studies are
based on this growth study
• Longitudinal studies by Thompson & Popovich to
derive cephalometric norms of a representative
sample was based on 210 children followed for 15
years at the Burlington growth center.
• age sex and growth type specific craniofacial
templates were derived and static and dynamic
analysis were proposed on the basis of this study.
www.indiandentalacademy.comwww.indiandentalacademy.com
The Iowa child welfare study.
• Sample size:it is a diminishing longitudinal
study which began with 20 males and 15
female 4 year old subjects. Followed till 17
years of age. Non -orthodontically treated
patients of entirely European origin were
used.
• Records:lateral and PA views and dental
casts.
• The study as done under Samir Bishara.
www.indiandentalacademy.comwww.indiandentalacademy.com
• Based on this study the changes in facial
dimensions & relationships as well as in
standing height were evaluated.
• The dentofacial relationships of 3 normal facial
types (long, average, short) from 5-25 yrs of
age was described & compared.
www.indiandentalacademy.comwww.indiandentalacademy.com
CLEFT PALATE STUDIES.
• LANCASTER PA:includes 850 record sets obtained
annually from birth to 15 years.
• HOSPITAL FOR SICK CHILDREN(Toronto):over
4000 subjects ranging in age from 5-20 years
• .CENTER FOR CRANIOFACIAL
ANOMALIES(Chicago);annual records of 1000
subjects.
• Records include series of x-ray films, casts, medical
and orthodontic treatment records.
• All subjects had surgical repair and minor to extensive
orthodontic treatment.
www.indiandentalacademy.comwww.indiandentalacademy.com
Methods of studying bone
growth
c e p h a lo m e tr y .
a n th r o p o m e tr y .
c r a n io m e tr y .
m e a s u r e m e n t a p p r o a c h e s .
a u to r a d io g r a p h y .
n u c le a r v o lu m e m o r p h o m e tr y .
r a d io is o to p e s .
p o la r is e d lig h t.
flu o r e s c e n t la b e ls .
m ic r o r a d io g r a p h y .
m in e r a lis e d s e c tio n s .
a t m ic r o s c o p ic le v e l.
fin ite e le m e n t m o d e lin g .
im p la n t m a r k e r s
a t m a c r o s c o p ic le v e l.
n a tu r a l m a r k e r s .
c o m p a r a tiv e a n a to m y .
v ita l s ta in in g .
a t b o th le v e ls .
e x p e r im e n ta l a p p r o a c h e s .
www.indiandentalacademy.comwww.indiandentalacademy.com
CRANIOMETRY.
Involves measurements of skull
used to study the Neanderthal
and Cro-magnon skull.
give information of extinct
population and pattern of growth
Advantages: Precise measurements.
Disadvantages:All growth data must be cross sectional.
www.indiandentalacademy.comwww.indiandentalacademy.com
ANTHROPOMETRY:
• measurements using soft tissue points overlying
bony landmarks in living individuals.
• can also be done on dried skulls but variation in
soft tissue thickness would produce different
results.
• Possible to follow the growth of an individual
directly.
www.indiandentalacademy.comwww.indiandentalacademy.com
• CEPHALOMETRIC RADIOGRAPHY:
• allows direct measurement of bony skeletal
dimensions and follow up of the same individual
over time .
• Disadvantages
•:Depends upon precise orientation of head and precise
control of magnification.
• 2D representation of 3D structurewww.indiandentalacademy.comwww.indiandentalacademy.com
Mineralized sections.
• Fully mineralized sections are superior to
demineralized specimens as there is less processing
distortions and both organic and inorganic matrix can
be studied simultaneously.
• Cellular details and resolutions can be enhanced by
reducing the thickness of the sections.
• Specific stains can be used to enhance both cellular and
extra cellular details.
• Thin sections can however quench more rapidly
www.indiandentalacademy.comwww.indiandentalacademy.com
Microradiography.
• High resolution of images of bone sections
• Differential density between primary and
secondary bone.
• Strength of the bone-proportional to degree of
mineralisation.
• secondary bone has more strength than primary
bone.
• Secondary mineralisation process takes about 8
months to form and hence the minimum retention
period after active orthodontic correction should
be 6-8 months.
www.indiandentalacademy.comwww.indiandentalacademy.com
Fluorescent labels.
• Administered in vivo calcium binding labels
• anabolic time markers of bone formation.
• Mechanism of bone growth determined by
analysis of label incidence and interlabel distance.
• Sequential use of different colored labels assess
bone growth,healing and functional adaptation.
• Tetracycline,calcein green,xylenol orange,alizarin
complexone,demeclocycline and oxytetracycline
commonly used labels.
www.indiandentalacademy.comwww.indiandentalacademy.com
Radioisotopes.
• Radioisotopes of certain elements or compounds
are often used as in vivo markers for studying
bone growth.
• Such labeled material is injected and after some
time located within the growing bone by means
of autoradiographic techniques.
• Commonly used markers are :
1. Technetium 99
2. Calcium 45
3. Potassium 32
www.indiandentalacademy.comwww.indiandentalacademy.com
Autoradiography.
• Histological sections are coated with a nuclear track
emulsion to detect radiographic precursor for
structural and metabolic material.
• Specific radioactive labels for protein carbohydrates
or nucleic acids are injected.
www.indiandentalacademy.comwww.indiandentalacademy.com
• Quantitative and qualitative assessment of the label uptake
is a physiologic index of cell activity.
• Commonly used autoradiographic labels are:
• A. 3
H thymidine.
• B. 3
H proline.
• C. Bromodeoxyuridine.
www.indiandentalacademy.comwww.indiandentalacademy.com
Polarized light.
• indicates the orientation of collagen fibers within
the bone matrix.
• Most lamellar bone consists of collagen fibers
oriented at right angles.
• However 2 other configurations can also be
noted:longitudinally aligned(L osteons).
www.indiandentalacademy.comwww.indiandentalacademy.com
• And mixed fiber pattern.(both L and A osteons).
• Loading condition at the time of bone formation
dictate the orientation of collagen fibers . Thus
bone formation can adapt to different loading
conditions by changing the internal lamellar
organization of bone tissue.
www.indiandentalacademy.comwww.indiandentalacademy.com
Nuclear volume morphometry.
• cytomorphometric procedure to measures the
nuclear size for assessing the stages of
differentiation of osteoblastic precursor cells.
• Pre osteoblasts have significantly larger nuclei
than their precursors.
• used in determining the relative differentiation of
PDL and other bone living cells.
www.indiandentalacademy.comwww.indiandentalacademy.com
Teleradiology.Teleradiology.
• Introduced in 1982 at international
conference of PACS.
• Universal method of storing and
transporting digital images .
• Currently American college of radiology
have developed DICOM to allow the
transmisssion of images over the internet.
www.indiandentalacademy.comwww.indiandentalacademy.com
Vital staining
• reported by Belchier in 1796
• John Hunter- alizarin dye
• Alizarin reacts with calcium at sites of bone
calcification i.e. sites of active skeletal growth
thus marking these locations
• Other dyes : tetracyline
trypon blue
lead acetate
procion
www.indiandentalacademy.comwww.indiandentalacademy.com
• Vital staining aids in studying:
Manner in which bone is laid down
site of bone growth
the direction and amount of growth
and the timing and relative duration
of growth at different sites.
www.indiandentalacademy.comwww.indiandentalacademy.com
Natural markers.
• The persistence of certain developmental features
has led to their use as natural markers by means of
serial radiography.
• Eg: trabaculae,nutrient canals and lines of arrested
growth can be used for reference to study
deposition, resorption and remodeling.
• Certain natural markers are used as cephalometric
landmarks.
www.indiandentalacademy.comwww.indiandentalacademy.com
Implant markers.
• Bjork devised a method of implanting tiny bits of
tantalum or biologically inert alloys into growing
bone which served as radiographic reference
markers for serial cephalometric study.
• The method allows precise orientation of serial
cephalograms and information on the amount and
sites of bone growth.
www.indiandentalacademy.comwww.indiandentalacademy.com
Mechanism of growthMechanism of growth
• 3 mechanisms at the cellular level
– Hyperplasia
– Hypertrophy
– Secretion of extracellular matter
www.indiandentalacademy.comwww.indiandentalacademy.com
Mechanism of growth inMechanism of growth in
soft tissuessoft tissues
• In soft tissues growth occurs by a combination of two
mechanisms namely:
• hyperplasia and hypertrophy
• These result in interstitial growth.
www.indiandentalacademy.comwww.indiandentalacademy.com
Mechanism of growth in hardMechanism of growth in hard
tissuestissues..
• The craniofascial skeleton grows by three
unique processes:
• Chondrogenesis: formation of cartilage
• Endochondral bone formation: process of
converting cartilage into bone
• Intramembranous bone formation: process of
bone formation from undifferentitaed
mesenchymal tissue.
www.indiandentalacademy.comwww.indiandentalacademy.com
Comparison of physiologicComparison of physiologic
properties of bone and cartilageproperties of bone and cartilage
• Characteristic cartilage
bone
• Calcification Non calcified Calcified
• Vascularity Avascular Vascular
• Surface membrane Nonessential Essential
• Pressure resistance Tolerant Sensitive
• Rigidity Flexible Inflexible
• Modes of growth Interstitial
Appositional
and appositional
www.indiandentalacademy.comwww.indiandentalacademy.com
Endochondral bone formationEndochondral bone formation
• Definition:It is the process of converting
cartilage into bone.
• Occurs in regions exposed to high levels of
compression
• In craniofacial region it is seen in areas like
• Synchondrosis at the cranial base
• Condylar cartilage
• Nasal septal cartilage
www.indiandentalacademy.comwww.indiandentalacademy.com
Steps of chondrogenesisSteps of chondrogenesis
• Chodroblasts produce matrix
• Cells become encased in matrix
• Chondrocytes enlarge,divide and produce
matrix
• Matrix remains uncalcified
• Membrane covers the surface but is not
essential
www.indiandentalacademy.comwww.indiandentalacademy.com
Steps of endochondral boneSteps of endochondral bone
formationformation
• hypertrophy of chondrocytes and matrix
calcifies
• Invasion of blood vessels and connective
tissue cells.
• osteoblasts differentiate and produce
osteoid tissue.
• osteoblast tissue calcifies.
www.indiandentalacademy.comwww.indiandentalacademy.com
Intramembranous boneIntramembranous bone
formationformation
Definition: it is the process of bone formation
from undifferentiated mesenchymal tissue
• Derived from neural crest cells
• Occurs in areas exposed to tension
• It differs from endochondral bone formation
by formation of bone directly from
mesenchymal tissue
www.indiandentalacademy.comwww.indiandentalacademy.com
–Seen in areas like:
– Cranial vault
• Maxilla
• Mandible except condylar
cartilage
www.indiandentalacademy.comwww.indiandentalacademy.com
Steps of intramembranous boneSteps of intramembranous bone
formationformation
• Osteoblasts produce osteoid tissue.
• Cells and blood vessels are encased.
• Osteoid tissue is produced by membrane
cells.
• Osteoid calcifies.
• Essential membrane covers bone.
www.indiandentalacademy.comwww.indiandentalacademy.com
Bone metabolismBone metabolism
• Bone is the primary calcium reservoir of the body
(99% stored in skeleton)
•Bone structure is sacrificed to maintain the critical
serum calcium levels at 10mg %
www.indiandentalacademy.comwww.indiandentalacademy.com
Bone metabolismBone metabolism
Calcium homeostasis is supported by 3 mechanisms :
1. Rapid instantaneous flux of calcium from bonefluid (seconds) by
selective transfer of calcium ions into and out of bone fluid.
2. Shorterm control of serum calcium levels affects rates of bone
formation $ resorption
3. Longterm regulation of metabolism- have effects on skeleton
.
www.indiandentalacademy.comwww.indiandentalacademy.com
TYPE OF BONESTYPE OF BONES
• Lamellar bone
• Non lamellar bone
• Fine cancellous bone
• Coarse cancellous bone
• Woven bone
• Bundle bone
• Composite bone
www.indiandentalacademy.comwww.indiandentalacademy.com
LAMELLAR BONELAMELLAR BONE
• Comprises 99% of human skeleton
• Strong highly mineralised
• Mineralised in two stages:
• primary mineralisation
• secondary mineralisation
www.indiandentalacademy.comwww.indiandentalacademy.com
Clinical significance
• Full strength of lamellar bone
supporting an orthodontically moved
tooth is not attained for upto a year after
completion of active treatment.
www.indiandentalacademy.comwww.indiandentalacademy.com
Non Lamellar boneNon Lamellar bone
• Makes up fine cancellous bone tissue
• No distinct stratification in fibre orientation
www.indiandentalacademy.comwww.indiandentalacademy.com
Woven boneWoven bone
• Type of non lamellar bone
• Weak , disorganised, poorly mineralised
• Not found in adult human skeleton under
normal conditions
• First bone formed in response to
orthodontic loading.
www.indiandentalacademy.comwww.indiandentalacademy.com
Bundle boneBundle bone
• Present adjacent to periodontal ligament
• Presence of perpendicular striations called
sharpey’s fibres.
• Formed on depository side of socket, laid
dowm in the direction toward the moving
tooth root.
www.indiandentalacademy.comwww.indiandentalacademy.com
Composite boneComposite bone
• Predominant bone type during early
retention phase
• Most rapid means of producing strong
bone
• Formed by deposition of lamellar bone
within a woven bone lattice.
www.indiandentalacademy.comwww.indiandentalacademy.com
Fine cancellous bone tissueFine cancellous bone tissue
• Formed by periosteum and endosteum
• Marrow spaces are fine
• It is located in cortex e.g. posterior border
of a growing ramus in a child
• Fastest growing of all bone types
www.indiandentalacademy.comwww.indiandentalacademy.com
Coarse cancellous boneCoarse cancellous bone
• Produced by endosteum only
• Irregular marrow spaces containing red or
yellow marrow
• Irregularly arranged trabeculae
• Present in medulla
www.indiandentalacademy.comwww.indiandentalacademy.com
Mechanisms of bone growthMechanisms of bone growth
• Deposition and resorption
• Growth fields
• Modelling
• Remodelling
• Growth movements
drift
displacement
www.indiandentalacademy.comwww.indiandentalacademy.com
Deposition and resorptionDeposition and resorption
www.indiandentalacademy.comwww.indiandentalacademy.com
Deposition and resorptionDeposition and resorption
• -periosteal bone
• -endosteal bone
www.indiandentalacademy.comwww.indiandentalacademy.com
Enlow’s V principalEnlow’s V principal
• Most useful and basic
concept
• Deposition and
Resorption
www.indiandentalacademy.comwww.indiandentalacademy.com
Transverse histologic section of bone:
A.Periosteal surface -
endosteal surface +
B.New endosteal bone on inner surface.
C.Endosteal layer produced covered by
periosteal layer following outward
reversal.
D.Cortex made entirely of periosteal
bone….outer surface depository and
inner surface resorptive.
www.indiandentalacademy.comwww.indiandentalacademy.com
Example with V oriented verticallyExample with V oriented vertically
• When bone + on
coronoidprocess, the
ramus increases in
vertical dimension.
www.indiandentalacademy.comwww.indiandentalacademy.com
Example of V oriented horizontallyExample of V oriented horizontally
• Same + of bone
posterior direction
of growth
movement.
• backward
movement of
coronoid processes
www.indiandentalacademy.comwww.indiandentalacademy.com
• Same deposits carry
base of bone in
medial direction as in
fig 1.
• Hence, the wider part
undergoes relocation
into a more narrow
part as the whole v
moves towards the
wide part (fig 2)
www.indiandentalacademy.comwww.indiandentalacademy.com
Growth fieldsGrowth fields
• Inside and outside of
every bone is covered
by growth fields which
control the bone
growth.
• They are both
resorptive and
depository types..
www.indiandentalacademy.comwww.indiandentalacademy.com
Growth sitesGrowth sites
• Growth fields having
special role in the
growth of the
particular bone are
called growth sites
• e.g. mandibular
condyle, maxillary
tuberosity,
synchondrosis of the
basicranium, sutures
and the alveolar
process.
www.indiandentalacademy.comwww.indiandentalacademy.com
Growth sitesGrowth sites
– Such special sites
do not out the
entire carry
growth process
but the entire
bone takes part
www.indiandentalacademy.comwww.indiandentalacademy.com
Growth centersGrowth centers
• Special areas which are
believed to control the
overall growth of the bone
e.g.mandibular condyle.
• Force, energy or motor
for a bone resides
primarily within its growth
centre.
• Now believed that these
centers do not control the
whole growth process.
www.indiandentalacademy.comwww.indiandentalacademy.com
MODELINGMODELING
www.indiandentalacademy.comwww.indiandentalacademy.com
CONTROL FACTORS FORCONTROL FACTORS FOR
BONE MODELINGBONE MODELING
– Mechanical Peak
load in Micro strain.
1. Disuse atrophy <200.
2. Bone Maintenance 200
—2500.
3. Physiological Hypertrophy 2500
—4000.
4. Pathological Overload
>4000.
www.indiandentalacademy.comwww.indiandentalacademy.com
•Endocrine.
1.Bone metabolic hormones-PTH,Vit
D,Calcitonin.
2.Growth Hormones-Somatotropin,IGF 1,IGF
2.
3.Sex steroids-Testosterone,Estrogen.
www.indiandentalacademy.comwww.indiandentalacademy.com
RemodellingRemodelling
• Required differential growth activity required for
bone shaping.
• It involves deposition and resorption occuring on
opposite ends
• Four types
– Biochemical remodelling
– Haversian remodelling
– Pathologic remodelling
– Growth remodelling
www.indiandentalacademy.comwww.indiandentalacademy.com
• E.g. The ramus moves
posteriorly by the
combination of
deposition and
resorption.
• so the anterior part of
the ramus gets
remodeled into a new
addition for the
mandibular corpus.
www.indiandentalacademy.comwww.indiandentalacademy.com
Functions of RemodelingFunctions of Remodeling
www.indiandentalacademy.comwww.indiandentalacademy.com
Functions of RemodelingFunctions of Remodeling
1. Progressively change the size of whole
bone
2. Sequentially relocate each component of
the whole bone
3. Progressively change the shape of the bone
to accommodate its various functions
www.indiandentalacademy.comwww.indiandentalacademy.com
4. Progressive fine tune fitting of all the
separate bones to each other and to their
contiguous ,growing, functioning soft tissues
5. Carry out continuous structural adjustments
to adapt to the intrinsic and extrinsic
changes in conditions .
www.indiandentalacademy.comwww.indiandentalacademy.com
DriftDrift
• It is remodeling
process and a
combination of
deposition and
resorption.
www.indiandentalacademy.comwww.indiandentalacademy.com
DisplacementDisplacement
• Displacement is a physical movement of
the whole bone as it remodels
• Two types:
primary displacement
secondary displacement
www.indiandentalacademy.comwww.indiandentalacademy.com
DisplacementDisplacement
www.indiandentalacademy.comwww.indiandentalacademy.com
Primary displacementPrimary displacement
• It is a physical
movement of a
whole bone and
occurs while the
bone grows and
remodels by
resorption
deposition
• E.g. in maxilla
www.indiandentalacademy.comwww.indiandentalacademy.com
Secondary displacementSecondary displacement
• It is the movement of
a whole bone caused
by the separate
enlargement of other
bones
www.indiandentalacademy.comwww.indiandentalacademy.com
Combination of remodeling &Combination of remodeling &
displacementdisplacement
• Both these
mechanisms carries
out two general
functions
• Positions each bone
• Designs and
constructs each bone
www.indiandentalacademy.comwww.indiandentalacademy.com
RotationRotation
• According to Enlow,
growth rotation is due
to diagonally placed
areas of deposition
and resorption
• Two types
– Remodelling rotations
– Displacement rotations
www.indiandentalacademy.comwww.indiandentalacademy.com
Principle of ‘Area relocationPrinciple of ‘Area relocation’’
Both remodeling and
displacement together
cause a shift in existing
position of a particular
structures with
reference to
another
.www.indiandentalacademy.comwww.indiandentalacademy.com
Counter part principleCounter part principle
• “Growth of any given
facial or cranial part
relates specifically to
other structural and
geometric
counterparts in the
face and cranium” -
Enlow
www.indiandentalacademy.comwww.indiandentalacademy.com
Growth equivalent principleGrowth equivalent principle
This principle proposed by Hunter & Enlow:
relates the effects of cranial base growth on
the facial bone growth.
www.indiandentalacademy.comwww.indiandentalacademy.com
www.indiandentalacademy.comwww.indiandentalacademy.com
REFERENCES:REFERENCES:
• Proffit:contemporary orthodontics.
• Moyers:handbook of orthodontics.
• An inventory of United states and
Canadian growth record sets.S.Hunter ,
Baumrind S AJO 1993.
• Craniofacial imaging in orthodontics :S
Kapila et al AO 1999:69
• Essays in honour of Robert moyers
CFGS.monograph 24.
www.indiandentalacademy.comwww.indiandentalacademy.com
ReferencesReferences
• Bone biodynamics in
orthodontics:CFGS.27
• Atlas of craniofacial growth in
Americans of African descent CFGS.26
• Growth changes in the nasal profile
from 7-8 yrs AJO 1988:94 Meng H ,R
Nanda
• Longitudinal changes in 3 normal facial
types .S Bishara,AJO1985:88
• S Bishara,J R Peterson, changes in the
facial dimensions & relationships
between the ages 5-25yrs.AJO 1984:85www.indiandentalacademy.comwww.indiandentalacademy.com
ReferencesReferences
• Lewis A B, Roche AF pubertal spurts in
cranial base & mandible AJO 1985:55
• Popovich.Thompson. Craniofacial
templates for orthodontic case analysis.
• Baumrind S,Korn EL,quantitation of
maxillary remodeling. AJO 1987:91
• Atlas of craniofacial growth CFGS
monograph 2.
• Moyers,Van Der Linden standards of
human occlusal development CFGS:5
• B Grayson 3D cephalogram
theory,technique and clinical
application.
www.indiandentalacademy.comwww.indiandentalacademy.com

Growth & development

  • 1.
    GROWTH &GROWTH & DEVELOPMENTDEVELOPMENT DEFINITIONSANDDEFINITIONS AND TERMINOLOGIESTERMINOLOGIES www.indiandentalacademy.comwww.indiandentalacademy.com
  • 2.
    Definition of GrowthDefinitionof Growth • “Growth refers to increase in size” - Todd • “Growth may be defined as the normal change in the amount of living substance”- Moyers • “Growth usually refers to an increase in size and number” – Proffitwww.indiandentalacademy.comwww.indiandentalacademy.com
  • 3.
    • “Change inany morphological parameter which is measurable”- Moss. • “Size development , progressive development (i.e, evolution, emergence, increase or expansion)”- Webster’s dictionary. • “Self multiplication of living substance”- J.S.Huxley. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 4.
    DIFFDIFFERENT KINDS OFGROWTHERENT KINDS OF GROWTH • Size change • Positional change • Proportional change • Functional change • Maturational change • Compositional change • Timing and sequential change • a Prenatal growth • b Postnatal growth • c Maturity • d Old age www.indiandentalacademy.comwww.indiandentalacademy.com
  • 5.
    Definition of DevelopmentDefinitionof Development “Development is a progress towards maturity” – Todd “Development refers to all naturally occurring progressive, unidirectional, sequential changes in the life of an individual from it’s existence as a single cell to it’s elaboration as a multifunctional unit terminating in death” – Moyers “Development connotes a maturational processwww.indiandentalacademy.comwww.indiandentalacademy.com
  • 6.
    Major themes ofdevelopmentMajor themes of development • Changing complexity • Shifts from competent to fixation • Shifts from dependent to independent • Ubiquity of genetic control modulated by environment www.indiandentalacademy.comwww.indiandentalacademy.com
  • 7.
    Changing complexity • Takesplace at all level of organisation from the sub-cellular to the whole organism • Normally complexity increases with development . • Most complex period of developing dentition is transition of dentitions. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 8.
    Shifts from competentto fixation • Undifferentiated cells once differentiated become fixed. Shifts from dependent to independent • Development brings greater independence at most levels of organisation. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 9.
    Ubiquity of geneticcontrol modulated by environment • Genetic control of development is constantly being modified by environmental interactions www.indiandentalacademy.comwww.indiandentalacademy.com
  • 10.
    Correlation betweenCorrelation between Growth& DevelopmentGrowth & Development • Growth is basically anatomic phenomenon and quantitative in nature Development is basically physiologic phenomenon and qualitative in nature • Growth may not always be associated with increase in size, it may at times result in decrease in size, e.g. thymus gland after puberty Development on the other hand is awww.indiandentalacademy.comwww.indiandentalacademy.com
  • 11.
    Importance of growthandImportance of growth and development to orthodontistdevelopment to orthodontist • Serves as a backbone to understand the etiology of malocclusion • Helps to assess the health and nutrition of children • Allows comparison of growth of an individual child with the growth of other children • Helps to identify abnormal occlusal development at an earlier stage www.indiandentalacademy.comwww.indiandentalacademy.com
  • 12.
    • Makes availableuse of growth spurts • Surgery is done when facial growth is completed • Growth affects stability of occlusion hence retention regime should be planned accordingly. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 13.
    DefinitionsDefinitions • Morphogenesis –“A biologic process having an underlying control at the cellular and tissue levels” • Differentiation – “It is a change from generalized cells or tissues to a more specialized kinds during development” www.indiandentalacademy.comwww.indiandentalacademy.com
  • 14.
    • Translocation –“It is a change in position” • Maturation – “The term maturation is sometimes used to express qualitative changes which occur with ripening or ageing” www.indiandentalacademy.comwww.indiandentalacademy.com
  • 15.
    Normal features ofNormalfeatures of Growth & DevelopmentGrowth & Development • Differential Growth • Pattern • Normality • Variability • Timing, rate & direction www.indiandentalacademy.comwww.indiandentalacademy.com
  • 16.
    DIFFERENTIAL GROWTHDIFFERENTIAL GROWTH Differentorgans grow at different rates to a different amount and at different times. • Scammon’s curve of growth • Cephalocaudal gradient of growth www.indiandentalacademy.comwww.indiandentalacademy.com
  • 17.
    SCAMMON’S CURVE OFSCAMMON’SCURVE OF GROWTHGROWTH • LYMPHOID • NEURAL • GENERAL • GENITAL www.indiandentalacademy.comwww.indiandentalacademy.com
  • 18.
  • 19.
  • 20.
    PATTERNPATTERN • Pattern ingrowth represents proportionality .It refers not just to a set of proportional relationships at a point in time but to change in these proportional relationships over time. • Cephalocaudal gradient • An important aspect of pattern is predictablity www.indiandentalacademy.comwww.indiandentalacademy.com
  • 21.
    PredictabilityPredictability • Predictability ofgrowth pattern is a specific kind of proportionality that exists at a particular time and progresses towards another, at the next time frame with slight variations. • In orthodontics, - Morphogenetic - Developmental www.indiandentalacademy.comwww.indiandentalacademy.com
  • 22.
    VariabilityVariability • No twoindividuals with the exception of monozygotic twins are like. • Variability quantitatively is categorized in terms of deviations from the usual pattern, for which it is imp to understand the concept of normality. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 23.
    NormalityNormality • Normality refersto that which is usually expected, is ordinarily seen or typical – Moyers • Normality may not necessarily be ideal. • Misuse of the concept of normality can lead to many problems in clinical orthodontics & treatment planning.• www.indiandentalacademy.comwww.indiandentalacademy.com
  • 24.
    • Statistical • Evolutionary •Functional • Esthetics • Clinical CONCEPTS OF NORMALITYCONCEPTS OF NORMALITY www.indiandentalacademy.comwww.indiandentalacademy.com
  • 25.
  • 26.
    Applications of growthcharts.Applications of growth charts. • Location of an individual relative to the group can be established. • Can be used to follow a child over time and note for any unexpected change in growth pattern. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 27.
    Timing of GrowthTimingof Growth • One of the factors for variablity in growth. • Timing variations arise because biologic clock of different individuals is different. • It is influenced by: genetic influence sex related differences physique related environmental influences www.indiandentalacademy.comwww.indiandentalacademy.com
  • 28.
    Distance curveDistance curve VsVs VelocitycurveVelocity curve Distance curve Velocity curve Age Height Distance Curve (cumulative curve): In this curve growth can be plotted in height or weight recorded at various ages. Velocity Curve(incremental curve): In this by amount of change in any given interval that is growth incrementwww.indiandentalacademy.comwww.indiandentalacademy.com
  • 29.
    Growth spurtsGrowth spurts •Defined as periods of growth acceleration • Sex-linked – Normal spurts are • Infantile spurt – at 3 years age • Juvenile spurt – 7-8 years (females); 8-10 years (males) • Pubertal spurt – 10-11 years(females); 18-15 years (males) www.indiandentalacademy.comwww.indiandentalacademy.com
  • 30.
  • 31.
  • 32.
    GROWTH STUDIES ANDMETHODS OF STUDYING GROWTH. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 33.
    • Types ofgrowth data • Methods of gathering growth data • Longitudinal growth studies • Methods of studying bone growth www.indiandentalacademy.comwww.indiandentalacademy.com
  • 34.
    Types of growthdata. Opinion Observations. Ratings and rankings. Quantitative measurements. direct data. indirect data. derived data. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 35.
    Types of growthdata. • Opinion It is a clever guess based on experience. they are the crudest form of scientific knowledge. • Observations: They are useful for studying all or none phenomenon.they are used in a limited way when more quantitative data is available. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 36.
    • Ratings andrankings: certain data is difficult to quantify and thus may be compared to conventional rating scale .ratings make use of comparisons with such scales.rankings array data in ordered sequence according to value. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 37.
    Quantitative measurements: Includes expressingan idea or fact as a meaningful quantity or numbers. • Direct data: derived from measurements taken on living persons or cadaver with a measuring device. • Indirect data: derived from measurements taken from images or reproductions of the actual person. • Derived data: obtained by comparing at least two other measurements. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 38.
    Methods of gatheringgrowth data. • Longitudinal studies . • Cross sectional studies. • Overlapping or semi longitudinal studies. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 39.
    Longitudinal studies. • Theseare measurements made of the same person or group at regular intervals through time. • Advantages: temporary temporal problems are smoothed with time, Variability in development within a group is put in proper perspective,serial comparison makes study of specific developmental pattern of individual possible. Disadvantages: time consuming, expensive, sample loss or attrition,averaging. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 40.
    Cross sectional studiesCrosssectional studies ADVANTAGES • Quicker • Less costly • Statistical treatment made easier • Allows repeating DISADVANTAGES • Variation in development amongst individuals within the sample cannot be studied www.indiandentalacademy.comwww.indiandentalacademy.com
  • 41.
    Semi longitudinal studies. •Longitudinal and cross sectional studies can be combined to to seek the advantages of both.in this way one might compress 15 years of study into 3 years of gathering growth data. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 42.
  • 43.
    Longitudinal growth studiesLongitudinalgrowth studies • Bolton brush growth study • Burlington growth study • Michigan growth study • Denver child growth study • Iowa child welfare study • Forsyth twin study • Meharry growth study www.indiandentalacademy.comwww.indiandentalacademy.com
  • 44.
    • Montreal growthstudy • Krogman philadelphia growth study • Fels growth study • Implant studies • the mathews implant collection • the hixon oregon implant study • Cleft palate study www.indiandentalacademy.comwww.indiandentalacademy.com
  • 45.
    Bolton Brush growthstudy. • Initiated by Prof T Wingate Todd in 1926 • Aim- studying skeletal development . • Initiated concurrently by Dr Holly Broadbent Sr in 1929. • Aim- studying normal development of facial skeleton. • Sample size:5000 normal healthy children. • Records:series of x-rays,casts,dental and medical examination and psychological tests. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 46.
    • The twocollections merged officially in 1970. • In 1975 the Bolton standards of dentofacial development growth were published by Dr Holly Broadbent jr. • These standards are a series of averages that represent optimum facial and developmental growth and form a baseline for understanding and assessing craniofacial growth. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 47.
    Burlington growth study •AIM • Malcclusion • Evaluate preventive and interceptive orthodontic treatment. • Obtain a set of growth records as a database for future studies. • Sample size:1632 subjects followed longitudinally. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 48.
    • Records :seriesof x-rays, casts,photographs,height and weight records and medical examination. • The original concept for the study was presented by Robert Moyers& the records were gathered under Frank Popovich. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 49.
    Burlington growth study •More than 247 investigations & 322 studies are based on this growth study • Longitudinal studies by Thompson & Popovich to derive cephalometric norms of a representative sample was based on 210 children followed for 15 years at the Burlington growth center. • age sex and growth type specific craniofacial templates were derived and static and dynamic analysis were proposed on the basis of this study. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 50.
    The Iowa childwelfare study. • Sample size:it is a diminishing longitudinal study which began with 20 males and 15 female 4 year old subjects. Followed till 17 years of age. Non -orthodontically treated patients of entirely European origin were used. • Records:lateral and PA views and dental casts. • The study as done under Samir Bishara. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 51.
    • Based onthis study the changes in facial dimensions & relationships as well as in standing height were evaluated. • The dentofacial relationships of 3 normal facial types (long, average, short) from 5-25 yrs of age was described & compared. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 52.
    CLEFT PALATE STUDIES. •LANCASTER PA:includes 850 record sets obtained annually from birth to 15 years. • HOSPITAL FOR SICK CHILDREN(Toronto):over 4000 subjects ranging in age from 5-20 years • .CENTER FOR CRANIOFACIAL ANOMALIES(Chicago);annual records of 1000 subjects. • Records include series of x-ray films, casts, medical and orthodontic treatment records. • All subjects had surgical repair and minor to extensive orthodontic treatment. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 53.
    Methods of studyingbone growth c e p h a lo m e tr y . a n th r o p o m e tr y . c r a n io m e tr y . m e a s u r e m e n t a p p r o a c h e s . a u to r a d io g r a p h y . n u c le a r v o lu m e m o r p h o m e tr y . r a d io is o to p e s . p o la r is e d lig h t. flu o r e s c e n t la b e ls . m ic r o r a d io g r a p h y . m in e r a lis e d s e c tio n s . a t m ic r o s c o p ic le v e l. fin ite e le m e n t m o d e lin g . im p la n t m a r k e r s a t m a c r o s c o p ic le v e l. n a tu r a l m a r k e r s . c o m p a r a tiv e a n a to m y . v ita l s ta in in g . a t b o th le v e ls . e x p e r im e n ta l a p p r o a c h e s . www.indiandentalacademy.comwww.indiandentalacademy.com
  • 54.
    CRANIOMETRY. Involves measurements ofskull used to study the Neanderthal and Cro-magnon skull. give information of extinct population and pattern of growth Advantages: Precise measurements. Disadvantages:All growth data must be cross sectional. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 55.
    ANTHROPOMETRY: • measurements usingsoft tissue points overlying bony landmarks in living individuals. • can also be done on dried skulls but variation in soft tissue thickness would produce different results. • Possible to follow the growth of an individual directly. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 56.
    • CEPHALOMETRIC RADIOGRAPHY: •allows direct measurement of bony skeletal dimensions and follow up of the same individual over time . • Disadvantages •:Depends upon precise orientation of head and precise control of magnification. • 2D representation of 3D structurewww.indiandentalacademy.comwww.indiandentalacademy.com
  • 57.
    Mineralized sections. • Fullymineralized sections are superior to demineralized specimens as there is less processing distortions and both organic and inorganic matrix can be studied simultaneously. • Cellular details and resolutions can be enhanced by reducing the thickness of the sections. • Specific stains can be used to enhance both cellular and extra cellular details. • Thin sections can however quench more rapidly www.indiandentalacademy.comwww.indiandentalacademy.com
  • 58.
    Microradiography. • High resolutionof images of bone sections • Differential density between primary and secondary bone. • Strength of the bone-proportional to degree of mineralisation. • secondary bone has more strength than primary bone. • Secondary mineralisation process takes about 8 months to form and hence the minimum retention period after active orthodontic correction should be 6-8 months. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 59.
    Fluorescent labels. • Administeredin vivo calcium binding labels • anabolic time markers of bone formation. • Mechanism of bone growth determined by analysis of label incidence and interlabel distance. • Sequential use of different colored labels assess bone growth,healing and functional adaptation. • Tetracycline,calcein green,xylenol orange,alizarin complexone,demeclocycline and oxytetracycline commonly used labels. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 60.
    Radioisotopes. • Radioisotopes ofcertain elements or compounds are often used as in vivo markers for studying bone growth. • Such labeled material is injected and after some time located within the growing bone by means of autoradiographic techniques. • Commonly used markers are : 1. Technetium 99 2. Calcium 45 3. Potassium 32 www.indiandentalacademy.comwww.indiandentalacademy.com
  • 61.
    Autoradiography. • Histological sectionsare coated with a nuclear track emulsion to detect radiographic precursor for structural and metabolic material. • Specific radioactive labels for protein carbohydrates or nucleic acids are injected. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 62.
    • Quantitative andqualitative assessment of the label uptake is a physiologic index of cell activity. • Commonly used autoradiographic labels are: • A. 3 H thymidine. • B. 3 H proline. • C. Bromodeoxyuridine. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 63.
    Polarized light. • indicatesthe orientation of collagen fibers within the bone matrix. • Most lamellar bone consists of collagen fibers oriented at right angles. • However 2 other configurations can also be noted:longitudinally aligned(L osteons). www.indiandentalacademy.comwww.indiandentalacademy.com
  • 64.
    • And mixedfiber pattern.(both L and A osteons). • Loading condition at the time of bone formation dictate the orientation of collagen fibers . Thus bone formation can adapt to different loading conditions by changing the internal lamellar organization of bone tissue. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 65.
    Nuclear volume morphometry. •cytomorphometric procedure to measures the nuclear size for assessing the stages of differentiation of osteoblastic precursor cells. • Pre osteoblasts have significantly larger nuclei than their precursors. • used in determining the relative differentiation of PDL and other bone living cells. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 66.
    Teleradiology.Teleradiology. • Introduced in1982 at international conference of PACS. • Universal method of storing and transporting digital images . • Currently American college of radiology have developed DICOM to allow the transmisssion of images over the internet. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 67.
    Vital staining • reportedby Belchier in 1796 • John Hunter- alizarin dye • Alizarin reacts with calcium at sites of bone calcification i.e. sites of active skeletal growth thus marking these locations • Other dyes : tetracyline trypon blue lead acetate procion www.indiandentalacademy.comwww.indiandentalacademy.com
  • 68.
    • Vital stainingaids in studying: Manner in which bone is laid down site of bone growth the direction and amount of growth and the timing and relative duration of growth at different sites. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 69.
    Natural markers. • Thepersistence of certain developmental features has led to their use as natural markers by means of serial radiography. • Eg: trabaculae,nutrient canals and lines of arrested growth can be used for reference to study deposition, resorption and remodeling. • Certain natural markers are used as cephalometric landmarks. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 70.
    Implant markers. • Bjorkdevised a method of implanting tiny bits of tantalum or biologically inert alloys into growing bone which served as radiographic reference markers for serial cephalometric study. • The method allows precise orientation of serial cephalograms and information on the amount and sites of bone growth. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 71.
    Mechanism of growthMechanismof growth • 3 mechanisms at the cellular level – Hyperplasia – Hypertrophy – Secretion of extracellular matter www.indiandentalacademy.comwww.indiandentalacademy.com
  • 72.
    Mechanism of growthinMechanism of growth in soft tissuessoft tissues • In soft tissues growth occurs by a combination of two mechanisms namely: • hyperplasia and hypertrophy • These result in interstitial growth. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 73.
    Mechanism of growthin hardMechanism of growth in hard tissuestissues.. • The craniofascial skeleton grows by three unique processes: • Chondrogenesis: formation of cartilage • Endochondral bone formation: process of converting cartilage into bone • Intramembranous bone formation: process of bone formation from undifferentitaed mesenchymal tissue. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 74.
    Comparison of physiologicComparisonof physiologic properties of bone and cartilageproperties of bone and cartilage • Characteristic cartilage bone • Calcification Non calcified Calcified • Vascularity Avascular Vascular • Surface membrane Nonessential Essential • Pressure resistance Tolerant Sensitive • Rigidity Flexible Inflexible • Modes of growth Interstitial Appositional and appositional www.indiandentalacademy.comwww.indiandentalacademy.com
  • 75.
    Endochondral bone formationEndochondralbone formation • Definition:It is the process of converting cartilage into bone. • Occurs in regions exposed to high levels of compression • In craniofacial region it is seen in areas like • Synchondrosis at the cranial base • Condylar cartilage • Nasal septal cartilage www.indiandentalacademy.comwww.indiandentalacademy.com
  • 76.
    Steps of chondrogenesisStepsof chondrogenesis • Chodroblasts produce matrix • Cells become encased in matrix • Chondrocytes enlarge,divide and produce matrix • Matrix remains uncalcified • Membrane covers the surface but is not essential www.indiandentalacademy.comwww.indiandentalacademy.com
  • 77.
    Steps of endochondralboneSteps of endochondral bone formationformation • hypertrophy of chondrocytes and matrix calcifies • Invasion of blood vessels and connective tissue cells. • osteoblasts differentiate and produce osteoid tissue. • osteoblast tissue calcifies. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 78.
    Intramembranous boneIntramembranous bone formationformation Definition:it is the process of bone formation from undifferentiated mesenchymal tissue • Derived from neural crest cells • Occurs in areas exposed to tension • It differs from endochondral bone formation by formation of bone directly from mesenchymal tissue www.indiandentalacademy.comwww.indiandentalacademy.com
  • 79.
    –Seen in areaslike: – Cranial vault • Maxilla • Mandible except condylar cartilage www.indiandentalacademy.comwww.indiandentalacademy.com
  • 80.
    Steps of intramembranousboneSteps of intramembranous bone formationformation • Osteoblasts produce osteoid tissue. • Cells and blood vessels are encased. • Osteoid tissue is produced by membrane cells. • Osteoid calcifies. • Essential membrane covers bone. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 81.
    Bone metabolismBone metabolism •Bone is the primary calcium reservoir of the body (99% stored in skeleton) •Bone structure is sacrificed to maintain the critical serum calcium levels at 10mg % www.indiandentalacademy.comwww.indiandentalacademy.com
  • 82.
    Bone metabolismBone metabolism Calciumhomeostasis is supported by 3 mechanisms : 1. Rapid instantaneous flux of calcium from bonefluid (seconds) by selective transfer of calcium ions into and out of bone fluid. 2. Shorterm control of serum calcium levels affects rates of bone formation $ resorption 3. Longterm regulation of metabolism- have effects on skeleton . www.indiandentalacademy.comwww.indiandentalacademy.com
  • 83.
    TYPE OF BONESTYPEOF BONES • Lamellar bone • Non lamellar bone • Fine cancellous bone • Coarse cancellous bone • Woven bone • Bundle bone • Composite bone www.indiandentalacademy.comwww.indiandentalacademy.com
  • 84.
    LAMELLAR BONELAMELLAR BONE •Comprises 99% of human skeleton • Strong highly mineralised • Mineralised in two stages: • primary mineralisation • secondary mineralisation www.indiandentalacademy.comwww.indiandentalacademy.com
  • 85.
    Clinical significance • Fullstrength of lamellar bone supporting an orthodontically moved tooth is not attained for upto a year after completion of active treatment. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 86.
    Non Lamellar boneNonLamellar bone • Makes up fine cancellous bone tissue • No distinct stratification in fibre orientation www.indiandentalacademy.comwww.indiandentalacademy.com
  • 87.
    Woven boneWoven bone •Type of non lamellar bone • Weak , disorganised, poorly mineralised • Not found in adult human skeleton under normal conditions • First bone formed in response to orthodontic loading. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 88.
    Bundle boneBundle bone •Present adjacent to periodontal ligament • Presence of perpendicular striations called sharpey’s fibres. • Formed on depository side of socket, laid dowm in the direction toward the moving tooth root. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 89.
    Composite boneComposite bone •Predominant bone type during early retention phase • Most rapid means of producing strong bone • Formed by deposition of lamellar bone within a woven bone lattice. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 90.
    Fine cancellous bonetissueFine cancellous bone tissue • Formed by periosteum and endosteum • Marrow spaces are fine • It is located in cortex e.g. posterior border of a growing ramus in a child • Fastest growing of all bone types www.indiandentalacademy.comwww.indiandentalacademy.com
  • 91.
    Coarse cancellous boneCoarsecancellous bone • Produced by endosteum only • Irregular marrow spaces containing red or yellow marrow • Irregularly arranged trabeculae • Present in medulla www.indiandentalacademy.comwww.indiandentalacademy.com
  • 92.
    Mechanisms of bonegrowthMechanisms of bone growth • Deposition and resorption • Growth fields • Modelling • Remodelling • Growth movements drift displacement www.indiandentalacademy.comwww.indiandentalacademy.com
  • 93.
    Deposition and resorptionDepositionand resorption www.indiandentalacademy.comwww.indiandentalacademy.com
  • 94.
    Deposition and resorptionDepositionand resorption • -periosteal bone • -endosteal bone www.indiandentalacademy.comwww.indiandentalacademy.com
  • 95.
    Enlow’s V principalEnlow’sV principal • Most useful and basic concept • Deposition and Resorption www.indiandentalacademy.comwww.indiandentalacademy.com
  • 96.
    Transverse histologic sectionof bone: A.Periosteal surface - endosteal surface + B.New endosteal bone on inner surface. C.Endosteal layer produced covered by periosteal layer following outward reversal. D.Cortex made entirely of periosteal bone….outer surface depository and inner surface resorptive. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 97.
    Example with Voriented verticallyExample with V oriented vertically • When bone + on coronoidprocess, the ramus increases in vertical dimension. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 98.
    Example of Voriented horizontallyExample of V oriented horizontally • Same + of bone posterior direction of growth movement. • backward movement of coronoid processes www.indiandentalacademy.comwww.indiandentalacademy.com
  • 99.
    • Same depositscarry base of bone in medial direction as in fig 1. • Hence, the wider part undergoes relocation into a more narrow part as the whole v moves towards the wide part (fig 2) www.indiandentalacademy.comwww.indiandentalacademy.com
  • 100.
    Growth fieldsGrowth fields •Inside and outside of every bone is covered by growth fields which control the bone growth. • They are both resorptive and depository types.. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 101.
    Growth sitesGrowth sites •Growth fields having special role in the growth of the particular bone are called growth sites • e.g. mandibular condyle, maxillary tuberosity, synchondrosis of the basicranium, sutures and the alveolar process. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 102.
    Growth sitesGrowth sites –Such special sites do not out the entire carry growth process but the entire bone takes part www.indiandentalacademy.comwww.indiandentalacademy.com
  • 103.
    Growth centersGrowth centers •Special areas which are believed to control the overall growth of the bone e.g.mandibular condyle. • Force, energy or motor for a bone resides primarily within its growth centre. • Now believed that these centers do not control the whole growth process. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 104.
  • 105.
    CONTROL FACTORS FORCONTROLFACTORS FOR BONE MODELINGBONE MODELING – Mechanical Peak load in Micro strain. 1. Disuse atrophy <200. 2. Bone Maintenance 200 —2500. 3. Physiological Hypertrophy 2500 —4000. 4. Pathological Overload >4000. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 106.
    •Endocrine. 1.Bone metabolic hormones-PTH,Vit D,Calcitonin. 2.GrowthHormones-Somatotropin,IGF 1,IGF 2. 3.Sex steroids-Testosterone,Estrogen. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 107.
    RemodellingRemodelling • Required differentialgrowth activity required for bone shaping. • It involves deposition and resorption occuring on opposite ends • Four types – Biochemical remodelling – Haversian remodelling – Pathologic remodelling – Growth remodelling www.indiandentalacademy.comwww.indiandentalacademy.com
  • 108.
    • E.g. Theramus moves posteriorly by the combination of deposition and resorption. • so the anterior part of the ramus gets remodeled into a new addition for the mandibular corpus. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 109.
    Functions of RemodelingFunctionsof Remodeling www.indiandentalacademy.comwww.indiandentalacademy.com
  • 110.
    Functions of RemodelingFunctionsof Remodeling 1. Progressively change the size of whole bone 2. Sequentially relocate each component of the whole bone 3. Progressively change the shape of the bone to accommodate its various functions www.indiandentalacademy.comwww.indiandentalacademy.com
  • 111.
    4. Progressive finetune fitting of all the separate bones to each other and to their contiguous ,growing, functioning soft tissues 5. Carry out continuous structural adjustments to adapt to the intrinsic and extrinsic changes in conditions . www.indiandentalacademy.comwww.indiandentalacademy.com
  • 112.
    DriftDrift • It isremodeling process and a combination of deposition and resorption. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 113.
    DisplacementDisplacement • Displacement isa physical movement of the whole bone as it remodels • Two types: primary displacement secondary displacement www.indiandentalacademy.comwww.indiandentalacademy.com
  • 114.
  • 115.
    Primary displacementPrimary displacement •It is a physical movement of a whole bone and occurs while the bone grows and remodels by resorption deposition • E.g. in maxilla www.indiandentalacademy.comwww.indiandentalacademy.com
  • 116.
    Secondary displacementSecondary displacement •It is the movement of a whole bone caused by the separate enlargement of other bones www.indiandentalacademy.comwww.indiandentalacademy.com
  • 117.
    Combination of remodeling&Combination of remodeling & displacementdisplacement • Both these mechanisms carries out two general functions • Positions each bone • Designs and constructs each bone www.indiandentalacademy.comwww.indiandentalacademy.com
  • 118.
    RotationRotation • According toEnlow, growth rotation is due to diagonally placed areas of deposition and resorption • Two types – Remodelling rotations – Displacement rotations www.indiandentalacademy.comwww.indiandentalacademy.com
  • 119.
    Principle of ‘ArearelocationPrinciple of ‘Area relocation’’ Both remodeling and displacement together cause a shift in existing position of a particular structures with reference to another .www.indiandentalacademy.comwww.indiandentalacademy.com
  • 120.
    Counter part principleCounterpart principle • “Growth of any given facial or cranial part relates specifically to other structural and geometric counterparts in the face and cranium” - Enlow www.indiandentalacademy.comwww.indiandentalacademy.com
  • 121.
    Growth equivalent principleGrowthequivalent principle This principle proposed by Hunter & Enlow: relates the effects of cranial base growth on the facial bone growth. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 122.
  • 123.
    REFERENCES:REFERENCES: • Proffit:contemporary orthodontics. •Moyers:handbook of orthodontics. • An inventory of United states and Canadian growth record sets.S.Hunter , Baumrind S AJO 1993. • Craniofacial imaging in orthodontics :S Kapila et al AO 1999:69 • Essays in honour of Robert moyers CFGS.monograph 24. www.indiandentalacademy.comwww.indiandentalacademy.com
  • 124.
    ReferencesReferences • Bone biodynamicsin orthodontics:CFGS.27 • Atlas of craniofacial growth in Americans of African descent CFGS.26 • Growth changes in the nasal profile from 7-8 yrs AJO 1988:94 Meng H ,R Nanda • Longitudinal changes in 3 normal facial types .S Bishara,AJO1985:88 • S Bishara,J R Peterson, changes in the facial dimensions & relationships between the ages 5-25yrs.AJO 1984:85www.indiandentalacademy.comwww.indiandentalacademy.com
  • 125.
    ReferencesReferences • Lewis AB, Roche AF pubertal spurts in cranial base & mandible AJO 1985:55 • Popovich.Thompson. Craniofacial templates for orthodontic case analysis. • Baumrind S,Korn EL,quantitation of maxillary remodeling. AJO 1987:91 • Atlas of craniofacial growth CFGS monograph 2. • Moyers,Van Der Linden standards of human occlusal development CFGS:5 • B Grayson 3D cephalogram theory,technique and clinical application. www.indiandentalacademy.comwww.indiandentalacademy.com